Reference_Reach_DesignTrabuco_ERFO_Bridge_LongPro_PebbleCount.xlsx

XLSX spreadsheet 60 KB Posted

Attached to
Trabuco Canyon Bridge Project Federal contract opportunity
Solicitation number
AG-9A40-S-14-0034
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Reach Design Trabuco ERFO Bridge LongPro Pebble Count

View the file

Other files for this federal contract opportunity

Other files attached to Trabuco Canyon Bridge Project, newest first.
File Type Posted
RFI_and_pre-bid_tour_notes.pdf PDF
Trabuco_Canyon_Bridge_Drawings_Revision__1_(2014-08-15).pdf PDF
Attendance_Sheet.pdf PDF
SF-30_Amendment_3.pdf PDF
Business_Cards.pdf PDF
Trabuco_ERFO_2nd_and_3rd_Crossings_Site_Assessment__(2).xlsx XLSX spreadsheet
Schedule_of_Items_Revision_1.pdf PDF
SF-30_Amemdment_No.2.pdf PDF
Amendment_1.pdf PDF
Google_Map_photo.pdf PDF
trabuco_creek_drawings.pdf PDF
Wage_Determination_CA140025.pdf PDF
PAL_Fire_Plan.pdf PDF
SF-24.pdf PDF
Solicitation.pdf PDF
Special_Project_Specifications.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Long Profile

Reference Reach with ~4-5% slope
Distance on Tape starting from base of stepRod HeightNotesBankful width (meters)
in metersin metersNotesReference Reach
0-1.1Start below woody debris dam, in a small pool.
0.6-1Bottom of wood/boulder stepStep
3.2-1Top of boulder step
4.5-1.47Bottom of boulder stepRun 1
5.4-1.54Begin run/glide (possibly shallow pool)
9.2-1.47Run continues through shallow step
12-1.46Run continues
14.6-1.25Run continues as substate increases in roughness and diameterRiffle 1
16.8-1.54Small riffle and step (left bank has large boulders, right bank smaller substrate)8.8
19-1.6Small step in riffle
20.6-1.94Bottom of riffle and step
22.1-2.16Pool below riffle, gradually becomes run through curve around gravel bar.
24.4-2.1Start run through curve
26.3-2Begin rock leading to top of large step.10Step
28-1.86Top of large step above cascade start
29-2.14Bottom of large step above cascade start
30.2-2.14Flat rocky section to cascade top
31.6-2.35Top of cascade9Cascade
33.5-2.64cascade step
36.5-3.1cascade step
37.3-3.12end cascade
38.6-3.15Pool at the base of the cascade6.4
40.8-3.2Another pool below small step.
42.5-3.16end pool. Begin step.
44.3-3.3Through rock step8.8
45.3-3.35Pool below step.
47.2-3.65Pool to riffle.
48-3.25RiffleRiffle 2
49.5-3.29Riffle
50-3.35Riffle
53.2-3.45Run8
61.8-3.59Top of cascade
63.3-3.95Cascade

Reference Reach 0 0.6 3.2 4.5 5.4 9.1999999999999993 12 14.6 16.8 19 20.6 22.1 24.4 26.3 28 29 30.2 31.6 33.5 36.5 37.299999999999997 38.6 40.799999999999997 42.5 44.3 45.3 47.2 48 49.5 50 53.2 61.8 63.3 -1.1000000000000001 -1 -1 -1.47 -1.54 -1.47 -1.46 -1.25 -1.54 -1.6 -1.94 -2.16 -2.1 -2 -1.86 -2.14 -2.14 -2.35 -2.64 -3.1 -3.12 -3.15 -3.2 -3.16 -3.3 -3.35 -3.65 -3.25 -3.29 -3.35 -3.45 -3.59 -3.95 Riffle 1 14.6 16.8 19 20.6 -1.25 -1.54 -1.6 -1.94 Step 26.3 28 29 -2 -1.86 -2.14 Cascade 31.6 33.5 36.5 37.299999999999997 -2.35 -2.64 -3.1 -3.12 Riffle 2 48 49.5 50 53.2 61.8 -3.25 -3.29 -3.35 -3.45 -3.59 Step 0.6 3.2 4.5 -1 -1 -1.47 Sediment Size

Riffle Pebble Count Results
% smallerin mm
12
1022.6
2032
3045
4064
5090
6090
70180
80200
84240
90250
95300
100540
Cascade Pebble Count Results
% smallerin mm
132
1145
2090
30128
40128
50180
60200
70270
80300
85500
90600
95700
1001400

Cascade Pebble Count Results 32 45 90 128 128 180 200 270 300 500 600 700 1400 0.96153846153846156 10.576923076923077 20.192307692307693 29.807692307692307 40.384615384615387 50 59.615384615384613 70.192307692307693 79.807692307692307 84.615384615384613 90.384615384615387 95.192307692307693 100 Riffle Pebble Count Results 2 22.6 32 45 64 90 90 180 200 240 250 300 540 1 10 20 30 40 50 60 70 80 84 90 95 100 image1.png image2.png image3.png

File details come from the government source that posted it. Updated .