Section_B_-__Schedule_of_Items_Riverside_Service_Road_Gate_relocation.doc

DOC document 28 KB Posted

Attached to
Relocation and Security Upgrade to Service Road Gate Federal contract opportunity
Solicitation number
AG-9AD6-S-15-0003
Issued by
Department of Agriculture Forest Service Pacific Southwest Research Station

About this file

Section B - Schedule of Items

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF ITEMS

RIVERSIDE SERVICE ROAD GATE RELOCATION

MOTORIZED WITH KEYPAD ENTRANCE

PACIFIC SOUTHWEST RESEARCH STATION

RIVERSIDE FIRE LABORATORY

Revised 4-16-15

METHOD OF

UNIT

TOTAL

ITEM

DESCRIPTION

MEASUREMENT

QUANT.

UNIT

PRICE

PRICE

Mobilization L.S.Q.

L.S.

New Fence, Iron Fence A.Q.

L.F.

(See Section C for Specs, Section J for photo of fence)

11 ft. wide gates A.Q.

L.S.

6”x6” gate posts A.Q.

EACH.

Gate operators A.Q.

EACH

Ramset Keypad A.Q.

1 L.S.

Goose neck post A.Q.

L.S.

Concrete 2500 PSI A.Q.

C.Y.

Knox key switch A.Q.

L.S.

Asphalt cutting A.Q.

L.F.

Maglock, 1300lb.

A.Q.

L.S.

$______S_______

Conduit & Wire A.Q.

L.S.

$______S_______

(Schedule 80 PVC electrical

Conduit, Standard THNN

Electrical wire; see Section C, Scope of Work)

Labor and materials A.Q.

L.S.

To mount Government

Furnished Sign (see Section C, Scope of Work)

TOTAL ALL ITEMS

Measurement:

L.S.Q.

Lump Sum Quantity V.Q.

Vehicle Quantity L.F.

Linear Feet

D.Q.

Designed Quantity L.S.

Lump Sum

LBS

Pounds

A.Q.

Actual Quantities C.Y.

Cubic Yards S.F.

Square Feet

SCHEDULE OF ITEMS

File details come from the government source that posted it. Updated .