SOLICITATION, OFFER AND AWARD
| 1.THIS CONTRACT IS A RATED ORDER |
| RATING |
| PAGE OF |
UNDER DPAS (15 CFR 700)
| 1 |
| 131 |
| PAGES |
| 2. CONTRACT NUMBER |
| 3. SOLICITATION NUMBER |
| 4. TYPE OF SOLICITATION |
| 5. DATE ISSUED |
| 6. REQUISITION/PURCHASE |
| AG-9A63-S-10-0047 |
| FORMCHECKBOX |
| SEALED BID (IFB) |
| July 8, 2010 |
| NUMBER |
FORMCHECKBOX
NEGOTIATED (RFP)
100694
| 7. ISSUED BY |
| CODE |
8. ADDRESS OFFER TO (If other than Item 7)
USDA FOREST SERVICE, TAHOE NATIONAL FOREST
631 COYOTE STREET, NEVADA CITY, CA. 95959
Same as Block #7
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION – Mt. Hough Empire Biomass ARRA Stewardship Project
| 9. Sealed offers in original and |
| ONE ( 1) |
| copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if |
| handcarried, in the depository located in |
| Same as Block #7, Attn: Contracting |
| until |
| AUGUST 26, 2010 |
| local time |
| 2:00pm |
(Hour)
(Date)
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
| 10. FOR INFORMATION |
| A. NAME |
| B. TELEPHONE NO. |
| C. E-MAIL ADDRESS |
| CALL: |
| Technical – Rick Stumpf |
Administrative – Matthew Gagnon Voice: 530-283-7644 fax:283-1821 Voice: 530-478-6826 fax:478-6126 rstumpf@fs.fed.us matthewgagnon@fs.fed.us
11. TABLE OF CONTENTS
| (X) |
| SEC. |
| DESCRIPTION |
| PAGE(S) |
| (X) |
| SEC. |
| DESCRIPTION |
| PAGE(S) |
| PART I - THE SCHEDULE |
| PART II - CONTRACT CLAUSES |
| x |
| A |
| SOLICITATION/CONTRACT FORM |
| 1 |
| x |
| I |
| CONTRACT CLAUSES |
| 35-43 |
| x |
| B |
| SUPPLIES OR SERVICES AND PRICES/COSTS |
| 2-3 |
| PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH. |
| x |
| C |
| DESCRIPTION/SPECS./WORK/STATEMENT |
| 4-5 |
| x |
| J |
| LIST OF ATTACHMENTS |
| 44-111 |
| N.A. |
| D |
| PACKAGING AND MARKING |
| N.A. |
| PART IV - REPRESENTATIONS AND INSTRUCTIONS |
| x |
| E |
| INSPECTION AND ACCEPTANCE |
| 6 |
| x |
| K |
| REPRESENTATIVES, CERTIFICATIONS AND |
| 112-115 |
| x |
| F |
| DELIVERIES OR PERFORMANCE |
| 7-8 |
OTHER STATEMENTS OF OFFERORS
| x |
| G |
| CONTRACT ADMINISTRATION DATA |
| 9-11 |
| x |
| L |
| INSTRS., CONDS., AND NOTICES TO OFFERORS |
| 116-121 |
| x |
| H |
| SPECIAL CONTRACT REQUIREMENTS |
| 12-34 |
| x |
| M |
| EVALUATION FACTORS FOR AWARD |
| 122-126 |
OFFER (Must be fully completed by offeror)
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
| 13. DISCOUNT FOR PROMPT PAYMENT |
| 10 CALENDAR DAYS |
| 20 CALENDAR DAYS |
| 30 CALENDAR DAYS |
| CALENDAR DAYS |
(See Section I, Clause No. 52-232-8)
| 14. ACKNOWLEDGMENT OF AMENDMENTS |
| AMENDMENT NO. |
| DATE |
| AMENDMENT NO. |
| DATE |
(The offeror acknowledges receipt of amend-ments to the SOLICITATION for offerors and related documents numbered and dated:
15A.
NAME AND ADDRESS
OF OFFEROR
CODE
FACILITY
| 16. |
| NAME AND TITLE OF PERSON AUTHORIZED TO SIGN |
OFFER (Type or Print)
15B. TELEPHONE NO. (Include area code and extension)
| 15C. CHECK IF REMITTANCE ADDRESS |
| 17. SIGNATURE |
18. OFFER DATE
IS DIFFERENT FROM ABOVE - ENTER
FORMCHECKBOX
SUCH ADDRESS IN SCHEDULE.
AWARD (To be completed by Government)
| 19. ACCEPTED AS TO ITEMS NUMBERED |
| 20. AMOUNT |
| 21. ACCOUNTING AND APPROPRIATION |
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION
| 23. SUBMIT INVOICES TO ADDRESS SHOWN IN |
| ITEM |
FORMCHECKBOX
10 U.S.C. 2304 (c) (
FORMCHECKBOX
41 U.S.C. 253(c) (
| ) |
| (4 copies unless otherwise specified) |
| 24. ADMINISTERED BY (If other than Item 7) |
| CODE |
| 25. PAYMENT WILL BE MADE BY |
| CODE |
| 26. NAME OF CONTRACTING OFFICER (Type or print) |
| 27. UNITED STATES OF AMERICA |
| 28. AWARD DATE |
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
STANDARD FORM 33 (REV.9-97)
PART I – THE SCHEDULE
SECTION B – SERVICES AND PRICES
B.1 SCHEDULE OF ITEMS
| ITEM NO. |
| DESCRIPTION |
| UNIT |
| ESTIMATED QUANTITY |
| UNIT PRICE |
| TOTAL |
| 1 |
| Felling, skidding and hauling of biomass material. Including piling of residual landing slash, and temporary road construction. |
| Ac. |
| 1012.4 |
| $________ |
| $________ |
| 2 |
| Total of Road maintenance costs associated with harvest of products. (totals to be taken from “Mt. Hough Empire ARRA Road Maintenance Detailed Schedule of Items” which has been uploaded separately as Upload No. 18) |
| MI |
| 7.24 |
| $________ |
| $________ |
| 3 |
| Mastication of competing vegetation and downed woody debris. |
| Ac. |
| 196.8 |
| $________ |
| $________ |
| 4 |
| Hand thinning and piling of brush, trees and dead surface fuels. |
| Ac. |
| 88.3 |
| $________ |
| $________ |
TOTAL ALL ITEMS
B.2 TIMBER REMOVAL PRICE SCHEDULE:
| SPECIES |
| PRODUCT |
| ESTIMATED |
QUANTITY
| UNIT OF MEASURE |
| MINIMUM ACCEPTABLE OFFER |
| OFFER / TON |
(FLAT)
TOTAL OFFER
| ALL SPECIES |
| SAW |
| 9,203.7 |
| GREEN TONS |
| $2,761.11 |
($0.30 / TON)
| $________ |
| $________ |
| ALL SPECIES |
| NONSAW |
| 22,569.9 |
| GREEN TONS |
| $2,256.99 |
($0.10 / TON)
| $________ |
| $________ |
See Timber Removal Project Terms and Specifications in Appendix B.
VENDOR TAX ID NUMBER__________________________
VENDOR DUNS NUMBER___________________________
NOTE: THERE WILL BE A PRE-BID MEETING AT 9:45 AM, JULY 12, 2010. MEET AT THE MT HOUGH RANGER STATION.
Notice of Litigation:
Offerors/Bidders are hereby put on notice that the Empire Vegetation Management Project EIS and associated decision, which provides the authority to conduct this project, is currently involved in litigation. This may result in contract suspension, modification, or termination. The contract provides for limited remedies in cases of suspension, modification, or termination due to litigation. The purchaser will be required to sign a liability waiver prior to award.
A deposit of $36,500 will be required to cover the cost of establishing a remote weight scaling station. If the contractor elects to utilize an alternative scaling location that has an approved yard agreement with the Forest Service; contract scaling services deposit collections will be made based upon the rate established in a scaling agreement for that delivery location and projected volume to be removed over shorter time frames.
A deposit of $47,293.16 will be required to cover the cost for reconstruction related engineering services to be completed by Forest Service personnel or by public works contract.
A deposit of $2,906.00 will be required to cover the cost for surface replacement of haul roads.
NOTE: THESE SCHEDULES ARE FOR PRICING/PAYMENT PURPOSES. SEE SECTION L FOR BUSINESS PROPOSAL REQUIREMENTS.
B.3 LAND MANAGEMENT ACTIVITIES.
Performance of land management activities shall be in accordance with Section C – Project Description and
Work Specifications. Payment for Land Management Work Activities in Schedule B-1, will be made in
Stewardship Credits in lieu of cash, as defined in Section G.
PART I - THE SCHEDULE
SECTION C - DESCRIPTION AND SPECIFICATIONS
General Clauses and Provisions Pertaining To All Items
C.1 AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
C.2 PROJECT DESCRIPTION
(a) Description of Work – This solicitation and any resultant contract is a stewardship project in accordance with Section 323 of Public Law 108-7 (16 U.S.C. 2104 Note, as revised February 28, 2003 to reflect sec. 323 of J.J. Res. 2 as enrolled), the Consolidated Appropriations Resolution, 2003, amending Public Law 105-277, sec. 347. This is a commercial item acquisition that has been tailored to fit the Government’s method of trading goods for services. The Mt. Hough, Empire Biomass ARRA Stewardship Project is located on the Mt. Hough Ranger District of the Plumas National Forest, encompassing the area indicated on the Project Area Map (which includes Timber Removal Units) along the southwest-facing slopes of Grizzly Ridge and Indian Falls Ridge northeast and east of the communities of Keddie, Butterfly Valley, Quincy, and Greenhorn. Fuels treatment / forest health improvement objectives for the project area are as follows:
· Improve Forest Health – Reduce vegetation competition in order to provide growing space for healthy trees and reduce fuel loading and ladder fuels.
· Utilize Timber Resources – Provide wood resource to the forest product industry.
To accomplish these objectives, the contract includes the following components: stand cleaning /thinning from below to meet desired crown spacing specifications, removal of nonsaw biomass materials in order to reduce fuel loading, associated road reconstruction and maintenance for timber product removal, mastication of conifers and / or brush in order to reduce fuel loading and competition for desired conifers or hardwoods to be retained, and hand thinning and piling of ladder fuels in order to reduce fuel loading and competition for desired conifers or hardwoods to be retained.
There are 4 work activity bid items that will be treated in addition to thinning and removal of commercial sawlogs on 924.8 acres. These stewardship work activity items are described in detail in Appendix A and attachments. Treatment areas consist of natural stands, or brush dominated areas. Biomass thinning will be accomplished through cutting of trees designated by description, and removing them for utilization.
(b) Unit Description – Product removal unit boundaries are shown on the Contract Area Map and delineated on the ground with orange paint on trees facing into the unit and/or blue flagging. Service work unit boundaries are shown on the Contract Area Map and delineated on the ground with yellow flagging.
(c) Resulting Contract – Any resultant contract will be a Construction contract with provisions for timber removal.
(d) Project Location - Mt. Hough Empire Biomass ARRA Stewardship Project is northeast of Quincy, California with most of the Project accessible via the Mt. Hough Road also known as Plumas County Road 403. The Legal Description is T24N R10E Sections 4 and 5, T25N R10E Sections 15, 16, 21, 22, 23, 24, 25, 26, 27, 28, 32, 33 and 34.
C.3 SPECIFICATIONS
Specifications for the Stewardship Activities, as identified in Section B.1, can be found in Appendix A.
Specifications for each Stewardship Activity individually described by an item number in Schedule B pages can be found in Appendix A. Specifications for timber removal can be found in Appendix B, and associated road plans and specifications in Appendix C.
Special Considerations
Landing on County roads is not to be allowed without appropriate encroachment permit issued by Plumas County. Contractor would be responsible for obtaining these permits. In lieu of landing adjacent to County roads, a number of short Temporary spur roads may be required to allow access to landings near County roads. With landings and temporary roads being subject to agreement, County roads 403 and 208 have eight landings planned, and five of these landings are new construction with up to 100ft. of temporary road construction for each landing if needed. Existing landings and existing temporary roads will be used as much as possible.
There are some steep areas within the project area that may require endlining.
Unit 25 of the mastication treatment (Item 3) is located in an area with a known infestation of noxious weeds. The Contractor will be required to clean all equipment and vehicles used off-road in the treatment of the unit of all attached mud, dirt and plant parts before leaving the site.
During Project Activity Level EV, special variances can be made by approval of the Forest Service.
C-7 GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause 52.245-4 contained in Section I of the contract.
| Description |
| Location |
| Remarks |
| Project area work map |
| To be delivered at pre-work meeting |
| 2 copies |
SECTION E - INSPECTION AND ACCEPTANCE
General Clauses and Provisions Pertaining To All Items
E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.arnet.gov/far http://www.usda.gov/procurement/policy/agar.html
I. FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-04 Inspection of Services – Fixed Price (AUG 1996)
52.246-12 Inspection of Construction (AUG 1996)
E.2 CONTRACTOR QUALITY CONTROL INSPECTION SYSTEM
The Contractor shall identify the quality control inspection system it will use to ensure that contract specifications will be achieved. At no time shall the contractor rely upon Government inspections to provide notification of unsatisfactory performance. The Contractor shall produce written inspection records in a format and at times and places satisfactory to the Contracting Officer. Inspection records shall be made available upon request of the Contracting Officer and be maintained until the date of contract closure. The Contracting Officer may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.
E.3 ACCEPTANCE
The Forest Service shall perform an inspection upon Contractor’s written request and assurance that work has been completed. Request shall be for a reasonable portion of work. Acceptance may be made for all or portions of work.
E.4 GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN
Quality assurance plans specific to individual items will be found in Appendix A. However, scheduling of work may be restricted based on the following:
Restrictions on Work Work may be performed at any time during the period of the contract, except as outlined here. Nothing in this part shall be construed to take away any of the Government's rights under the Suspension of Work Clause (52.242-14). Restrictions are as follows:
1. In accordance with the Fire Precautions and Emergency Measures in Clause H.21.
2. When the Contracting Officer (or designated representative) determines that adverse weather has made access too dangerous or that continued vehicular travel would cause unacceptable road damage, or operations are causing excessive soil erosion or compaction.
3. Limited operating period (LOP) shall be observed for the portion of Forest Service Road 25N10Y as identified on the map, between March 1st and August 15th, inclusive, unless otherwise agreed. Reconstruction, Maintenance and Hauling activities are prohibited .
4. For the entire project area, no ground disturbing activities are permitted within Protected Areas shown on the Contract Area Map.
SECTION F - DELIVERIES OR PERFORMANCE
General Clauses and Provisions Pertaining To All Items
F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically a this/these address(es):
http://www.arnet.gov/far http://www.usda.gov/procurement/policy/agar.html
I. FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
52.242-15 Stop-Work Order (AUG 1989)
52.242-17 Government Delay of Work (APR 1984)
52.247-55 F.O.B. Point for Delivery of Government-Furnished Property (JUN 2003)
F. 2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 15 calendar days after receipt of Notice to Proceed or Task Order for specific work items, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than December 31, 2011. The time stated for completion shall include final cleanup of the premises. Performance shall be made only as authorized by orders issued in accordance with the Ordering clauses. Except as this contract otherwise provides, the Government shall order all services within the scope that are required by Government activities specified in the Schedule only with the vendor holding this contract for the specified services. Timber Removal activities shall be scheduled and carried out in accordance with the Timber Removal Specifications in Appendix B and as approved by the Contracting Officer. It is estimated that work will begin October 1, 2010. Actual date is negotiable based upon actual award date, prospective work and weather conditions. Any restrictions on the Scheduling of Work for resource protection, etc. will be addressed in the Technical Specifications.
F.3 AGAR 452.211-74 PERIOD OF PERFORMANCE (FEB 1988)
The period of performance of this contract is from date of contract award through 2 years after date of contract award or by December 31, 2011, whichever comes first.
F.4 AGAR 452.236-75 MAXIMUM WORKWEEK – CONSTRUCTION SCHEDULE (NOV 1996)
Within 5 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following in writing for approval:
(a) A schedule as required by FAR clause 52.236-15 “Schedules for Construction Contracts” and
(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposes to carry out the work.
F.5 SCHEDULES AND REPORTS
Pursuant to contract requirements, the following submittals are required within 10 days after issuance of a
Notice to Proceed or Task Order for review and/or approval, unless stated elsewhere in the specifications or otherwise mutually agreed:
| ITEM DESCTRIPTION |
| COPIES REQUIRED |
| Proposed progress schedule showing starting and completion dates of various phases of the work |
| 2 |
| List of proposed sub-contractors and their intended work. Sub-contractors must have Contracting Officers Written approval prior to starting work on the project. Submit on Standard Form 1413 which is available from the contracting office. |
| 2 |
| Quality Control Plan |
| 2 |
| Fire Plan |
| 2 |
| Traffic Control Plan |
| 2 |
| Soil Erosion and Water Pollution Control Plan |
| 2 |
| Designation of Contractor personnel describing responsibilities and authorities |
| 2 |
All schedules and reports shall be submitted to: The COR.
SECTION G – CONTRACT ADMINISTRATION DATA
General Clauses Pertaining To All Items
G.1 PAYMENT
It is anticipated that funds will be exchanged in the performance of this contract because the value of the timber will not offset the value of the work to be performed. Payment shall only be made under this clause to the extent that the work performed will not be offset by the timber value during the contract period. If payment is to be made to the contractor for work performed, it will be made in accordance with FAR 52.232-1 – Payments. The value of work completed and timber removed will be documented in an Integrated Resource Statement of Account produced by Timber Sale Accounting (TSA) monthly when harvesting operations are underway.
G.2 STEWARDSHIP CREDITS
Stewardship Credits are credits that are earned and established when work listed in the B.1 Schedule of
Supplies/Services has been performed and accepted. Stewardship credits shall be earned at the rate as shown in the Schedule. Earned credits may be used to pay for timber value included in Schedule B.2. Unless otherwise indicated in the Schedules, credits will be earned based upon Actual Quantities accomplished and accepted.
G.3 ESTABLISHMENT OF STEWARDSHIP CREDITS
Notwithstanding references to payments in “Payment” clauses or provisions of this contract, payment for
Stewardship Activities will be made with Stewardship Credits as indicated in the award document. Stewardship Credits will be established on a monthly basis. Stewardship credits will be established for the number of units of each activity that have been completed and accepted. Acceptance may be for all, or a reasonable portion of, any specific activity.
Stewardship credits will not be established for work that is in progress that has not been accepted by the Forest Service. No credits will be established for work performed under terms of Schedule B.2 and Appendix B Timber Removal Specification.
G.4 CONTRACTOR CERTIFICATION
Monthly, as Stewardship Credits are established, the Contractor shall furnish the following certification
(Contractor Certification - Earned Stewardship Credits) or credit will not be received.
CONTRACTOR CERTIFICATION - EARNED STEWARDSHIP CREDITS
Mt. Hough Empire Biomass ARRA Stewardship Project I hereby certify, to the best of my knowledge and belief, that—
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) Payments to subcontractors and suppliers have been made, and timely payments will be made for the work activities covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments/credits does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor's performance.
(Name)
(Title)
(Date)
G.5 TIMBER PAYMENT GUARANTEE
(1) General—(a) To guarantee payment for timber scheduled for removal under the IRSC, Contractor may earn Stewardship Credits in advance of removal, or provide a Timber Payment Guarantee in the form of an acceptable surety payment bond, cash payment, or a deposit in a Federal Depository negotiable securities of the United States. (b) Any earned Stewardship Credits and alternate Timber Payment Guarantee together will maintain a minimum unobligated balance equal to the applicable charges for timber the Forest Service estimates will be cut in 30 to 60 calendar days plus the value of any outstanding charges, or equal to the total value of the timber that has not been paid for. If at any time, the value of unobligated earned Stewardship Credits plus the amount of Timber Payment Guarantee is not sufficient to cover any outstanding charges for timber hauled plus the value of timber to be cut in the next 10 calendar days, the Contracting Officer shall suspend the cutting and/or hauling of timber until such time as more Stewardship Credits are established, or acceptable Timber Payment Guarantee is received. (c) Securities shall be deposited through the Contracting Officer accompanied by a power of attorney and agreement authorizing the bond-approving officer to sell or collect such securities if payment is not made within 15 days of billing by Forest Service. The penal sum of such surety bond or the market value at time of deposit of such negotiable securities shall be the maximum amount of the payment guaranteed.
(2) A Timber Payment Guarantee for a single contract shall be provided utilizing FS Form 6500-12.
(3) Blanket Surety Bond—(a) Contractor may furnish an acceptable bond, or deposit securities, to guarantee payment for timber from multiple contracts. Contractor shall not start cutting hereunder until this contract receives an allocation that will meet the obligation for payment guarantee. (b) The amount of such bond or deposited securities shall be allocated to such contracts by the Forest Service. The Contractor will provide the contact information for the Forest Service representative administering the Blanket Guarantee. (c) When there is to be no timber cutting hereunder for 30 days or more and payment of current charges has been made, the allocation to this contract shall be reallocated to other contracts at Contractor’s request. (d) A Timber Payment Guarantee for multiple contracts (Blanket Guarantee) shall be provided utilizing FS Form 6500-12a.
(4) Letters of Credit for Payment Guarantee—Contractor may use letters of credit in lieu of a surety bond for payment guarantee purposes when approved by Contracting Officer.
G.6 EXCESS STEWARDSHIP CREDITS
In the event there are excess (unused) established Stewardship Credits when all of the included timber has been cut and removed the Forest Service, at its option, shall either add more timber or make cash payment for the unused credits.
G.7 EXCESS TIMBER VALUE
In the event the value of the included timber exceeds the total value of all of the mandatory activities plus the ordered elective activities, the Contractor shall make cash payment for the excess timber value.
G.8 REFUND OF EXCESS CASH
If at any time the credit balance of the Integrated Resource Statement of Account exceeds the charges for timber removed to date and for timber that the Forest Service estimates will be cut within the next 60 calendar days, any portion of such excess from cash in the account shall be refunded if requested by Contractor. If no cutting is planned within the next 60 calendar days, refund of the entire unencumbered cash balance may be made. After a refund, deposits shall be made to meet the requirements of the clause entitled, “TIMBER PAYMENT GUARANTEE” before additional timber may be cut.
G.9 FINAL PAYMENT - RELEASE OF CLAIMS
The Government shall pay the amount due the Contractor under this contract after—
(1) Completion and acceptance of all work;
(2) Presentation of a properly executed voucher; and
(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release.
SECTION H - SPECIAL CONTRACT REQUIREMENTS
General Clauses and Provisions Pertaining To All Items
H.1 FAR 52.236-4 PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) - The indications of physical conditions on the drawings and in the specifications are the result of site investigations by visual observation.
(b) - Additional informational material made available to contractors including but not limited to:
environmental documentation, timber cruise data, timber removal report and appraisal, maps, access permits, etc.
Copies of the above documents are on file at the Mt. Hough Ranger District and Plumas National Forest Supervisor’s office. The Forest Service has determined the estimated quantities of Included Timber in accordance with the volume equations or tables approved for use in the area by the Forest Service with adjustment for defect as appropriate. The Forest Service makes no representation, warranty, or guarantee of the accuracy of the estimate.
H.2 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled within (To Be Determined) days after the date of contract award. The conference will be held at the (To Be Determined), and will include discussion of contract terms and work performance requirements, work progress schedule and fire prevention/suppression and safety plans.
H.3 AGAR 452.236-72 USE OF PREMISES (NOV 1996)
(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor.
(b) Unless excepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the work force at the site and (i) dispose of solid waste in accordance with applicable Federal, State and local regulations.
H.4 AGAR 452.236-76 SAMPLES AND CERTIFICATES (FEB 1988)
When required by the specifications or the Contracting Officer, samples, certificates, and test data shall be submitted after award of the contract, prepaid, in time for proper action by the Contracting Officer or his/her designated representative. Certificates and test data shall be submitted in triplicate to show compliance of materials and construction specified in the contract performance requirements.
Samples shall be submitted in duplicate by the Contractor, except as otherwise specified, to show compliance with the contract requirements. Materials or equipment for which samples, certifications or test data are required shall not be used in the work until approved in writing by the Contracting Officer.
H.5 AGAR 452.237-74 KEY PERSONNEL (FEB 1988)
(a) The Contractor shall assign to this contract the following key personnel:
Overall Project Manager
Logging Supervisor
Fuels Treatment Supervisor
Road Construction Supervisor(s) – supervising work in the timber removal specifications as well as other road work, maintenance and obliteration.
Individual Sub-Managers – Individuals supervising individual sub-contracts for work items not covered by personnel noted previously herein.
(b) During the first 90 days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
H.6 FSAR 4G52.222-701 EMPLOYMENT OF ELIGIBLE WORKERS (DEC 1999)
Section 274A of the Immigration and Nationality Act (8 USC 1324a) makes it unlawful for an employer to hire unauthorized aliens. The Immigration and Naturalization Service (INS) has established the Form I-9, Employment Eligibility Verification Form, as the document to be used for employment eligibility verification (see 8 CFR 274a).
The contractor is required to (1) have all employees complete and sign the I-9 Form to certify that they are eligible for employment; (2) examine documents presented by the employee and ensure the documents appear to be genuine and related to the individual; (3) record information about the documents on the form, and complete the certification portion of the form; (4) retain the form for three years, or one year past the end of employment of the individual, whichever is longer.
It is illegal to discriminate against any individual (other than a citizen of another country who is not authorized to work in the United States) in hiring, discharging, or recruiting because of that individual's national origin or citizenship status. Compliance with Section 274A of the Immigration and Nationality Act (8 U.S.C. 1324a) is a material condition of the contract. If the contractor employs unauthorized workers during contract performance in violation of section 274A, the Government may terminate the contract, in addition to other remedies or penalties prescribed by law.
For further information on the requirements of the Act, contractors should contact the Employer and Labor
Relations Officer of their local INS office.
H.7 FSAR 4G52.222-702 LABOR STANDARDS FOR CONTRACTS INVOLVING MIGRANT
AND SEASONAL AGRICULTURAL WORKERS (DEC 1999)
(a) General. This contract is subject to the Migrant and Seasonal Agricultural Workers Protection Act
(MSPA) (29 U.S.C 1801-1872) and to Department of Labor regulations implementing MSPA (see 29 CFR
500). The purpose of MSPA is to eliminate activities that are detrimental to migrant and seasonal agricultural workers, to require registration of farm labor contractors, and to assure necessary protections for the workers. In addition to traditional farm labor activities, the Act applies to predominately manual forestry work including, but not limited to, tree planting, release, precommercial thinning, and site preparation and wildland fire fighting.
(b) Definitions.
"Migrant Agricultural Worker" and "Seasonal Agricultural Worker", as used in this clause, mean individuals employed in agricultural (including forestry) work on a seasonal or temporary basis. A worker who moves from one seasonal activity to another is employed on a seasonal basis even though the worker may continue to be employed during a major portion of the year. Migrant workers are required to be absent overnight from their permanent place of residence. Seasonal workers are not required to be absent overnight from their permanent place of residence. Members of the contractor's immediate family are not considered to be either migrant or seasonal workers. "Immediate family" includes only (1) spouse; (2) children, stepchildren, or foster children; (3) parents, stepparents, or foster parents; and (4) brothers and sisters.
"Farm Labor Contractor", as used in this clause, means an individual who, for any money or other valuable consideration, paid or promised to be paid, performs any recruiting, soliciting, hiring, employing, furnishing, or transporting of any migrant or seasonal agricultural worker.
(c) Registration Requirement. Any contractor who provides or hires migrant or seasonal workers to perform agricultural or manual forestry work shall first obtain a Certificate of Registration from the Department of
Labor or an authorized State agency. The contractor shall carry the Certificate at all times while engaged in contract performance, and shall display it upon request. Any of the contractor's employees who also perform any one or more of the activities defined for a "Farm Labor Contractor" in paragraph (b) must have their own Farm Labor Contractor Employee Certificate.
(d) Worker Protections. The contractor shall comply with the following protections and standards related to wage disclosure, recordkeeping, vehicle safety, and housing:
(1) The contractor shall display and maintain at the place of employment the MSPA poster provided by the Department of Labor.
(2) Wage and Payroll Standards
(i) The contractor shall disclose in writing to each worker in a language common to the worker the full terms of their employment, including workers compensation information, at the time they are recruited or hired. The Department of Labor provides an optional form WH-516 for contractor's use in disclosure.
(ii) The contractor must keep the following payroll records for each employee: name, address, social security number, basis for wages (i.e. per hour, per tree, per acre), number of units earned if paid on a per unit basis, hours worked, total pay, withholdings and purpose for each, and net pay. Payroll records shall be retained for three years.
(iii) Payments must be made no less frequently than every two weeks or semi-monthly. At the time of each payment, the contractor shall provide to the employee a written itemization of the information listed above and which shall include the employer's tax identification number.
(iv) If paid on a piece rate basis, the employee's wage must be at least equivalent to the required hourly wage for the hours worked, including overtime differential for time in excess of 40 hours per week.
(3) Motor Vehicle Safety
(i) The contractor must be registered to transport employees, unless employees provide their own transportation or carpool by their own arrangement in one of their own vehicles. The authorization to transport employees must appear on the contractor's certificate. If the contractor directs or requests employees to carpool, the registration requirement is still applicable. Any driver who transports workers for a fee or at the direction of the contractor must be registered as a farm labor contractor or a farm labor contractor employee.
(ii) Any vehicle under the ownership or control of the contractor shall comply with safety standards applicable to that vehicle. Generally passenger vehicles or station wagons must comply with Department of Labor regulations at 29 CFR 500.104. Vehicles other than passenger vehicles or station wagons which are driven more than 75 miles must comply with Department of Transportation Regulations at 29 CFR 500.105. All drivers must have a current, valid State driver’s license.
(iii) Each vehicle under the ownership or control of the contractor which is used to transport any migrant or seasonal agricultural worker shall be covered by vehicle insurance of $100,000 per seat (maximum $5,000,000). A workers compensation policy which covers the workers while being transported plus an additional property damage policy for $50,000 for loss or damage in any one accident to the property of others may be substituted for the vehicle insurance requirement.
(4) Housing
(i) The contractor shall house workers only in a commercial establishment or a facility that has been certified by a health authority or other appropriate agency. The contractor must post the certificate of occupancy at the housing site.
(ii) The authorization to furnish housing, other than commercial lodging, must appear on the contractor's certificate.
(iii) If the contractor is not furnishing worker housing:
Workers on this contract may obtain housing only in a residential accommodation, including a commercial establishment such as a hotel or motel, which meets all applicable state and federal standards for employee housing.
Within 10 days after award, and prior to the issuance of Notice to Proceed, the contractor must notify the Contracting Officer of the planned worker housing site.
If the housing site is located on a National Forest, the Contractor must obtain a permit from the District Ranger or the District on which the housing site is located and the facilities established for the workers must meet the applicable U.S. Department of Labor (USDOL) MSPA standards for such sites.
If the housing site is not located on a National Forest, the site must meet the applicable housing standards in MSPA.
If an exemption from the permit requirement is claimed, the contractor must provide a written statement identifying the law authorizing the exemption, stating the facts constituting an exemption under that law, and identifying a USDOL employee or official who stated or concurred that the accommodations were exempt, citing name, date, and means of communication.
If the housing site is changed after approval by the Contracting Officer, the contractor must provide a new Permit or exemption statement. The above requirements are material conditions of this contract. If the contractor fails to comply, the Government may terminate the contract. In addition, other remedies or penalties prescribed by law may apply
Field Sanitation
In accordance with US Department of Labor Fact Sheet No. ESA 97-28 “Field Sanitation Standards” (Ref. 29CFR 1928.110), employers must provide:
►Potable drinking water, suitably cool and in sufficient amounts, dispensed in single-use cups or by fountains, located so as to be readily accessible to employees.
► Facilities maintained in accordance with public health sanitation practices include upkeep of water quality through daily change or more often if necessary.
► Notification to each employee of the location of the water and allowance of reasonable opportunities during the workday to use them. The employer also must inform the employee of the relevant health hazards in the field and the practices necessary to minimize them.
Employees cannot be made to bear the costs incurred by the employer for providing required facilities.
(e) For further information on the requirements of the Act, contractors should contact their local Wage and
Hour Division of the Department of Labor.
H.8 FSAR 4G52.222-703 MIGRANT AND SEASONAL AGRICULTURAL WORKER
PROTECTION ACT REGISTRATION (DEC 1999)
The Migrant and Seasonal Agricultural Worker Protection Act (MSPA) (29 U.S.C. 1801-1872) and implementing regulations issued by the Department of Labor (29 CFR 500), require any employer who hires or anticipates hiring employees subject to MSPA to obtain an MSPA registration number.
If the contractor employs or anticipates hiring employees subject to MSPA, the contractor shall provide a valid U.S. Department of Labor MSPA Registration Number to the Contracting Officer within 10 days after notification of award of the contract.
The Government may demand that the contractor display MSPA registration at any time during contract performance if it appears that the contractor is employing workers subject to MSPA. On demand, the contractor shall display its MSPA registration or state why it is exempt from MSPA.
Compliance with MSPA is a material condition of the contract. If the contractor fails to provide a valid MSPA number in accordance with this clause, or falsely states that it is exempt from the MSPA, the Government may terminate the contract, in addition to other remedies or penalties prescribed by law.
H.9 PROTECTION MEASURES NEEDED FOR PLANTS, ANIMALS, CULTURAL RESOURCES,
AND CAVE RESOURCES
Locations of known areas needing special measures for the protection of plants, animals, cultural resources, and/or cave resources are shown on Contract Area Map and/or identified on the ground.
Special protection measures needed to protect such known areas are identified.
Area
Treatment Measure
All areas within or near units No operations permitted within zones flagged in red and black striped, as identified in the Contract flagging and / or identified by red “CA” placards on trees, or zones Area Map 2 of 3 flagged in orange with “Noxious Weeds” text (with the exception of mastication unit 25).
Spotted Owl Protected Activity No operations permitted (including hauling on Road 25N10Y) from
Center (PAC) as identified on March 1st through August 15th inclusive, unless alternative
Contract Area Map agreement is made with the Forest Service due to confirmed non-presence of Spotted Owls.
In addition to any special protection measures noted, Contractor has a general duty to protect all known and identified resources referenced in this Subsection from damage or removal during Contractor’s operations.
Discovery of additional areas, resources, or members of species needing special protection shall be promptly reported to the other party, and operations shall be delayed or interrupted at that location, if Contracting Officer determines there is risk of damage to such areas, resources, or species from continued operations.
Wheeled or track-laying equipment shall not be operated in areas identified as needing special measures for the protection of cultural resources, except on roads, landings, tractor roads, or approved skid trails. Unless agreed otherwise, trees will not be felled into such areas. Contractor may be required to backblade skid trails and other ground disturbed by Contractor’s Operations within such areas in lieu of required cross ditching.
Contractor shall immediately notify Forest Service if disturbance occurs to any area identified as needing special protection measures and shall immediately halt operations in the vicinity of the disturbance until Forest Service authorizes Contractor to proceed. Contractor shall bear costs of resource evaluation and restoration to identified sites. Such payment shall not relieve Contractor from civil or criminal remedies otherwise provided by law.
Forest Service has exercised due diligence and followed established protocols in identifying known areas needing special protection measures. Nevertheless, nothing in this provision shall be interpreted as creating any warranty that all locations and special measures for the protection of plants, animals, cultural resources, and cave resources have been described herein, elsewhere in the contract, or designated on the ground.
H.10 EROSION PREVENTION AND CONTROL
Contractor’s Operations shall be conducted reasonably to minimize soil erosion. Equipment shall not be operated when ground conditions are such that excessive damage will result. The kinds and intensity of erosion control work done by Contractor shall be adjusted to ground and weather conditions and the need for controlling runoff. Erosion control work shall be kept current immediately preceding expected seasonal periods of precipitation or runoff.
If Contractor fails to do seasonal erosion control work prior to any seasonal period of precipitation or runoff, Forest Service may temporarily assume responsibility for the work and any unencumbered deposits hereunder may be used by Forest Service to do the work. If needed for such work, Contractor shall make additional deposits on request by Forest Service. Any money deposited or used for this purpose shall be treated as cooperative deposits.
H.11 PROTECTION OF IMPROVEMENTS
So far as practicable, Contractor shall protect roads and other improvements (such as: culverts; asphalt, wood, and rock barriers; trails; telephone lines; gates; signs; buildings; ditches; water sources; below-ground water pipes and storage tanks; fiberglass travel restriction posts; and, fences):
(a) Existing in the operating area,
(b) Determined to have a continuing need or use,
(c) Designated on Contract Area Map, and
(d) Trail marked on Contract Area Map within Mastication Unit 24 is to have a no-treatment buffer within 10 feet of the trail surface. Trail is marked in the field with white flagging.
Contractor shall keep roads and trails needed for fire protection or other purposes and designated on Contract Area Map reasonably free of equipment and products, slash, and debris resulting from Contractor’s Operations. Contractor shall make timely restoration of any such improvements damaged by Contractor’s Operations and, when necessary because of such operations, shall move such improvements. If improvements are moved or damaged by Contractor’s Operations, improvements shall be replaced or repaired to their original condition within 10 working days, unless otherwise agreed in writing.
H.12 PROTECTION OF LAND SURVEY MONUMENTS
Forest Service shall appropriately designate on the ground all known survey monuments including but not limited to horizontal control stations (Triangulation Stations), vertical control stations (Bench Marks), property corner monuments, and all Public Land Survey System monuments. This shall include reference monuments, corner accessories such as bearing trees, line trees and line posts. Identifying signs shall be posted by Forest Service on two sides of each known bearing tree, and each line post shall be posted with a metal sign or decal. Line trees may be cut if designated by the Government.
In authorized clearings such as road construction clearings, and in other instances where damage to survey monuments, corners, corner accessories and survey of property line markers is unavoidable, Forest Service shall arrange protective or perpetuative action which does not cause unnecessary delay to Contractor.
Contractor shall protect all known survey monuments, witness corners, reference monuments, bearing trees and line markers against avoidable destruction, obliteration or damage during Contractor's operations. Additional monuments or objects discovered on the area shall be promptly reported to the other party and shall also be protected. If any known monuments, corners, corner accessories, and survey or property line markers are destroyed, obliterated or damaged during Contractor's operations, Contractor shall employ a registered professional land surveyor to reestablish or restore at the same location the monuments, corners, corner accessories or line markers. Such surveyors shall use procedures and monumentation that accords with the Bureau of Land Management Manual of Instructions for the Survey of the Public Lands of the United States for General Land Office surveys and any applicable State statutes concerned with land surveys. Contractor's agent shall record such surveys in accordance with state survey statutes.
H.13 PROTECTION OF RESIDUAL TREES
Contractor's Operations shall not unnecessarily damage young growth, black oak trees, residual conifer trees, rust resistant sugar pine trees, or other trees to be reserved.
Damage, as used herein, includes any injury to the living crown, bole, or roots of trees. If areas are marked on the ground around such young growth, leave islands, or individual trees, operation of heavy equipment or skidding of products within the area shall be considered to be damage to the leave islands or trees.
Contractor shall pay as fixed, agreed, and liquidated damages $4,628.00 for each rust resistant sugar pine reserve tree and $250.00 for each wildlife reserve tree damaged or destroyed by Contractor's Operations.
H.14 SANITATION AND SERVICING
Contractor shall take all reasonable precautions to prevent pollution of air, soil, and water by Contractor's
Operations. If facilities for employees are established on Contract Area, they shall be operated in a sanitary manner. Contractor shall not service tractors, trucks, or other equipment on National Forest lands where servicing is likely to result in pollution to soil or water. Contractor shall remove from National Forest lands all refuse resulting from use, servicing, repair, or abandonment of equipment. In the event that Contractor's
Operations or servicing of equipment result in pollution to soil or water, Contractor shall conduct cleanup to restore the polluted site to the satisfaction of Forest Service.
Contractor shall maintain all equipment…