AHRQ-18-10001 ATTACHMENT #2 – Delivery Schedule Healthcare Cost and Utilization Project (HCUP) FY 2018-2023
The items specified for delivery below are subject to the review and approval of the Contracting Officer’s Representative (COR) before final acceptance. The contractor shall be required to make revisions deemed necessary by the COR. The deliverable schedule may only be changed by a contract modification signed by an AHRQ Contracting Officer. Days mean calendar days.
The Contractor shall submit all documents electronically (e.g. Word, PDF, HTML) and be posted on the HCUP-US Web site. In addition, financial and management reports should be delivered with three bound hard copies. The Contractor shall be required to make revisions deemed necessary by the COR. All deliverables to AHRQ will follow a naming convention agreed upon by AHRQ and the Contractor.
Submit all electronic documents on HCUP-US and send hard copy financial and management reports to:
HCUP Contracting Officer Representative
AHRQ
5600 Fishers Lane, Mail Stop 7W25B Rockville, MD 20857
Copies of any deliverables should be sent to the Contracting Officer upon request.
Agency for Healthcare Research and Quality ATTN: Contracting Officer Contracts Management 5600 Fishers Lane, Mail Stop 06N34B Rockville, Maryland 20857
Due Date: Dates shown are from beginning of contract period.
EDOA: Effective Date of Award for the Base and Each Option Year
Key:
Base = Base year (12/27/2017 – 12/26/2018) Year 1 = Option Year 1 (12/27/2018 – 12/26/2019) Year 2 = Option Year 2 (12/27/2019 – 12/26/2020)
Request for Proposal v. Jan-17; FAC 93 AHRQ-2018-10001 Healthcare Cost and Utilization Project (HCUP) FY 2018-2023 Attachment #2
Year 3 = Option Year 3 (12/27/2020 – 12/26/2021) Year 4 = Option Year 4 (12/27/2021 – 12/26/2022)
Contract Number Task Name Period Deliverable Description Due Date Format Audience Section 508
Standards Crosswalk to:
C.4.1.1 Project Management
Base year
Project Orientation Meeting and Decision Memo
10 days EDOA PDF file
Internal Project Staff
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.4.2 Project Management
Base & Years 1-3
Draft Annual Project Management Plan
1 month EDOA and annually thereafter
PDF Internal Project Staff na na
C.4.2 Project Management
Base & Years 1-3
Final Annual Project Management Plan
6 weeks after draft and annually thereafter
PDF Internal Project Staff na na
C.4.4 Project Management Year 4 Draft Final Project
Management Report 8/1/2022 PDF Internal Project Staff na na
C.4.4 Project Management Year 4 Final Project Management
Report 10/1/2022 PDF Internal Project Staff na na
C.4.4 Project Management
Base year & Years 1-4
Monthly Progress Report
6 weeks from EDOA and monthly thereafter
PDF file Internal project staff na na
C.4.4 Project Management
Base year & Years 1-4
Estimate to Complete Report
6 and 9 months from EDOA and biannually thereafter
PDF file Internal project staff na na
C.4.4 Project Management
Base year & Years
Memo on Major Accomplishments
10 months EDOA then annually
PDF file Internal project staff na na
Standards Crosswalk to:
1-3 thereafter
C.5 Take Over Operations
Base year
Inventory and process report for transferring HCUP files and documentation
1/6/2018 PDF file Internal project staff na Na
C.5.1 Take Over Operations
Base year Draft Transition Plan 1/10/2018 PDF file Internal project staff na Na
C.5.1 Take Over Operations
Base year Final Transition Plan 1/15/2018 PDF file Internal project staff na Na
C.5.3 Take Over Operations
Base year
Transition plan for operation of the HCUP-US Web site
1/15/2018 PDF file Internal project staff na Na
C.6.1.3 Data Acquisition
Base year & Years 1-4
Conference Calls and Work Groups Summary Notes (number depends on number of workgroups)
2 weeks after meetings PDF file Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.6.2 Data Acquisition
Base year & Years 1-4
Annual Activities Report
2 months EDOA and annually thereafter
PDF file Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.6.2 Data Acquisition
Base year & Years 1-4
HCUP Overview Binder and Components (including DUA & Security Plan))
3 months EDOA and annually thereafter
PDF file Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.6.3 Data Acquisition
Base year & Partner Contact Lists 1 month
EDOA and PDF file Internal
Standards Crosswalk to:
Years 1-4 quarterly thereafter
C.6.3 Data Acquisition
Base year & Years 1-4
Up-to-date E-mail Lists
1 month EDOA and quarterly thereafter
PDF file Internal project staff na na
C.6.7 Data Acquisition
Base year & Years 1-4
Sample Memorandum of Agreement (MOA)
3 months EDOA and annually thereafter
PDF file Internal project staff na na
C.6.10 Data Acquisition
Base year & Years 1-4
Data Acquisition memo on potential new data types or Partner organizations
1 month EDOA and annually thereafter
PDF file Internal project staff na na
C.7 Process and Create State Databases
Base year & Years 1-4
Memo detailing proposed changes to master processing programs
6 months EDOA and annually thereafter
PDF file Internal project staff na na
C.7 Process and Create State Databases
Base year & Years 1-4
Memo detailing annual updates to the processing program
3 months EDOA and annually thereafter
PDF file Internal project staff na na
C.7.1 Process and Create State Databases
Base year & Years 1-4
Memo detailing proposed topics on state-specific comparative data quality
6 months EDOA and annually thereafter
PDF file Internal project staff na na
C.7.2 Process and Create State Databases
Base year & Years 1-4
Partner Specific Requirements Record
2 months EDOA and annually thereafter
PDF file Internal and project staff na na
C.7.6 Process and Create State Databases
Base year & Years 1-4
Quality control procedures document
2 months EDOA and annually thereafter
Standards Crosswalk to:
C.7.7.1 Process and Create State Databases
Years 1 & 3
Memo on updating service flags
2/1/2019 2/1/2021 PDF file Internal project staff na na
C.7.7.6 Process and Create State Databases
Base year
Memo detailing recommendations for applying third-party severity adjustment
9/29/2018 PDF file Internal project staff na na
C.7.10 Process and Create State Databases
Year 1 Memo on derived data elements and flags 3/31/2019 PDF file Internal project staff na na
C.7.11.1 Process and Create State Databases
Base year & Years 1-4
SID/SASD/SEDD
intramural data files (annual data) and documentation
1 month after receipt of the data
ASCII
data File
Internal project staff na na
C.7.13
Process and Create State Quarterly Database
Base year & Years 1-4
SID/SASD/SEDD
intramural data files (quarterly data) and documentation
1 month after receipt of the data
ASCII
data File
Internal project staff na na
C.7.13.3 Process and Create Quarterly Files
Base year & Years 1-4
Memo to recommend inpatient and outpatient quarterly data
3 months EDOA and annually thereafter
PDF file Internal project staff na na
C.7.13.4 Process and Create Quarterly Files
Base year & Years 1-4
Memo on evaluation of quarterly data
10 months EDOA and annually thereafter
PDF file Internal project staff na na
C.7.14 Process and Create State Database
Base year & Years 1-4
Central Distributor SID/SASD/SEDD data files
1.5 months following creation of state databases
ASCII
data File
Internal project staff na na
C.7.15 Process and Create State Database
Base year & Years 1-4
Log of reprocessing for data files
8 months EDOA and annually thereafter
Standards Crosswalk to:
C.7.16 Process and Create State Database
Base year & Years 1-4
Documentation for intramural and Central Distributor SID/SASD/SEDD data files (Including corresponding binder material)
1 month following receipt of the data
PDF file Internal project staff na na
C.7.17.1 Process and Create State Database
Base year & Years 1-4
Copy of data files and documentation to States
1.5 months after creation of intramural State databases
ASCII
data and PDF file, emailed
Partners
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final Rule) ASCII: Not Required
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.7.17.1 Process and Create State Database
Base year & Years 1-4
Data quality report and summary statistics for each state
8 months EDOA and annually thereafter
PDF file Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.7.17.2 Process and Create State Database
Base year & Years 1-4
Copy of intramural data files to AHRQ
8 months EDOA and annually thereafter
ASCII
data file
Internal project staff na na
C.7.17.3 Process and Create State Database
Base year & Years 1-4
Copy of data processing programs to AHRQ
8 months EDOA and annually thereafter
SAS data file
Internal project staff na na
C.7.17.4 Process and Create State Database
Base year & Years 1-4
Copy of summary statistics to AHRQ
8 months EDOA and annually thereafter
SAS data file
Internal project staff na na
C.8.1 NIS
Base year & Years 1-4
NIS Logistics Memo
9 months EDOA and annually thereafter
Standards Crosswalk to:
C.8.3 NIS
Base year & Years 1-4
NIS Verification of Restrictions Memorandum
9 months EDOA and annually thereafter
PDF file Internal project staff na na
C.8.4 NIS
Base year & Years 1-4
NIS Database Files and Documentation for External Release, ASCII
10 months EDOA and annually thereafter
ASCII
data and PDF files
Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final Rule) ASCII: Not Required
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.8.5 NIS
Base year & Years 1-4
Intramural NIS Database Files and Documentation, SAS
10 months EDOA and annually thereafter
ASCII
data file
Internal project staff na na
C.8.6.2 NIS
Base year & Years 1-4
NIS Processing Programs
10 months EDOA and annually thereafter
SAS file Internal project staff na na
C.8.7.2 NIS
Base year & Years 1-4
NIS Comparison Report
12 months EDOA and annually thereafter
PDF file Public
These standards are represented in the current HHS PAT as
36 CFR 1194.21, .22,
.31, and .41
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.9.1 KID
Base year & Year 3
KID Verification of Restrictions Memorandum
8 months EDOA and 8/31/2021
PDF file Internal project staff na na
C.9.1 KID
Base year & Year 3
Intramural KID database files and documentation, SAS
10 months EDOA and 10/31/2021
SAS data file
Internal project staff na na
C.9.1 KID
Base year & Year 3
KID database files and documentation for external release, ASCII
10 months EDOA and 10/31/2021
ASCII
data and PDF files
Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
Standards Crosswalk to:
ASCII: Not Required
C.9.1 KID
Base year & Year 3
Deliver KID processing programs
10 months EDOA and 10/31/2021
SAS data file
Internal project staff na na
C.9.1 KID
Base year & Year 3
KID Comparison Report 12 months EDOA and 12/26/2021
PDF file Public
These standards are represented in the current HHS PAT as
36 CFR 1194.21, .22,
.31, and .41
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.10.1 NEDS
Base year & Years 1-4
NEDS Logistics Memo
8 months EDOA and annually thereafter
PDF file Internal project staff na na
C.10.2 NEDS
Base year & Years 1-4
Multi-state emergency department data file and documentation for Internal Use, SAS
8 months EDOA and annually thereafter
ASCII
data and PDF files
Internal project staff na na
C.10.2 NEDS
Base year & Years 1-4
Hospital trauma center data file and documentation for Internal Use, SAS
7 months EDOA and annually thereafter
ASCII
data and PDF files
Internal project staff na na
C.10.4 NEDS
Base year & Years 1-4
Intramural NEDS database and documentation for Internal Use, SAS
9 months EDOA and annually thereafter
ASCII
data and PDF files
Internal project staff na na
C.10.5 NEDS
Base year & Years 1-4
NEDS Verification of Restrictions Memorandum
8 months EDOA and annually thereafter
PDF file Internal project staff na na
C.10.6 NEDS
Base year & Years 1-4
Central Distributor NEDS database , ASCII
9 months EDOA and annually thereafter
ASCII
data Public na na
Standards Crosswalk to:
C.10.7.1 NEDS
Base year and Years 1-4
NEDS documentation
9 months EDOA and annually thereafter
PDF file Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final Rule) ASCII: Not Required
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.10.7.2 NEDS
Base year & Years 1-4
NEDS Processing Programs
9 months EDOA and annually thereafter
SAS data file
Internal project staff na na
C.10.8.2 NEDS
Base year & Years 1-4
Deliver SAS file on hospital ED trauma centers
9 months EDOA and annually thereafter
SAS data file
Internal project staff na na
C.10.8.2 NEDS
Option years 1 & 3
Memo on Identification of ED trauma centers
2/20/2018 and 2/20/2021
PDF file Internal project staff na na
C.10.8.3 NEDS
Base year & Years 1-4
NEDS Comparison Report
10 months EDOA and annually thereafter
PDF file Public
These standards are represented in the current HHS PAT as
36 CFR 1194.21, .22,
.31, and .41
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.10.8.4 NEDS Option year 1
Memo on NEDS Severity Index and potential data elements
3/15/2019 PDF file Internal project staff na na
C.10.9 NEDS
Base year & Years 1-4
Memo on comparison of NEDS with multi-state ED file
9 months EDOA and annually thereafter
PDF file Internal Project staff na na
C.10.10 NEDS Option year 3 NEDS Redesign Report 10/1/2021 PDF file Public
These standards are represented in the current HHS PAT as
36 CFR 1194.21, .22,
.31, and .41
These standards are represented in the current HHS PAT as 36
Standards Crosswalk to:
C.11 NRD
Base year & Years 1-4
Memo on available SID with robust patient identifiers
1 month from EDOA and annually thereafter
PDF file Internal project staff na na
C.11 NRD
Base year & Years 1-4
NRD Logistics Memo
8 months EDOA and annually thereafter
PDF file Internal project staff na na
C.11 NRD
Base year & Years 1-4
NRD Verification of Restrictions Memorandum
9 months EDOA and annually thereafter
PDF file Internal project staff na na
C.11 NRD
Base year & Years 1-4
Memo on review of data assessment and cleaning to produce NRD
4 months EDOA and annually thereafter
PDF file Internal project staff na na
C.11 NRD
Base year & Years 1-4
Intramural NRD Database files and documentation, SAS
10 months EDOA and annually thereafter
ASCII
data file
Internal project staff na na
C.11 NRD
Base year & Years 1-4
NRD Processing Programs
10 months EDOA and annually thereafter
SAS file Internal project staff na na
C.12.3 NASS
Base year & Years 1-4
NASS Verification of Restrictions Memorandum
9 months EDOA and annually thereafter
PDF file Internal project staff na na
C.12.4 NASS
Base year & Years 1-4
Intramural NASS, Database Files and Documentation, SAS
9 months EDOA and annually thereafter
SAS data and PDF files
Internal project staff na na
C.12.5 NASS Base year
Memo on Partner consent for a publicly released the
NASS
7/31/2018 PDF file Internal
Standards Crosswalk to:
C.12.6 NASS
Base year & Years 1-4
Multi-state NASS and documentation for internal use
10 months EDOA and annually thereafter
ASCII
data and PDF files
Internal project staff na na
C.12.8 NASS
Base year & Years 1-4
NASS Processing Programs
10 months EDOA and annually thereafter
SAS files Internal project staff na na
C.12.9 NASS
Base year & Years 1-4
NASS Comparison Report
10 months EDOA and annually thereafter
PDF file Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.12.10 NASS
Base year & Years 1-4
NASS database and documentation for external release, ASCII
10 months EDOA and annually thereafter
ASCII
data and PDF files
Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final Rule) ASCII: Not Required
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C12.11 NASS Year 3 Report on NASS sampling design 9/1/2021 PDF file Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.13.1.3 Hospital ID
Base year & Years 1-4
HCUP Version of AHA Analytic File
2 months EDOA and annually thereafter
PDF file Internal project staff na na
C.13.2.1 Hospital ID
Base year & Years 1-4
E-Version of AHA File Documentation
2 months EDOA and annually thereafter
SAS data and PDF files
Standards Crosswalk to:
C.13.2.2 Hospital ID
Base year & Years 1-4
Updated Overview of HCUP AHA Survey File
2 months EDOA and annually thereafter
HTML Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.13.3.1 Hospital ID
Base year & Years 1-4
Intramural Version of the AHA Linkage File and Documentation (consolidated)
8 months EDOA and annually thereafter
PDF file Internal project staff na na
C.13.3.2 Hospital ID
Base year & Years 1-4
Extramural Version of the AHA Linkage File and Documentation (consolidated)
8 months EDOA and annually thereafter
SAS data and PDF files
Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final Rule) SAS: Not Required
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.13.4 Hospital ID
Base year & Years 1-4
Summary Tables to Compare AHA/State Data
8 months EDOA and annually thereafter
PDF file Internal project staff na na
C.13.5 Hospital ID
Base year & Years 1-4
Dataset and documentation for Partner-supplied hospital information
7 months EDOA and annually thereafter
ASCII
data and PDF files
Internal project staff na na
C.13.6 Hospital ID
Base year & Years 1-4
Memo with recommendations on third-party data sources
9 months EDOA and annually thereafter
PDF files Internal project staff na na
C.13.7 Hospital ID
Base year & Years 1-4
Memo and prototype of HCUP Hospital Master file
10 months EDOA and annually thereafter
ASCII
data and PDF files
Internal project staff na na
C.13.8 Hospital ID Base year & Years
Memo and supplemental file on Hospital System and Networks
10 months EDOA and annually
ASCII
data and PDF files
Standards Crosswalk to:
1-4 thereafter
C.13.9 Hospital ID
Base year & Years 1-4
2016 AHA EHR file and documentation
7 months EDOA and annually thereafter
ASCII
data and PDF files
Internal project staff na na
C.14.1 Supplemental Files / Linkable Files
Base year & Years 1-4
Procure CMS accounting database (HCRIS reports filed on March 31)
Within 2 weeks following data availability
ASCII
data
Internal project staff na na
C.14.1 Supplemental Files / Linkable Files
Base year & Years 1-4
CCR Intramural file and basic documentation
Within 2 months of receiving
CMS / HCRIS
data
Data and PDF files
Internal project staff na na
C.14.1 Supplemental Files / Linkable Files
Option year 1
Memo on alternative methodologies for more accurate cost estimates
4/15 2019 PDF file Internal project staff na na
C.14.1 Supplemental Files / Linkable Files
Base year & Year 3
KID CCR files and documentation.
10/1/2018 10/1/2021
SAS data
files
Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final Rule) SAS: Not Required
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.14.1 Supplemental Files / Linkable Files
Base year & Years 1-4
NIS and SID CCR files and documentation.
8 months EDOA and annually thereafter
SAS &
PDF files Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final Rule) SAS: Not Required
These standards are represented in the current HHS PAT as 36
Standards Crosswalk to:
C.14.4 Supplemental Files / Linkable Files
Option years 1-
Update Hospital Market Structure (HMS) files
Within 2 weeks following State data files availability
SAS data files
Internal project staff na na
C.14.4.1 Supplemental Files / Linkable Files
Option year 1
Document Partner permission for HMS release through Central Distributor
11 months EDOA PDF file Internal project staff na na
C.14.4.2 Supplemental Files / Linkable Files
Option years 2 and 4
Central Distributor HMS files
Within 2 weeks of
HCUP 2018
and 2021 data files availability
SAS data files Public na na
C.14.5 Supplemental Files / Linkable Files
Option years 1-
Intramural Quality Indicator files
4 months EDOA and annually thereafter
SAS data files
Internal project staff na na
C.14.5.1 Supplemental Files / Linkable Files
Option years 1-
Documentation for Quality Indicator files
4 months EDOA and annually thereafter
PDF files Internal project staff na na
C.14.5.2 Supplemental Files / Linkable Files
Option years 1-
Partner permission for Central Distributor QI file release
18 months EDOA and annually thereafter
PDF files Internal project staff na na
C.14.6.1 Supplemental Files / Linkable Files
Option years 2, 3, & 4
Obtain Hospital Financial data
Within 14 months of data availability and annually thereafter
SAS data files
Standards Crosswalk to:
C.14.6.3 Supplemental Files / Linkable Files
Option years 2,3, & 4
Analytic files and intramural Payment-to-Charge Ratio files
11/1/2020 and annually thereafter
SAS data files
Internal project staff na na
C.14.6.5 Supplemental Files / Linkable Files
Option years 2,3, & 4
Central Distributor Payment-to-Charge Ratio files
11/1/2020 and annually thereafter
SAS data files Public na na
C.14.7 Supplemental Files / Linkable Files
Base year & Years 1-4
Physician data files and documentation
8 months EDOA and annually thereafter
SAS data and PDF files
Internal project staff na na
C.15.3 Central Distributor
Base year & Years 1-4
Technical Guide to CDOW ordering system
4 months EDOA and annually thereafter
PDF file Internal project staff na na
C.15.4 Central Distributor
Base year & Years 1-4
Operate Central Distributor with CDOW: Host and Maintain Tracking and E- Commerce
1.5 month EDOA and annually thereafter
HTML Public
These standards are represented in the current HHS PAT as
36 CFR 1194.21, .22,
.31, and .41
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.15.4 Central Distributor
Base year
Report on CDOW Web site Policies and Procedures
3 months EDOA PDF file Internal project staff na na
C.15.5 Central Distributor
Base year & Years 1-4
Implement Refinements to the CDOW Web site Quarterly HTML Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.15.7 Central Distributor
Base year & Years 1-4
Application Kit:
SID/SASD/SEDD
1 month EDOA and monthly thereafter
PDF file Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
Standards Crosswalk to:
C.15.7 Central Distributor
Base year & Years 1-4
Application Kit:
NIS/KID/NEDS/NRD
6 months EDOA and monthly thereafter
PDF file Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.15.8 Central Distributor
Base year & Years 1-4
Central Distributor tracking system content 12/18/2018 ASCII data file Internal project staff na na
C.15.13 Central Distributor
Base year & Years 1-4
HCUP Central Distributor Financial Report
6 months EDOA and biannually thereafter
PDF file Internal project staff na na
C.15.14 Central Distributor
Base year & Years 1-4
Reimburse HCUP Partner organizations
1 month EDOA and monthly thereafter
Monetary Payment Partners na na
C.15.14 Central Distributor
Base year & Years 1-4
Monthly Reports to Partner organizations
1 month EDOA and monthly thereafter
PDF file Partners
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.15.15 Central Distributor
Base year & Years 1-4
Central Distributor Monthly Activity Reports
1 month EDOA and monthly thereafter
PDF file Internal project staff na na
C.15.16 Central Distributor
Base year & Years 1-4
Delivery of PDF copies of Data Use Agreements and an electronic cumulative report of DUA holders
1 month EDOA and quarterly thereafter
PDF file Internal project staff na na
C.15.17 Central Distributor
Base year & Years 1-4
Customized files (Up to 2 annually)
11.5 months EDOA and annually thereafter
SAS data file
Standards Crosswalk to:
C.16.1.2 Delivery and Management
Base year & Years 1-4
Documentation of source data destruction
12 months EDOA and annually thereafter
PDF file Internal project staff na na
C.16.3.1 Delivery and Management
Base year
Report on policy for handling management and documentation records
3/1/2018 PDF file Internal project staff na na
C.16.3.1 Delivery and Management
Base year
Report on assessment of records management 7/1/2019 PDF file Internal project staff na na
C.17.1 HCUP-US
Web site
Base year & Years 1-4
Report on HCUP-US Web site policies and procedures
2 months EDOA and annually thereafter
PDF file Internal project staff na na
C.17.4 HCUP-US
Web site
Base year & Years 1-4
HCUP-US Web site enhancements (2 new enhancements every 6 months)
6.5 and 11.5 months EDOA and bi-annual thereafter
HTML Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.17.6 HCUP-US
Web site
Base year & Years 1-4
Technical Guide to HCUP- US Web site
10 months EDOA and annually thereafter
PDF file Internal project staff na na
C.18.2 Tech Support for Partners
Base year & Years 1-4
Partner Workgroups (up to 2 active workgroups per year)
10 days following each event
Conferen ce calls Partners na na
C.18.2 Tech Support for Partners
Base year & Years 1-4
Memo on technical support for Partner workgroups (up to 2 active workgroups per year)
10 days following each event
PDF file Internal project staff na na
C.18.3 Tech Support for Partners
Base year & Years 1-4
Memo on participation in conferences and other meetings of HCUP Partners
3 weeks following each event
Standards Crosswalk to:
C.18.5 Tech Support for Partners
Base year & Years 1-4
Memo on Technical Support for Partners
6 months
EDOA &
biannual thereafter
PDF file Internal project staff na na
C.19 HCUP Partner Webinar Meetings
Base year & Years 1-4
Partners Meeting – Webinars Slides Posted
1 week following webinar
Webinar Software Partners
Webinar platform:
Offeror should provide Webinar platform VPAT
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.19 HCUP Partner Webinar Meetings
Base year & Years 1-4
Annual Report on Partner Webinars
11.5 months EDOA and annually thereafter
PDF file Internal project staff na na
C.21.2.1 Technical Support to Users
Base year & Years 1-4
Fiscal year Technical Support Statistics Report
2 months EDOA and biannually thereafter
PDF file Internal project staff na na
C.21.2.1 Technical Support to Users
Base year & Years 1-4
Calendar year Technical Support Statistics Report
5 months EDOA and biannually thereafter
PDF file Internal project staff na na
C.21.3 Technical Support to Users
Base year & Years 1-4
Cumulative bibliography & DUA violations
2/25/2018 6/25/2018 10/25/2018 12/15/2018 and annually thereafter
PDF file Internal project staff na na
C.21.4 Technical Support to Users
Base year & Years 1-4
Fiscal year Publications Report
11 months EDOA and annually thereafter
Standards Crosswalk to:
C.21.4 Technical Support to Users
Base year & Years 1-4
Calendar year Publications Report (previous year)
2 months EDOA and annually thereafter
PDF file Internal project staff na na
C.22.1 Presentations and Training
Base year & Years 1-4
Annual presentation plan for next calendar year
7 months EDOA and annually
PDF file Internal project staff na na
C.22.2 Presentations and Training
Base year & Years 1-4
Presentation/poster #1 2 weeks prior to venue date
Physical poster or in-person presentat ion at conferen ce (PPT)
Public na na
C.22.2 Presentations and Training
Base year & Years 1-4
Presentation slides/poster #2
2 weeks prior to venue date
Physical poster or in-person presentat ion at conferen ce (PPT)
Public na na
C.22.2 Presentations and Training
Base year & Years 1-4
Presentation slides/poster #3
2 weeks prior to venue date
Physical poster or in-person presentat ion at conferen ce (PPT)
Public na na
C.22.2 Presentations and Training
Base year & Years 1-4
Presentation slides/poster #4
2 weeks prior to venue date
Physical poster or in-person presentat ion at conferen ce (PPT)
Public na na
Standards Crosswalk to:
C.22.2 Presentations and Training
Base year & Years 1-4
Presentation slides/poster #5
2 weeks prior to venue date
Physical poster or in-person presentat ion at conferen ce (PPT)
Public na na
C.22.2 Presentations and Training
Base year & Years 1-4
Presentation slides/poster #6
2 weeks prior to venue date
Physical poster or in-person presentat ion at conferen ce (PPT)
Public na na
C.22.2 Presentations and Training
Base year & Years 1-4
Presentation slides/poster #7
2 weeks prior to venue date
Physical poster or in-person presentat ion at conferen ce (PPT)
Public na na
C.22.2 Presentations and Training
Base year & Years 1-4
Presentation slides/poster #8
2 weeks prior to venue date
Physical poster or in-person presentat ion at conferen ce (PPT)
Public na na
C.22.2 Presentations and Training
Base year & Years 1-4
Presentation slides/poster #9
2 weeks prior to venue date
Physical poster or in-person presentat ion at conferen ce (PPT)
Public na na
Standards Crosswalk to:
C.22.2 Presentations and Training
Base year & Years 1-4
Presentation slides/poster #10
2 weeks prior to venue date
Physical poster or in-person presentat ion at conferen ce (PPT)
Public na na
C.22.2 Presentations and Training
Base year & Years 1-4
#11
Physical poster or in-person presentat ion at conferen ce (PPT)
Public na na
C.22.2 Presentations and Training
Base year & Years 1-4
#12
Physical poster or in-person presentat ion at conferen ce (PPT)
Public na na
C.22.1 Presentations and Training
Base year & Years 1-4
Presentation plan for current calendar year
2 months EDOA and annually
PDF file Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.22.2 Presentations and Training
Base year & Years 1-4
Webinar #1 -post slides and feedback
10 days following Webinar date
Webinar Software Public
Webinar platform:
Offeror should provide Webinar platform VPAT
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board
These standards are represented in the current HHS PAT as 36
Standards Crosswalk to:
January 2017 Final Rule)
C.22.2 Presentations and Training
Base year & Years 1-4
Webinar #2 -post slides and feedback
10 days following Webinar date
Webinar software Public
Webinar platform:
Offeror should provide Webinar platform VPAT
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.22.2 Presentations and Training
Base year & Years 1-4
Webinar #3 -post slides and feedback
10 days following Webinar date
Webinar software Public
Webinar platform:
Offeror should provide Webinar platform VPAT
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.22.2 Presentations and Training
Base year & Years 1-4
Webinar #4 -post slides and feedback
10 days following Webinar date
Webinar software Public
Webinar platform:
Offeror should provide Webinar platform VPAT
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.22.2 Presentations and Training
Base year & Years 1-4
Webinar #5 -post slides and feedback
10 days following Webinar date
Webinar software Public
Webinar platform:
Offeror should provide Webinar platform VPAT
These standards are represented in the current HHS PAT as 36
Standards Crosswalk to:
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule) and .41
C.22.2 Presentations and Training
Base year & Years 1-4
Webinar #6 - post slides and feedback
10 days following Webinar date
Webinar software Public
Webinar platform:
Offeror should provide Webinar platform VPAT
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.22.2 Presentations and Training
Base year & Years 1-4
Presentation slides for hands-on training workshop #1
2 weeks prior to venue date
In-person training Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.22.2 Presentations and Training
Base year & Years 1-4
Presentation slides for hands-on training workshop #2
2 weeks prior to venue date
In-person training Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.22.3 Presentations and Training
Base year & Years 1-4
Draft electronic tutorial #1
6 months EDOA and annually thereafter
HTML Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
Standards Crosswalk to:
C.22.3 Presentations and Training
Base year & Years 1-4
Final electronic tutorial #1
9 months EDOA and annually thereafter
HTML Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.22.3 Presentations and Training
Base year & Years 1-4
Draft electronic tutorial #2
6 months EDOA and annually thereafter
HTML Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.22.3 Presentations and Training
Base year & Years 1-4
Final electronic tutorial #2
9 months EDOA and annually thereafter
HTML Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.22.3 Presentations and Training
Base year & Years 1-4
Draft electronic tutorial #3
6 months EDOA and annually thereafter
HTML Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.22.3 Presentations and Training
Base year & Years 1-4
Final electronic tutorial #3
9 months EDOA and annually thereafter
HTML Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.23.1 HCUP Impact through Outreach
Base year & Years 1-4
Outreach Initiative
11.5 months EDOA and annually thereafter
TBD Internal
Standards Crosswalk to:
C.23.2.1 HCUP Impact through Outreach
Base year & Years 1-4
Draft Quarterly HCUP Newsletter
3 months EDOA and quarterly thereafter
PDF file / HTML Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.23.2.1 HCUP Impact through Outreach
Base year & Years 1-4
Final Quarterly HCUP Newsletter
3.5 months EDOA and quarterly thereafter
PDF file / HTML Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.23.2.2 HCUP Impact through Outreach
Base year & Years 1-4
HCUP Calendar of Events
1 month EDOA and monthly thereafter
HTML Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.23.2.2 HCUP Impact through Outreach
Base year & Years 1-4
Research Spotlights
1 month EDOA and quarterly thereafter
HTML Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.23.2.2 HCUP Impact through Outreach
Base year & Years 1-4
Update HCUP public Wikipedia page
6 months EDOA and annually thereafter
HTML Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.23.2.2 HCUP Impact through Outreach
Base year & Years 1-4
Update HCUP-US Web site technical support Web pages
12 months EDOA and annually thereafter
HTML Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
Standards Crosswalk to:
C.23.2.2 HCUP Impact through Outreach
Option year 1
Memo on improving Calendar of Events 1/15/2019 PDF Internal project staff na Na
C.24.1 Create Software Tools
Base year & Years 1-4
CCS- Single level
10 months EDOA and annually thereafter
SAS file Public na na
C.24.1 Create Software Tools
Base year & Years 1-4
Chronic Condition Indicator
10 months EDOA and annually thereafter
SAS file Public na na
C.24.1 Create Software Tools
Base year & Years 1-4
Comorbidity Software
10 months EDOA and annually thereafter
SAS file Public na na
C.24.1 Create Software Tools
Base year & Years 1-4
Procedure Classes
10 months EDOA and annually thereafter
SAS file Public na na
C.24.1 Create Software Tools
Base year & Years 1-4
CCS for Services and Procedures
4 months EDOA and annually thereafter
SAS file Public na Na
C.24.1 Create Software Tools
Base year & Years 1-4
Utilization Flags
10 months EDOA and annually thereafter
SAS file Public na Na
C.24.2 Create Software Tools
Base year & Years 1-4
Memo on Software Tool Logistics
5 months EDOA and annually thereafter
PDF file Internal project staff na na
C.25.1 Online Statistical Reporting
Base year & Years 1-4
Create Readmissions tables
3 months EDOA and annually thereafter
SAS data Files
Internal project staff na na
Standards Crosswalk to:
C.25.2 Online Statistical Reporting
Base year & Years 1-4
Create Community Statistics Tables for HCUPnet
4 months EDOA and annually thereafter
SAS data Files
Internal project staff na na
C.25.4 Online Statistical Reporting
Base year & Years 1-4
Update Existing Fast Stats Analyses and Tool Paths
5 months EDOA and annually thereafter
SAS data Files
Internal project staff na na
C.25.6 Online Statistical Reporting
Base year & Years 1-4
Create New Fast Stats Analyses and Tool Path
6 months EDOA and annually thereafter
SAS data Files
Internal project staff na na
C.25.3 Statistical and Technical Reports
Base year & Years 1-4
Memo of potential sets of Community-level statistics
2 months EDOA and annually thereafter
PDF file Internal project staff na na
C.25.3 Statistical and Technical Reports
Base year & Years 1-4
Tables of Community-level statistics delivered to HCUP Partners
10 months EDOA and annually thereafter
SAS data Files
Internal project staff na na
C.25.3 Statistical and Technical Reports
Base year & Years 1-4
Final Community-level tables delivered to AHRQ
11 months EDOA and annually thereafter
SAS data files
Internal project staff na na
C.26.1 Statistical and Technical Reports
Base year & Years 1-4
Create Statistical Brief (up to 14 per year)
4 months after assigned and last statistical brief at 12 months
EDOA
PDF and HTML Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.26.2 Statistical and Technical Reports
Base year & Years 1-4
Methods Series report #1 -draft
7 months EDOA and annually thereafter
PDF file Internal project staff
Standards Crosswalk to:
C.26.2 Statistical and Technical Reports
Base year & Years 1-4
Methods Series report #1 -final
8 months EDOA and annually thereafter
HTML Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.26.2 Statistical and Technical Reports
Base year & Years 1-4
Methods Series report #2 -draft
10 months EDOA and annually thereafter
PDF file Internal project staff na na
C.26.2 Statistical and Technical Reports
Base year & Years 1-4
Methods Series report #2 -final
11 months EDOA and annually thereafter
HTML Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.26.2 Statistical and Technical Reports
Base year & Years 1-4
Update Methods Series report (Up to 3 per year)
12 months EDOA and annually thereafter
HTML Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.27.1 Research
Base year & Years 1-4
Draft Report/Manuscript for targeted limited-effort research study #1
10.5 months EDOA and annually thereafter
PDF file Internal project staff na na
C.27.1 Research
Base year & Years 1-4
Final Report/Manuscript for targeted limited-effort research study #1
11.5 months EDOA and annually thereafter
PDF file Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final Rule) ASCII: Not Required
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.27.1 Research Base year &
Draft Report/Manuscript for targeted limited-effort
10.5 months EDOA and PDF file Internal
Standards Crosswalk to:
Years 1-4 research study #2 annually thereafter
C.27.1 Research
Base year & Years 1-4
Final Report/Manuscript for targeted limited-effort research study #2
11.5 months EDOA and annually thereafter
PDF file Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.27.1 Research
Base year & Years 1-4
Draft Report/Manuscript for targeted limited-effort research study #3
10.5 months EDOA and annually thereafter
PDF file Internal project staff na na
C.27.1 Research
Base year & Years 1-4
Final Report/Manuscript for targeted limited-effort research study #3
11.5 months EDOA and annually thereafter
PDF file Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.27.3 Research
Base year & Years 1-4
Memo on potential analytic topics
9 months EDOA and annually thereafter
PDF file Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.28
Quick Turn- Around and Periodic Data Analysis
Base year & Years 1-4
Small Analysis (Up to 5 per year)
2 weeks following topic assignment
SAS data files
Internal project staff na na
C.28
Quick Turn- Around and Periodic Data Analysis
Base year & Years 1-4
Moderate Analysis (Up to 5 per year)
1 month following topic assignment
SAS data files
Standards Crosswalk to:
C.28.2
Quick Turn- Around and Periodic Data Analysis
Base year & Years 1-4
Summary of Quick Turn-around analyses
12 months EDOA and annually thereafter
PDF Internal project staff na na
C.30.3.1 QDR
Base year & Years 1-4
QDR Estimates Working Tables
9 months EDOA and annually thereafter
SAS data files Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.30.3.2 QDR
Base year & Years 1-4
Final QDR Tables
12 months EDOA and annually thereafter
Excel data files
AHRQ Staff on QDR Team na na
C.30.3.3 QDR
Base year & Years 1-4
QDR Skinny Files and Documentation of Data for Reports
10 months EDOA and annually thereafter
Excel data files
AHRQ Staff on QDR Team na na
C.30.3.4 QDR
Base year & Years 1-4
QDR Technical Specifications Report
11 months EDOA and annually thereafter
PDF file AHRQ Staff on QDR Team
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.30.3.4 QDR
Base year & Years 1-4
QDR Computer Programs and program Documentation for Reports
12 months EDOA and annually thereafter
PDF and
SAS
data files
AHRQ Staff on QDR Team
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final Rule) SAS: Not Required
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.30.3.4 QDR
Base year & Years
3 Short methods reports describing NHQR/NHDR table production
11 months EDOA and annually
PDF file AHRQ Staff on QDR Team
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the
These standards are
Standards Crosswalk to:
1-4 thereafter Access Board January 2017 Final Rule)
CFR 1194.21, .22, .31,
and .41
C.30.4.1 QDR
Base year & Years 1-4
Additional QDR Statistical Tables
9 months EDOA and annually thereafter
Excel data files
AHRQ Staff on QDR Team
C.30.7.1 QDR
Base year & Years 1-4
Partners – State-level Preview Materials and Letter to Volunteer for the
QDR
9 months EDOA and annually thereafter
Files Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.30.7.2 QDR
Base year & Years 1-4
Partners – Briefing Materials for the Release of State-focused Derivative Product
10 months EDOA and annually thereafter
Files Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.30.5.2 QDR
Base year & Years 1-4
Partners – Briefing Materials for the Annual Release of QDR
12 months EDOA and annually thereafter
Files Public
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final Rule) ASCII: Not Required
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.31.8 Confidentiality & Security
Base year & Years 1-4
Annual Security and Privacy Training
1 month EDOA and annually thereafter
Confidentiality & Security
Base year & Years
Memo documenting yearly review and updates needed for the Electronic
3 months EDOA and annually
HTML Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the
These standards are
Standards Crosswalk to:
C.31.8
1-4 Privacy Training Tools thereafter Access Board
Rule)
C.31.8
Confidentiality & Security
Base year & Years 1-4
Completed updates for the Electronic Privacy Training Tools
9 months EDOA and annually thereafter
HTML Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
Sec H Subcontracting Provisions
Base year & Years 1-4
Subcontracting Report for Individual Contracts (SF- 294)
Annually in October and April via e-
SRS
PDF file Internal project staff na na
Sec H Confidentiality & Security
Base year & Years 1-4
Memo of Schedule for Completing ATO Components
1 month EDOA and annually thereafter
PDF file Internal project staff na na
Sec H Confidentiality & Security
Base year & Years 1-4
Monitor Security of System and Submit Monthly Reports
1 month EDOA and monthly thereafter
PDF files Internal project staff na na
Sec H Confidentiality & Security
Base year & Years 1-4
Privacy Impact Assessment (PIA)
1 month EDOA and annually thereafter
PDF file Internal project staff na na
Sec H Confidentiality & Security
Base year & Years 1-4
Submit full Security System Package for Authorization to Operate (ATO) or annual self-assessment maintain existing ATO - HCUP Web Services (low risk system)
1/30/18 and annually thereafter
PDF file Internal project staff na na
Sec H Confidentiality & Security
Base year &
Submit full Security System Package for Authorization
1/30/18 and annually PDF file Internal
Standards Crosswalk to:
Years 1-4 to Operate (ATO) or annual self-assessment to maintain existing ATO - HCUP System (moderate risk system) thereafter
Sec H Confidentiality & Security
Base year & Years 1-4
Submit full Security System Package for Authorization to Operate (ATO) or annual self-assessment to maintain existing ATO - HCUP CDOW System (low risk system)
1/30/18 and annually thereafter
BASE YEAR OPTIONAL TASKS
C.15.16.1 Central Distributor
All years
Establish online Acknowledgement of DUA for non-purchasers
6 months EDOA HTML Public
36 CFR 1194 E.204,
E.205, E.208. (as identified in the Access Board January 2017 Final Rule)
These standards are represented in the current HHS PAT as 36
CFR 1194.21, .22, .31,
and .41
C.16.4 Delivery and Management
All years
Obtain and Renew SAS Licenses
2 weeks EDOA PDF file Internal project staff na na
C.16.5 Delivery and Management
Base year
Assessment of Records Management
12 months EDOA PDF file Internal project staff na na
C.17.7 HCUP-US
Web site
All years
Draft Plan for HCUP-US Web Redesign
8 months EDOA PDF file Internal project staff na na
C.17.7 HCUP-US
Web site
All years
Final Plan for HCUP-US Web Redesign
10 months EDOA PDF file Internal project staff
PDF: 36 CFR 1194
E.204, E.205, E.208.
(as identified in the Access Board January 2017 Final
These standards are represented in the current HHS PAT as 36
Standards Crosswalk to:
Rule)
C.25.6 Online Statistical Reporting
Base year and Years 1-4
Develop new Fast Stats reporting path (up…