SF-30_Amendment_3.pdf

PDF 23 KB Posted

Attached to
Trabuco Canyon Bridge Project Federal contract opportunity
Solicitation number
AG-9A40-S-14-0034
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

SF-30 Amendment 3

View the file

Other files for this federal contract opportunity

Other files attached to Trabuco Canyon Bridge Project, newest first.
File Type Posted
RFI_and_pre-bid_tour_notes.pdf PDF
Trabuco_Canyon_Bridge_Drawings_Revision__1_(2014-08-15).pdf PDF
Attendance_Sheet.pdf PDF
Business_Cards.pdf PDF
Trabuco_ERFO_2nd_and_3rd_Crossings_Site_Assessment__(2).xlsx XLSX spreadsheet
Reference_Reach_DesignTrabuco_ERFO_Bridge_LongPro_PebbleCount.xlsx XLSX spreadsheet
Schedule_of_Items_Revision_1.pdf PDF
SF-30_Amemdment_No.2.pdf PDF
Amendment_1.pdf PDF
Google_Map_photo.pdf PDF
trabuco_creek_drawings.pdf PDF
PAL_Fire_Plan.pdf PDF
SF-24.pdf PDF
Wage_Determination_CA140025.pdf PDF
Solicitation.pdf PDF
Special_Project_Specifications.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 33

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

Amendment 3 August 20, 2014

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

USDA Forest Service R5 Acquisition Management 1600 Tollhouse Road Clovis, CA 93611

USDA Forest Service R5 Acquisition Management 1600 Tollhouse Road Clovis, CA 93611

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-9A40-S-14-0034

9B. DATED (SEE ITEM 11)

July 21, 2014

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning ____ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return Original copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Trabuco Canyon Bridge and Stream Restoration, Cleveland National Forest This solicitation is amended as follows:

1. Closing date for receipt of proposals has been extended to September 5, 2014. 1600 (hour) local time.

2. Attached are the RFI Questions and Answers and pre-bid tour notes with answers.

3. Attached is the Attendance Sheet and Business Cards of those present during the pre-bid tour.

4. Delete the original Schedule of Items and replace with the attached revised Schedule of Items.

5. Delete the original construction drawings and replace with the attached revised construction drawings, dated 8/15/2014.

6. Attached are two documents to assist bidders in designing the Stream Simulation. These are only provided if offeror choose to offer a price on Option 2. The Documents are 1. Reach Design ERFO Bridge LongPro Pebble Count and 2.

Trabuco ERFO 2nd and 3rd Crossings Site Assessment.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PATRICK J. GALLEGOS, Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243