Sycamore_Road__Spec_Mobilization.pdf

PDF 10 KB Posted

Attached to
Emergency Storm Patrol, Sycamore Road
Solicitation number
AG-9A40-S-14-0007
Issued by

About this file

Specifications

View the file

Other files

File Type Posted
FirePlan.pdf PDF
Wage_Rate.pdf PDF
Experience_Questionnaire.pdf PDF
9A40S140007.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIAL PROJECT SPECIFICATION

SECTION 151 – MOBILIZATION

DESCRIPTION

151.01 WORK. This work consists of moving personnel, equipment, materials, and incidentals to the project and performing all work necessary work at the project site.

Mobilization includes the obtaining of permits, insurance, and bonds.

MEASUREMENT

151.02 METHOD. Mobilization will be measured by the Lump Sum.

PAYMENT

151.03 BASIS. The accepted quantity, measured as provided above, will be paid at the contract price per unit of measurement for the pay item listed below that is shown in the schedule of items. Payment will be full compensation for the work prescribed in this Section.

The mobilization lump sum will be paid as follows:

(a) Bond premiums will be reimbursed after receipt of the evidence of payment.

(b) 50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.

(c) Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.

(d) Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.

Payment will be made under:

Pay Item 151 (01) Mobilization ………………………………………………Lump Sum (includes bonding cost)

SPECIAL PROJECT SPECIFICATION

SECTION 628 –TYPE III STORM PATROL

DESCRIPTION

628.01. Type III Storm Patrol is for paved roads. The Contractor is to respond to the site within 24 hours after being contacted by the Government. Contractor shall provide a phone number where he can be reached (no recording devices) 24 hrs. per day. When it begins to rain, the contractor shall be prepared. In the event of a slide the COR will contact the contractor and the contractor is to respond to the emergency within 24 hours.

In rare circumstances, an emergency such as a threat to life may arise and night operations may be authorized by the COR. The contractor and equipment shall remain in the vicinity of the road (1/2 Hour Response) until it has been determined that the storm event is over and the road is open and drainage function is working properly, at which point the contractor will be released.

628.01a Equipment:

Minimum of one backhoe/front loader, 90 hp min. with operator.

Minimum of one 10 Cu.Yd. Dump Truck with driver/laborer.

Recommended, one Pickup with fuel tank for refueling equipment.

628.01b Work:

The work is to maintain and restore access following storm events on paved roads.

Typical work activities involve removal of storm debris, cleaning out of culverts and catch basins, to allow access for local traffic. The contractor shall provide road closure signs for the clean up work.

628.01c Method of Measurement: Type III Storm Patrol will be Days.

628.01 PAYMENT

The accepted quantities will be paid for at the contract unit price for each pay item shown in the Schedule of Items. Payment will be made under:

628(01) Type III Storm Patrol ……………………………………………. DAY