File Type Posted
Amend_1_SF30.pdf PDF
Attach_1_Specs.pdf PDF
Attach_4_Wage_Determination.pdf PDF
Sol_AG-9AB5-S-17-0016.pdf PDF
Attach_3_Fire_Plan.pdf PDF
Attach_2_Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 5

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

Amendment 2 02/15/2017

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

USDA Forest Service Southern California Service Area 1600 Tollhouse Road Clovis, CA 93611

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-9AB5-S-17-0016

9B. DATED (SEE ITEM 11)

01/23/2017

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning _1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return Original copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Soberanes Road Rehab project is amended as follows:

1. Revised Road Log is hereby incorporated.

2. Questions and Answers are hereby incorporated.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

MARY CANTRELL, Contracting Officer

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

SOBERANES FIRE

ROAD LOG - ROAD NFSR 20S05 REHABILITATION PROJECT

February 2017

MP

Inlet, starter & flume

Inlet & starter Notes

1.093 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

1.418 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

2.227 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet & Starter

2.546 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

2.836 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet & Starter

2.941 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet & Starter

2.991 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet & Starter

3.175 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet & Starter

4.297 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

5.275 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

5.392 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

5.568 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

5.961 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet & Starter

6.008 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet & Starter

6.799 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet & Starter

7.207 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

February 2017

MP

Inlet, starter & flume

Inlet & starter Notes

7.316 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet & Starter

7.561 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet & Starter

8.409 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

8.652 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

8.746 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

9.457 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

9.479 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet & Starter

9.608 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet & Starter

9.668 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

9.729 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

9.967 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

10.105 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

10.118 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

10.288 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

10.376 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

10.427 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

February 2017

MP

Inlet, starter & flume

Inlet & starter Notes

10.545 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

10.663 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

10.711 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet & Starter

10.848 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet & Starter

11.08 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet & Starter

11.275 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

11.45 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet & Starter

11.703 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

11.808 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet & Starter

12.102 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

12.257 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet, Starter, 10' flume and Rip Rap.

12.898 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet & Starter

13.206 1 Remove and dispose exisiting Corrugated Metal Spillway, furnish and install new one including Inlet & Starter

Total 26 19

Soberanes Road 20S05 Rehabilitation

AG‐9AB5‐S‐17‐0016

Questions and Answers

1. Where does the road reconditioning begin?

A. NFSR 20S05 starts at the junction with the state highway 1. The first 0.3 miles of the road are paved, and per the specification 303(01) the contractor shall work ONLY specification

303.03 (Ditch Reconditioning) and 303.04 (Shoulder Reconditioning). For the remaining 13.2 miles, follow specification 303.01 entirely as per the schedule of items.

2. I went up today and looked at the road and drove all the way to the vortex station‐it is probably in far worse shape now than when the Forest Service put together the road log. Some of the flumes and spillways are either totally gone or in the canyon‐some of them are not even taking water and there will need to be plenty of grading to get the job done.

A. We know the conditions are changing per recent rain events and will still changing until the day we start working on the ground. Contractor shall bid accordingly of current conditions of the road.

3. If you don’t reassess it I guess we just bid on what is in the log, correct?

A. The Contractor shall bid on the Schedule of Items (not the road log)

4. I found out that the material required to do the fix, flumes, starters, inlets will take two weeks to acquire. Nobody I have called stocks this material and if they do there is not enough for the entire job. Given the job will be starting less than two weeks after bid acceptance I would think we or whomever wins the bid will need to push the start date back. The bid is only allowing 22 days and you will need all of them to install and recondition each area.

A. After a contract is awarded, the Contractor will provide evidence of material ordering and expected delivery dates. The Notice to Proceed effective date will be the date materials are received by the contractor.

5. Before the job starts you will need to mark out the exact spots (again) that were put in the road log‐since there is in my opinion far more than 46 spots which need attention.

A. Yes, the areas on the road log will be marked.