Secret_Saxon_Lily_Solicitation.docx

DOCX document 177 KB Posted

Attached to
Secret Saxon Lily Federal contract opportunity
Solicitation number
AG-9JGP-S-17-0030
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Secret Saxon Lily, newest first.
File Type Posted
ExhibitA-8_LilyLake_unit_113.pdf PDF
ExhibitA-6_LilyLake_unit_62.pdf PDF
PAL_Fire_Plan_Aug_2012_Draft.doc DOC document
ExhibitA-5_LilyLake_unit_194.pdf PDF
ExhibitA_Saxon_Vicinity.pdf PDF
ExhibitA-7_LilyLake_unit_1192.pdf PDF
ExhibitA-1_Secret_unit_1006.pdf PDF
ExhibitA-5_Saxon_units_69_80.pdf PDF
ExhibitA-7_Saxon_Aspen.pdf PDF
ExhibitA-3_LilyLake_unit_2169.pdf PDF
ExhibitA-6_Saxon_unit_1087.pdf PDF
ExhibitA-4_LilyLake_units_11_1011.pdf PDF
ExhibitA-1_Saxon_units_7_190.pdf PDF
ExhibitA-10_LilyLake_units_BE01_BE02.pdf PDF
ExhibitA-1_LilyLake_unit_1001.pdf PDF
WD_77.docx DOCX document
ExhibitA-2_Secret_units_13_1013.pdf PDF
ExhibitA-4_Saxon_unit_89.pdf PDF
ExhibitA-9_LilyLake_unit_ST01.pdf PDF
ExhibitA-4_units_GE22thruGE26.pdf PDF
ExhibitA-2_Saxon_unit_87.pdf PDF
ExhibitA-2_LilyLake_units_2_3.pdf PDF
ExhibitA-11_LilyLake_unit_BE03.pdf PDF
ExhibitA Lily Lake Vicinity.pdf PDF
ExhibitA-3_Secret_units_17_18.pdf PDF
ExhibitA_Secret_Vicinity.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-9JGP-S-17-0030 Secret Saxon Lily Hand Thinning – Lake Tahoe Basin Management Unit

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
1. REQUISITION NUMBER
PAGE 1 OF

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NUMBER
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
AG-9JGP-S-17-0030
May 24th, 2017
7. FOR SOLICITATION INFORMATION CALL:
a. NAME

Matthew Gagnon

b. CONTACT INFORMATION Matthewgagnon@fs.fed.us

8. OFFER DUE DATE / TIME

June 13th, 2017 at 2:00pm

9. ISSUED BY CODE 9JGP

10. THIS ACQUISITION IS |_|UNRESTRICTED OR |X| SET ASIDE: 100 % FOR:

|X| SMALL BUSINESS |_| WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

|_| HUBZONE SMALL SMALL BUSINESS PROGRAM

BUSINESS

|_| SERVICE DISABLED |_| EDWOSB

VETERAN- OWNED

SMALL BUSINESS |_| 8(A)

NAICS: 115310

SIZE STANDARD: $19 million

USDA Forest Service Central CA Acquisition Service Area 631 Coyote Street Nevada City, CA 95959

11. DELIVERY FOR FOB DESTINATION UNLESS BLOCK IS MARKED

|_| SEE SCHEDULE

12. DISCOUNT TERMS
|_| 13a. THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 CFR 700)
13b. RATING

14. METHOD OF SOLICITATION

|_| RFQ |_| IFB |_| RFP

15. DELIVER TO CODE

See specifications.

16. ADMINISTERED BY CODE

See block 9.

17a. CONTRACTOR / OFFEROR FACILITY

18a. PAYMENT WILL BE MADE BY CODE

|_| 17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
OFFER
IS CHECKED

|X| SEE ADDENDUM

19.
20.
21.
22.
23.
24.
ITEM N0.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Secret Saxon Lily Hand Thinning Lake Tahoe Basin Management Unit

See separate schedule sheet.

Please provide the following information:

DUNS#______________________

Email:_____________________________

PHONE No.:______________________

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

See IAS requisition.

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

|X|
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
|X|
ARE
|_|
ARE NOT ATTACHED
|_|
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
|_|
ARE
|_|
ARE NOT ATTACHED
|X| 28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______1________
|_| 29. AWARD OF CONTRACT: REF. OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
DATED .. YOUR OFFER ON SOLICITATION
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS: ____________________

30a. SIGNATURE OF OFFEROR/CONTRACTOR
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or print)
30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER (Type or print)
31c. DATE SIGNED

See schedule on next page.

32a. QUANTITY IN COLUMN 21 HAS BEEN

|_| RECEIVED |_| INSPECTED |_| ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ________________________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER
34. VOUCHER NUMBER
35. AMOUNT VERIFIED

CORRECT FOR

36. PAYMENT
37. CHECK NUMBER

|PARTIAL | |FINAL

|_| COMPLETE |_| PARTIAL |_| FINAL

38. S/R ACCOUNT NUMBER
39. S/R VOUCHER NUMBER
40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
42a. RECEIVED BY (Print)
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41c. DATE

42b. RECEIVED AT (Location)

42c. DATE RECD (YY/MM/DD)
42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV.2/2012) BACK

SECTION B: SCHEDULE OF ITEMS

PROJECT
Secret Hand Thinning
UNIT
Lake Tahoe Basin Management Unit
SOLICITATION NO.
AG-9JGP-S-17-0030
ITEM NO.
DESCRIPTION
UNIT
QUANTITY
UNIT PRICE
TOTAL PRICE
1a
Unit 1006 Thinning & snag falling
Acre
81.
1b
Unit 1006 Bucking & Piling
Acre
81.
2a
Unit 1013 Thinning & snag falling
Acre
10.
2b
Unit 1013 bucking & pilling
Acre
10.
3a
Unit 13 Thinning & snag falling
Acre
12
3b
Unit 13 Bucking & piling
Acre
12
4a
Unit 17 Thinning & Snag falling
Acre
59.
4b
Unit 17 Bucking & piling
Acre
59.
5a
Unit 18 Thinning & Snag falling
Acre
63.
5b
Unit 18 Bucking and piling
Acre
63.
6a
Unit GE 22 Conifer removal & snag falling
Acre
6.
6b
Unit GE 22 Aspen Bucking & piling
Acre
6.
6c
Unit GE 22 Fuelwood Stacking with lop and scatter within 75' of road
Acre
1.
7a
Unit GE 23 Conifer removal & snag falling
Acre
6.
7b
Unit GE 23 Aspen Bucking & piling
Acre
6.
7c
Unit GE 23 Fuelwood Stacking with lop and scatter within 75' of road
Acre
3.1
8a
Unit GE 24 Conifer removal & snag falling
Acre
3.
8b
Unit GE 24 Aspen Bucking & piling
Acre
3.
8c
Unit GE 24 Fuelwood Stacking with lop and scatter within 75' of road
Acre
1.2
9a
Unit GE 25 Conifer removal & snag falling
Acre
3.
9b
Unit GE 25 Aspen Bucking & piling
Acre
3.
10a
Unit GE 26 Conifer removal & snag falling
Acre
2.
10b
Unit GE 26 Aspen Bucking & piling
Acre
2.
10c
Unit GE 26 Fuelwood Stacking with lop and scatter within 75' of road
Acre
1.
Total:
$
NOTES
1. Responses for quantities less than those listed in the numbered items may be rejected.

2. Responses without prices for each item and sub-item may be rejected.

PRICE SUBMITTED BY:

SIGNATURE:

PHONE:

VENDOR NAME:

FAX:

ADDRESS:

EMAIL:

DUNS NUMBER:

CONTACT:

SECTION B: SCHEDULE OF ITEMS

PROJECT
Saxon Hand Thinning
UNIT
Lake Tahoe Basin Management Unit
SOLICITATION NO.
AG-9JGP-S-17-0030
ITEM NO.
DESCRIPTION
UNIT
QUANTITY
UNIT PRICE
TOTAL PRICE
1a
Unit 7 Thinning & snag falling
Acre
6.
1b
Unit 7 Bucking & Piling
Acre
6.
2a
Unit 190 Thinning & snag falling
Acre
65.
2b
Unit 190 Bucking & Piling
Acre
65.
3a
Unit 87 Thinning & snag falling
Acre
78
3b
Unit 87 Bucking & Piling
Acre
78
4a
Unit 88 Thinning & snag falling
Acre
79.
4b
Unit 88 Bucking & Piling
Acre
79.
5a
Unit 89 Thinning & snag falling
Acre
47.
5b
Unit 89 Bucking & Piling
Acre
47.
6a
Unit 1087 Thinning & snag falling
Acre
4.
6b
Unit 1087 Bucking & Piling
Acre
4.
7a
Unit 69 Thinning & snag falling
Acre
3.
7b
Unit 69 Bucking, Fuelwood Stacking, & Small Material Piling
Acre
3.
7c
Unit 69 Slash Treatment-Roadside Chipping
Acre
3.
8a
Unit 80 Thinning & snag falling
Acre
2.
8b
Unit 80 Bucking, Small Material Piling
Acre
2.
9a
Unit 1088 Thinning & snag falling
Acre
6.
9b
Unit 1088 Bucking & Piling
Acre
6.
10a
Unit 1190 Thinning & snag falling
Acre
3.
10b
Unit 1190Bucking & Piling
Acre
3.
11a
Unit 2087 Thinning & snag falling
Acre
1.
11b
Unit 2087 Bucking & Piling
Acre
1.
12a
Unit 1089 Thinning & snag falling
Acre
3.
12b
Unit 1189 Bucking & Piling
Acre
3.
13a
Unit 3087 Thinning & snag falling
Acre
1.
13b
Unit 3087 Bucking & Piling
Acre
1.
Total:
$
NOTES
1. Responses for quantities less than those listed in the numbered items may be rejected.

2. Responses without prices for each item and sub-item may be rejected.

PRICE SUBMITTED BY:

SIGNATURE:

PHONE:

VENDOR NAME:

FAX:

ADDRESS:

EMAIL:

DUNS NUMBER:

CONTACT:

SECTION B: SCHEDULE OF ITEMS

PROJECT
Lily Lake Hand Thinning
UNIT
Lake Tahoe Basin Management Unit
SOLICITATION NO.
AG-9JGP-S-17-0030
ITEM NO.
DESCRIPTION
UNIT
QUANTITY
UNIT PRICE
TOTAL PRICE
1a
Unit 1001 Thinning & Snag Felling
Acre
35.
1b
Unit 1001 Bucking & Piling
Acre
35.
2a
Unit 3 Thinning & Snag Felling
Acre
26.
2b
Unit 3 Bucking & Piling
Acre
26.
3a
Unit 11 Thinning & Snag Felling
Acre
19
3b
Unit 11 Bucking & Piling
Acre
19
4a
Unit 62 Thinning & Snag Felling
Acre
20.
4b
Unit 62 Bucking & Piling
Acre
20.
5a
Unit 113 Thinning & Snag Felling
Acre
11.
5b
Unit 113 Bucking & Piling
Acre
11.
6a
Unit 1192 Thinning & Snag Felling
Acre
46.
6b
Unit 1192 Bucking & Piling
Acre
46.
7a
Unit 194 Thinning & Snag Felling
Acre
39.
7b
Unit 194 Bucking & Piling
Acre
39.
8a
Unit 2169 Thinning & Snag Felling
Acre
31.
8b
Unit 2169 Bucking & Piling
Acre
31.
9c
Unit 2 Conifer Removal & Snag Felling (Aspen Treatment)
Acre
23.
9d
Unit 2 Bucking & Piling (Aspen Treatment)
Acre
23.
10c
Unit 1011 Conifer Removal & Snag Felling (Aspen Treatment)
Acre
14.
10d
Unit 1011 Bucking & Piling (Aspen Treatment)
Acre
14.
11c
Unit ST01 Conifer Removal & Snag Felling (Meadow Treatment)
Acre
39.
11d
Unit ST01 Bucking & Piling (Meadow Treatment)
Acre
39.
12c
Unit BE01 Conifer Removal & Snag Felling (Meadow Treatment)
Acre
4.
12d
Unit BE01 Bucking & Piling (Meadow Treatment)
Acre
4.
13c
Unit BE02 Conifer Removal & Snag Felling (Meadow Treatment)
Acre
8.
13d
Unit BE02 Bucking & SEZ Piling (Meadow Treatment)
Acre
8.
14c
Unit BE03 Conifer Removal & Snag Felling (Meadow Treatment)
Acre
42.
14d
Unit BE03 Bucking & Piling (Meadow Treatment)
Acre
42.
Total:
$
NOTES
1. Responses for quantities less than those listed in the numbered items may be rejected.

2. Responses without prices for each item and sub-item may be rejected.

PRICE SUBMITTED BY:

SIGNATURE:

PHONE:

VENDOR NAME:

FAX:

ADDRESS:

EMAIL:

DUNS NUMBER:

CONTACT:

TABLE OF CONTENTS

C. DESCRIPTION/ SPECIFICATIONS/ STATEMENT OF WORK8
C.1 Scope of Work8
C.2 Project Location & Description8
C.3 Maps10
C.4 Estimated Start Date & Contract Time11
C.5 Restrictions on Work11
C.6 Licenses and Insurance12
C.7 Technical Requirements12
E.INSPECTIONS AND ACCEPTANCE21
E.1 Government Inspections21
E.2 Specific Inspection Procedures22
F.DELIVERIES OR PERFORMANCE23
F.1 Work Timing23
F.2 Winter Shutdown24
G.CONTRACT ADMINISTRATION DATA24
G.1 Pre-work24
G.2 Measurement24
G.3 Payment24
H.SPECIAL CONTRACT REQUIREMENTS26
H.1 Emergencies26
H.2 Safety26
H.3 Road Maintenance26
H.4 Superintendence by Contractor26
H.5 Archaeological and Historic Sites26
H.6 Spill Plan27
H.7 Equipment Cleaning27
H.8 Final cleanup27
H.9 Public officials not personally liable27
H.10 Designation of Contracting Officer’s Representative27
H.11 Approval of Subcontracting28
H.12 Certification of Compliance28
H.13 Camping28
I.CONTRACT TERMS & CONDITIONS28
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)28
FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders - Commercial Items (JAN 2017)30
J.ATTACHED DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS36
Project Area or Unit Maps36
Wage Determination36
Fire Plan36
K.OFFEROR REPRESENTATIONS & CERTIFICATIONS36
L.INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS57
FAR 52.212-1 Instructions to Offerors – Commercial Items (Jan 2017)57
L.1 FAR 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998)60
L.2 AGAR 452.219-70 Size Standard and NAICS Code Information (SEP 2001)60
L.3 FAR 52.237-1 SITE VISIT (Apr 1984)61
L.4 FAR 52.233-2 Service of Protest (SEP 2006)61
L.5 FAR 52.212-2 EVALUATION - COMMERCIAL ITEMS (Oct 2014)61
L.6 Submission of Proposals63

C. DESCRIPTION/ SPECIFICATIONS/ STATEMENT OF WORK

C.1 Scope of Work Description of Work: The intent of this contract is to secure services to pre-commercially thin trees, remove encroaching conifer from aspen stands, fell snags, and hand pile activity fuels and down logs in conifer/aspen stands. Work activities are to be accomplished utilizing hand-held or manual equipment.

The Secret project area consists of 245 acres with a contract length of 1 season. It is expected that the contractor shall begin work within ten (10) days of award of this contract if awarded with in the operational season (May 1st thru Oct 15th), or an agreed start date based upon workable conditions within the Lake Tahoe Basin.

The Saxon project area consists of 298 acres with a contract length of 1 seasons. It is expected that the contractor shall begin work within ten (10) days of award of this contract if awarded within the operational season (May 1st thru Oct 15th), or an agreed start date based upon workable conditions within the Lake Tahoe Basin.

The Lily project area consists of 357 acres with a contract length of 1 season. It is expected that the contractor shall begin work within ten (10) days of award of this contract if awarded with in the operational season (May 1st thru Oct 15th), or an agreed start date based upon workable conditions within the Lake Tahoe Basin.

Contractor Responsibility: The Contractor shall provide everything--including, but not limited to, all technical expertise, equipment, supplies, transportation, labor, incidentals, and supervision--necessary to complete the project, except for that which the contract clearly states is to be furnished by the Government.

C.2 Project Location & Description The Secret project is located within the Lake Tahoe Basin Management Unit in the East Shore area of Lake Tahoe. The project location consists of 10 units in two areas: 9 units are located off of Hwy 50 at the Spooner summit area on both the north and south side of Hwy 50. One unit is located approximately 3 miles north of Hwy 50 along Hwy 28 in between Skunk Harbor and Secret Harbor on the east side of Hwy 28. See the vicinity map and project area maps. Maps are general in nature and are not to be considered as definitively identifying locations.

The Saxon project area is located within the Lake Tahoe Basin Management Unit in the South Shore area of Lake Tahoe. Access to all 13 units within the contract area are southeast of Meyers, CA and south of Pioneer Trail. From Meyers, head east on Pioneer Trail then turn right onto Oneidas Street. Proceed to the end of Oneidas Street, continue east on Forest Service System Road 1201 approximately .4 miles to its intersection with Forest Service System Road 12N01A. Proceed south on Forest Road 12N01A for approximately .5 miles.

The Lily project area is located within the Lake Tahoe Basin Management Unit on the South Shore of Lake Tahoe, California. Access to the project area is from Fallen Leaf Rd, Tahoe Mountain Rd, forest roads 1214, 1216, 1201, 12N01D, 12N08, 12N21, 12N21A, 1103, and forest trails 18E01.1 and PC 2000A (Pacific Crest Trail). See the vicinity map and project area maps. Maps are general in nature and are not to be considered as definitively identifying locations.

This contract does not describe work locations in detail. The technical contact listed may be called to verify information and to arrange a time to view it if requested. All contract units are accessible with no controls on access at this time. Photocopies of stand cards will be made available for viewing only. Verbal information will not be considered binding.

Description: The project areas consist of broken topography dominated by slopes ranging from 0 to 70 percent. Due to the nature of the broken topography, it is expected that hand-held equipment will be used on all units.

The Secret project area is comprised of 10 units with 5 separate work items.

Secret Item 1 – Units: 1006, 1013, 13, 17 and 18 Conifer thinning is comprised of 225 acres of ground that is all workable with hand-held equipment. Work consists of cutting live conifer trees up to the specified diameter limit and a specific spacing and the felling of snags up to a specified DBH (see Table 1 – Summary of Thinning Specifications).

Secret Item 2 – Units: 1006, 1013, 13, 17 And 18 Fuel – Slash and Piling is comprised of 225 acres of hand piling of contractor-generated slash, and the bucking/piling of existing downed tree boles material up to a specified diameter (see Table 2 – Summary of Fuel - Slash Treatment Specifications), or as agreed to with COR.

Secret Item 3 – Units: GE22, GE23, GE24, GE25 and GE26 Aspen improvement, conifer removal is comprised of 20 acres of ground that is all workable with hand-held equipment. Work consists of the cutting of all live conifer trees up to the specified diameter limit, and felling of snags up to a specified DBH (see Table 1 – Summary of Treatment Specifications). Apply a California registered Borate compound to all stumps ≥ 14” diameter.

Secret Item 4 – Units : GE22, GE23, GE24, GE25 and GE26 Aspen Slash Treatment is comprised of 20 acres of hand piling of contractor-generated slash and the bucking/piling of existing downed tree boles up to a specified diameter (see Table 2 – Summary of Slash Treatment Specifications). Units must be piled to meet the SEZ piling specifications.

Secret Item 5 – Units: GE22, GE23, GE24, and GE26 Aspen Fuelwood Stacking - Fuelwood Stacking/Small Material Piling is comprised of areas within 75 feet of roads for bucking and hand stacking of contractor generated bole wood >6” in diameter for fuelwood gathering. Material <6” diameter to be lopped and scattered to a depth of no more than 1 foot in depth.

The Saxon project area is comprised of 12 units with 2 separate work items for each unit and 1 unit with 3 separate work items.

Saxon Item 1 - Units: 7, 69, 80,87,88,89,190, and 1087 Conifer thinning is comprised of 285 acres of ground that is all workable with hand-held equipment. Work consists of cutting live conifer trees up to the specified diameter limit and a specific spacing and the felling of snags up to a specified DBH (see Table 1 – Summary of Thinning Specifications).

Saxon Item 2 - Units: 7, 80,87,88,89,190, and 1087 Fuel – Slash and Piling is comprised of 282 acres of hand piling of contractor-generated slash, and the bucking/piling of existing downed tree boles material up to a specified diameter (see Table 2 – Summary of Fuel - Slash Treatment Specifications).

Saxon Item 3 - Units: 1088, 1089, 1190, 2087, and 3087 Aspen Improvement- Conifer Removal is comprised of 13 acres of ground that is all workable with hand-held equipment. Work consists of cutting all live conifer trees up to the specified diameter limit, and felling of snags up to a specified DBH (see Table 1- Summary of Treatment Specifications)

Saxon Item 4 – Units: 1088, 1089, 1190, 2087, and 3087 Fuels Treatment- Aspen Slash Treatment is comprised of 13 acres of hand piling contractor-generated slash and the bucking/piling of existing downed tree boles up to a specified diameter (see Table 2- Summary of Slash Treatment Specifications). Units must be piled to meet the SEZ piling specifications.

Saxon Item 5- Units: 69 Fuels Treatment- Fuelwood Stacking/Small Material Piling is comprised of 3 acres of bucking and hand stacking of contractor generated bole wood >6” in diameter for fuelwood gathering. Material <6” diameter that would create excess chip depth will be piled for burning.

Saxon Item 6- Unit: 69 Fuels Treatment- Chipping is comprised of 3 acres of chipping contractor generated material <6” diameter along Forest Road 12N01A

The Lily project area is comprised of 14 units with 2 separate work items for each unit.

Lily Item 1 – Units 1001, 3, 11, 62, 113, 1192, 194, 2169: Conifer Thinning (see C.8-1.1 thru C.8-1.4) is comprised of 227 acres of ground that is all workable with hand-held equipment. Work consists of cutting live conifer trees up to the specified diameter limit and a specific spacing and the felling of snags up to a specified DBH (see Table 1 – Summary of Thinning Specifications).

Lily Item 2 – Units 1001, 3, 11, 62, 113, 1192, 194 & 2169: Fuels Treatment – Bucking and Piling is comprised of 227 acres of hand piling of contractor-generated slash, and the bucking/piling of existing downed tree boles material up to a specified diameter (see Table 2 – Summary of Fuel - Slash Treatment Specifications).

Lily Item 3 – Units 2, 1011, ST01, BE01, BE02 & BE03: Aspen Improvement/Meadow Enhancement - Conifer Removal is comprised of 130 acres of ground that is all workable with hand-held equipment. Work consists of the cutting of all live conifer trees or Lodgepole Pine trees up to the specified diameter limit, and felling of snags up to a specified DBH (see Table 1 – Summary of Treatment Specifications). Apply a California registered Borate compound to all stumps ≥ 14” diameter. There is a walk in requirement of 2 miles for Unit ST01, 0.2 miles for Unit BE01, 0.3 miles for Unit BE02 and 0.5 miles for Unit BE03.

Lily Item 4 – Units 2, 1011, ST01, BE01, BE02 & BE03: Fuels Treatment – Bucking and Piling is comprised of 130 acres of hand piling of contractor-generated slash and the bucking/piling of existing downed tree boles up to a specified diameter (see Table 2 – Summary of Slash Treatment Specifications). Units must be piled to meet the SEZ piling specifications. There is a walk in requirement of 2 miles for Unit ST01, 0.2 miles for Unit BE01, 0.3 miles for Unit BE02 and 0.5 miles for Unit BE03.

Exterior boundaries of all units are marked on the ground with blue/pink flagging, and painted with orange dots; one facing into the treatment unit and one facing each direction of the boundary. Yellow and black cutting unit cards are placed at each corner and intermittently along the boundary indicating the contract name and unit number.

Refer to Project Maps for information on unit specific flagging locations.

Exclusions (Non-Work areas): Within the bid-item boundaries, the Government may exclude non-work areas such as: rocky areas, wildlife areas, wet areas, streamside buffers, and other special areas. The CO will designate non-work areas. When areas are deleted from the contract by mutual agreement, payment will not be made for non-worked areas that are greater than one (1) acre in size.

C.3 Maps Maps showing the general vicinity and/or specific work areas are included in this contract. Maps are general in nature and are not to be considered as definitively identifying locations. The size, shape, and location of the contract units were mapped utilizing Global Positioning Satellite (GPS) technology, and processed using Geographic Information Systems (GIS).

C.4 Estimated Start Date & Contract Time Secret Start: June 30, 2017 Time: Contract to be completed by September 22, 2017 (112 days of contract performance time).

Saxon Start: June 30, 2017 Time: Contract to be completed by Nov 15, 2017 (131 days of contract time).

Lily Start: June 30, 2017 Time: Contract to be completed by December 29, 2017, in one operational season.

C.5 Restrictions on Work Work may be performed at any time during the period of the contract, except as outlined in the following. Nothing in this part shall be construed to take away any of the Government's rights under the Suspension of Work Clause (52.242-14). Restrictions are as follows:

1. In accordance with the fire plan, included in Section J.

2. When the Contracting Officer (or designated Contract Officers Representative) determines that adverse weather has made access too dangerous or that continued vehicular travel would cause unacceptable road damage. Forest roads will not be used for access if such use will result in the road being rutted to a depth of greater than or equal to two inches over more than 10% of the length of the road (measured on a mile by mile basis).

3. In accordance with the Plan of Operations approved by Contracting Officer.

4. Chainsaw Operations (thinning) are limited to the hours of 8 am to 6 pm Monday thru Sunday, unless otherwise agreed to by the COR.

5. No work on Federal Holidays.

6. Location of areas needing special measures for protection of plants or animals are shown on individual unit maps and identified on the ground (blue / white stripped flagging for wildlife; blue and orange for botanical) where possible. If a Limited Operating Period is needed for such protection, the dates of restricted activity are shown on individual unit maps. If protection measures prove inadequate or other such areas are discovered, or if new species are listed or found during the term of the contract, the Forest Service may either cancel or unilaterally modify this contract to provide additional protection regardless of when such facts become known. Discovery of such areas by either party shall be promptly reported to the other party.

7. Wildlife Limited Operating Period (LOP) for the Lily project:

· Units 194, 1192: (February 15 - September 15)

· Unit 1011(March 1 - August 15)

· Unit 2: (May 1 - July 31)

· Unit 3: (March 1 - August 15)

8. For Lily project Units ST01, BE01, BE02 & BE03 all operations must be complete by 1/7/2018 due to the funding expiration date.

C.6 Licenses and Insurance The contractor shall obtain the insurance and licenses listed here; (see also Section L, Notices to Offerors and Respondents). Failure to provide the information will not change the date for starting work, and contract time may begin before the contractor is actually permitted to work. Once contract time begins, the contractor shall provide the documentation within 10 calendar days or 20 percent of the contract time (whichever is less) or the contract may be terminated for default in accordance with the clause governing default (termination for cause).

MSPA Card (Form WH510): This contract does require the contractor to be registered with the US Department of Labor as a Farm Labor Contractor. The Contractor shall provide a current Form WH510 or legible copy.

Worker’s Compensation Insurance: The Contractor shall provide evidence of Worker's Compensation Insurance or a written explanation as to why the Contractor is exempt from the requirement. NOTE: The Contractor working alone is not required to carry the insurance.

C.7 Technical Requirements C.7-1 Thinning and Conifer Removal Specifications For Item 1, treatments are designed to improve forest health through thinning of conifer forests and reduction of hazardous fuels by modifying the quantity and arrangement of live and dead forest fuels to reduce fire size, fire intensity and fire severity. The method to accomplish thinning includes hand felling or cutting with chain saws. Tree thinning in this contract is defined by selection of cut trees and selection of leave trees.

C.7-1.1 Selection of Cut Trees Cut all excess conifers greater than 20” in height and less than or equal to specifications in Table 1 under “Live Conifers Designation by Description” and “Spacing from Leave Trees.” Cut all dead conifers up to diameter specified in Table 1 under “Dead Conifers Designation by Description.” Dead conifers over 20” DBH will not be cut unless approved by the COR.

C.7-1.2 Selection of Leave Trees Leave trees shall generally be those of tallest height, largest crown, straightest bole, and greatest vigor that are free of damage from insects, disease, physical, and other mechanical causes. Select leave trees using the following hierarchical criteria:

1. Leave all damaged or undamaged conifer trees, which exceed the diameter limit listed in Table 1 – Summary of Thinning Specifications.

2. Leave all hardwood trees, unless tree is a snag.

3. Select leave trees from healthy undamaged conifers less than or equal to the specified diameter limit in order to achieve desired spacing.

4. If no healthy undamaged tree exists at the required spacing interval, leave the best tree with the least amount of damage.

5. Do not cut Western Juniper.

6. Species selections preference for leave trees shall be:

a. Sugar pine

b. Western White pine

c. Jeffrey / Ponderosa pine

d. Incense Cedar

e. Red fir

f. White fir

g. Lodgepole pine

7. Retain taller trees with good form (e.g. straight bole, good vigor (>30% crown ratio, no visual evidence of insect or disease (i.e. Mistletoe, White pine blister rust)) while maintaining existing species composition.

8. Leave the bigger of two trees that are healthy (see criteria above), and of the same species.

9. For trees forked above ground, leave both or take both trees. Do not cut just one stem.

Table 1 – Summary of Thinning Specifications Treatment Unit

Live Conifers Designation by Description: Cut excess conifers 20” tall to less than or equal to:
Spacing from Leave Tree / Target TPA
Dead Conifers

Designation by Description

Secret Units

1006
14” DBH
25 foot / 70 TPA
Remove all up to 20” DBH
1013
8” DBH
N/A
Remove all up to 20” DBH
13
14” DBH
25 foot / 70 TPA
Remove all up to 20” DBH
17
14” DBH
25 foot / 70 TPA
Remove all up to 20” DBH
18
14” DBH
21 foot / 100 TPA
Remove all up to 20” DBH
GE22
14” DBH
N/A
Remove all up to 20” DBH
GE23
10” DBH
N/A
Remove all up to 20” DBH
GE24 A/B
A = 12” DBH / B = 14” DBH
N/A
Remove all up to 20” DBH
GE25
14” DBH, conifer only
25 foot / 70 TPA
Remove all up to 20” DBH
GE26
14” DBH
N/A
Remove all up to 20” DBH

Saxon Units

7
Cut all Lodgepole Pine and White Fir up to 14” DBH. Do not cut any Jeffrey Pine
N/A
Remove all up to 20” DBH. Retain 3 of the largest dead conifers per acre.
69
10” DBH
N/A
Remove all up to 20” DBH
80
8” DBH
N/A
Remove all up to 20” DBH
87
14” DBH
20’x 20’/ 100 TPA
Remove all up to 20” DBH
88
14” DBH
20’x 20’/ 100 TPA
Remove all up to 20” DBH
89
14” DBH
20’x 20’/ 100 TPA
Remove all up to 20” DBH
190
14” DBH
25’x 25’/ 70 TPA
Remove all up to 20” DBH
1087
Cut all Lodgepole Pine and White Fir up to 8” DBH. Do not cut any Jeffrey Pine
N/A
Remove dead conifers only if hazardous to work
1088
6” DBH
N/A
Remove all up to 10” DBH, remove up to 20” DBH if hazardous to work
1089
6” DBH
N/A
Remove all up to 10” DBH, remove up to 20” DBH if hazardous to work
1190
6” DBH
N/A
Remove all up to 10” DBH, remove up to 20” DBH if hazardous to work
2087
6” DBH
N/A
Remove all up to 10” DBH, remove up to 20” DBH if hazardous to work
3087
6” DBH
N/A
Remove all up to 10” DBH, remove up to 20” DBH if hazardous to work

Lily Units

1001
14” DBH
14’ – 18’ / 170 TPA
All up to 20” DBH
3
10” DBH
18’ – 22’ / 100 TPA
All up to 20” DBH
11
14” DBH WF/LP/IC

10”DBH JP

Do not cut Sugar Pine

16’ – 20’ / 130 TPA
All up to 20” DBH
62
14” DBH
16’ – 20’ / 130 TPA
All up to 20” DBH
113
14” DBH
28 – 32’ / 50 TPA
All up to 20” DBH
1192
12” DBH
14’ – 18’ / 170 TPA
All up to 20” DBH
194
8” DBH
18’ – 22’ / 100 TPA
All up to 20” DBH
2169
14” DBH
14’ – 18’ / 170 TPA
All up to 20” DBH
2
Cut all conifers up to 16” DBH
N/A
All up to 20” DBH
1011
Cut all conifers up to 10” DBH
N/A
All up to 15” DBH
ST01
Cut all LP up to 18” DBH
N/A
All up to 18” DBH
BE01
Cut all conifers up to 20” DBH
N/A
All up to 16” DBH
BE02
Cut all conifers up to 10” DBH
N/A
Cut all snags up to 10” DBH.
BE03
Cut all conifers up to 10” DBH
N/A
Cut all snags up to 10” DBH

C.7-1.3 Stump Height, Removal of Live Limbs, and Stump Post Treatment All conifer trees that meet designation by description greater than 20 inches in height, other than leave trees, shall be cut. White or red fir and all trees under 1 inch stump diameter which are cut will be cut below the lowest live limb unless prevented by a natural obstacle. Stump heights for all cut trees shall not exceed 6 inches above ground level or 4 inches above natural obstacles. Stumps within 15’ of Tahoe Rim Trail (19E00 and 19E00A) must be cut flush to within 2” of the ground as conditions allow, or as agreed to by the COR. Stumps within 10’ of Saxon Creek Trail (18E13) must be cut flush to within 2” of the ground, or as agreed to by the COR. Stumps within 15’ of specified trails (Corral Trail 18E14, Pacific Crest Trail PC2000 & PC 2000A) must be cut flush to within 2” of the ground, or as agreed to by the COR.

C.7-1.4 Felling Cut trees shall be felled away from unit boundaries, structures, roads, power lines, established trails, driveways, fence lines, established land corners, archeology sites and stream channels. Any trees falling on such areas shall be removed immediately and damage shall be repaired to pre-damage condition at the expense of the Contractor. Trees shall be felled so as to avoid damage to residual trees. If the Contractor feels falling difficult trees is unsafe, notify the COR.

C.7-2 Aspen Improvement/Meadow Restoration – Conifer Removal Treatment Aspen treatments are designed to remove competing conifer from the stand that will increase aspen vigor and health, and provide opportunities for aspen regeneration and stand expansion.

Meadow restoration treatments are designed to remove competing conifers from meadows to improve health and vigor of riparian plant species associated with meadows.

The method to accomplish removal includes hand felling or cutting with chain saws. Conifer removal in this contract is defined by selection of cut trees.

C.7-2.1 Aspen Improvement/Meadow Restoration Treatment – Selection of Cut Trees Cut all conifer greater than 6” in height and less than or equal to the specifications in Table 1 under “Live Conifers Designation by Description”. Cut dead conifers as specified in Table 1 under “Dead Conifers Designation by Description”. Dead conifers over 20” DBH will not be cut unless approved by the COR. Trees shall be felled so as to avoid damage to residual trees, and felled away from stream channels. Apply a California registered Borate compound to all stumps ≥ 14” diameter on the Secret units.

C.7-3 Fuel – Slash Treatment and Piling Specifications Fuel and slash treatments are designed to improve forest health through modifying the quantity and arrangement of live and dead forest fuels to reduce fire size, fire intensity and fire severity. The method to accomplish this is through bucking and piling using chain saws and the manual hand piling of material. Bucking in this contract is defined by cutting contractor-generated fuels and existing ground fuels to a specific length. Piling in this contract is defined as piling of material.

C.7-3.1 Bucking Felled trees, snags, and existing down logs and limbs shall be cut into 5’ lengths for piling. See Table 2 – “Summary of Fuel - Slash Treatment Specifications” for bucking specifications. Existing logs that have decayed so that 2 or more inches of the log have settled into the soil/duff layer (little to no bark left intact) shall not be bucked. All thinning slash shall be placed on or near the ground surface so that it will not lean against or be suspended by an uncut tree. For dead conifers between 15” and 20” DBH at time of felling, do not buck or limb any part of the tree.

C.7-3.2 Piling Hand pile all contractor-generated slash and existing down log bole material that is smaller than the diameter specified in Table 2 – “Summary of Fuel - Slash Treatment Specifications”. Existing logs that have decayed so that 2 or more inches of the log have settled into the soil/duff layer (little to no bark left intact) shall not be piled. For dead conifers between 15” and 20” DBH at time of felling, do not pile any part of the tree.

Piling specifications are shown in Table 2 – Fuel - Slash Treatment Specifications. For Secret Units 1006, 1013, 13, 17 and 18, for Saxon Units 7, 80, 87, 88, 89, 190, 1087, and for Lily Unit BE01, piles shall be a distance of at least one and one-half (1-1.5) times the diameter of the pile from residual trees, or as agreed to by the COR. Pile height and width should be proportionate; for example a 4-foot high pile should be 4-feet wide. Minimum pile size shall be 4 feet in diameter. For Lily Unit 113, stack bole wood up to 6 inches small end diameter within 200 feet of Road 1216 for fuelwood.

C.7-3.2.1 Aspen Slash Treatment-Piling Units designated for Aspen piling specifications are shown on Project maps and in Table 2 – Slash Treatment Specifications. In Secret Units GE22, GE23, GE24, GE25 and GE26 pile outside of 75 feet from roads. Minimum pile size shall be four feet in diameter. Maximum pile size shall be 12 feet in diameter and not to exceed 6 feet in height. Pile height and width should be proportionate; for example a 4-foot high pile should be 4-feet wide. There must be at least 20 feet spacing between piles. To the extent feasible based upon ground conditions, place piles in a non-linear pattern while maximizing the distance between piles. No piles allowed within stream buffer exclusion areas.

C.7-3.3 Fuelwood Stacking/Small Material Lop and Scatter/Small Material Piling In Secret Units GE22, GE23, GE24, and GE26 material more than 6” diameter and within 75 feet of roads shall be cut into 5’ lengths and stacked within 10 feet of NFS system roads. Contractor-generated material less than 6” diameter within 75 feet of roads will be lopped and scattered to a depth of less than 1 foot in height.

In Saxon Unit 69: Material more than 6” diameter shall be cut into 5’ lengths and stacked separately from burn piles. Contractor-generated material less than 6” diameter that would create chip depth in excess of 6” will be piled for burning. Piling specifications are shown in Table 2 – Fuel - Slash Treatment Specifications. For Unit 69 piles shall be a distance of at least one and one-half (1-1.5) times the diameter of the pile from residual trees, or as agreed to by the COR. Pile height and width should be proportionate; for example a 4-foot high pile should be 4-feet wide. Minimum pile size shall be 4 feet in diameter.

C.7-3.4 Roadside Chipping For Saxon Unit 69: Material less than 6” shall be chipped. Chipped material will be broadcast back into unit west of Forest Road 12N01A. Chipped material will be broadcast to a maximum depth of 6 inches.

Table 2 – Summary of Fuel - Slash Treatment Specifications

Unit
Contractor-Generated Slash; Buck and pile to:
Existing Down Logs and Slash; Buck and pile to:
Piling Restrictions

Secret

1006
14” dia
14” dia
No piling within 50’ Perennial/Intermittent;

No Piling within 10’ephemeral; No piling within 20’ from centerline of linear heritage features; No piling within heritage site boundaries

1013
14” dia
14” dia
N/A
13
14” dia
14” dia
No piling within 20’ of 19E00 Tahoe Rim trail
17
14” dia
14” dia
No piling within 20’ of 19E00 Tahoe Rim trail; no piling inside dripline of powerline
18
14” dia
14” dia
No piling within 20’ of 19E00 Tahoe Rim trail
GE22
14” dia; Fuelwood stacking of material within 75’ of road, Aspen piling outside of 75’ of road
14” dia; Fuelwood stacking of material within 75’ of road, Aspen piling outside of 75’ of road
No piling within

10’ ephemeral; Aspen Piling specifications

GE23
14” dia; Fuelwood stacking of material within 75’ of road, Aspen piling outside of 75’ of road
14” dia; Fuelwood stacking of material within 75’ of road, Aspen piling outside of 75’ of road
Aspen Piling specifications
GE24
14” dia; Fuelwood stacking of material within 75’ of road, Aspen piling outside of 75’ of road
14” dia; Fuelwood stacking of material within 75’ of road, Aspen piling outside of 75’ of road
Aspen Piling specifications
GE25
14” dia
14” dia
Aspen Piling specifications
GE26
14” dia; Fuelwood stacking of material within 75’ of road, Aspen piling outside of 75’ of road
14” dia; Fuelwood stacking of material within 75’ of road, Aspen piling outside of 75’ of road
No piling within

50’ Perennial; Aspen Piling specifications

Saxon

7
16” dia
16” dia
Minimum 15 foot spacing between piles. No piling within 20’ of linear archeological feature. No piling 50’ Perennial/Intermittent; 10’ephemeral.
69
14” dia
14” dia
Bole wood Material >6” diameter stack for fuelwood. Broadcast chip back into unit on west side of Forest Road 12N01A only. Pile material <6” diameter only on west side of Forest Road 12N01A, if necessary due to chip depth in excess of 6 inches. Minimum 15’ spacing between piles.
80
14” dia
14” dia
Piling only on west side of 18E13 trail. No piling within 15’ of 18E13 trail. Minimum 10’ spacing between piles. No piling 50’ Perennial/Intermittent; 10’ephemeral.
87
14” dia
14” dia
No piling 50’ Perennial/Intermittent; 10’ephemeral. No piling within 10’ of 18E03.3 trail. No piling within 20’ of linear archeological feature.
88
14” dia
14” dia
No piling 50’ Perennial/Intermittent; 10’ephemeral. No piling within 10’ of 18E03.3 trail.
89
14” dia
14” dia
No piling 50’ Perennial/Intermittent; 10’ephemeral. No piling within 10’ of 18E03.3 trail and 18E03.3B
190
14” dia
14” dia
No piling 50’ Perennial/Intermittent; 10’ephemeral;
1087
8” dia
8” dia
No piling 50’ Perennial / Intermittent; 10’ ephemeral. If more piling room is necessary, contractor shall pile excess material outside Unit 1087 in Unit 87.
1088
12” dia
12” dia
Minimum spacing of 20’ between piles, placed in non-linear pattern (see C.8-2.3). No piling 50’ Perennial/Intermittent; 25’ephemeral.
1089
12”dia
12”dia
Minimum spacing of 20’ between piles, placed in non-linear pattern (see C.8-2.3). No piling 50’ Perennial / Intermittent; 25” ephemeral. No piling 10’ from trails
1190
12” dia
12” dia
Minimum spacing of 20’ between piles, placed in non-linear pattern (see C.8-2.3). No piling 50’ Perennial/Intermittent; 25’ephemeral.
2087
12” dia
12” dia
Minimum spacing of 20’ between piles, placed in non-linear pattern (see C.8-2.3). No piling 50’ Perennial/Intermittent; 25’ephemeral.
3087
12” dia
12” dia
Minimum spacing of 20’ between piles, placed in non-linear pattern (see C.8-2.3). No piling 50’ Perennial/Intermittent; 25’ephemeral.

Lily

1001
14” dia
14” dia
N/A
3
14” dia
14” dia
No piling 50’ Lake buffer. No piling within 10’ of linear heritage feature
11
14” dia
14” dia
No piling 10’ Ephemerals. No piling or dragging material within 20’ of centerline of linear heritage feature
62
14” dia
14” dia
No piling 50’ Perennials. No piling within 20’ of the Corral Trail; No piling within 10’ of centerline of linear heritage feature
113
14” dia
14” dia
No piling 50’ Intermittent, 10’ephemeral; Pile Fuelwood along Rd 1216
1192
14” dia
14” dia
No piling 50’ Perennials/Intermittent; No piling within 10’ of centerline of linear heritage features
194
14” dia
14” dia
No piling 50’ Perennial; No piling within 10’ of centerline of linear heritage features or within flagged site boundaries
2169
14” dia
14” dia
No piling 10’ Ephemerals
2
14” dia
14” dia
No piling 25’ Ephemeral; Aspen SEZ piling specifications
1011
10” dia
10” dia
No piling 25’ Ephemeral; No piling 25’ Wildlife Tree; No piling within 210’ of trail 18E33A; No piling within 20’ of centerline of linear heritage feature or within flagged site boundaries; Aspen SEZ piling specifications
ST01
14” dia
14” dia
No piling 25’ Ephemerals, 50’ Intermittent/Perennial;

1 Acre no piling area; No piling or dragging of material within flagged heritage site or botany exclusion boundary. Meadow SEZ piling specifications. OK to pile in botany exclusion.

BE01
10” dia
14” dia
No piling within 20’ of the Pacific Crest Trail
BE02
10” dia
14” dia
No piling 25’ Ephemeral; No piling within 20’ of the Pacific Crest Trail; No dragging of activity fuel area. Meadow SEZ piling specifications
BE03
10” dia
14” dia
No piling 25’ Ephemerals; No piling 50’ Intermittent; No piling within 20’ of the Pacific Crest Trail; No dragging of activity fuel area. Meadow SEZ piling specifications

C.7-3.5 Pile Exclusions Piles shall not be located within pile exclusion areas: This includes areas within 50’ of structures/cabins, specified distances from stream channels, identified sensitive areas, and archeological sites. Remove all slash and existing down conifer bole material specified in Table 2 – “Summary of Fuel - Slash Treatment Specifications,” and pile outside the exclusion areas. The exclusions are:

Stream Channels and Sensitive Areas:

In Secret Units 1006, 12, 1013, 17, 18, GE22, GE23, GE24, GE25 and GE26, all perennial and intermittent stream channels have a pile exclusion area of 50 feet in width, and ephemeral stream channels have a pile exclusion area of 10 feet in width, from the edge of the channel.

In Saxon Units 7, 69, 80, 87, 88, 89, 190, 1087 all perennial and intermittent stream channels have a pile exclusion area of 50 feet in width and ephemeral stream channels have a pile exclusion area of 10 feet in width, from the edge of the channel.

In Saxon Units 1088, 1089, 1190, 2087, 3087 all perennial and intermittent stream channels have a pile exclusion area of 50 feet in width and ephemeral stream channels have a pile exclusion area of 25 feet in width, from the edge of the channel.

In all Lily thinning units, all perennial and intermittent stream channels have a pile exclusion area of 50 feet in width and ephemeral stream channels have a pile exclusion area of 10 feet in width (25 feet for units 2, 1011, ST01, BE01, BE02 & BE03), from the edge of the channel.

Exclusions are marked on the ground with red and black striped flagging. The general location of most perennial and intermittent stream channels are shown on Project Maps, however some channels may not be shown. Actual ground locations take precedence over map locations.

Trail Exclusion Widths:

In Secret units 13, 17, 18, areas with specified trails (Tahoe Rim Trail 19E00), there will be no piling within 20 feet of the trail or as agreed to by the COR.

In Saxon project areas with specified trails (18E03.3, 18EO3.1 18EO3.2A 18E03.3B) there will be no piling within 10 feet of the trail or as agreed to by the COR. In Saxon Unit 80 there will be no piling within 15 feet of the Saxon Creek Trail (18E13) or as agreed to by the COR.

In Lily project areas with specified trails (Corral Trail 18E14, Pacific Crest Trail PC2000 & PC 2000A), there will be no piling within 20 feet of the trail or as agreed to by the COR.

Archeological Site Exclusions:

In Secret units 17, 18, 1006, GE22, GE23, GE24, GE25 and GE26, protected historical sites are marked on the ground with blue and black-striped flagging. No piling is allowed within or on these sites.

In Saxon Units 7, 87, 89 there will be no piling within 20’ of centerline of linear archeological sites. No piling is allowed within or on these sites.

In the Lily project area protected historical sites are marked on the ground with blue and black-striped flagging. No piling is allowed within or on these sites.

Wildlife trees: Protected wildlife trees are marked with a wildlife tag and/or white and blue striped flagging. Wildlife trees will be protected from damage with a no pile exclusion of 25 feet.

C.7-3.6 SEZ Piling Lily project units designated for SEZ piling specifications are shown in Table 2 – Slash Treatment Specifications.

For Lily Aspen Treatment units 2 & 1011 pile height and width should be proportionate; for example a 4-foot high pile should be 4-feet wide. Minimum pile size shall be four feet in diameter. Maximum pile size shall be 12 feet in diameter and not to exceed 6 feet in height. Piles must be piled with at least 20 feet spacing between piles.

For Lily Meadow Treatment units ST01, BE02 & BE03 pile height and width should be proportionate; for example a 4-foot high pile should be 4-feet wide. Minimum pile size shall be four feet in diameter. Maximum pile size shall be 15 feet in diameter. Piles must be piled with at least 10 feet spacing between piles.

For all SEZ piling units to the extent feasible based upon ground conditions, place piles in a non-linear pattern while maximizing the distance between piles. No piles allowed within stream buffer exclusion areas.

C.7-4 Contractor-Furnished Equipment Any hand held mechanical equipment (i.e. chainsaws, etc.) necessary to complete the project shall be provided by the contractor. Use of motorized equipment other than hand held equipment such as power saws will not be permitted off designated roads in the project area without approval of the Contracting Officer or his representative. All power saws or any internal combustion engine will require a Forest Service approved spark arrestor.

C.7-5 Government-Furnished Equipment None

E. INSPECTIONS AND ACCEPTANCE

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: www.acquisition.gov/far/

FAR 52.246-4 Inspection of Services – Fixed Price (Aug 1996)

E.1 Government Inspections Government inspections are for the purpose of satisfying the Government that the services are acceptable and do not relieve the Contractor of the responsibility for maintaining quality control.

The Contracting Officer's Representative or designated inspector will conduct all inspections. The Contractor (or designated representative) is encouraged to be present to observe inspections. Summary results will be made available on request.

Compliance Inspections. Visual compliance inspections will be made on a periodic basis. Such inspections are not final and do not constitute acceptance by the Government.

Final Inspections. Final (formal) inspections for payment will be made on completed sub-items only. Contractor shall request final inspections in writing and give the Forest Service at least two working days advanced notice. Inspections will be completed within four working days after the notice is received. If the work is not ready for inspection at the time specified by the Contractor, the cost associated with the inspection attempt may be charged to the Contractor.

Disputed Inspection. The Contractor may request re-inspection without rework if the results are unacceptable. Re-inspection must be requested in writing within 48 hours after receiving written notice of the inspection results. Re-inspection will be accomplished within five working days after receipt of the contractor's written request.

The same sampling and inspection procedures will be used, but new samples will be taken. The inspection pattern will be shifted so that new samples will not overlap previously inspected samples. Results will be rounded to the nearest whole percent.

If re-inspection results are within five percentage points of the first inspection, the original inspection result will be used in determining acceptability and payment. If re-inspection results are greater than five percentage points above or below the first inspection, the re-inspection results will be used.

If the re-inspection results are within five percentage points of the first inspection, the Contractor shall pay the actual costs of the re-inspection.

Re-inspection after Rework. Where rework after a failed inspection may improve the inspection results, the Contractor may rework the area and request (in writing) a second inspection. The Government will charge to the Contractor the cost of this additional inspection. Re-inspection will be accomplished within five working days after the notice is received. The results of the second inspection will be final, and no further rework will be permitted. Areas not ready for re-inspection at the time specified by the Contractor will not be re-inspected, and the results of the first inspection will be final.

E.2 Specific Inspection Procedures Work will be accepted for payment on the basis of a final inspection and passage of specification. The Government will inspect for compliance of specifications. Plots will be located throughout the sub-items so as to obtain a representative sample of the area. Sub-items will be inspected separately and not combined for the purpose of determining percent of satisfactory work.

E.2-1 Sampling

At least one percent of each treatment area will be sampled by a random series of plots distributed over the entire area.

E.2-2 Method On each plot…

This is the start of the file's text. The full file is on GovTribe.