SUMMIT_&_MILLER_CANYON_OHV_STAGING_AREA.pdf

PDF 1 MB Posted

Attached to
Miller/Summit Staging Federal contract opportunity
Solicitation number
AG-9AB5-S-17-0034
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Attachment 1 - Maps and Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Miller/Summit Staging, newest first.
File Type Posted
DRAFT_Sol_AG-9AB5-S-17-0034.pdf PDF
Attachment_Wage_Determination.pdf PDF
Attachment_3_Compiled_Spec.pdf PDF
Attachment_2_Fire_Plan_OHV_Staging_Area_FY2017.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SANTA

ROSA

OAKLAND

SAN

FRANCISCO

SAN

JOSE

SALINAS

BISHOP

FRESNO

STOCKTON

80101

EUREKA

SANTA

BARBARA

EL

CENTRO

SAN

DIEGO

LOS

ANGELES

CALIFORNIA

BAKERSFIELD

CALIFORNIA

DESERT

(RIVERSIDE)

SACRAMENTO

UKIAH

SUSANVILLE

MEXICO

A R I Z O N A

PROJECT: SUMMIT & MILLER CANYON OHV STAGING

AREA

FRONT COUNTRY & MOUNTAIN TOP RANGER DISTRICT

UNITED STATES DEPARTMENT OF AGRICULTURE

SAN BERNARDINO NATIONAL FOREST

REGION FIVE

PAGE SHEET NO. DESCRIPTION

1 T1 TITLE SHEET

2 C1 SUMMIT OHV STAGING AREA

3 C2 MILLER CANYON OHV STAGING AREA

6 D1 2-UNIT VAULT TOILET REFERENCE DETAILS

7 D2 MISCELLANEOUS DETAILS

8 D3 BEAR PROOF TRASH RECEPTACLE DETAILS

4 C3 MILLER CANYON SITE LAYOUT 1

5 C4 MILLER CANYON SITE LAYOUT 2

SHEET OF

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

STSERO

D

F CIVRE

E

E

FOTNEMT

R

A P

E R U

TLUCIRGA

National Forest San Bernardino

XXXXX

S U

M M

IT

M

IL

LE

R

C A

N Y

O N

O H

V S

TA

G

IN

G

A R

E A

TI

TL

E S

H E

E T

T-1

AS NOTED

01/27/2017

SA

N

B

ER

N A

R D

IN

O

1 8

PROJECT LOCATION PROJECT SITES

IRON PIPE RAILING FENCE

EL: 3975.00'

EL: 3975.00'

Proposed 2-Unit ToiletProposed

Picnic Tables

Proposed Trash Receptacle

Proposed Boulders Placement

NOTES:

1. ALL PROPOSED TABLES AND TRASH RECEPTACLE SHALL BE INSTALLED

AS SHOWN ON THE DRAWINGS.

2. BOULDERS SHALL BE PLACED TO DELINEATE RESTROOM AND PICNIC

AREA AS SHOWN ON THE DRAWINGS.

3. THE SITE SURROUNDING THE PROPOSED 2-UNIT VAULT TOILET SHALL

BE GRADED TO A MINIMUM 2% SLOPE TO ALLOW WATER TO DRAIN AWAY

FROM THE BUILDING. VAULT TOILET LOCATION IS TO BE FIELD STAKED.

Existing 12" Overside Drain

Existing 12" Overside Drain

Existing 12" Overside Drain

Proposed Boulders and Picnic Table

SHEET OF

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

STSERO

D

F CIVRE

E

E

FOTNEMT

R

A P

E R U

TLUCIRGA

National Forest San Bernardino

XXXXX

S U

M M

IT

M

IL

LE

R

C A

N Y

O N

O H

V S

TA

G

IN

G

A R

E A

S U

M M

IT

O

H V

S

TA

G

IN

G A

R E

A

C0-1

AS NOTED

01/27/2017

SA

N

B

ER

N A

R D

IN

O

2 8

SCALE:1"=40

40 0 4020

BOULDER

TABLE

PREFABRICATED CONCRETE

LEGEND

TOILET

BEAR PROOF TRASH

RECEPTACLE

PINE 10

OAK MULTI

S W

A

L

E

Existing Picnic Table

Proposed Trash Receptacle

Proposed Entry Sign

Existing Picnic Table

Proposed Trash Receptacle

Proposed Kiosk Relocation

Proposed 2-Unit

Toilet

Existing Picnic Table

SHEET OF

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

STSERO

D

F CIVRE

E

E

FOTNEMT

R

A P

E R U

TLUCIRGA

National Forest San Bernardino

XXXXX

S U

M M

IT

A

N D

M

IL

LE

R

C A

N Y

O N

O H

V S

TA

G

IN

G

A R

E A

M

IL

LE

R

C A

N Y

O N

O H

V S

TA

G

IN

G

A R

E A

C0-2

AS NOTED

01/27/2017

SA

N

B

ER

N A

R D

IN

O

3 8

KIOSK

TABLE

PREFABRICATED CONCRETE

LEGEND

TOILET

BEAR PROOF TRASH

RECEPTACLE

MILLER CANYON ENTRANCE

SIGN

NOTES:

1. ALL PROPOSED TRASH RECEPTACLES AND ENTRY SIGN SHALL BE

INSTALLED AS SHOWN ON THE CONTRACT DRAWINGS.

2. THE SITE SURROUNDING THE PROPOSED 2-UNIT VAULT TOILET SHALL

BE GRADED TO A MINIMUM 2% SLOPE TO ALLOW WATER TO DRAIN AWAY

FROM THE BUILDING. VAULT TOILET LOCATION IS TO BE FIELD STAKED.

3. THE EXISTING KIOSK SHALL BE RELOCATED FROM THE USER CREATED

OHV STAGING AREA TO THE NEW LOCATION SHOWN ON THE DRAWING.

4. ALL PROPOSED ITEM LOCATIONS MAY BE SUBJECTED TO CHANGE AND

SHOULD NOT, IN ANY FORM, BE INTERPRETED AS THE FINAL PLACEMENT

FOR OBJECTS SHOWN ON THE CONTRACT DRAWINGS. THEREFORE,

PROPOSED ITEMS MAY BE FIELD LOCATED.

S W

A

L

E

Proposed Trash Receptacle

Proposed Entry Sign

Existing Picnic Table

Proposed Kiosk Relocation

Proposed 2-Unit

Toilet

Existing Picnic Table

SHEET OF

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

STSERO

D

F CIVRE

E

E

FOTNEMT

R

A P

E R U

TLUCIRGA

National Forest San Bernardino

S U

M M

IT

M

IL

LE

R

C A

N Y

O N

O H

V S

TA

G

IN

G

A R

E A

M

IL

LE

R

C A

N Y

O N

L A

Y O

U T

C0-3

AS NOTED

01/27/2017

SA

N

B

ER

N A

R D

IN

O

4 8

OAK MULTI

Existing Picnic Table

Proposed Entry Sign

Proposed Trash Receptacle

Proposed 2-Unit

Toilet

Existing Picnic Table

SHEET OF

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

STSERO

D

F CIVRE

E

E

FOTNEMT

R

A P

E R U

TLUCIRGA

National Forest San Bernardino

S U

M M

IT

A

N D

M

IL

LE

R

C A

N Y

O N

O H

V S

TA

G

IN

G

A R

E A

M

IL

LE

R

C A

N Y

O N

L A

Y O

U T

C0-4

AS NOTED

01/27/2017

SA

N

B

ER

N A

R D

IN

5 8

4" 4"

14'-4"

2'-1"

7'-10 1/2"

1'-6 1/2"

5"

11'-11"

16'-10 1/4"

60" DIA TURNING CIRCLE

4"

4"

6'-8" 6'-8"4"

R O O F

L I N E

A B O V E

W

L

W

R

W 3

W 4W 4 W 4

R

R

R O O F

L I N E

A B O V E

R

L

F 1

W

1'-6" 1'-6"

5'

1'

2'-4"

3'-6" 3'-6"

60" DIA TURNING CIRCLE

CXT STANDARD BUILDING

SHEET OF

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

STSERO

D

F CIVRE

E

E

FOTNEMT

R

A P

E R U

TLUCIRGA

National Forest San Bernardino

XXXXX

S U

M M

IT

M

IL

LE

R

C A

N Y

O N

O H

V S

TA

G

IN

G

A R

E A

C X

T

TI

O G

A

-U N

IT

V

A U

LT

T

O

IL

E T

D-1

AS NOTED

01/27/2017

SA

N

B

ER

N A

R D

IN

6 8

KIOSK PLACEMENT DETAIL

SINGLE PANEL

KIOSK

N.T.S.

D1

POST DETAIL

1'-6"

N.T.S.

D1

POST HEIGHT

VARIES

GALVANIZED

POST BASE

BRACKET

12" x 48"

FORMING

TUBE

1. BOULDER LOCATIONS SHALL BE

AS SHOWN ON THE DRAWINGS.

NOTE:

VARIES 4' TO 6'

COMPACTED

SUBGRADE

BOULDER

2/3 HEIGHT

ABOVE GROUND

BELOW GROUND

OF BOULDER

OF BOULDER

BURY 1/3 HEIGHT

MAX.

2'

BOULDER PLACEMENT DETAIL

N.T.S.

ENTRANCE SIGN DETAIL

E R

U

TLUCIRGAT FONEMT

R

A P

E D

U.S. DEPARTMENT OF AGRICULTURE

U.S.D.A. PLAQUE DETAIL1-1/2" LETTER HEIGHT

3-1/2"

1/4" WIDE BORDER

MOUNTING BOLT LOCATION

RECREATION SITE ENTRANCE SIGN (RS-2)

(GOVERNMENT FURNISHED)

BOLT SIGN TO POST

WITH 1/2" X 8"

CARRIAGE BOLT, TWO

WASHERS, AND VANDAL

PROOF NUTS. (TYP.)

3/4" X 10" CARRIAGE BOLT

WITH WASHERS AND VANDAL

PROOF NUTS. (TYP.)

1/2" CHAMFER

(TYPICAL)

6" X 6" TREATED TIMBER POST

9-1/2

10" FOREST SERVICE SHIELD (S-10)

(GOVERNMENT FURNISHED)

2" X 6" TREATED TIMBER

6" x 6"

2" x 6"

TREATED

TIMBER

ATTACH SHIELD WITH FOUR (4)

3/8" X 3" LAG SCREWS

NOTE: BACKFILL DENSITY SHALL

EXCEED THE DENSITY OF

THE SURROUNDING

EMBANKMENT

* APPROXIMATE DIMENSIONS

U.S. DEPARTMENT OF AGRICULTURE

U.S.D.A. Plaque (P-37) (Gov't Furnished)

FRONT

SIDE

1/2" CHAMFER

(TYPICAL)

NOTE: COUNTERSINK HOLES

SHALL BE DRILLED

TO MATCH HARDWARE

2" X 6" TREATED TIMBER

2" X 6" TREATED TIMBER

(TYPICAL)

1/2" CHAMFER

3/4" DIA. X 10" CARRIAGE BOLT WITH

WASHERS AND VANDAL PROOF NUTS. (TYP.)

WASHERS AND VANDAL PROOF NUTS. (TYP.)

3/4" DIA. X 10" CARRIAGE BOLT WITH

3/4" DIA. X 12" CARRIAGE BOLT WITH

WASHER & NUT. HEAD COUNTERSUNK

WASHER & NUT. HEAD COUNTERSUNK

3/4" DIA. X 12" CARRIAGE BOLT WITH

9-1/2

3/4" DIA. X 18" CARRIAGE BOLT WITH

WASHER & NUT. HEAD COUNTERSUNK

8'-5"

TREATED TIMBER

8"

5'-3"

10"

1'-0"

1'-6"

3'-0"

3'-1"

SHEET OF

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

STSERO

D

F CIVRE

E

E

FOTNEMT

R

A P

E R U

TLUCIRGA

National Forest San Bernardino

XXXXX

S U

M M

IT

M

IL

LE

R

C A

N Y

O N

O H

V S

TA

G

IN

G

A R

E A

M

IS

C E

LL

A

N E

O U

S D

E

TA

IL

S

D-2

AS NOTED

01/27/2017

SA

N

B

ER

N A

R D

IN

O

5 8

GENERAL NOTES:

1. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY REQUIRED SITE EXCAVATION AND

GRADING WORK THAT IS INCIDENTAL TO THIS CONTRACT.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR FINISH GRADING AROUND ALL STRUCTURES.

ALL CONSTRUCTION DEBRIS SHALL BE REMOVED FROM THE PROJECT SITE.

3. GOVERNMENT SHALL FURNISH TO THE JOB SITE THE FOLLOWING ITEMS FOR MILLER

CANYON:

i) ONE RECREATION SITE SIGN

ii) ONE 10" FOREST SERVICE SHIELD

iii) ONE U.S.D.A PLAQUE

4. ALL FINAL LOCATIONS TO BE DESIGNATED ON THE GROUND BY THE PROJECT ENGINEER.

48"

26"

43" 36"

Front ViewTop View

Back View Side View

BEARSAVER TRASH RECEPTACLE DETAIL

D1

FOOTING DETAIL

D1

30"X12"X12"

CONCRETE

FOOTING

∅ 3/8"

8"-LONG

ANCHOR BOLT

4.0"

1' 2'-6.0"

4.0"

1'

SHEET OF

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

STSERO

D

F CIVRE

E

E

FOTNEMT

R

A P

E R U

TLUCIRGA

National Forest San Bernardino

XXXXX

S U

M M

IT

M

IL

LE

R

C A

N Y

O N

O H

V S

TA

G

IN

G

A R

E A

B E

A R

S A

V E

R T

R A

S H

R E

C E

P

TA

C

LE

D E

TA

IL

S

D-3

AS NOTED

01/27/2017

SA

N

B

ER

N A

R D

IN

O

8 8

INSTALLATION:

This unit is mounted on four 3-inch high legs that are retrofitted with bolt down flanges to keep bears from tipping the container over. The container may be bolted onto a 4 inch slab with deepened footings at each corner or just bolted on individual concrete footings, one for each leg. The recommended size of the concrete footing is 12 inch x 12 inch x 12 inch with an 8-inch long, 3/8-inch diameter anchor bolt.

3 - OHV SUMMIT C0-1
SHEET 1_TITLE PAGE_SUMMITOHV
SHEET 2_SUMMIT OHV STAGING AREA
5 - OHV MILLER C0-4_REVISED_LAYOUT
SHEET 3_MILLER CANYON OHV STAGING AREA
SHEET 4_MILLER CANYON SITE LAYOUT 1
SHEET 5_MILLER CANYON SITE LAYOUT 2
3 - OHV SUMMIT C0-2
SHEET 3_UNIT TOILET REFERENCE DRAWING
SHEET 4_POST DETAIL
SHEET 6_TRASH DETAIL

File details come from the government source that posted it. Updated .