A2_North_Fork_Drawings.pdf

PDF 314 KB Posted

Attached to
North Fork Eel Stormproofing Federal contract opportunity
Solicitation number
AG-9AC7-S-16-0032
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Drawings

View the file

Other files for this federal contract opportunity

Other files attached to North Fork Eel Stormproofing, newest first.
File Type Posted
Amendment_002_package.pdf PDF
A1_CA4 _mod_2 _dated_022616.pdf PDF
North_Fork_Eel_Stormproofing _Amendment_001.pdf PDF
A5_SF_24_BID_BOND.pdf PDF
A1_NFEel_lNotes_ _Road_Logs.pdf PDF
A4_CA4 _Mod_1 _dated_012916_hwy_Humboldt_Co.pdf PDF
A3_PAL_Fire_Plan.pdf PDF
AG-9AC7-S-16-0032_Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRIVABLE WATERBAR TYPICAL

DOWNGRADE30 MIN.

CUT SLOPE

6"

12"

12"

ROADBED

INLET SHALL INTERCEPT BOTTOM

OF DITCH WHEN PRESENT

STRUCTURE SHALL BE FREE DRAINING

EXTEND OUTLET WHEN NECESSARY

FOR DRAINAGE

D

IP

FILL IN DITCHLINE A MINIMUM OF 5 FEET

ROLLING DIP STATIONS SHOWN ARE APPROXIMATE.

DIP SHALL BE CONSTRUCTED TO THE DIMENSIONS

-3%

-1%

+2%

GRADIENT AGRADE

DESIGNED

1' 4'

RIPRAP DETAIL FOR OULET

TOE OF FILLA

EXCAVATED MATERIALRAISE GRADE WITH

BOTTOM OF DIP

ORIGINAL GROUND LINE

TOP OF CUT

30'

15' 30'

U.S. DEPARTMENT OF AGRICULTURE

PACIFIC SOUTHWEST REGION

FOREST SERVICE

R-5 TYPICAL DRAWING

Six Rivers Natonal Forest

ROLLING DIP

N/A 1 OF 1

SIDE VIEW

RIPRAP DETAIL

4.

3.

2.

1.

CONSTRUCTION TOLERANCE FOR GRADIENT A

BEYOND SAG IN DIP.

COURSE.

SHOWN PRIOR TO PLACEMENT OF AGGREGATE

5 TO 7 PERCENT.

ENTIRE LENGTH OF DIP SHALL BE OUTSLOPED

NOTES:

0%-8%

8%-10%

Kurt Werner 04/01/2008

IS 1%.

EXCAVATION SHALL BE TO A DEPTH TO ACCOMODATE

18 TONS OF AGGREGATE BASE ROLLER COMPACTED.

5.

RIPRAP OUTLET WHEN DESIGNATED IN THE ROAD LOG.6.

SKEW BOTTOM OF DIP

OUTLET STAKED ON THE GROUND

THE MINIMUM DIFFERENCE IN ELEVATION BETWEEN THE

SAG AND CREST OF THE DRAIN DIP (DIMENSION B) IS 0.5 FEET.

7.

THE DRAIN DIP CONSTRUCTED FEATURE SHALL BE SMOOTH

AND FREE DRAINING.

8.

B

SEE NOTE 7.

10%-12%

BEGIN EXCAVATION

END EMBANKMENT

o

60o

PROFILE VIEW

30' 30'15'

B

TYPE 2

ORIGINAL GROUND LINE

CLASS II RIPRAP

NATURAL GROUND DIP OUTLET

1' BOTTOM OF DIP

ROAD SURFACE

4' MIN.

Checked

Design

Drawn

Reviewed

Project Name

Forest Sheet Title

Scale Sheet

C

D

R

EP A

TME FO AGRITN

ER

U

U

LT

File details come from the government source that posted it. Updated .