Special Project Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Trabuco Canyon Bridge Project, newest first.
File Type Posted
Attendance_Sheet.pdf PDF
SF-30_Amendment_3.pdf PDF
RFI_and_pre-bid_tour_notes.pdf PDF
Trabuco_Canyon_Bridge_Drawings_Revision__1_(2014-08-15).pdf PDF
Business_Cards.pdf PDF
Trabuco_ERFO_2nd_and_3rd_Crossings_Site_Assessment__(2).xlsx XLSX spreadsheet
Reference_Reach_DesignTrabuco_ERFO_Bridge_LongPro_PebbleCount.xlsx XLSX spreadsheet
Schedule_of_Items_Revision_1.pdf PDF
SF-30_Amemdment_No.2.pdf PDF
Amendment_1.pdf PDF
Google_Map_photo.pdf PDF
Wage_Determination_CA140025.pdf PDF
trabuco_creek_drawings.pdf PDF
Solicitation.pdf PDF
PAL_Fire_Plan.pdf PDF
SF-24.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP AG-9A40-S-14-0034

Trabuco Canyon Bridge

TABLE OF CONTENTS FP-03 SPECIAL PROJECT SPECIFICATIONS

Preface 101 - Terms, Format, and Definitions

101.01 Meaning of Terms

101.03 Abbreviations.

101.04 Definitions

102 - Bid, Award, and Execution of Contract 102 Deletions

103 - Scope of Work Deletions

104 - Control of Work Deletions

104.06 Use of Roads by Contractor

104.07 Permitting Requirements

105 - Control of Material

105.02(a) Government Provided Sources

105.05 Use of Material Found in the Work

106 - Acceptance of Work

106.01 Conformity with Contract Requirements

106.07 Delete

107 - Legal Relations and Responsibility to the Public

107.02 Protection and Restoration of Property and Landscape

107.05 Responsibility for Damage Claims.

107.06 Contractor’s Responsibility for Work.

107.09 Legal Relationship of the Parties

107.10 Environmental Protection.

108 - Prosecution and Progress 108 Deletions

109 - Measurement and Payment 109 Deletions

109.02 Measurement Terms and Definitions.

151 - Mobilization

151.01 Description

151.02 Measurement

152 - Construction Survey and Staking

152.01 (c) Material

152.02 General

152.03 Survey and Staking Requirements

152.03(l) Miscellaneous Survey and Staking Table 152-1 Tolerances for reestablishing P-line, traverse, and elevations Table 152-2 Cross section and slope stake tolerances

153 - Contractor Quality Control

153.02 Contractor Quality Control Plan

154 – Contractor Sampling and Testing

154.01 Description

154.02 Sampling

154.03 Testing

154.07 Payment

156– Public Traffic

156.01 Description

156.02 Material

156.03 General

156.04 Temporary Traffic Control

156.05 Temporary Closures

156.06 Acceptance

156.07 Measurement and Payment

157 - Soil Erosion Control

157.01 Description

157.02 Materials

157.03 General

157.12 Inspection and Reporting

157.13 Maintenance

171 - Weed and Disease Prevention

171.01 Description

171.02 Material

171.03 General

171.04 Equipment

171.05 Washing

171.06 Inspection

171.07 Acceptance

171.08 Measurement

171.09 Payment

201 - Clearing and Grubbing

201.01 Description

201.03 General

201.06 Disposal

203 - Removal of Structures and Obstructions

203.01 Description

204 - Excavation and Embankment

204.05 Conservation of topsoil

204.10 Embankment Construction

204.11 Compaction

204.13 Sloping, Shaping and Finishing

204.14 Disposal of Unsuitable or Excess Material

208 - Structure Excavation and Backfill for Selected Major Structures

208.04 General

208.09 Foundation Preparation

208.13 Measurement

211 - Roadway Obliteration

211.02 Construction Requirements

251 - Riprap

251.03 General

251.08 Measurement

301 - Untreated Aggregate Courses 301 Title Change

301.05 Compacting

301.06 Surface Tolerance

301.08b Plasticity Index Table 301-1 Acceptance Sampling and Testing Requirements

301.09 Measurement

301.10 Payment

303 - Road Reconditioning

303.01 Description

403 - Hot Asphalt Concrete Pavement

403.06 Surface Preparation

403.16 Pavement Smoothness

403.17 Acceptance

Table 403-1 Acceptance Sampling and Testing Requirement 553 - Prestressed Concrete

553.02 Material

553.03 Method Approval

553.05 Concrete

553.07 Pretensioned Members

553.08 Storing, Transporting and Erecting

625 - Turf Establishment 625- Title Change

625.03 General

625.04 Preparing Seedbed

625.05 Watering

625.06 Fertilizing

625.07 Seeding

625.08 Mulching

625.09 Protecting and Caring for Seeded Areas

625.11 Measurement

626 - Plants, Trees, Shrubs, Vines and Groundcovers

626.01 Description

633 - Permanent Traffic Control

633.02 Material

633.03 General

633.05 Panels

635 - Temporary Traffic Control

635.03 General

648 - Stream Simulation

648.01 Description

648.02 Material

648.03 General

648.04 Equipment Operations

648.05 Excavation

648.06 Dewatering

648.07 Rewatering

648.08 Blasting and Rock Removal

648.09 Placed Streambed Simulation Material

648.10 Rock Bedforms, Forcing Features and Bank Construction

648.11 Log and Root Wad Structures

648.12 Measurement

648.13 Payment

701 - Cement

701.02 Masonry and Mortar Cement

702 - Asphalt Material

702.01 Asphalt Binder

703 - Aggregate

703.05 Subbase, Base and Surface Course Aggregate

705 - Rock

705.02 Riprap

705.07 Streambed Simulation Rock

705.08 Channel Rock

709 - Reinforcing Steel and Wire Rope

709.01 Reinforcing Steel

712 - Joint Material

712.01 Sealants, Fillers, Seals and Sleeves

713 - Roadside Improvement Material

713.05 Mulch

717 - Structural Metal

717.01 Structural Steel

717.07 Galvanized Coatings

718 - Traffic Signing and Marking Material

718.02 Protective Overlay Film and Edge Film

718.05 Aluminum Panels

Preface Preface_wo_03_15_2004_m

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005

101.01_nat_us_02_17_2005

101.01 Meaning of Terms.

Add the following:

Delete all references in FP-03 to Transportation Acquisition Regulations (TAR).

101.03_nat_us_02_17_2005

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI Symbols:

mp Milepost ppm Part Per Million

101.04_nat_us_02_22_2005

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

http://www.nist.gov/

Design Quantity-- “Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges.

Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

R ig ht of

W ay

R oa ds id e R oa ds id e

C le ar in g W id th

R oa dw ay

C le ar in g Li m it

X Y

G ro un d

Li ne

Tr av el ed

W ay C L

B er m S ur fa ce C ou rs e B as e

C ou rs e

Fi ll

S lo pe

B ac k S lo pe

D ra in ag e D itc h

G ro un d

Li ne

S ub gr ad e

R oa d B ed

S ha pe s an d di m en si on s w ill va ry to fi t l oc al c on di tio ns

S ee d ra w in gs fo r t yp ic al s ec tio ns

X a nd Y d en ot e cl ea rin g ou ts id e of ro ad w ay

N ot e:

Right - of - Way Line

Right - of - Way Line

Clearing Limit

Shoulder

Shoulder

102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work 103.00_nat_us_02_16_2005

Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work 104.00_nat_us_02_17_2005

Deletions

Delete sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005 Add the following subsections:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

104.07 Permitting Requirements

There are a number of permits that will need to be received prior to the start of construction. The Forest Service will submit the applications for these permits.

• The San Diego Water Quality Control Board will need to issue a Section 401 Water Quality Certification. They will also be issuing a Construction Activities Storm Water General Permit. The application for the Storm Water Permit requires submittal of a Storm Water Pollution Prevention Plan (SWPPP). It is the Contractor’s responsibility to prepare the SWPPP in accordance with Section 157

– Soil Erosion Control.

• The US Army Corps of Engineers will issue a Section 404 permit.

• The California Department of Fish and Wildlife will be issuing a Streambed

Alteration Agreement. The application for this permit requires submittal of the Dewater Plan. It is the Contractor’s responsibility to prepare the Dewater Plan in accordance with Sections 157 – Soil Erosion Control and 648 – Stream Simulation.

105 - Control of Material 105.02_nat_us_05_11_2004

105.02 Material Sources.

105.02(a) Government Provided Sources.

Add the following:

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work 106.01_nat_us_03_29_2005

106.01 Conformity with Contract Requirements.

Delete Subsection 106.01 and substitute the following:

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance.

Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price.

Four methods of determining conformity and accepting work are described in Subsections

106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

(1) Sampling method;

(2) Number of samples;

(3) Sample transport;

(4) Test procedures;

(5) Testing laboratories;

(6) Reporting;

(7) Estimated time and costs; and

(8) Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

(1) Have the work accepted at a reduced price; or

(2) Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public 107.10_05_us_07_27_2005

107.02 Protection and Restoration of Property and Landscape

Add the following:

Meet the requirements chapters 10, 11, and 12.2 in their entirety of “Water Quality Management for National Forest System Lands in California Best Management Practices” dated September 2000. This publication can be downloaded from http://www.fs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb5362512.pdf. In addition, all construction activities shall comply with the requirements of the FS National Core BMPs, dated April 2012. This publication can be downloaded from:

http://www.fs.fed.us/biology/resources/pubs/watershed/FS_National_Core_BMPs_April 2012.pdf .

All staging areas, the bypass location and other areas disturbed during construction activities shall be restored and left in an acceptable condition, as determined by the Contracting Officer.

107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_04_27_2005

107.06 Contractor’s Responsibility for Work.

Delete the following:

“except as provided in Subsection 106.07”.

107.09_nat_us_05_11_2004

107.09 Legal Relationship of the Parties.

Delete the entire subsection:

107.10_nat_us_02_23_2005

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

• Exact time and location of spill including a description of the area involved.

• Containment procedures.

http://www.fs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb5362512.pdf http://www.fs.fed.us/biology/resources/pubs/watershed/FS_National_Core_BMPs_April2012.pdf http://www.fs.fed.us/biology/resources/pubs/watershed/FS_National_Core_BMPs_April2012.pdf

• Summary of any communications contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up all spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress 108.00_nat_us_02_16_2005

108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment 109.00_nat_us_02_17_2005

109 Deletions Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_02_23_2005

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

109.02 Measurement Terms and Definitions.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

151 - Mobilization

151.01 Description

Add the following:

This work consists of washing and treating construction equipment and vehicles necessary for equipment transport to remove seeds, plants, and plant fragments before the equipment is used on Forest Service lands.

Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment. Only equipment inspected by the Forest Service will be allowed to operate within the project area. All subsequent move-ins of equipment to the project area will be treated in the same manner as the initial move-in. This requirement does not apply to cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas off the National Forest.

Equipment will be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment, components or the need for specialized inspection tools is not required.

Notify the CO in writing at least 48 hours before moving any construction equipment onto the national forest. Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service. Inspection will be required after every cleaning.

Use methods of cleaning and locations for cleaning approved by the C.O.

For work at a commercial washing facility, use an approved facility.

New infestations of noxious weeds of concern to Forest Service and identified by either Contractor or Forest Service, on the Project Area or on the haul route, will be promptly reported to the other party. Contractor and Forest Service will agree on treatment methods to reduce or stop the spread of noxious weeds when new infestations are found. A current list of noxious weeds of concern to Forest Service is available at each Forest Service office.

151.02 Measurement

Clean equipment prior to moving onto this project. The initial cleaning will not be included in the measurement for payment. Payment under this item will only be made if subsequent cleanings are ordered by the CO. Measurement shall be on an “each” basis, meaning one complete cleaning of all equipment required for this contract.

Subsequent cleanings necessitated by the Contractor’s actions but not directed by the CO will not be included in the measurement for payment.

152 - Construction Survey and Staking 152.00_nat_us_02_23_2005

Description

152.01(c) Material.

Use required stake dimensions and materials. Pre-paint the top 2 inches of all stakes and lath, or mark them with plastic flagging. Use designated colors for paint or flagging.

Mark all stakes with a stake pencil that leaves a legible imprint, or with waterproof ink.

Do not use aerosol spray paints.

Use moisture-resistant paper for survey notes. Keep notes in books with covers that will protect the contents and retain the pages in numerical sequence.

Construction Requirements

152.02 General.

Delete the first two sentences.

Add the following:

All construction staking for elevation control, grade control, site layout, bridge components and roadway shall be the responsibility of the Contractor. Contractor shall stake location of all bridge components for approval of the Contracting Officer prior to construction. The Contractor is responsible for maintaining the construction staking.

When indicated on the plans, a preliminary survey line has been established on the ground. The project location line is established by offsets from this preliminary line.

Delete second sentence in second paragraph and replace with the following:

Reestablish missing reference, control lines, or stakes as necessary to control subsequent construction staking operations

152.03 Survey and Staking Requirements.

(b) Roadway cross-sections.

Replace the first two sentences with the following:

Take roadway cross-sections normal to centerline. When the centerline curve radius is less than or equal to 200 feet, take cross-sections at a maximum centerline spacing of 25 feet. When the centerline curve radius is greater that 200 feet take cross-sections at a maximum centerline spacing of 80 feet.

c) Slope Stakes & References:

Replace section with the following:

Slope stakes and references. When required, locate slope stakes on designated portions of the road. Locate the slope stake catch points and use them to establish clearing limits and slope stake references.

Mark slope stakes with the station, the amount of cut or fill, the horizontal distance to centerline, and the slope ratios.

Place slope reference stakes at least 10 feet outside the clearing limit and mark with the offset distance to the slope stake. Place sight stakes when required.

Prior to clearing and grubbing operations, move the slope stake outside the clearing limit to the slope reference stake. After clearing and grubbing and before excavation, reset the slope stakes in their original position.

Use the designated method to establish the slope stake catchpoint.

• Method I—Computed Method. Use the template information shown in the plans or other Government-provided data to calculate the actual location of the catchpoint. The slope stake “catchpoint distance” provided may be used as a trial location to initiate slope staking. Recatch slope stakes on any section that does not match the staking report within the tolerances established in Table 152-2.

• Method II—Catchpoint Measurement Method. Determine the location of slope stake catchpoints by measuring the catchpoint distances shown in the plans or other Government-provided data.

(d) Clearing and grubbing limits.

Establish clearing limits on each side of the location line by measuring the required horizontal or slope distances shown in the stake notes. Mark the clearing limits with flagging or tags on trees to be left standing, or on lath. Make markings intervisible, and no more than 90 feet apart.

After establishing clearing limits, move the location line stake outside the clearing limits for station identification purposes, and mark it with horizontal distance to location line.

(e) Centerline reestablishment.

Replace with the following:

Reestablish centerline from instrument control points. The maximum spacing between centerline points is 25 feet when the centerline curve radius is less than or equal to 200 feet. When the centerline curve radius is greater than 200 feet, the maximum distance between centerline points is 80 feet.

(g) Culverts.

Replace subsection with the following:

Set culvert reference stakes at all culvert locations. Set a culvert reference stake on the centerline of the culvert 10 feet from each end or beyond the clearing limit, whichever is greater. Record the following on culvert reference stakes:

(1) Diameter, actual field measured length, and type of culvert.

(2) The vertical and horizontal distance from the reference stake to the invert at the ends of the culvert.

(3) Station of actual point where culvert intersects centerline.

When required, stake headwall for culverts by setting a hub with a guard stake on each side of the culvert on line with the face of the headwall. Perform this work after clearing is completed.

152.03 (l) Miscellaneous Survey and Staking.

Add the following:

(11) Cattleguards

(12) Drain Dips

(13) Erosion Control Measures

Replace Table 152-1 with the following two tables:

Table 152-1 Tolerances for reestablishing P-line, traverse, and elevations.

Precision

Class

Minimum Position Closure

Angular Accuracy

L-Line Tangent Control Pointsa

Vertical Closureb

A (Bridges) 1/10,000

2 sets, direct/reverse 10 second rejection limit

N/A 0.02 ft or 0.02ft/1000ftc

B 1/5,000 2 sets, direct/reverse 20 second rejection limit

0.1 ft 0.02 ft or 0.02ft/1000ftc

C 1/1,000 1 set, direct/reverse 1 minute rejection limit

0.2 ft 0.5ft/1000ftc

D 1/300 Foresight and backsight; 15 minute rejection limitc

0.4 ft 1.0ft/1000ftc

E 1/100 Foresight and backsight; 30 minute rejection limitc

0.8 ft 1.0ft/1000ftc

a. Accuracy of offset measurement.

b. Determine vertical closures at intervals not to exceed 2000 ft. as measured along centerline.

c. Use greater value.

Table 152-2 Cross section and slope stake tolerances.

Item Tolerances A B C D E

Allowable deviation of cross-section line projection from a true perpendicular to tangents, a true bisector of angle points, or a true radius of curves

(±)2o (±)3o (±)3o (±)5o (±)5o

Take cross-sections topography measurements so that variations in ground from a straight line connecting the cross-section points will not exceed

0.5 ft 1.0 ft 2.0 ft 2.0 ft 3.0 ft

Horizontal and vertical accuracy for cross-sections, in feet or percentage of horizontal distance measured from traverse line, whichever is greater.

0.1 ft or 0.4%

0.15 ft or 0.6%

0.2 ft or 1.0%

0.2 ft or 1.0%

0.3 ft or 1.0%

Horizontal and vertical accuracy for slope stake, slope stake references, and clearing limits. In feet or percentage of horizontal distance measured from centerline or reference stake, whichever is greater.

Slope reference stakes and slope stakes.

0.1 ft or 0.4%

0.15 ft or 0.6%

0.2 ft or 1.0%

0.2 ft or 1.0%

0.3 ft or 1.0%

Clearing limits 1.0 ft 1.0 ft 1.0 ft 1.5 ft 2.5 ft

153 - Contractor Quality Control 153.02_nat_us_02_17_2005

153.02 Contractor Quality Control Plan.

Add the following:

Submit written proposals for approval of alternate AASHTO or State approved test methods. Alternate methods may be allowed based on documented equivalence to the specified method.

154 – CONTRACTOR SAMPLING AND TESTING

154.01 Description

Add the following paragraph, after the first paragraph:

Inspection and testing shall be performed by an independent third party, having no other assignments under this contract. Inspection personnel shall be experienced in this type of work, and familiar with Government contracts and specifications. Failure to perform testing and reporting in accordance with this and other applicable specifications shall be grounds for dismissal of this personnel. The contractor shall promptly replace faulty inspection.

154.02 Sampling

Delete the first two (2) sentences of the first paragraph and add the following sentence to the end of the first paragraph:

All sampling and testing shall be performed in accordance with the table below.

154.03 Testing

Delete the first sentence of the paragraph and add the following sentence to the end of the first paragraph:

All sampling and testing shall be performed in accordance with the table below.

154.07 Payment

Delete the first sentence of the first paragraph. Add the following at the end of the first paragraph:

Do not measure contractor sampling and testing for payment. Compensation is made as an indirect payment.

Delete the last two paragraphs.

156 – PUBLIC TRAFFIC

This Specification is revised as follows:

Delete Section 156 in its entirety and replace with the following:

156.01 Description

This work consists of controlling and protecting public traffic adjacent to and within the project.

156.02 Material

Conform to the MUTCD and a minimum, include the following Sections and Subsections:

Construction sign panels 633 Retro-reflective sheeting 718.01 Temporary concrete barrier 618 Temporary plastic fence 710.11 Temporary traffic control devices 718.22

156.03 General.

The Contractor’s construction operations will be limited to Monday through Friday, between the hours of 0800-1630, unless otherwise approved by the Contracting Officer.

No construction work will be allowed on Federal holidays. Keep existing roads open to all traffic during construction work, and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed 30 minutes at any one time followed by an open period of no less than 30 minutes, unless approved in advance by the Contracting Officer. No overnight closures will be approved. All emergency traffic shall be adequately accommodated at all times.

A temporary bypass route shall be designed and submitted to the Contracting Officer for approval. The bypass route shall provide a means for vehicles to cross over the stream during construction. The design shall prevent delivery of sediment into streams, shall avoid damaging the streambed or channel, or cause flooding. The temporary bypass shall be located where erosion potential is low, where practical, and to keep stream disturbance to a minimum. Install any required culverts in temporary bypass with sufficient capacity to accommodate the stream flow during the period the bypass will be installed. The Q2 flow is 128 cfs. The temporary bypass shall have a minimum travelled way width of 10 feet and a maximum grade of 10%. The bypass shall be designed and maintained for use by passenger cars. Appropriate signage will be installed in accordance with MUTCD. The design of the bypass includes design of a sign plan. It’s the contractor’s responsibility to inspect and maintain the temporary bypass during its life. The temporary bypass shall be removed when no longer needed.

Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved. Install construction signs and traffic control devices in conformance with MUTCD. All required signs will be in place and approved prior to beginning work on project.

156.04 Temporary Traffic Control.

Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:

(a) Furnish and install traffic control devices before the start of construction operations.

(b) All detours will be approved in writing by the Contracting Officer as part of the traffic control plan.

(c) Install only those traffic control devices needed for each stage or phase.

(d) Relocate temporary traffic control devices as necessary.

(e) Remove devices that no longer apply to the existing conditions.

(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.

(g) Keep temporary traffic control devices clean.

(h) Remove all temporary traffic control devices upon contract completion or when approved.

(i) When required, use flaggers certified by the American Traffic Safety Services

Association, the National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.

156.06 Acceptance.

Public traffic work will be evaluated under Subsection 106.02.

156.07 Measurement and Payment

Payment will be made as specified in the Schedule of Items.

157 - Soil Erosion Control

157.01 Description

A. Water pollution control work shall conform to the provisions in the CalTrans

Stormwater Quality Handbook and these special provisions.

This project shall conform to the requirements of the National Pollutant Discharge Elimination System (NPDES) Permit for General Construction Activities by the State Water Resources Control Board (SWRCB). This General Permit, hereafter referred to as the “Permit,” regulates storm water discharges associated with construction activities.

Water pollution control work shall conform to the requirements in the CalTrans “Storm Water Pollution Prevention Plan (SWPPP) and Water Pollution Control Program (WPCP) Preparation Manual” and the CalTrans “Construction Site Best Management Practices (BMPs) Reference Manual,” and addenda thereto issued up to, and including, the date of advertisement of the project, hereafter referred to respectively as the “Preparation Manual” and the “Construction Site BMP Manual” and collectively as the “Manuals.” Copies of the Manuals and the Permits may be obtained from the Department of Transportation, Material Operations Branch, Publication Distribution Unit, 1900 Royal Oaks Drive, Sacramento, California 95815, Telephone: (916) 445-3520. Copies of the Manuals may also be obtained from the Department of Transportation’s Internet Web Site at: http://www.dot.ca.gov/hq/construc/stormwater.html.

B. The Contractor shall know and fully comply with the applicable provisions of the Manuals, Permit, and Federal, State, and local regulations that govern the Contractor’s operations and storm water discharges from both the project site and areas of disturbance outside the project limits during construction. The Contractor shall maintain a copy of the Permit at the project site and shall make the Permit available during construction.

The Contractor shall implement, inspect and maintain all necessary water pollution control practices to satisfy all applicable Federal, State, and Local laws and regulations that govern water quality for areas used outside of the Project limits or areas arranged for the specific use of the Contractor for this project. Installing, inspecting, and maintaining water pollution control practices on areas outside the Project limits will not be paid for by the Government.

C. The Contractor shall be responsible for the costs and for liabilities imposed by law as a result of the Contractor’s failure to comply with the provisions set forth in this section “Water Pollution Control”, including but not limited to, compliance with the applicable provisions of the Manuals, Permit, and Federal, State and local regulations. Costs and liabilities include, but are not limited to, fines, http://www.dot.ca.gov/hq/construc/stormwater.html penalties, and damages whether assessed against the Government or the Contractor, including those levied under the Federal Clean Water Act and the State Porter Cologne Water Quality Act.

D. Conformance with the provisions of this section “Soil Erosion Control” shall not relieve the Contractor from the Contractor’s responsibilities.

E. The Contractor shall notify the Contracting Officer immediately upon request from the regulatory agencies to enter, inspect, sample, monitor or otherwise access the project site or the Contractor’s records pertaining to water pollution control work.

157.02 Materials

Except as otherwise indicated in this Section, the Contractor shall comply with the most recent version of the following reference documents:

A. CalTrans Standard Specifications, Section 7-1.01G “Water Pollution”, 2010 edition.

B. CalTrans “Storm Water Pollution Prevention Plan Preparation Manual”, March

2007 edition.

C. CalTrans “Water Pollution Control Program Preparation Manual”, March 2007 edition.

D. CalTrans “Construction Site Best Management Practices (BMPs) Reference

Manual”, March 2007 edition.

E. General Permit – Regional Water Quality Control Board.

157.03 General

Delete the entire subsection and replace with the following:

Prior to the start of construction, submit a written plan that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control. An alternate erosion control plan with all necessary permits may be submitted 30 days before intended use.

Incorporate all permanent erosion control features into the project at the earliest practicable time, as outlined in the approved plan.

When erosion control measures are not functioning as intended, immediately take corrective action.

SWPPP Preparation, Approval and Updates

A. As part of the water pollution control work, a Storm Water Pollution Prevention Plan, hereafter referred to as the “SWPPP,” is required for this contract. The SWPPP shall conform to the provisions in Section 7-1.01G, “Water Pollution,” of the CalTrans Standard Specifications, the requirements in the Manuals, the requirements of the Permit, and these special provisions. Upon the RWQCB approval and the Forest Service approval of the SWPPP, the SWPPP shall be considered to fulfill the provisions in Section 7-1.01G, “Water Pollution,” of the CalTrans Standard Specifications for development and submittal of a Water Pollution Control Program.

B. No work having potential to cause water pollution, as determined by the

Contracting Officer or RWQCB, shall be performed until the Contracting Officer and RWQCB has approved the SWPPP.

C. The Contractor shall designate a Water Pollution Control Manager. The Water

Pollution Control Manager shall be responsible for the preparation of the SWPPP and any required modifications or amendments and shall be responsible for the implementation and adequate functioning of the various water pollution control practices employed. The Water Pollution Control Manager shall serve as the primary contact for all issues related to the SWPPP or its implementation, monitoring and maintenance. The Contractor shall submit to the Contracting Officer a statement of qualifications, describing the training, previous work history and expertise of the individual selected by the Contractor to serve as Water Pollution Control Manager. The Contracting Officer will reject the Contractor’s submission of a Water Pollution Control Manager if the submitted qualifications are deemed to be inadequate.

D. Within 30 days after the issuance of the Notice to Proceed on the contract, the

Contractor shall submit 5 copies of the SWPPP to the Contracting Officer.

E. The objectives of the SWPPP shall be to:

• Identify all pollutant sources including sources of sediment that may affect the quality of storm water discharges associated with construction activity (storm water discharges) from the construction site, and

• Identify non-storm water discharges, and

• Identify, construct and implement in accordance with a time schedule, and maintain BMPs to reduce or eliminate pollutants in storm water discharges from the site during the duration of the work.

• Develop a maintenance schedule for BMPs installed before and during construction designed to reduce or eliminate pollutants after construction is completed (post-construction BMPs).

The SWPPP shall apply to all areas that are directly related to construction activities and other site work including, but not limited to, staging areas, storage yards, and access roads within or outside of the Project limits.

F. As a minimum, the SWPPP shall incorporate pollution control practices in the following categories:

1. Soil Stabilization;

2. Sediment control;

3. Tracking control;

4. Wind erosion control;

5. Non-storm water control; and

6. Waste management and material pollution control.

7. Sampling and analysis

G. The Contractor shall develop a Water Pollution Control Schedule that shall describe the timing of grading or other work activities that could affect water pollution. The Water Pollution Control Schedule shall be updated by the Contractor to reflect any changes in the Contractor’s operations that would affect the necessary implementation of water pollution control practices.

H. The Contractor shall incorporate the “Minimum Requirements” presented in the Preparation Manual into the SWPPP. In addition to the “Minimum Requirements” presented in the Preparation Manual, the Contractor shall complete the BMP Consideration Checklist presented in the Preparation Manual and incorporate the appropriate BMPs into the SWPPP.

I. One hundred percent (100%) of exposed disturbed areas including all flat areas and slopes must have erosion protection BMPs properly installed and maintained during the rainy season (October 1 through April 30). Unpaved roadways and traveled ways within contractor’s onsite yards are exempt from 100% erosion control protection requirement but shall have, where appropriate, BMPs installed such as gravel bag chevrons as conditions warrant.

J. The Contractor shall prepare an amendment to the SWPPP when there is a change in construction activities or operations which may affect the discharge of pollutants to surface waters, ground waters, municipal storm drain systems, or when recommended by the Forest Service. Amendments shall show additional water pollution control practices or revised operations, including those areas or operations not shown in the initially approved SWPPP.

Amendments to the SWPPP shall be prepared and submitted for review and approval in the same manner as specified for the SWPPP approval.

Subsequent amendments shall be submitted within a time approved by the Contracting Officer, but in no case longer than the time specified for the initial submittal and review of the SWPPP. At a minimum, the SWPPP shall be amended annually and submitted to the Contracting Officer 25 days prior to the defined rainy season.

K. The Contractor shall keep one copy of the approved SWPPP and approved amendments at the project site. The SWPPP shall be made available upon request of a representative of the Regional Water Quality Control Board, State Water Resources Control Board, United States Environmental Protection Agency or the local storm water management agency. Requests by the public shall be directed to the Contracting Officer.

L. SWPPP IMPLEMENTATION

Upon approval of the SWPPP, the Contractor shall be responsible throughout the duration of the project for sampling and analysis (if required), installing, constructing, inspecting, maintaining, removing and disposing of the water pollution control practices included in the SWPPP and any amendments.

Implementation of the SWPPP begins when construction begins, and before initial clearing, grubbing, and grading operations. Unless otherwise directed by the Contracting Officer, the Contractor’s responsibility for SWPPP implementation shall continue throughout any temporary suspension of work ordered.

If the Contractor or the Contracting Officer identifies a deficiency in any aspect of the implementation of the approved SWPPP or amendments, the deficiency shall be corrected immediately. The deficiency may be corrected at a later date and time, if requested by the Contractor, and approved by the Contracting Officer in writing, but not later than the onset of the precipitation. If the Contractor fails to correct the identified deficiency by the date agreed or prior to the onset of precipitation the project shall be in noncompliance.

If the Contractor fails to conform to the provisions of “Water Pollution Control,” the Contracting Officer may order the suspension of any construction operations which create water pollution.

Implementation of water pollution control practices may vary by season. The Construction Site BMP Reference Manual and these special provisions shall be followed for control practice selection of year round, rainy season and non-rainy season water pollution control practices.

M. YEAR- ROUND IMPLEMENTATION REQUIREMENTS

1. The Contractor shall conduct sampling and analysis (if required), and have a year-round program for implementing, inspecting and maintaining water pollution control practices for soil stabilization, wind erosion control, tracking control, sediment control, non-storm water control, waste management and materials pollution control.

2. As part of the SWPPP, the Contractor’s shall have a “weather triggered” action plan and have the ability to deploy standby BMPs as needed to completely protect the exposed portion of the project site within 48 hours of a predicted storm event.

3. The National Weather Service weather forecast shall be monitored and used by the Contractor on a daily basis. An alternative weather forecast proposed by the Contractor may be used if approved by the Contracting Officer. If precipitation is predicted, the necessary water pollution control practices shall developed prior to the onset of the precipitation.

4. A minimum of 100% of the material needed to install weather triggered BMPs necessary to completely protect the exposed portions of the site from erosion, and to prevent sediment discharges, must be stored on site. Areas that have already been protected from erosion using physical stabilization or established vegetation stabilization BMPs as determined by the Contracting Officer, are not considered “exposed” for purposes of this requirement.

5. Disturbed soil areas shall be considered active whenever the soil disturbing activities have occurred, continues to occur or will occur during the ensuing 21 days. Non-active areas shall be protected as prescribed in the Construction Site BMP Manual within 14 days of cessation of soil disturbing activities or prior to the onset of precipitation, whichever occurs first.

6. In order to provide effective erosion control the Contractor may be requested to apply permanent erosion control in small or multiple units as disturbed soil areas are deemed substantially complete by the Contracting Officer.

7. The Contractor shall implement, maintain, and inspect the following temporary sediment control practices on a year-round basis, as conditions warrant. The listed practices shall remain in place until their use is no longer needed, as determined by the Contracting Officer.

8. The active disturbed soil area of the project site shall be not more than 1 acre.

The Contracting Officer may approve, on a case-by-case basis, expansions of the active disturbed soil area limit. Soil stabilization and sediment control materials shall be maintained on site sufficient to protect the unprotected disturbed soil area. A detailed plan for the mobilization of sufficient labor and equipment shall be maintained to deploy the water pollution control practices required to protect the project site prior to the onset of precipitation events.

157.12 Inspection and Reporting

A. Report of Discharges, Notices or Orders:

If the Contractor identifies any discharge into receiving waters in a manner causing, or potentially causing, a condition of pollution, or if the project receives a written notice or order from any regulatory agency, the Contractor shall immediately inform the Contracting Officer within 2 days of the discharge event, notice, or order. The report shall include the following information:

1. The date, time, location, nature of the operation, and type of discharge, including the cause or nature of the notice or order.

2. The water pollution control practices deployed before the discharge event, or prior to…