Amendment_0001_attachment.pdf

PDF 74 KB Posted

Attached to
North Fork Feather River Aggregrate Supply and Haul
Solicitation number
AG-9AC7-S-16-0087
Issued by

About this file

Amended description of work

View the file

Other files

File Type Posted
SF_30.pdf PDF
Vicinity_Map2016.pdf PDF
AG-9AC7-S-16-0087_NFFR_solicitation_package.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0001 AG-9AC7-S-16-0087

CONTRACT DOCUMENTS, EXHIBITS OR ATTACHMENTS

9. DESCRIPTION OF WORK:

This contract is for the supply and delivery of 8,000 tons of crushed aggregate for the use by the government in road maintenance. The contractor shall furnish all labor, supervision, transportation, operating supplies, and incidentals necessary to perform this project.

Contractor furnished aggregate shall comply with Section 703.05(b) of the attached Forest Service Specifications, Grading Designation G.

The contractor shall provide a water truck and operator for dust abatement of the haul route. Aggregate shall be delivered to the project in bottom dump trucks only. Contractor shall provide a minimum of 8 trucks for delivery and hauling of material. Aggregate shall be placed in windrows for the full length of the project as directed by the

Contracting Officer. Government operated equipment will mix, spread, compact and grade the windrowed aggregate.

Contractor shall be responsible for providing a quality control plan to assure that the materials meet specifications.

Material sampling and testing is required as specified in Table 1 of the Specific Work Requirements (below).

PROJECT LOCATION(S):

The Project is located in the North Fork Feather River Watershed. The beginning of the project is located on Plumas

County 311 (paved) road approximatey 8 miles north west of CA HWY 36 The intersection of CA HWY 36 and

Plumas County Road 311 is located in Chester CA.

Domingo Springs water source is available for dust abatement. The legal description for the location of the water source is Section 20, Township 29 North, Range 6 East, Mount Diablo Base.

10. SPECIFIC WORK REQUIRMENT:

Dust Abatement

The Contractor shall be responsible for dust abatement (watering) along the haul route during operations.

Traffic Safety

The Contractor shall be responsible for traffic control, signs, flagmen and other traffic control devices to ensure public safety. All such signs or warning devices shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways. The Contractor shall not obstruct public traffic for a period over 10 minutes.

Pollution and Erosion Control

During all operations under this contract, the Contractor shall prevent or minimize soil erosion and pollution of water and other resources. Damage to any improvements or natural resource by the Contractor, including damage to roads that is not caused by normal operations, shall be promptly repaired to the satisfaction of the Contracting Officer.

Acceptable Quality Levels (AQLs)

Weight tickets shall be required prior to acceptance and payment for contractor furnished aggregate. Aggregate sampling and testing results (for contractor furnished aggregate) shall be submitted to the Contracting Officer as specified below.

File details come from the government source that posted it. Updated .