A1_NFEel_lNotes_ _Road_Logs.pdf
PDF 533 KB Posted
- Attached to
- North Fork Eel Stormproofing Federal contract opportunity
- Solicitation number
- AG-9AC7-S-16-0032
About this file
Road Logs Notes
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_002_package.pdf | ||
| A1_CA4 _mod_2 _dated_022616.pdf | ||
| North_Fork_Eel_Stormproofing _Amendment_001.pdf | ||
| A5_SF_24_BID_BOND.pdf | ||
| A3_PAL_Fire_Plan.pdf | ||
| AG-9AC7-S-16-0032_Solicitation.pdf | ||
| A2_North_Fork_Drawings.pdf | ||
| A4_CA4 _Mod_1 _dated_012916_hwy_Humboldt_Co.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
North Fork Eel Stormproofing 1 | P a g e
AG-9AC7-S-16-0032
NORTH FORK EEL RIVER STROMPROOFING
GENERAL NOTES-ROAD LOGS
GENERAL NOTES
Section 201 – Clearing and Grubbing: This work consists of clearing and grubbing within the clearing limits designated in the plans.
Section 203 – Removal of Structures and Obstructions: All pipes being replaced (and their accessories) shall be removed and disposed off government land in compliance with state, federal and local regulations. This section does NOT include any excavation, only the removal of the pipe and accessories.
Section 303 – Reconditioning: This work consists of reconditioning ditches, shoulders, roadbeds, and aggregate surfaces of the entire roads listed in the road logs, including grading with water and culvert replacement where indicated on the road logs. Reconditioning will also include some slide and slough removal at locations noted in the road logs.
Section 602 – Culverts and Drains: As stated in the specification, the contractor shall determine the final location, skew, length, elevations, and grade. Do not order or install culverts until the
CO has accepted the final structure size, length, and alignment.
Section 607 – Cleaning, Reconditioning, and Repairing Existing Drainage Structures - Work under this section includes specifically the cleaning of all culvert inlets and outlets up to 48” diameter and any material inside the culvert when noted in the road log. The road log will detail the items of work required under this pay item.
Final shaping of the road at culvert installation and replacement sites shall be constructed so no water diversion potential exists in case the culvert plugs and fails. This shall be accomplished by shaping a dip in the road over the culvert location, or installing a rolling dip downgrade of the culvert at the soonest possible location.
Pay Item 20467 – Drivable Drainage Dip: This pay item includes the excavation, shaping, and aggregate surfacing for rolling dip installation. The aggregate shall be spread the full length of the constructed dip, the full width of the road, and at a 4 inch compacted depth.
Pay Item 30802 – Roadway Aggregate: This pay item includes aggregate surfacing over culvert locations, spot rocking at locations noted in the road logs and flagged on the grouind, and where required in the general notes and plans.
Pay Item 62540 – Mulching, Straw Bales: Spread uniformly across disturbed ground on fill slopes at culvert installation sites, at rates noted on the plans.
North Fork Eel Stormproofing 2 | P a g e
ROAD LOGS
Road Mile Post Description
2S16 0 Intersection with private road (S. Hettenshaw Drive)
2S16 0.025 Install rolling dip, 10 CU YD aggregate
2S16 0.04 Gate.
2S16 0.084 Repair old waterbar
2S16 0.125 Repair old waterbar
2S16 0.149 Install rolling dip, 10 CU YD aggregate
2S16 0.19 Repair old waterbar
2S16 0.217 Install rolling dip, 10 CU YD aggregate
2S16 0.22 18-inch CMP, clean.
2S16 0.238 Repair old waterbar
2S16 0.24 18-inch CMP
2S16 0.272 Repair old waterbar
2S16 0.294 18-inch CMP, clean.
2S16 0.311 Install rolling dip, 10 CU YD aggregate, but leave ditch
2S16 0.351 Existing dip, repair
2S16 0.371 Significant fillslope failure
2S16 0.411 Existing dip, repair
2S16 0.424 18-inch plastic culvert.
2S16 0.456 Install rolling dip, 10 CU YD aggregate
2S16 0.468 18-inch (?) plastic culvert. Major poison oak.
2S16 0.539 Install rolling dip, 10 CU YD aggregate
2S16 0.584 Existing dip, repair
2S16 0.599 Install rolling dip, 10 CU YD aggregate
2S16 0.626 Install rolling dip, 10 CU YD aggregate
2S16 0.628 18-inch CMP, clean.
2S16 0.65 Repair old waterbar. Failing.
2S16 0.678 Install rolling dip, 10 CU YD aggregate
2S16 0.692 18-inch plastic culvert.
2S16 0.708 Install rolling dip, 10 CU YD aggregate
2S16 0.732 Existing dip, repair
2S16 0.761 Install rolling dip, 10 CU YD aggregate
2S16 0.795 Install rolling dip, 10 CU YD aggregate
2S16 0.858 Install rolling dip, 10 CU YD aggregate
2S16 0.888 Intersection with 2S16F, on right
2S16 0.966 Existing dip, repair
2S16 0.992 Install rolling dip, 10 CU YD aggregate
2S16 1.1 Rock 12 X 100
2S16 1.12 Rock 12 X 40
2S16 1.281 Repair old waterbar.
2S16 1.337 Repair old waterbar.
North Fork Eel Stormproofing 3 | P a g e
Road Mile Post Description
2S16 1.364 Repair old dip.
2S16 1.473 Mudhole. Spot rock 12 X 50
2S16 1.5 Repair old waterbar.
2S16 1.618 Install rolling dip, 10 CU YD aggregate.
2S16 1.631 Install rolling dip, 10 CU YD aggregate. Intersection with 2S16C.
2S16 1.676 Repair old waterbar. Failing.
2S16 1.718 Install rolling dip, 10 CU YD aggregate
2S16 1.753 Repair old waterbar
2S16 1.759 Repair old waterbar
2S16 1.786 Repair old waterbar
2S16 1.816 Repair old waterbar. Spot rock 12 X 50
2S16 1.834 Repair old waterbar
2S16 1.848 Repair old waterbar
2S16 1.873 Repair old waterbar
2S16 1.968 Repair old waterbar.
2S16 2.027 Repair old waterbar
2S16 2.118 Mudhole. Spot rock 12 X 50
2S16 2.136 Repair old waterbar
2S16 2.156 Install rolling dip, 10 CU YD aggregate
2S16 2.186 Repair old waterbar
2S16 2.226 Repair old waterbar.
2.25 Rock 12 X 50
2S16 2.3 - 2.5 Remove slough 3X3X500
2S16 2.333 Repair old waterbar. Rock low spot 12 X 50
2S16 2.458 Repair old waterbar
2S16 2.489 Old dip. Repair
2S16 2.518 Old dip. Repair
2S16 2.546 Install rolling dip, 10 CU YD aggregate
2S16 2.564 Old dip. Repair
2S16 2.609 Old dip. Repair
2S16 2.645 Install new 18-inch by 30’ culvert in swale.
2S16 2.67 Install rolling dip, 10 CU YD aggregate
2.7 Rock low spot 12 X 50
2S16 2.725 Old dip. Repair
2S16 2.755 Remove old waterbar, not needed.
2S16 2.837 Repair old waterbar.
2.9 Rock low spot 12 X 50
4.2 Rock low spot 12 X 50
3S09 0 Gate @ 3S07
3S09 0.006 18" CMP, clean, Rock low spot 12 X 40
3S09 0.075 Install rolling dip, 10 CU YD aggregate.
3S09 0.143 18" CMP, clean, North Fork Eel Stormproofing 4 | P a g e
Road Mile Post Description
3S09 0.167 18" CMP, clean, sort of high rust line
3S09 0.171 Existing rocked rolling dip
3S09 0.212 18" CMP, clean, 3S09 0.242 18" CMP Rock outlet 1 CY
3S09 0.243 Install rocked rolling dip
3S09 0.283 48" CMP, clean with MES, no D.P. Rock outlet 1CY, rock road 12 X 50
3S09 0.407 Install rolling dip, 10 CU YD aggregate
3S09 0.595 Very old dip, repair Rock 12 X 50
3S09 0.615 Very old dip, repair
3S09 0.635 Very old dip, repair
3S09 0.705 Install rolling dip, 10 CU YD aggregate
3S09 0.89 Install rolling dip, 10 CU YD aggregate
3S09 0.97 Install rolling dip, 10 CU YD aggregate
3S09 1.066 Install rolling dip, 10 CU YD aggregate
3S09 1.086 Install rolling dip, 10 CU YD aggregate
3S09 1.44 Intersection with 3S09A, on left
3S09 1.55 Rock 12 X 50
3S09 1.6 Rock 12 X 100
3S09 1.928 Intersection with 3S09B, on right/Rock 12 X100
3S09 1.95 Install rolling dip, 10 CU YD aggregate
3S09 1.97 Old dip, repair
3S09 1.99 Install rolling dip, 10 CU YD aggregate
3S09 2.13 Old dip, repair
3S09 2.176 Install rolling dip, 10 CU YD aggregate
3S09 2.198 Repair old waterbar, repair
3S09 2.2 Rock 12 X 50
3S09 2.303 Old dip, repair
3S09 2.314 Repair old waterbar
3S09 2.4 Rock 12 X 50
3S09 2.498 User created route on left. Rock 12X50
3S09 2.593 Install rolling dip, 10 CU YD aggregate
3S09 2.69 Intersection with 3S09C, on left
3S09 2.969 Old dip, repair
3S09 3.043 Old dip, repair.
3S09 3.163 Old dip, repair.
3S09 3.235 Road ends at landing
3S09A 0 Intersection with 3S09
3S09A 0.065 Install rolling dip, 10 CU YD aggregate
3S09A 0.133 18" CMP, clean
3S09A 0.184 18" CMP, clean
3S09A 0.372 Intersection with spur to right
3S09A 0.57 Road ends at landing
3S09A 0 – 0.57 Brush entire road
North Fork Eel Stormproofing 5 | P a g e
Road Mile Post Description
3S09C 0 Intersection with 3S09C
3S09C 0.003 18" CMP, clean, clean inlet
3S09C 0.025 18" CMP, clean, clean inlet
3S09C 0.101 User created route on left
3S09C 0.155 Old dip, repair
3S09C 0.177 18" CMP, clean, clean inlet
3S09C 0.343 Road ends at landing, becomes a user-created route.
3S09C 0 – 0.343 Brush entire road
3S15B 0 Intersection with 3S15
3S15B 0.014 Gate
3S15B 0.137 Install rolling dip, 10 CU YD aggregate/Slough removal 3X3X100
3S15B 0.231 Install rolling dip, 10 CU YD aggregate/ Rock 12X200
3S15B 0.314 Mudholes. Spot rock 50 feet
3S15B 0.794 Install rolling dip, 10 CU YD aggregate
3S15B 1.036 Intersection with 3S15L on left, landing on right.
3S15B 1.052 Existing waterbar
3S15B 1.074 Existing waterbar
3S15B 1.108 Install rolling dip, 10 CU YD aggregate
3S15B 1.124 Existing waterbar
3S15B 1.162 Install rolling dip, 10 CU YD aggregate
3S15B 1.388 Intersection with 3S15D, decommissioned, rock 12X50 @CMP, clean
3S15B 1.451 Existing waterbar, old, repair
3S15B 1.581 Mudhole, spot rock 12X 100 feet
3S15B 1.789 Road ends at landing.
3S15L 0 Intersection with 3S15B
3S15L 0.049 Install rolling dip, 10 CU YD aggregate
3S15L 0.07 18-inch CMP, clean.
3S15L 0.1 Existing Waterbar
3S15L 0.122 24-inch CMP, clean.
3S15L 0.136 18-inch CMP w/DI, clean.
3S15L 0.137 Existing Waterbar
3S15L 0.204 24-inch CMP, clean.
3S15L 0.206 Existing Waterbar
3S15L 0.291 72-inch CMP, clean with MES. Perennial. No DP
3S15L 0.339 Existing Waterbar
3S15L 0.343 48-inch CMP, clean.
3S15L 0.428 Existing Waterbar
3S15L 0.434 18-inch CMP, clean.
3S15L 0.448 18-inch CMP, clean.
3S15L 0.468 Existing Waterbar
3S15L 0.471 18-inch CMP, clean.
North Fork Eel Stormproofing 6 | P a g e
Road Mile Post Description
3S15L 0.513 18-inch CMP. Clean inlet
3S15L 0.587 Decommissioned spur on left.
3S15L 1.03 Road ends at landing.
3S18 0 Intersection with short spur to rock pit
3S18 0.214 Install rolling dip, 10 CU YD aggregate
3S18 0.369 User-created route to left/Rock 12 X 100
3S18 0.44 Rock 12 X 100
3S18 0.537 User-created route through trees, left
3S18 0.6 Low spot. Spot rock 30' x 15'
3S18 0.725 Install rolling dip, 10 CU YD aggregate
3S18 0.832 Install rolling dip, 10 CU YD aggregate/Rock 12 X 50
3S18 0.935 Cattle guard, clean.
3S18 0.953 Install rolling dip, 10 CU YD aggregate
3S18 0.991 Intersection with 3S68
3S18 1.002 Install rolling dip, 10 CU YD aggregate
3S18 1.005 Install rolling dip, 10 CU YD aggregate
3S18 1.025 Install rolling dip, 10 CU YD aggregate
3S18 1.047 Install rolling dip, 10 CU YD aggregate
3S18 1.115 Install rolling dip, 10 CU YD aggregate
3S18 1.214 Install rolling dip, 10 CU YD aggregate
3S18 1.248 Three forks, begin private property 3S18 0 - 1.33 Brush entire road
3S18A 0 Intersection with 3S18
3S18A 0.183 18-inch CMP. Clean inlet
3S18A 0.593 Private gate on right. Locked closed
3S18A 0.627 Install rolling dip, 10 CU YD aggregate
3S18A 0.812 Intersection with 3S18B. Grassed over
3S18A 0.862 24-inch CMP, clean.
3S18A 0.918 Unnamed spur on right
3S18A 0.930-0.942 Mudhole. Spot rock 12X75
3S18A 1.273 24-inch CMP, clean.
3S18A 1.291 Install rolling dip, 10 CU YD aggregate
3S18A 1.311 24-inch CMP, clean.
3S18A 1.315 Install rolling dip, 10 CU YD aggregate 3S18A 1.339 Road turns to jeep trail, goes through several unculverted streams.
Install berm per typical drawing provided
3S18A 0 - 1.34 Brush road
3S18D 0 Intersection with 3S18
3S18D 0.014 Install rolling dip, 10 CU YD aggregate
3S18D 0.047 Install rolling dip, 10 CU YD aggregate
3S18D 0.069 Install rolling dip, 10 CU YD aggregate
3S18D 0.097 Install rolling dip, 10 CU YD aggregate
North Fork Eel Stormproofing 7 | P a g e
Road Mile Post Description
3S18D 0.121 24-inch CMP, clean.
3S18D 0.215 24-inch CMP, clean.
3S18D 0.24 Road ends at landing
0 - .24 Brush road
3S16 0 Intersection with 3S15
3S16 0.056 Install rolling dip, 10 CU YD aggregate
3S16 0.09 Install rolling dip, 10 CU YD aggregate
3S16 0.162 Install rolling dip, 10 CU YD aggregate
3S16 0.235 Install rolling dip, 10 CU YD aggregate
3S16 0.317 Install rolling dip, 10 CU YD aggregate
3S16 0.352 Install rolling dip, 10 CU YD aggregate
3S16 0.364 Intersection with 3S16H
3S16 0.372 Install rolling dip, 10 CU YD aggregate
3S16 0.425 Repair old waterbar.
3S16 0.478 Install rolling dip, 10 CU YD aggregate
3S16 0.55 Install rolling dip, 10 CU YD aggregate
3S16 0.596 Install rolling dip, 10 CU YD aggregate
3S16 0.641 Install rolling dip, 10 CU YD aggregate
3S16 0.675 Install rolling dip, 10 CU YD aggregate
3S16 0.813 Install rolling dip, 10 CU YD aggregate
3S16 0.837 Install rolling dip, 10 CU YD aggregate
3S16 0.859 18-inch CMP, clean.
3S16 0.898 24-inch CMP, clean.
3S16 0.919 End FS/Begin Private
3S16 0.919 Install rolling dip, 10 CU YD aggregate
3S16 0.956 24-inch CMP, clean.
3S16 0.956 Install rolling dip, 10 CU YD aggregate
3S16 1.003 Install rolling dip, 10 CU YD aggregate
3S16 1.029 Install rolling dip, 10 CU YD aggregate
3S16 1.075 Install rolling dip, 10 CU YD aggregate
3S16 1.111 4-way intersection. 3S16 to right.
3S16 1.159 Forest Service Boundary
3S16 1.215 Unculverted swale. Install 18-inch by 30-foot culvert. Rock 12X500
3S16 1.257 Unmarked spur to right.
3S16 1.767 4-way Intersection. Private
3S16 2.427 Old dip, repair
3S16 2.453 Install rolling dip, 10 CU YD aggregate
3S16 2.514 Old dip, repair
3S16 2.541 Install rolling dip, 10 CU YD aggregate
3S16 2.56 Install rolling dip, 10 CU YD aggregate
3S16 2.581 Existing dip, repair
3S16 2.605 Old dip, repair
North Fork Eel Stormproofing 8 | P a g e
Road Mile Post Description Road
3S16 2.621 Old dip, repair
3S16 2.641 Old dip, repair
3S16 2.669 Old dip, repair
3S16 2.693 Unculverted swale. Install 18-inch by 30-foot culvert
3S16 2.695 Old dip, repair
3S16 2.713 Existing dip, repair
3S16 2.748 Existing dip, repair
3S16 2.779 Bluff Creek. Low-water crossing.
3S16 2.911 Existing rolling dip, 2CY aggregate
3S16 2.912 18-inch CMP, clean.
3S16 2.942 Old dip, repair
3S16 2.963 Old dip, repair
3S16 2.989 Old dip, repair
3S16 3.033 Existing dip, repair
3S16 3.073 Old dip, repair
3S16 3.132 Old dip, repair
3S16 3.159 Old dip, repair
3S16 3.187 Old dip, repair
3S16 3.215 Old dip, repair
3S16 3.242 Intesection with 3S21
3S21 0 Intersection with 4S15
3S21 0.044 Install rolling dip, 10 CU YD aggregate
3S21 0.135 Install rolling dip, 10 CU YD aggregate
3S21 0.232 Install rolling dip, 10 CU YD aggregate
3S21 0.343 Forest Service boundary
3S21 0.394 Private drive on left
3S21 0.434 Install rolling dip, 10 CU YD aggregate
3S21 0.492 18-inch CMP, clean. Huge fill
3S21 0.572 Install rolling dip, 10 CU YD aggregate
3S21 0.775 18-inch CMP, clean. Huge fill
3S21 0.897 18-CMP, clean with huge DI
3S21 1.063 18-inch CMP, clean.
3S21 1.125 Install rolling dip, 10 CU YD aggregate
3S21 1.14 18-inch CMP, clean.
3S21 1.613 18-inch CMP.
3S21 1.91 30-inch CMP, clean.
3S21 2.063 24-inch CMP, clean with downspout.
3S21 2.283 24-inch CMP, clean.
3S21 2.316 24-inch CMP, clean.
3S21 2.433 24-inch CMP, clean.
3S21 2.602 24-inch CMP, clean.
3S21 2.725 18-inch CMP, clean.
North Fork Eel Stormproofing 9 | P a g e
Road Mile Post Description
3S21 2.817 24-inch CMP, clean. Rusting out
3S21 3.029 Motorcycle trail on right
3S21 3.746 24-inch CMP, clean.
3S21 3.832 24-inch CMP.
3S21 3.863 Unauthorized route to left.
3S21 3.982 24-inch CMP, clean.
3S21 4.009 18-inch CMP, clean.
3S21 4.364 Intersection with 3S22
3S21 4.502 24-inch CMP.
3S21 4.511 Install rolling dip, 10 CU YD aggregate
3S21 4.563 Intersection with 3S16
3S21 4.629 24-inch CMP, clean.
3S21 4.705 Existing dip, repair
3S21 4.753 Old dip.
3S21 4.873 Install rolling dip, 10 CU YD aggregate
3S21 4.944 Existing dip, repair
3S21 4.988 Old dip.
3S21 5.021 Old dip.
3S21 5.059 Install rolling dip, 10 CU YD aggregate
3S21 5.086 Old dip.
3S21 5.116 Install rolling dip, 10 CU YD aggregate
3S21 5.138 Install rolling dip, 10 CU YD aggregate
3S21 5.16 Old dip.
3S21 5.188 Old dip.
3S21 5.285 Old dip.
3S21 5.357 Old dip.
3S21 5.392 Old dip.
3S21 5.657 Road ends.
3S22 0 Intersection with 3S21
3S22 0.08 Install rolling dip, 10 CU YD aggregate
3S22 0.109 Install rolling dip, 10 CU YD aggregate
3S22 0.143 24-inch CMP, clean.
3S22 0.293 18-inch CMP, clean.
3S22 0.33 18-inch CMP, clean.
3S22 0.402 18-inch CMP, clean.
3S22 0.454 48-inch CMP, clean with MES. Slight flow still
3S22 0.537 30-inch CMP, clean.
3S22 0.694 60-inch CMP, clean with MES. Outlet control
3S22 0.708 Install rolling dip, 10 CU YD aggregate
3S22 0.75 Install rolling dip, 10 CU YD aggregate
3S22 0.831 Install rolling dip, 10 CU YD aggregate
3S22 0.979 18-inch CMP.
North Fork Eel Stormproofing 10 | P a g e
Road Mile Post Description
3S22 1.031 Install rolling dip, 10 CU YD aggregate
3S22 1.121 24-inch CMP, clean.
3S22 1.205 24-inch CMP, clean.
3S22 1.229 18-inch CMP, clean.
3S22 1.303 18-inch CMP.
3S22 1.326 18-inch CMP, clean. Bad gully upstream. Sediment deposits at outlet.
3S22 1.423 36-inch CMP, clean.
3S22 1.472 Install rolling dip, 10 CU YD aggregate
3S22 1.487 18-inch CMP with 36-inch DI
3S22 1.539 36-inch CMP, clean.
3S22 1.672 72-inch (?) CMP, clean. Good.
3S22 1.701 18-inch CMP.
3S22 1.783 18-inch CMP.
3S22 2.014 18-inch CMP, clean.
3S22 2.034 48-inch CMP, clean.
3S22 2.08 18-inch CMP.
3S22 2.22 18-inch CMP.
3S22 2.279 Install rolling dip, 10 CU YD aggregate
3S22 2.323 Install rolling dip, 10 CU YD aggregate
3S22 2.366 60-inch CMP, clean with MES.
3S22 2.454 60-inch CMP, clean.
3S22 2.595 60-inch CMP, clean.
3S22 2.72 Install rolling dip, 10 CU YD aggregate
3S22 2.791 18-inch CMP, clean/CMP
3S22 2.866 24-inch CMP, clean.
3S22 2.925 24-inch CMP, clean.
3S22 3.147 Intersection with spur on right. 4S20B
3S22 3.234 Intersection with spur on right. 4S20 4WD trail left
3S22 3.386 24-inch CMP, clean.
3S22 3.588 60-inch CMP, clean.
3S22 3.703 Intersection with 4S15
3S68 0 Instersection with 3S18
3S68 0.005 18-inch CMP, clean. Outlet half buried.
3S68 0.034 Gate, locked open
3S68 0.061 24-inch CMP, clean.
3S68 0.199 Install rolling dip, 10 CU YD aggregate
3S68 0.237 Install rolling dip, 10 CU YD aggregate
3S68 0.286 Install rolling dip, 10 CU YD aggregate
3S68 0.321 Install rolling dip, 10 CU YD aggregate
3S68 0.391 Install rolling dip, 10 CU YD aggregate
3S68 0.425 Install rolling dip, 10 CU YD aggregate
3S68 0.458 Install rolling dip, 10 CU YD aggregate
North Fork Eel Stormproofing 11 | P a g e
Road Mile Post Description
3S68 0.469 Big landing with road around the outside.
3S68 0.547 60-inch CMP, clean with MES. Good condition. Perennial
3S68 0.574 48-inch CMP, clean.
3S68 0.613 18-inch CMP, clean.
3S68 0.621 Cutbank slump for 50 feet, remove 6 CY and place at designated dump site
3S68 0.672 48-inch CMP, clean, good condition, no DP
3S68 0.725 Install rolling dip, 10 CU YD aggregate
3S68 0.752 Replace 18-inch CMP.
3S68 0.755 Install rolling dip, 10 CU YD aggregate
3S68 0.79 Install rolling dip, 10 CU YD aggregate
3S68 0.817 36-inch CMP, clean.
3S68 0.891 24-inch CMP, clean.
3S68 0.96 Install rolling dip, 10 CU YD aggregate
3S68 1.032 Install rolling dip, 10 CU YD aggregate
3S68 1.103 24-inch CMP, clean. Inlet a little crushed, but functions.
3S68 1.128 60-inch CMP, clean. Good condition. Intermittent
3S68 1.17 Install rolling dip, 10 CU YD aggregate
3S68 1.182 User created route on right. Install berm per drawing provided.
3S68 1.197 48-inch. Good condition.
3S68 1.229 Install rolling dip, 10 CU YD aggregate
3S68 1.232 18-inch CMP, clean.
3S68 1.249 Install rolling dip, 10 CU YD aggregate
3S68 1.268 Install rolling dip, 10 CU YD aggregate
3S68 1.327 18-inch CMP, clean.
3S68 1.607 Install rolling dip, 10 CU YD aggregate
3S68 1.634 Install rolling dip, 10 CU YD aggregate
3S68 1.671 Install rolling dip, 10 CU YD aggregate
3S68 1.718 Install rolling dip, 10 CU YD aggregate
3S68 1.737 Install rolling dip, 10 CU YD aggregate
3S68 1.775 Install rolling dip, 10 CU YD aggregate
3S68 1.823 Install rolling dip, 10 CU YD aggregate
3S68 1.895 Intersection with 3S68B. Begin heavy brush.
3S68 2.013 24-inch CMP, clean.
3S68 2.049 Mushy meadow. Spot rock 12X150
3S68 2.076 24-inch CMP, clean.
3S68 2.1 24-inch CMP, clean.
5S30 0 Intersection with County road 503
5S30 0.176 18-inch CMP, clean.
5S30 0.283 18-inch CMP, clean.
5S30 0.896 Knock hole through berm for runoff passage, 2’ wide
5S30 0.935 Intersection with 5S30A
North Fork Eel Stormproofing 12 | P a g e
Road Mile Post Description
5S30 0.943 Gate. No locking post.
5S30 1.03 Install rolling dip, 10 CU YD aggregate
5S30 1.111 Install rolling dip, 10 CU YD aggregate
5S30 1.206 Install rolling dip, 10 CU YD aggregate
5S30 1.253 Existing dip, repair.
5S30 1.425 Install rolling dip, 10 CU YD aggregate
5S30 1.553 Install rolling dip, 10 CU YD aggregate
5S30 1.578 Install rolling dip, 10 CU YD aggregate
5S30 1.653 Install rolling dip, 10 CU YD aggregate
5S30 1.899 Install rolling dip, 10 CU YD aggregate
5S30 1.98 Install rolling dip, 10 CU YD aggregate
5S30 2.023 18-inch CMP, clean.
5S30 2.027 Existing rolling dip, 2CY aggregate. Good condition
5S30 2.07 18-inch CMP, clean.
5S30 2.071 Existing rolling dip, 2CY aggregate. Good condition
5S30 2.14 72-inch CMP, clean. No DP
5S30 2.232 36-inch CMP, clean. High rustline.
5S30 2.296 Install rolling dip, 10 CU YD aggregate
5S30 2.376 18-inch CMP, clean.
5S30 2.721 18-inch CMP, clean.
5S30 2.956 48-inch CMP, clean. Good
5S30 3.077 Unmarked spur on right
5S30 3.165 48-inch CMP, clean. Stream barely flowing
5S30 3.187 Install rolling dip, 10 CU YD aggregate
5S30 3.223 Install rolling dip, 10 CU YD aggregate
5S30 3.251 Install rolling dip, 10 CU YD aggregate
5S30 3.399 Replace 48" CMP
5S30 3.434 Existing rolling dip, 2CY aggregate
5S30 3.438 18-inch CMP, clean.
5S30 3.543 18-inch CMP, clean.
5S30 3.544 Existing rolling dip, 2CY aggregate
5S30 3.575 Existing rolling dip, 2CY aggregate
5S30 3.579 18-inch CMP, clean.
5S30 3.621 Existing rolling dip, 2CY aggregate
5S30 3.627 18-inch CMP, clean.
5S30 3.788 18-inch CMP, clean. No DP
5S30 3.919 Install rolling dip, 10 CU YD aggregate
5S30 4.003 24-inch CMP, clean. No DP
5S30 4.013 Existing rolling dip, 2CY aggregate
5S30 4.076 18-inch CMP.
5S30 4.126 Replace 48" CMP
5S30 4.249 24-inch CMP, clean. No DP
North Fork Eel Stormproofing 13 | P a g e
Road Mile Post Description
5S30 4.607 Replace 24-inch CMP
5S30 4.695 Install rolling dip, 10 CU YD aggregate
5S30 4.755 72-inch CMP, clean.
5S30 4.773 Existing rolling dip, 2CY aggregate. Good condition
5S30 4.775 Replace 18-inch CMP
5S30 4.815 Existing rolling dip, 2CY aggregate.
5S30 4.818 18-inch CMP, clean.
5S30 5.073 Existing dip, repair
5S30 5.171 18-inch CMPwith DI, clean.
5S30 5.199 18-inch CMP. Clean/re-establish inlet basin.
5S30 5.268 18-inch CMP with DI
5S30 5.341 18-inch CMP. Clean inlet.
5S30 5.795 18-inch CMP, clean.
5S30 5.8 Install rolling dip, 2CY aggregate
5S30 5.897 Install rolling dip, 10 CU YD aggregate
5S30 5.962 24-inch CMP, clean.
5S30 6.129 36-inch CMP, clean. High rustline.
5S30 6.165 User created route on right.
5S30 6.571 Existing critcal dip.
5S30 6.575 24-inch CMP, clean.
5S30 7.068 36-inch CMP, clean.
5S30 7.158 36-inch CMP, clean.
5S30 7.395 Road ends at landing.
5S32 0 Intersection with County roads 522 & 503
5S32 0.034 Gate, open, no lock
5S32 0.04 24-inch CMP, clean.
5S32 0.043 Existing rolling dip, 2CY aggregate
5S32 0.137 Install rolling dip, 10 CU YD aggregate
5S32 0.2 Install rolling dip, 10 CU YD aggregate
5S32 0.281 Install rolling dip, 10 CU YD aggregate
5S32 0.342 Install rolling dip, 10 CU YD aggregate
5S32 0.37 18-inch CMP. Clean inlet
5S32 0.443 Install rolling dip, 10 CU YD aggregate
5S32 0.507 18-inch CMP.
5S32 0.541 Fillslope slump. Roadbed
5S32 0.546 Install rolling dip, 10 CU YD aggregate
5S32 0.558 18-inch CMP with DI.
5S32 0.605 Install rolling dip, 10 CU YD aggregate
5S32 0.619 18-inch CMP
5S32 0.639 Install rolling dip, 10 CU YD aggregate
5S32 0.678 Install rolling dip, 10 CU YD aggregate
5S32 0.719 Install rolling dip, 10 CU YD aggregate
North Fork Eel Stormproofing 14 | P a g e
Road Mile Post Description
5S32 0.747 Install rolling dip, 10 CU YD aggregate
5S32 0.792 18-inch CMP.
5S32 0.817 18-inch CMP. Clean inlet
5S32 0.839 Install rolling dip, 10 CU YD aggregate
5S32 0.873 Install rolling dip, 10 CU YD aggregate
5S32 0.907 Install rolling dip, 10 CU YD aggregate
5S32 0.927 Install rolling dip, 10 CU YD aggregate
5S32 0.99 Install rolling dip, 10 CU YD aggregate
5S32 1.03 Install rolling dip, 10 CU YD aggregate
5S32 1.06 Install rolling dip, 10 CU YD aggregate
5S32 1.094 Install rolling dip, 10 CU YD aggregate
5S32 1.172 Muddy spot - spot rock 50-feet
5S32 1.269 18-inch CMP, clean. Clean inlet
5S32 1.298 Install rolling dip, 10 CU YD aggregate
5S32 1.333 Install rolling dip, 10 CU YD aggregate
5S32 1.371 18-inch CMP with DI.
5S32 1.378 Install rolling dip, 10 CU YD aggregate
5S32 1.421 Install rolling dip, 10 CU YD aggregate
5S32 1.47 User created route on right
5S32 1.507 Muddy spot - spot rock 50-feet
5S32 1.662 Intersection with 5S32A, on right
5S32 2.118 Install rolling dip, 10 CU YD aggregate
5S32 2.487 User created route to "Antler Creek" on right. Install berm per drawing provided
5S32 2.528 Salt Creek ford.
5S32A 0 Intersection with 5S32
5S32A 0.008 18-inch CMP, clean.
5S32A 0.14 18-inch CMP, clean.
5S32A 0.14-0.16 Spot rock 12X100
5S32A 0.161 Replace 24" CMP
5S32A 0.167 Install rolling dip, 10 CU YD aggregate
5S32A 0.196 User created route to right.
5S32A 0.227 18-inch CMP, clean. Spot rock 50 feet
5S32A 0.345 Road ends at small landing.
5S34 0 Intersection with County Road 522
5S34 0.094 18-inch CMP, clean.
5S34 0.098 Gate. Closed but not locked. Has lock.
5S34 0.198 Install rolling dip, 10 CU YD aggregate
5S34 0.333 Install rolling dip, 10 CU YD aggregate
5S34 0.382 Install rolling dip, 10 CU YD aggregate
5S34 0.437-0.45 Roadbed slump - grade smooth
5S34 0.67 24-inch CMP, clean. No DP
North Fork Eel Stormproofing 15 | P a g e
Road Mile Post Description
5S34 0.701 18-inch CMP with DI and downspout.
5S34 0.72 Install rolling dip, 10 CU YD aggregate
5S34 0.797 Install rolling dip, 10 CU YD aggregate
5S34 0.805 Install rolling dip, 10 CU YD aggregate
5S34 0.82 Trail on right
5S34 0.864 Install rolling dip, 10 CU YD aggregate
5S34 0.908 Install rolling dip, 10 CU YD aggregate
5S34 0.974 Install rolling dip, 10 CU YD aggregate
5S34 1.673 Road ends.
5S39 0 Intersection with County road 503
5S39 0.04 18-inch CMP, clean.
5S39 0.048 Existing rolling dip, 2CY aggregate
5S39 0.117 Fillslope failure. Narrow roadbed
5S39 0.161 18-inch CMP with DI and downspout
5S39 0.19 Install rolling dip, 10 CU YD aggregate
5S39 0.29 User created route to right, down ridge.
5S39 0.35 Road ends at landing.
2S30 0.00 Start from 2S05
2S30 0.28 Repair dip
2S30 0.31 Repair dip
2S30 0.32 end rills
2S30 0.33 dip, unauthorized road on right
2S30 0.35 start ditch right
2S30 0.38 18" CMP to clean out, end ditch
2S30 0.40 cross drain
2S30 0.41 start ditch right
2S30 0.44 18" CMP to clean out, end ditch
2S30 0.47 start ditch
2S30 0.50 24" CMP, end ditch
2S30 0.54 ditch right, cross drain washed out
2S30 0.57 18" CMP to clean out, end ditch
2S30 0.61 Repair dip
2S30 0.66 Repair dip
2S30 0.69 Repair dip
2S30 0.76 gate
2S30 0.80 18" CMP
2S30 0.83 start ditch
2S30 0.84 18" CMP to clean out, end ditch, dip
2S30 0.86 dip
2S30 0.89 dip
2S30 0.92 dip
2S30 0.95 dip
North Fork Eel Stormproofing 16 | P a g e
Road Mile Post Description
2S30 1.11 dip
2S30 1.20 cross drain washed out
2S30 1.23 spur right
2S30 1.36 start ditch right
2S30 1.38 DI needs lid, 18" CMP to clean out
2S30 1.40 dip
2S30 1.44 start slump, 2' wide, 3' high
2S30 1.61 end slump
2S30 1.64 dip
2S30 1.67 dip
2S30 1.69 start ditch left
2S30 1.72 18" CMP to clean out, end ditch
2S30 1.73 dip
2S30 1.81 18" CMP
2S30 1.85 cross drain bad, repair
2S30 1.97 dip
2S30 2.01 dip
2S30 2.07 Repair dip
2S30 2.17 Repair dip
2S30 2.21 dip
2S30 2.25 dip
2S30 2.28 dip
2S30 2.36 dip
2S30 2.38 Repair dip
2S30 2.40 jeep trail right
2S30 2.45 unauth road left
2S30 2.46 dip
2S30 2.75 Repair dip
2S30 2.94 spur left
2S30 3.48 dip
2S30 3.51 dip
2S30 3.54 Repair dip
2S30 3.57 Repair dip
2S30 3.96 dip
2S30 4.02 dip
2S30 4.06 dip, start slump
2S30 4.14 dip, end slump
2S30 4.15 road left, closed
2S30 4.21 unauth road left
2S30 4.23 unauth trail right
2S30 4.25 unauth road right
2S30 4.47 spur right
North Fork Eel Stormproofing 17 | P a g e
Road Mile Post Description
2S30 4.62 dip
2S30 4.66 dip
2S30 4.77 dip
2S30 4.78 dip
2S30 4.80 start ditch left
2S30 4.82 end ditch, dip
2S30 4.86 Repair dip
2S30 4.88 Repair dip
2S30 4.91 18" CMP to clean out
2S30 4.95 Repair dip
2S30 4.97 dip
2S30 4.99 dip
2S30 5.01 dip
2S30 5.04 Repair dip
2S30 5.07 dip
2S30 5.09 Repair dip
2S30K 0.00 Start spur @ MP 5.11 of 02S30
2S30K 0.07 Dip
2S30K 0.09 dip, erosion left side
2S30K 0.11 24" CMP to clean out
2S30K 0.12 Dip
2S30K 0.17 Repair dip
2S30K 0.19 Repair dip
2S30K 0.21 start ditch right
2S30K 0.23 end ditch
2S30K 0.34 Dip
2S30K 0.37 Repair dip
2S30K 0.42 Dip
2S30K 0.44 Dip
2S30K 0.46 Dip
2S30K 0.48 Repair dip
2S30K 0.49 Dip
2S30K 0.52 Dip
2S30K 0.63 Dip
2S30K 0.76 unauth road left
2S30K 0.83 Dip
2S30K 0.86 Dip
2S30K 0.88 Dip
2S30K 0.93 Dip
2S30K 0.95 Dip
2S30K 0.96 Dip
2S30K 0.98 Dip
North Fork Eel Stormproofing 18 | P a g e
Road Mile Post Description
2S30K 1.06 Dip
2S30K 1.08 Dip
2S30K 1.20 Dip
2S30K 1.22 Dip
2S30K 1.24 Repair dip
2S30K 1.25 Dip
2S30K 1.27 Dip
2S30K 1.29 Dip
2S30K 1.34 Dip 2S30K 1.39 end road