2016_OCFR_Attachments_Package.pdf
PDF 1 MB Posted
- Attached to
- 2016 OCFR Fuels (Thinning, Piling & Covering) Federal contract opportunity
- Solicitation number
- AG-9AC7-S-16-0132
About this file
Attachments
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG9AC7S160132_Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Area Unit # Acres Cut Handpile Road Township Range Section LOP Notes Walk-In
OCFR SOUTH 10 19.49 <4" YES 10N13D 10N 6E 17, 8 S, NSO No Operations 2/1 - 7/9 NO
OCFR SOUTH 12 12.46 <4" YES 10N13A 10N 6E 5, 8 S, NSO No Operations 2/1 - 7/9 NO
OCFR SOUTH 13 7.14 <4" YES 10N13 10N 6E 8 S, NSO No Operations 2/1 - 7/9 NO
OCFR SOUTH 16 13.43 <4" YES 10N46 10N 6E 5, 8 S Limited Operation between 8/1 - 9/15 (ask COR) NO
OCFR SOUTH 19 4.65 <4" YES 10N13 10N 6E 5 S, NSO, BS No Operations 2/1 - 7/9 NO
OCFR SOUTH 23 18.33 <4" YES 10N13B 10N 6E 6 S Limited Operation between 8/1 - 9/15 (ask COR) NO
OCFR SOUTH 50 3.24 <4" YES 10N13D 10N 6E 8 S, NSO No Operations 2/1 - 7/9 Nno
OCFR SOUTH 52 6.73 <4" YES 10N45A 10N 6E 8 S, NSO No Operations 2/1 - 7/9 NO
OCFR NORTH 110 13.44 <4" YES 13N18E 11N 6E 6 BS Operations ONLY between 7/1 - 8/31 NO
OCFR NORTH 142 1.37 <4" YES 13N18 11N 6E 7 B, BS, NSO No Operations 2/1 - 7/9 NO
OCFR NORTH 143 2.21 <4" YES 13N18 11N 6E 7 B, BS NSO No Operations 2/1 - 7/9 NO
OCFR NORTH 154 3.68 <4" YES 11N12 11N 6E 8 NSO No Operations 2/1 - 9/15 NO
OCFR NORTH 157 5.94 <4" YES 11N11 11N 6E 7 NSO No Operations 2/1 - 7/9 NO
OCFR NORTH 196 22.09 <4" YES 11N48 11N 6E 19, 30 S Limited Operation between 8/1 - 9/15 (ask COR) YES, 1/4 MI
OCFR NORTH 199 8.50 <4" YES 11N48 11N 6E 30 S Limited Operation between 8/1 - 9/15 (ask COR) YES, 1/2 MI
OCFR NORTH 202 11.54 <4" YES 11N34 11N 6E 17 B, NSO No Operations 2/1 - 7/9 YES, 1/8 MI
OCFR NORTH 215 4.70 <4" YES 11N48 11N 6E 19 S, B Limited Operation between 8/1 - 9/15 (ask COR) YES, 1/8 MI
OCFR NORTH 226 7.84 <4" YES 13N18E 11N 6E 6 NONE NO
166.77
Project Area Unit # Acres Cut Handpile Road Township Range Section LOP Notes Walk-In
OCFR North 167 3.93 <3" YES 13N18C 11N 6E 8 BS Operations ONLY between 7/1 - 8/31 NO
3.93
Project Area Unit # Acres Cut Handpile Road Township Range Section LOP Notes Walk-In
OCFR NORTH 130 12.34 <4" NONE 13N18E 11N 6E 6 NONE Create jackpot piles where feasible NO
12.34Total Acres
Total Acres
Total Acres
Task 1 Item 3 Pre-commerical Thin, Lop & Scatter (Jackpot)
Task 1 Item 2 Pre-commerical Thin, Prune & Pile
Six Rivers National Forest
Orleans Ranger District 2016 OCFR Thinning Project
Task 1 Item 1 Pre-commerical Thin, Prune & Pile
110n060e110n050e
7 8
61 5
18 17
323136
St Hwy 96720
1840 1920
40 31
02720
27202880
Kla ma th Riv er
Ca mp
C ree k
Pearch Creek
Ca mp
C ree k
15N
12N20
N1
8 11 N1
11N48
11N45
11N11
N0
11N09 13N18B
11N08
12N20D
11N26
15N 01C
12N20G
N3
N1
8C
11N60
13N 18D
N2
0J
11N 48E
11N12C
11N
A
13N18A
11N12B 11N57 11N56
12N20E 11N34
11N62
12N20K
11N61 11N12A
N7
N3 µ
0 3,250 6,500 9,750 13,0001,625 Feet
2016 OCFR Fuels Contract (Northern Units)
Orick
Hoopa
Arcata
Orleans
Weitchpec
Blue Lake
Willow CreekMcKinleyville
Six Rivers
Legend 2016 WFHF Contract Units
0 8 16 24 324 Miles
100n060e100n050e
110n060e110n050e
36 32
St Hwy 96
00 1680
0 22
1040 1040
Boise Creek
Kla ma th Riv er
Ca mp C ree k
Red Cap Creek
10N13 10N01
10N07
N0
10N45
N1
3D
10N18
N0
10N13A
N4
10N13C
10N46
10N25
10N13G
10N45A
N1
3B
10N28
11N70
Orleansµ
0 2,200 4,400 6,600 8,8001,100 Feet
2016 OCFR Fuels Contract (Southern Units)
Orick
Hoopa
Arcata
Orleans
Weitchpec
Blue Lake
Willow CreekMcKinleyville
Six Rivers
Legend 2016 WFHF Contract Units
0 8 16 24 324 Miles
FIRE PLAN FOR CONSTRUCTION AND SERVICE CONTRACTS
03/06/2013
1. SCOPE:
The provisions set forth below outline the responsibility for fire prevention and suppression activities and establish a suppression plan for fires within the contract area. The contract area is delineated by map in the contract. The provisions set forth below also specify conditions under which contract activities will be curtailed or shut down.
2. RESPONSIBILITIES:
A. Contractor
(1) Shall abide by the requirements of this Fire Plan.
(2) Shall take all steps necessary to prevent his/her employees, subcontractors and their employees from setting fires not required in completion of the contract, shall be responsible for preventing the escape of fires set directly or indirectly as a result of contract operations, and shall extinguish all such fires which may escape.
(3) Shall permit and assist in periodic testing and inspection of required fire equipment. Contractor shall certify compliance with specific fire precautionary measures in the fire plan, before beginning operations during Fire Precautionary Period and shall update such certification when operations change.
(4) Shall designate in the Fire Plan and furnish on Contract Area, during operating hours, a qualified fire supervisor authorized to act on behalf of Contractor in fire prevention and suppression matters.
B. Forest Service
The Forest Service may conduct one or more inspections for compliance with the Fire Plan. The number, timing, and scope of such inspections will be at the discretion of agency employees responsible for contract administration. Such inspections do not relieve the Contractor of responsibility for correcting violations of the fire plan or for fire safety in general, as outlined in paragraph 2.A above.
3. DEFINITIONS:
The following definitions shall apply:
Hand work: This designation of work is used to cover a variety of operations that are conducted by hand without the use of heavy equipment. It includes the use of chainsaws, wee-eaters with cutter heads, loppers, pole pruners, etc. This designation also includes the use of fire to reduce fuels and/or to reduce or enhance vegetation.
Thinning: Cutting of small diameter trees (<4” in diameter) and brush to create separation or reduce continuity of vertical and horizontal vegetation. These treatments would also reduce ladder fuels.
Pruning or limbing: Removing branches from boles of trees up to shoulder height to increase distance from surface to base of live crown reducing ladder fuels.
Hand piling: Piling of dead and down fuels from the forest floor either present or created by thinning and pruning activities of small trees and brush. Piles are covered with barrier material (either waxed paper or plastic) to keep the pile dry so they can be burned once fuels have cured.
4. TOOLS AND EQUIPMENT:
The Contractor shall comply with the following requirements during the fire precautionary period, as defined by unit administering contracts:
The Fire Precautionary Period is set by the State of California which is April 1 through December 1 of any year.
This contract requires, does not require, a Fire Box and associated Fire Tools according to CPRC Section 4428.
A. Fire Tools and Equipment: Contractor shall meet minimum requirements of Section 4428 of the California Public Resources Code (C.P.R.C.). Fire tools kept at each operating landing shall be sufficient to equip all employees in the felling, yarding, loading, chipping, and material processing operations associated with each landing. Fire equipment shall include two tractor headlights for each tractor dozer used in Contractor's Operations. Tractor headlights shall be attachable to each tractor and served by an adequate power source. All required fire tools shall be maintained in suitable and serviceable condition for fire fighting purposes.
Trucks, tractors, skidders, pickups and other similar mobile equipment shall be equipped with and carry at all times a size 0 or larger shovel with an overall length of not less than 46 inches and a 2-1/2 pound axe or larger with an overall length of not less than 28 inches.
Where cable yarding is used, Contractor shall provide a size 0 or larger shovel with an overall length of not less than 46 inches and a filled backpack can (4 or 5 gallon) with hand pump within 25 feet of each tail and corner block.
B. Fire Extinguishers: Contractor shall equip each internal combustion yarder, fuel truck, and loader with a fire extinguisher for oil and grease fires (4-A:60-B:C).
Skidders and tractors shall be equipped with a minimum 5-BC fire extinguisher.
All Fire Extinguishers shall be mounted, readily accessible, properly maintained and fully charged.
Contractor shall equip each mechanized harvesting machine with hydraulic systems, powered by an internal combustion engine (chipper, feller/buncher, harvester, forwarder, hot saws, stroke delimber, etc), except tractors and skidders, with at least two 4-A:60-B:C fire extinguishers or equivalent.
C. Spark Arresters and Mufflers: Contractor shall equip each operating tractor and any other internal combustion engine with a spark arrester, except for motor vehicles equipped with a maintained muffler as defined in C.P.R.C. Section 4442 or tractors with exhaust-operated turbochargers. Spark Arresters shall be a model tested and approved under Forest Service Standard 5100-1a as shown in the.
National Wildlife Coordinating Group Spark Arrester Guide, Volumes 1 and 2, and shall be maintained in good operating condition. Every motor vehicle subject to registration shall at all times be equipped with an adequate exhaust system meeting the requirements of the California Vehicle Code.
D. Power Saws: Each power saw shall be equipped with a spark arrester approved according to C.P.R.C. Section 4442 or 4443 and shall be maintained in effective working order. An Underwriters Laboratories (UL) approved fire extinguisher containing a minimum 14 ounces of fire retardant shall be kept with each operating power saw. In addition, a size 0 or larger shovel with an overall length of not less than 38 inches shall be kept with each gas can but not more than 300 feet from each power saw when used off cleared landing areas.
• This contract requires, does not require, Section 4E of the Fire Plan.
E. Tank Truck or Trailer: Contractor shall provide a water tank truck or trailer on or in proximity to Contract Area during Contractor's Operations hereunder during Fire Precautionary Period.
When Project Activity Level B or higher is in effect, a tank truck or trailer shall be on or immediately adjacent to each active landing, unless otherwise excepted when Hot Saws or Masticators are being used. See Section 6 for specific contract requirements.
The tank shall contain at least 300 gallons of water available for fire suppression. Ample power and hitch shall be readily available for promptly and safely moving tank over roads serving Contract Area.
Tank truck or trailer shall be equipped with the following:
(1) Pump, which at sea level, can deliver 23 gallons per minute at 175 pounds per square inch measured at the pump outlet. Pumps shall be tested on Contract Area using a 5/16 inch orifice in the Forester One Inch In-Line Gauge test kit. Pump shall meet or exceed the pressure value in the following table for nearest temperature and elevation:
T e m p
Sea
Level
Feet
10000
55 179 23 174 23 169 23 165 22 161 22 157 22 153 22 150 21 146 21 142 21 139 21 70 175 23 171 23 166 22 162 22 158 22 154 22 150 21 147 21 143 21 139 21 136 20 85 171 23 168 23 163 22 159 22 155 22 151 21 147 21 144 21 140 21 136 20 133 20
100 168 23 164 23 159 22 155 22 152 22 148 21 144 21 141 21 137 20 133 20 131 20 P
S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
P S I
G P M
The pump outlet shall be equipped with 1-1/2 inch National Standard Fire Hose thread. A bypass or pressure relief valve shall be provided for other than centrifugal pumps.
(2) 300 feet of 3/4-inch inside diameter rubber-covered high-pressure hose mounted on live reel attached to pump with no segments longer than approximately 50 feet, when measured to the extreme ends of the couplings. Hose shall have reusable compression wedge type 1-inch brass or lightweight couplings (aluminum or plastic). One end of hose shall be equipped with a coupling female section and the other end with a coupling male section. The hose shall, with the nozzle closed, be capable of withstanding 200 PSI pump pressure without leaking, distortions, slipping of couplings, or other failures.
(3) A shut-off combination nozzle that meets the following minimum performance standards when measured at 100 P.S.I. at the nozzle:
G.P.M. Horizontal Range Straight Stream 10 38 feet Fog Spray 6 - 20 N/A
(4) Sufficient fuel to run the pump at least 2 hours and necessary service accessories to facilitate efficient operation of the pump.
When Contractor is using Hot Saws or Masticators, an additional 250 feet of light weight hose, approved by the Forest Service, shall be immediately available for use and be capable of connecting to the 300 feet of hose and appurturances in (2) and (3) above.
This equipment and accessories shall be deliverable to a fire in the area of operations and is subject to the requirements for each specific activity level identified in Section 6.
F. Compressed Air Foam System: A Compressed Air Foam System (CAFS) is a fire suppression system where compressed air is added to water and a foaming agent. By agreement, Contractor may substitute a CAFS or functional equivalent in lieu of the tank truck, trailer or fire extinguishers, provided it meets or exceeds the following specifications and requirements:
1. Variable foam expansion ratio – 10:1 to 20:1.
2. Units shall be kept fully charged with air; water and foam concentrate as recommended by the manufacturer and have the appropriate tools to service the system.
3. The unit shall contain enough energy to empty tank and clear hose prior to exhausting propellant.
4. The unit shall be capable of being completely recharged within 10 minutes.
5. When used on cable yarding landings, the unit shall be outfitted for immediate attachment to carriage and transported without damage to the unit.
Fire extinguishers required for Hot Saws, Masticators and similar equipment identified in Section 4 B.
above may be substituted with a 3 gallon CAFS.
Tank truck, trailer or equivalent may be substituted with a 30 Gallon CAFS with at least 550 feet of one inch hose and an adjustable nozzle with enough water, air and foam concentrate for at least one recharge.
This equipment and accessories shall also be deliverable to a fire in the area of operations and subject to the requirements for each specific activity level identified in Section 6.
5. GENERAL
A. State Law: In addition to the requirements in this Fire Plan, the Contractor shall comply with all applicable laws of the State of California. In particular, see California Public Resource Codes.
B. Permits Required: The Contractor must secure a special written permit from the District Ranger or designated representative before burning, welding or cutting metal or starting any warming fires. If contract requires Blasting and Storing of Explosives and Detonators, an Explosives Permit may be required pursuant to the California Health and Safety Code, Section 12101.
C. Blasting: Contractor shall use electric caps only unless otherwise agreed in writing. When blasting is necessary in slash areas, a Fire Patrolperson equipped with a size 0 or larger shovel with an overall length of not less than 46 inches and a filled backpack can (4 or 5 gallon) with hand pump shall remain in the immediate area for an hour after blasting has been completed.
D. Smoking: Smoking shall not be permitted during fire season, except in a barren area or in an area cleared to mineral soil at least three feet in diameter. In areas closed to smoking, the CO may approve special areas to be used for smoking. The Contractor shall sign designated smoking areas. Contractor shall post signs regarding smoking and fire rules in conspicuous places for all employees to see.
Contractor's supervisory personnel shall require compliance with these rules. Under no circumstances shall smoking be permitted during fire season while employees are operating light or heavy equipment, or walking or working in grass and woodlands.
E. Storage and Parking Areas. Equipment service areas, parking areas, and gas and oil storage areas shall be cleared of all flammable material for a radius of at least 10 feet unless otherwise specified by local administrative unit. Small mobile or stationary internal combustion engine sites shall be cleared of flammable material for a slope distance of at least 10 feet from such engine. The COR shall approve such sites in writing.
F. Reporting Fires: As soon as feasible but no later than 15 minutes after initial discovery, Contractor shall notify Forest Service of any fires on Contract Area or along roads used by Contractor.
Contractor's employees shall report all fires as soon as possible to any of the following Forest Service facilities and/or personnel listed below, but not necessarily in the order shown:
Name Office Address Telephone Number Dispatch Center Fortuna Dispatch Fortuna CA 707-726-1266 Nearest FS Station Orleans RD 1 Ishi-Pishi Rd, Orleans, CA 530-627-3291 COR Zack Taylor, Robert McConnell 1 Ishi-Pishi Rd, Orleans, CA 530-627-3339
Inspector Roberto Beltran 1 Ishi-Pishi Rd, Orleans, CA 707-457-3968 District Ranger Nolan Colegrove 1 Ishi-Pishi Rd, Orleans, CA 530-627-3207
When reporting a fire, provide the following information:
Your Name Call back telephone number Project Name
Location: Legal description (Township, Range, Section); and Descriptive location (Reference point)
Fire Information: Including Acres, Rate of Spread and Wind Conditions.
This contract requires, does not require, Section 5G of the Fire Plan.
G. Communications: Contractor shall furnish a serviceable telephone, radio-telephone or radio system connecting each operating side with Contractor's headquarters. When such headquarters is at a location which makes communication to it clearly impractical, Forest Service may accept a reasonable alternative location. The communication system shall provide prompt and reliable communications between Contractor's headquarters (or agreed to alternative) and Forest Service via commercial or Forest Service telephone.
This contract requires, does not require, Section 5H of the Fire Plan.
H. Fire Patrolperson: Contractor shall furnish a qualified fire patrolperson each operating day when Project Activity Level C or higher is in effect. When on duty, sole responsibility of patrolperson shall be to patrol the operation for prevention and detection of fires, take suppression action where necessary and notify the Forest Service as required. This Fire patrol is required on foot, unless otherwise agreed.
By agreement, one patrolperson may provide patrol on this and adjacent projects. No patrolperson shall be required on Specified Road construction jobs except during clearing operations unless otherwise specified.
The Contractor shall, prior to commencing work, furnish the following information relating to key personnel:
Title Name Telephone Number Fire Supervisor
Fire Patrolperson
I. Clearing of Fuels: Contractor shall clear away, and keep clear, fuels and logging debris as follows:
Welding equipment and stationary log loaders, yarders and other equipment listed in California State Law:
10 feet slope radius
Tail or corner haulback blocks: All running blocks shall be located in the center of an area cleared to mineral soil at least 15 feet in diameter.
Lines near, between or above blocks: Sufficient clearing to prevent line from rubbing on snags, down logs and other dead woody material.
6. EMERGENCY PRECAUTIONS
Contractor's Operations shall conform to the limitations or requirements in the Project Activity Level (PAL) table below. Project Activity Levels applicable to this project shall be the predicted activity levels for the Fire Danger Rating Area(s), or fire weather station(s) stated in the Contract Area Map Legend on Integrated Resource Service Contracts (IRSC’s), and other contracts where applicable.
Fire Danger Rating Area/Fire Weather Station for Project 112/115/Somes Bar RAWS
The Forest Service, in its sole discretion, may change the predicted activity level if the current fire suppression situation, weather and vegetation conditions warrant an adjustment. If practicable, Forest Service will determine the following day’s activity level by 6:00 PM. Contractor shall obtain the predicted Project Activity Level from the appropriate Ranger District Office before starting work each day.
Phone Number or Website to obtain Predicted Activity Levels: 707-441-3665
Forest Service may change the Project Activity Level Table to other values upon revision of the National Fire Danger Rating System. When Contractor is notified, the revised Project Activity Levels will supersede the levels in the Project Activity Level Table below.
PROJECT ACTIVITY LEVEL
Level Project Activity Minimum Requirements and Restrictions. Restrictions at each level are cumulative.
A Minimum requirements noted above in Sections 4 and 5.
B 1. Tank truck, trailer, or approved CAFS substitute shall be on or adjacent to the Active Landing.
C 1. When Hot Saws or Masticators are operating, a tank truck, trailer, or approved CAFS substitute shall be within ¼ mile of these operations. Effective communications shall exist between the operator and the Active Landing.
2. Immediately after Mechanical Operations cease, Fire patrol is required for two hours.
D 1. Immediately after Hot Saw or Masticator operations cease, Fire patrol is required for three hours.
2. No Dead Tree felling after 1:00 PM, except recently dead.
3 No burning, blasting, welding or cutting of metal after 1:00 PM, except by special permit.
Ev 1. The following activities may operate all day:
a) Loading and hauling logs decked at approved landings.
b) Loading and hauling chips stockpiled at approved landings.
c) Servicing equipment at approved sites.
d) Dust abatement, road maintenance (Chainsaw use prohibited), culvert installation within cleared area, chip sealing, paving, earth moving or rock aggregate stock pile loading and installation (does not include pit or quarry development).
e) Chainsaw and log processing operations associated with loading logs or other forest products at approved landings.
2. Hot Saws or Masticators may operate until 1:00 PM; provided that:
a) A tractor with a blade or other equipment capable of constructing fireline is on or adjacent to the active landing or within ¼ mile of the operating equipment. This piece of equipment shall have effective communication with the Hot Saw or Masticator.
b) Any additional restrictions specified by the Forest.
3. All other conventional Mechanical Operations are permitted until 1:00 PM.
4. Some operations may be permitted after 1:00 PM, on a case-by-case basis, under the terms of a PAL Ev Variance Agreement. Activities for which a Variance may be issued are:
• Rubber Tire Skidding
• Chipping on Landings
• Helicopter Yarding
• Fire Salvage
When approved by a Line Officer, a Variance Agreement can be implemented when the criteria specified in the agreement are met and mitigation measures are in place. This approval is good for ten
(10) days unless cancelled sooner or extended by the Contracting Officer for an additional ten (10) days. Variance approval can be withdrawn at the sole discretion of the Forest Service. Variance approval is contingent on the 7-day fire weather forecast, fuel conditions, site characteristics, current fire situation, state of Contractor’s equipment for prevention and suppression readiness, type of operation and social and community considerations etc. (See attached Project Activity Level Variance Agreement).
Level Project Activity Minimum Requirements and Restrictions. Restrictions at each level are cumulative.
E The following activities may operate all day:
1. Loading and hauling logs decked at approved landings.
2. Loading and hauling chips stockpiled at approved landings.
3. Servicing Equipment at approved sites.
4. Dust abatement, road maintenance (chainsaw use prohibited) or loading stock piles and rock aggregate installation (does not include pit or quarry development).
5. Chainsaw operation associated with loading at approved landings.
All other activities are prohibited.
This Project utilizes “The Project Activity Level” (PAL), an industrial operation’s fire precaution system. The following Climatology Chart indicates the Historic Activity Levels for the Project Fire Danger Rating Area or Fire Weather Station utilized on this Project. This is only a historical average of the Activity Levels for the identified Fire Danger Rating Area or Weather Station.
Project Activity Level Climatology Fire Danger Rating Area/Weather Station:
AREA 112/115
(Orleans)
Years Analyzed 2004-2013
A B C D Ev E Days Month Expected Days per Month at each PAL Value Analyzed
May 12.5 10.2 7.0 1.2 0.1 0.0 305.0 31 June 6.5 7.9 12.0 3.5 0.0 0.0 299.0 30 July 0.5 2.7 16.7 7.8 3.3 0.0 310.0 31 August 0.0 1.4 13.3 12.7 3.6 0.0 310.0 31 September 1.0 3.3 14.5 8.4 2.8 0.0 300.0 30 October 10.7 8.9 10.7 0.5 0.2 0.0 310.0 31 November 18.0 12.0 0.0 0.0 0.0 0.0 10.0 30
Region 5 Project Activity Level (PAL) Ev Variance Application/Agreement
Project Name: __________________________________________ Contract Number: _______________________________________ Contractor Name: _______________________________ Request #__, for period: __________________________________ Units/Subdivisions Affected: _______________________________
Location of operation:
Slope
Aspect
Elevation
Fuels on site
Fuels in surrounding area
7 Day PAL Outlook
Short range predictions (Red Flags)
Fuel Moistures
Response time of suppression resources
Potential for ignition
RAWS location
Current Fire Situation:
Draw down information
National Readiness Level
Contractual considerations:
Normal Operating Season
Frequency of recent contract fires in area
Type of operation Contractors past/current performance & equipment readiness
Other site specific mitigation or precaution (i.e. Contractors proposals)
Social & Community Considerations:
Proximity of high value resources
Sensitivity of location
Proposed Actions:
Description of Mitigation Measures:
Remarks:
Fire Management Officer Concurrence
Date
Line Officer Approval Date
I have considered the above request and determined the specified mitigation measures or actions must be implemented to continue operations in Project Activity Level Ev. Unless extended, the approval remains in effect for ten
(10) calendar days unless cancelled sooner or extended by the Forest Service for an additional ten (10) days. At the sole discretion of the Forest Service, this variance can be modified and/or cancelled at no cost to the government.
Contracting Officer Date
Contractor Representative Date
WD 77-0727 (Rev.-49) was first posted on www.wdol.gov on 01/05/2016 Forestry and Land Management Services
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON, D.C. 20210
Daniel W. Simms Division of Wage | Wage Determination No: 1977-0727 Director Determinations | Revision No: 49 | Date Of Revision: 12/29/2015 Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Service Contract Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
State: California Area: California Statewide
**Fringe Benefits Required Follow the Occupational Listing**
Employed on service contracts for forestry, land management, the cleaning of public use areas and timber inventory services.
OCCUPATION CODE - TITLE FOOTNOTE RATE
08010 - Brush/Precommercial Thinner 15.14 08040 - Choker Setter 15.90 08070 - Faller/Bucker 33.86 08100 - Fire Lookout 15.14 08160 - Forestry/Logging Heavy Equipment Operator 17.95 08190 - Forestry Technician 16.84 08200 - Forestry Truck Driver 18.21 08250 - General Forestry Laborer 14.83 08280 - Nursery Specialist 21.00 08310 - Slash Piler/Burner 15.14 08340 - Tree Climber 17.00 08370 - Tree Planter 13.48 08400 - Tree Planter, Mechanical 13.48
ALL OCCUPATIONS LISTED ABOVE RECEIVE THE FOLLOWING BENEFITS:
HEALTH & WELFARE: $4.27 per hour or $170.80 per week or $740.13 per month
VACATION: 2 weeks paid vacation after 1 year of service with a contractor or successor, 3 weeks after 5 years, and 4 weeks after 15 years. Length of service includes the whole span of continuous service with the present contractor or successor, wherever employed, and with the predecessor contractors in the performance of similar work at the same Federal facility. (Reg. 29 CFR 4.173)
HOLIDAYS: A minimum of ten paid holidays per year: New Year's Day, Martin Luther King Jr.'s Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans' Day, Thanksgiving Day, and Christmas Day. (A contractor may substitute for any of the named holidays another day off with pay in accordance with a plan communicated to the employees involved.) (See 29 CFR 4.174)
** UNIFORM ALLOWANCE **
If employees are required to wear uniforms in the performance of this contract (either by the terms of the Government contract, by the employer, by the state or local law, etc.), the cost of furnishing such uniforms and maintaining (by laundering or dry cleaning) such uniforms is an expense that may not be borne by an employee where such cost reduces the hourly rate below that required by the wage determination. The Department of Labor will accept payment in accordance with the following standards as compliance:
The contractor or subcontractor is required to furnish all employees with an adequate number of uniforms without cost or to reimburse employees for the actual cost of the uniforms. In addition, where uniform cleaning and maintenance is made the responsibility of the employee, all contractors and subcontractors subject to this wage determination shall (in the absence of a bona fide collective bargaining agreement providing for a different amount, or the furnishing of contrary affirmative proof as to the actual cost), reimburse all employees for such cleaning and maintenance at a rate of $3.35 per week (or $.67 cents per day). However, in those instances where the uniforms furnished are made of "wash and wear" materials, may be routinely washed and dried with other personal garments, and do not require any special treatment such as dry cleaning, daily washing, or commercial laundering in order to meet the cleanliness or appearance standards set by the terms of the Government contract, by the contractor, by law, or by the nature of the work, there is no requirement that employees be reimbursed for uniform maintenance costs.
** NOTES APPLYING TO THIS WAGE DETERMINATION **
Under the policy and guidance contained in All Agency Memorandum No. 159, the Wage and Hour Division does not recognize, for section 4(c) purposes, prospective wage rates and fringe benefit provisions that are effective only upon such contingencies as "approval of Wage and Hour, issuance of a wage determination, incorporation of the wage determination in the contract, adjusting the contract price, etc." (The relevant CBA section) in the collective bargaining agreement between (the parties) contains contingency language that Wage and Hour does not recognize as reflecting "arm's length negotiation" under section 4(c) of the Act and 29 C.F.R. 5.11(a) of the regulations. This wage determination therefore reflects the actual CBA wage rates and fringe benefits paid under the predecessor contract.
The duties of employees under job titles listed are those described in the "Service Contract Act Directory of Occupations", Fifth Edition (Revision 1), dated September 2014, unless otherwise indicated.
REQUEST FOR AUTHORIZATION OF ADDITIONAL CLASSIFICATION AND WAGE RATE
Standard Form 1444 (SF-1444)
Conformance Process:
The contracting officer shall require that any class of service employee which is not listed herein and which is to be employed under the contract (i.e., the work to be performed is not performed by any classification listed in the wage determination), be classified by the contractor so as to provide a reasonable relationship (i.e., appropriate level of skill comparison) between such unlisted classifications and the classifications listed in the wage determination. Such conformed classes of employees shall be paid the monetary wages and furnished the fringe benefits as are determined (See 29 CFR 4.6(b)(2)(i)). Such conforming procedures shall be initiated by the contractor prior to the performance of contract work by such unlisted class(es) of employees (See 29 CFR 4.6(b)(2)(ii)). The Wage and Hour Division shall make a final determination of conformed classification, wage rate, and/or fringe benefits which shall be retroactive to the commencement date of the contract (See 29 CFR 4.6(b)(2)(iv)(C)(vi)). When multiple wage determinations are included in a contract, a separate SF-1444 should be prepared for each wage determination to which a class(es) is to be conformed.
The process for preparing a conformance request is as follows:
1) When preparing the bid, the contractor identifies the need for a conformed occupation(s) and computes a proposed rate(s).
2) After contract award, the contractor prepares a written report listing in order the proposed classification title(s), a Federal grade equivalency (FGE) for each proposed classification(s), job description(s), and rationale for proposed wage rate(s), including information regarding the agreement or disagreement of the authorized representative of the employees involved, or where there is no authorized representative, the employees themselves. This report should be submitted to the contracting officer no later than 30 days after such unlisted class(es) of employees performs any contract work.
3) The contracting officer reviews the proposed action and promptly submits a report of the action, together with the agency's recommendations and pertinent information including the position of the contractor and the employees, to the Wage and Hour Division, U.S. Department of Labor, for review (See 29 CFR 4.6(b)(2)(ii)).
4) Within 30 days of receipt, the Wage and Hour Division approves, modifies, or disapproves the action via transmittal to the agency contracting officer, or notifies the contracting officer that additional time will be required to process the request.
5) The contracting officer transmits the Wage and Hour decision to the contractor.
6) The contractor informs the affected employees.
Information required by the Regulations must be submitted on SF-1444 or bond paper.
When preparing a conformance request, the "Service Contract Act Directory of Occupations" (the Directory) should be used to compare job definitions to ensure that duties requested are not performed by a classification already listed in the wage determination. Remember, it is not the job title, but the required tasks that determine whether a class is included in an established wage determination. Conformances may not be used to artificially split, combine, or subdivide classifications listed in the wage determination.
| 1. 2016 OCFR WFHF CONTRACT UNITS |
| 2. 2016 OCFR Unit Maps |
| 2016 OCFR WFHF Contract Northern Units |
| 2016 OCFR WFHF Contract Southern Units |
| 3. 2016 PAL Fire Plan_OCFR Fuels |
| A. Contractor |
| B. Forest Service |
| The Forest Service may conduct one or more inspections for compliance with the Fire Plan. The number, timing, and scope of such inspections will be at the discretion of agency employees responsible for contract administration. Such inspections do no... |
| The Contractor shall comply with the following requirements during the fire precautionary period, as defined by unit administering contracts: |
| The Fire Precautionary Period is set by the State of California which is April 1 through December 1 of any year. |
| E. Storage and Parking Areas. Equipment service areas, parking areas, and gas and oil storage areas shall be cleared of all flammable material for a radius of at least 10 feet unless otherwise specified by local administrative unit. Small mobile or ... |
| F. Reporting Fires: As soon as feasible but no later than 15 minutes after initial discovery, Contractor shall notify Forest Service of any fires on Contract Area or along roads used by Contractor. Contractor's employees shall report all fires as so... |
| The Contractor shall, prior to commencing work, furnish the following information relating to key personnel: |
| Title |
| Fire Supervisor |
| Fire Patrolperson |
| Fuel Moistures |
4. WD 77-0727, rev 49, dated 01052016
File details come from the government source that posted it. Updated .