CalTrans Standard Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit_Attendance_Ebbetts_Pass.docx | DOCX document | |
| Pre-Work_Meeting_Notes.docx | DOCX document | |
| Drawings-rev1.pdf | ||
| SF30_Amend_002_Ebbetts_Sno_Park.doc | DOC document | |
| Amendment_001.pdf | ||
| Ebbetts_Pass_Sno_Park.doc | DOC document | |
| Project_Specifications.pdf | ||
| Wage_Determination.pdf | ||
| Drawings.pdf | ||
| Caltrans_Encroachment_Permit.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD SPECIFICATIONS
STATE OF CALIFORNIA
BUSINESS, TRANSPORTATION AND HOUSING AGENCY
DEPARTMENT OF TRANSPORTATION
PUBLISHED BY
DEPARTMENT OF TRANSPORTATION
Copies of this book may be obtained from:
STATE OF CALIFORNIA
DEPARTMENT OF TRANSPORTATION
PUBLICATION DISTRIBUTION UNIT
1900 ROYAL OAKS DRIVE
SACRAMENTO, CALIFORNIA 95815-3800
Telephone (916) 263-0822 Fax (916) 263-0470 Publication Unit Web site: http://caltrans-opac.ca.gov/publicat.htm
The Standard Specifications for the California Department of Transportation listed on the following pages which are not struck out are included by reference and are applicable for all work with the State of California right of way.
These Standard Specifications are the controlling document in the event of any conflict with these specifications and other specifications included in this solicitation.
TABLE OF CONTENTS
i
DIVISION I GENERAL PROVISIONS
1 GENERAL
2 BIDDING
3 CONTRACT AWARD AND EXECUTION
4 SCOPE OF WORK
5 CONTROL OF WORK
6 CONTROL OF MATERIALS
7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
8 PROSECUTION AND PROGRESS
9 PAYMENT
DIVISION II GENERAL CONSTRUCTION
10 GENERAL
11 QUALITY CONTROL AND ASSURANCE
12 TEMPORARY TRAFFIC CONTROL
13 WATER POLLUTION CONTROL
14 ENVIRONMENTAL STEWARDSHIP
15 EXISTING FACILITIES
DIVISION III GRADING
16 CLEARING AND GRUBBING
17 WATERING
18 DUST PALLIATIVE
19 EARTHWORK
20 LANDSCAPE
21 EROSION CONTROL
22 FINISHING ROADWAY
23 RESERVED
DIVISION IV SUBBASES AND BASES
24 STABILIZED SOILS
25 AGGREGATE SUBBASES
26 AGGREGATE BASES
27 CEMENT TREATED BASES
28 CONCRETE BASES
29 TREATED PERMEABLE BASES
30-36 RESERVED
DIVISION V SURFACING AND PAVEMENTS
ii
37 BITUMINOUS SEALS
38 RESERVED
39 HOT MIX ASPHALT
40 CONCRETE PAVEMENT
41 CONCRETE PAVEMENT REPAIR
42 GROOVE AND GRIND CONCRETE
43–45 RESERVED
DIVISION VI STRUCTURES
46 GROUND ANCHORS AND SOIL NAILS
47 EARTH RETAINING SYSTEMS
48 TEMPORARY STRUCTURES
49 PILING
50 PRESTRESSING CONCRETE
51 CONCRETE STRUCTURES
52 REINFORCEMENT
53 SHOTCRETE
54 WATERPROOFING
55 STEEL STRUCTURES
56 SIGNS
57 WOOD AND PLASTIC LUMBER STRUCTURES
58 SOUND WALLS
59 PAINTING
60 RESERVED
DIVISION VII DRAINAGE
61 CULVERT AND DRAINAGE PIPE JOINTS
62 ALTERNATIVE CULVERTS
63 RESERVED
64 PLASTIC PIPE
65 CONCRETE PIPE
66 CORRUGATED METAL PIPE
67 STRUCTURAL PLATE CULVERTS
68 SUBSURFACE DRAINS
69 OVERSIDE DRAINS
70 MISCELLANEOUS DRAINAGE FACILITIES
71 RESERVED
iii
DIVISION VIII MISCELLANEOUS CONSTRUCTION
72 SLOPE PROTECTION
73 CONCRETE CURBS AND SIDEWALKS
74 PUMPING EQUIPMENT AND CONTROLS
75 MISCELLANEOUS METAL
76 WELLS
77 LOCAL INFRASTRUCTURE
78–79 RESERVED
80 FENCES
81 MONUMENTS
DIVISION IX TRAFFIC CONTROL FACILITIES
82 MARKERS AND DELINEATORS
83 RAILINGS AND BARRIERS
84 TRAFFIC STRIPES AND PAVEMENT MARKINGS
85 PAVEMENT MARKERS
86 ELECTRICAL SYSTEMS
DIVISION X MATERIALS
87 MATERIALS–GENERAL
88 GEOSYNTHETICS
89 RESERVED
90 CONCRETE
91 PAINT
92 ASPHALTS
93 LIQUID ASPHALTS
94 ASPHALTIC EMULSIONS
95 EPOXY
96–98 RESERVED
DIVISION XI BUILDING CONSTRUCTION
99 BUILDING CONSTRUCTION