SUMMIT_&_MILLER_CANYON_OHV_STAGING_AREA.pdf
PDF 1 MB Posted
- Attached to
- Miller/Summit Staging Federal contract opportunity
- Solicitation number
- AG-9AB5-S-17-0034
About this file
Attachment 1 - Maps and Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DRAFT_Sol_AG-9AB5-S-17-0034.pdf | ||
| Attachment_Wage_Determination.pdf | ||
| Attachment_3_Compiled_Spec.pdf | ||
| Attachment_2_Fire_Plan_OHV_Staging_Area_FY2017.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SANTA
ROSA
OAKLAND
SAN
FRANCISCO
SAN
JOSE
SALINAS
BISHOP
FRESNO
STOCKTON
80101
EUREKA
SANTA
BARBARA
EL
CENTRO
SAN
DIEGO
LOS
ANGELES
CALIFORNIA
BAKERSFIELD
CALIFORNIA
DESERT
(RIVERSIDE)
SACRAMENTO
UKIAH
SUSANVILLE
MEXICO
A R I Z O N A
PROJECT: SUMMIT & MILLER CANYON OHV STAGING
AREA
FRONT COUNTRY & MOUNTAIN TOP RANGER DISTRICT
UNITED STATES DEPARTMENT OF AGRICULTURE
SAN BERNARDINO NATIONAL FOREST
REGION FIVE
PAGE SHEET NO. DESCRIPTION
1 T1 TITLE SHEET
2 C1 SUMMIT OHV STAGING AREA
3 C2 MILLER CANYON OHV STAGING AREA
6 D1 2-UNIT VAULT TOILET REFERENCE DETAILS
7 D2 MISCELLANEOUS DETAILS
8 D3 BEAR PROOF TRASH RECEPTACLE DETAILS
4 C3 MILLER CANYON SITE LAYOUT 1
5 C4 MILLER CANYON SITE LAYOUT 2
SHEET OF
DRAWING
PROJECT NUMBER
CHECKED BY
SCALE
DATE
CHECKED BY
DESIGNED BY
DRAWN BY
FO
R
ES
T:
D R
A W
IN
G
PR
O
JE
C
T N
A M
E:
N A
M E:
FOREST
REGION
SOUTHWEST
PACIFIC
DATENO. REVISIONS
R5
SERVICE
U S D A
STSERO
D
F CIVRE
E
E
FOTNEMT
R
A P
E R U
TLUCIRGA
National Forest San Bernardino
XXXXX
S U
M M
IT
M
IL
LE
R
C A
N Y
O N
O H
V S
TA
G
IN
G
A R
E A
TI
TL
E S
H E
E T
T-1
AS NOTED
01/27/2017
SA
N
B
ER
N A
R D
IN
O
1 8
PROJECT LOCATION PROJECT SITES
IRON PIPE RAILING FENCE
EL: 3975.00'
EL: 3975.00'
Proposed 2-Unit ToiletProposed
Picnic Tables
Proposed Trash Receptacle
Proposed Boulders Placement
NOTES:
1. ALL PROPOSED TABLES AND TRASH RECEPTACLE SHALL BE INSTALLED
AS SHOWN ON THE DRAWINGS.
2. BOULDERS SHALL BE PLACED TO DELINEATE RESTROOM AND PICNIC
AREA AS SHOWN ON THE DRAWINGS.
3. THE SITE SURROUNDING THE PROPOSED 2-UNIT VAULT TOILET SHALL
BE GRADED TO A MINIMUM 2% SLOPE TO ALLOW WATER TO DRAIN AWAY
FROM THE BUILDING. VAULT TOILET LOCATION IS TO BE FIELD STAKED.
Existing 12" Overside Drain
Existing 12" Overside Drain
Existing 12" Overside Drain
Proposed Boulders and Picnic Table
SHEET OF
DRAWING
PROJECT NUMBER
CHECKED BY
SCALE
DATE
CHECKED BY
DESIGNED BY
DRAWN BY
FO
R
ES
T:
D R
A W
IN
G
PR
O
JE
C
T N
A M
E:
N A
M E:
FOREST
REGION
SOUTHWEST
PACIFIC
DATENO. REVISIONS
R5
SERVICE
U S D A
STSERO
D
F CIVRE
E
E
FOTNEMT
R
A P
E R U
TLUCIRGA
National Forest San Bernardino
XXXXX
S U
M M
IT
M
IL
LE
R
C A
N Y
O N
O H
V S
TA
G
IN
G
A R
E A
S U
M M
IT
O
H V
S
TA
G
IN
G A
R E
A
C0-1
AS NOTED
01/27/2017
SA
N
B
ER
N A
R D
IN
O
2 8
SCALE:1"=40
40 0 4020
BOULDER
TABLE
PREFABRICATED CONCRETE
LEGEND
TOILET
BEAR PROOF TRASH
RECEPTACLE
PINE 10
OAK MULTI
S W
A
L
E
Existing Picnic Table
Proposed Trash Receptacle
Proposed Entry Sign
Existing Picnic Table
Proposed Trash Receptacle
Proposed Kiosk Relocation
Proposed 2-Unit
Toilet
Existing Picnic Table
SHEET OF
DRAWING
PROJECT NUMBER
CHECKED BY
SCALE
DATE
CHECKED BY
DESIGNED BY
DRAWN BY
FO
R
ES
T:
D R
A W
IN
G
PR
O
JE
C
T N
A M
E:
N A
M E:
FOREST
REGION
SOUTHWEST
PACIFIC
DATENO. REVISIONS
R5
SERVICE
U S D A
STSERO
D
F CIVRE
E
E
FOTNEMT
R
A P
E R U
TLUCIRGA
National Forest San Bernardino
XXXXX
S U
M M
IT
A
N D
M
IL
LE
R
C A
N Y
O N
O H
V S
TA
G
IN
G
A R
E A
M
IL
LE
R
C A
N Y
O N
O H
V S
TA
G
IN
G
A R
E A
C0-2
AS NOTED
01/27/2017
SA
N
B
ER
N A
R D
IN
O
3 8
KIOSK
TABLE
PREFABRICATED CONCRETE
LEGEND
TOILET
BEAR PROOF TRASH
RECEPTACLE
MILLER CANYON ENTRANCE
SIGN
NOTES:
1. ALL PROPOSED TRASH RECEPTACLES AND ENTRY SIGN SHALL BE
INSTALLED AS SHOWN ON THE CONTRACT DRAWINGS.
2. THE SITE SURROUNDING THE PROPOSED 2-UNIT VAULT TOILET SHALL
BE GRADED TO A MINIMUM 2% SLOPE TO ALLOW WATER TO DRAIN AWAY
FROM THE BUILDING. VAULT TOILET LOCATION IS TO BE FIELD STAKED.
3. THE EXISTING KIOSK SHALL BE RELOCATED FROM THE USER CREATED
OHV STAGING AREA TO THE NEW LOCATION SHOWN ON THE DRAWING.
4. ALL PROPOSED ITEM LOCATIONS MAY BE SUBJECTED TO CHANGE AND
SHOULD NOT, IN ANY FORM, BE INTERPRETED AS THE FINAL PLACEMENT
FOR OBJECTS SHOWN ON THE CONTRACT DRAWINGS. THEREFORE,
PROPOSED ITEMS MAY BE FIELD LOCATED.
S W
A
L
E
Proposed Trash Receptacle
Proposed Entry Sign
Existing Picnic Table
Proposed Kiosk Relocation
Proposed 2-Unit
Toilet
Existing Picnic Table
SHEET OF
DRAWING
PROJECT NUMBER
CHECKED BY
SCALE
DATE
CHECKED BY
DESIGNED BY
DRAWN BY
FO
R
ES
T:
D R
A W
IN
G
PR
O
JE
C
T N
A M
E:
N A
M E:
FOREST
REGION
SOUTHWEST
PACIFIC
DATENO. REVISIONS
R5
SERVICE
U S D A
STSERO
D
F CIVRE
E
E
FOTNEMT
R
A P
E R U
TLUCIRGA
National Forest San Bernardino
S U
M M
IT
M
IL
LE
R
C A
N Y
O N
O H
V S
TA
G
IN
G
A R
E A
M
IL
LE
R
C A
N Y
O N
L A
Y O
U T
C0-3
AS NOTED
01/27/2017
SA
N
B
ER
N A
R D
IN
O
4 8
OAK MULTI
Existing Picnic Table
Proposed Entry Sign
Proposed Trash Receptacle
Proposed 2-Unit
Toilet
Existing Picnic Table
SHEET OF
DRAWING
PROJECT NUMBER
CHECKED BY
SCALE
DATE
CHECKED BY
DESIGNED BY
DRAWN BY
FO
R
ES
T:
D R
A W
IN
G
PR
O
JE
C
T N
A M
E:
N A
M E:
FOREST
REGION
SOUTHWEST
PACIFIC
DATENO. REVISIONS
R5
SERVICE
U S D A
STSERO
D
F CIVRE
E
E
FOTNEMT
R
A P
E R U
TLUCIRGA
National Forest San Bernardino
S U
M M
IT
A
N D
M
IL
LE
R
C A
N Y
O N
O H
V S
TA
G
IN
G
A R
E A
M
IL
LE
R
C A
N Y
O N
L A
Y O
U T
C0-4
AS NOTED
01/27/2017
SA
N
B
ER
N A
R D
IN
5 8
4" 4"
14'-4"
2'-1"
7'-10 1/2"
1'-6 1/2"
5"
11'-11"
16'-10 1/4"
60" DIA TURNING CIRCLE
4"
4"
6'-8" 6'-8"4"
R O O F
L I N E
A B O V E
W
L
W
R
W 3
W 4W 4 W 4
R
R
R O O F
L I N E
A B O V E
R
L
F 1
W
1'-6" 1'-6"
5'
1'
2'-4"
3'-6" 3'-6"
60" DIA TURNING CIRCLE
CXT STANDARD BUILDING
SHEET OF
DRAWING
PROJECT NUMBER
CHECKED BY
SCALE
DATE
CHECKED BY
DESIGNED BY
DRAWN BY
FO
R
ES
T:
D R
A W
IN
G
PR
O
JE
C
T N
A M
E:
N A
M E:
FOREST
REGION
SOUTHWEST
PACIFIC
DATENO. REVISIONS
R5
SERVICE
U S D A
STSERO
D
F CIVRE
E
E
FOTNEMT
R
A P
E R U
TLUCIRGA
National Forest San Bernardino
XXXXX
S U
M M
IT
M
IL
LE
R
C A
N Y
O N
O H
V S
TA
G
IN
G
A R
E A
C X
T
TI
O G
A
-U N
IT
V
A U
LT
T
O
IL
E T
D-1
AS NOTED
01/27/2017
SA
N
B
ER
N A
R D
IN
6 8
KIOSK PLACEMENT DETAIL
SINGLE PANEL
KIOSK
N.T.S.
D1
POST DETAIL
1'-6"
N.T.S.
D1
POST HEIGHT
VARIES
GALVANIZED
POST BASE
BRACKET
12" x 48"
FORMING
TUBE
1. BOULDER LOCATIONS SHALL BE
AS SHOWN ON THE DRAWINGS.
NOTE:
VARIES 4' TO 6'
COMPACTED
SUBGRADE
BOULDER
2/3 HEIGHT
ABOVE GROUND
BELOW GROUND
OF BOULDER
OF BOULDER
BURY 1/3 HEIGHT
MAX.
2'
BOULDER PLACEMENT DETAIL
N.T.S.
ENTRANCE SIGN DETAIL
E R
U
TLUCIRGAT FONEMT
R
A P
E D
U.S. DEPARTMENT OF AGRICULTURE
U.S.D.A. PLAQUE DETAIL1-1/2" LETTER HEIGHT
3-1/2"
1/4" WIDE BORDER
MOUNTING BOLT LOCATION
RECREATION SITE ENTRANCE SIGN (RS-2)
(GOVERNMENT FURNISHED)
BOLT SIGN TO POST
WITH 1/2" X 8"
CARRIAGE BOLT, TWO
WASHERS, AND VANDAL
PROOF NUTS. (TYP.)
3/4" X 10" CARRIAGE BOLT
WITH WASHERS AND VANDAL
PROOF NUTS. (TYP.)
1/2" CHAMFER
(TYPICAL)
6" X 6" TREATED TIMBER POST
9-1/2
10" FOREST SERVICE SHIELD (S-10)
(GOVERNMENT FURNISHED)
2" X 6" TREATED TIMBER
6" x 6"
2" x 6"
TREATED
TIMBER
ATTACH SHIELD WITH FOUR (4)
3/8" X 3" LAG SCREWS
NOTE: BACKFILL DENSITY SHALL
EXCEED THE DENSITY OF
THE SURROUNDING
EMBANKMENT
* APPROXIMATE DIMENSIONS
U.S. DEPARTMENT OF AGRICULTURE
U.S.D.A. Plaque (P-37) (Gov't Furnished)
FRONT
SIDE
1/2" CHAMFER
(TYPICAL)
NOTE: COUNTERSINK HOLES
SHALL BE DRILLED
TO MATCH HARDWARE
2" X 6" TREATED TIMBER
2" X 6" TREATED TIMBER
(TYPICAL)
1/2" CHAMFER
3/4" DIA. X 10" CARRIAGE BOLT WITH
WASHERS AND VANDAL PROOF NUTS. (TYP.)
WASHERS AND VANDAL PROOF NUTS. (TYP.)
3/4" DIA. X 10" CARRIAGE BOLT WITH
3/4" DIA. X 12" CARRIAGE BOLT WITH
WASHER & NUT. HEAD COUNTERSUNK
WASHER & NUT. HEAD COUNTERSUNK
3/4" DIA. X 12" CARRIAGE BOLT WITH
9-1/2
3/4" DIA. X 18" CARRIAGE BOLT WITH
WASHER & NUT. HEAD COUNTERSUNK
8'-5"
TREATED TIMBER
8"
5'-3"
10"
1'-0"
1'-6"
3'-0"
3'-1"
SHEET OF
DRAWING
PROJECT NUMBER
CHECKED BY
SCALE
DATE
CHECKED BY
DESIGNED BY
DRAWN BY
FO
R
ES
T:
D R
A W
IN
G
PR
O
JE
C
T N
A M
E:
N A
M E:
FOREST
REGION
SOUTHWEST
PACIFIC
DATENO. REVISIONS
R5
SERVICE
U S D A
STSERO
D
F CIVRE
E
E
FOTNEMT
R
A P
E R U
TLUCIRGA
National Forest San Bernardino
XXXXX
S U
M M
IT
M
IL
LE
R
C A
N Y
O N
O H
V S
TA
G
IN
G
A R
E A
M
IS
C E
LL
A
N E
O U
S D
E
TA
IL
S
D-2
AS NOTED
01/27/2017
SA
N
B
ER
N A
R D
IN
O
5 8
GENERAL NOTES:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY REQUIRED SITE EXCAVATION AND
GRADING WORK THAT IS INCIDENTAL TO THIS CONTRACT.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR FINISH GRADING AROUND ALL STRUCTURES.
ALL CONSTRUCTION DEBRIS SHALL BE REMOVED FROM THE PROJECT SITE.
3. GOVERNMENT SHALL FURNISH TO THE JOB SITE THE FOLLOWING ITEMS FOR MILLER
CANYON:
i) ONE RECREATION SITE SIGN
ii) ONE 10" FOREST SERVICE SHIELD
iii) ONE U.S.D.A PLAQUE
4. ALL FINAL LOCATIONS TO BE DESIGNATED ON THE GROUND BY THE PROJECT ENGINEER.
48"
26"
43" 36"
Front ViewTop View
Back View Side View
BEARSAVER TRASH RECEPTACLE DETAIL
D1
FOOTING DETAIL
D1
30"X12"X12"
CONCRETE
FOOTING
∅ 3/8"
8"-LONG
ANCHOR BOLT
4.0"
1' 2'-6.0"
4.0"
1'
SHEET OF
DRAWING
PROJECT NUMBER
CHECKED BY
SCALE
DATE
CHECKED BY
DESIGNED BY
DRAWN BY
FO
R
ES
T:
D R
A W
IN
G
PR
O
JE
C
T N
A M
E:
N A
M E:
FOREST
REGION
SOUTHWEST
PACIFIC
DATENO. REVISIONS
R5
SERVICE
U S D A
STSERO
D
F CIVRE
E
E
FOTNEMT
R
A P
E R U
TLUCIRGA
National Forest San Bernardino
XXXXX
S U
M M
IT
M
IL
LE
R
C A
N Y
O N
O H
V S
TA
G
IN
G
A R
E A
B E
A R
S A
V E
R T
R A
S H
R E
C E
P
TA
C
LE
D E
TA
IL
S
D-3
AS NOTED
01/27/2017
SA
N
B
ER
N A
R D
IN
O
8 8
INSTALLATION:
This unit is mounted on four 3-inch high legs that are retrofitted with bolt down flanges to keep bears from tipping the container over. The container may be bolted onto a 4 inch slab with deepened footings at each corner or just bolted on individual concrete footings, one for each leg. The recommended size of the concrete footing is 12 inch x 12 inch x 12 inch with an 8-inch long, 3/8-inch diameter anchor bolt.
| 3 - OHV SUMMIT C0-1 |
| SHEET 1_TITLE PAGE_SUMMITOHV |
| SHEET 2_SUMMIT OHV STAGING AREA |
| 5 - OHV MILLER C0-4_REVISED_LAYOUT |
| SHEET 3_MILLER CANYON OHV STAGING AREA |
| SHEET 4_MILLER CANYON SITE LAYOUT 1 |
| SHEET 5_MILLER CANYON SITE LAYOUT 2 |
| 3 - OHV SUMMIT C0-2 |
| SHEET 3_UNIT TOILET REFERENCE DRAWING |
| SHEET 4_POST DETAIL |
| SHEET 6_TRASH DETAIL |
File details come from the government source that posted it. Updated .