Painting Statement of Work.pdf

PDF 14 KB Posted

Attached to
Painting - Los Angeles River Ranger District
Solicitation number
AG-9A40-S-11-0014
Issued by

About this file

Specifications

View the file

Other files

File Type Posted
Amendment1.pdf PDF
PaintingRFQ.pdf PDF
WageRate.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR PAINTING DISTRICT OFFICE

PART 1 GENERAL

1.01 DESCRIPTION: The work of this task order is to re-stain siding and repaint other surfaces including block walls of the District Office and building 2318 at the Los Angeles River Ranger District Office.

1.02 PROJECT LOCATION: Los Angeles River Ranger District Office, 12371 Little Tujunga Canyon Road, Sylmar, CA 91342.

1.04 LICENSED CONTRACTOR: All work under this section shall be performed by a California licensed painting contractor.

1.05 SUBMITTALS: Submittals shall include manufacturer’s technical information, label analysis, and application instructions for each material proposed for use.

Provide samples of each color and material to be applied, with texture to simulate actual conditions.

1.06 SCOPE OF WORK: The scope of work can be broken up into five subparts.

1. Provide paint materials. Materials shall meet or exceed the current VOC requirements. Materials shall include stain and paint. Colors shall be the same as original. Provide primers and undercoats that are produced by the same manufacturer. Provide the Manufacturer’s best quality trade sale paint material of the coatings required. Stain shall be solid body. Stain shall be Sherwin Williams, Dunn Edwards or equal.

2. Re-stain the exterior wood siding on the District Office and repaint the block siding on the District Office, building 2318, stairway including case and handrails, all wooden railing, exterior doors of either building, fascia and gutters, and window frames and trims. Paint and stain shall be applied in accordance with the Manufacturer’s instructions.

4. Clean and prepare surfaces to be painted in accordance with the manufacturer’s instructions for each particular substrate condition and as specified. Pressure wash entire surface a minimum of 24 hours prior to application of paint. Fill holes and cracks and sand smooth.

5. At the end of each work day, remove empty cans, rags, rubbish, and other discarded paint materials from the site. Upon completion of the painting, clean glass and paint spattered surfaces. Remove spattered paint by washing and scraping, using care not to scratch or damage adjacent finished surfaces. Provide wet paint signs to protect newly painted finishes. Remove all paint chips left over from the preparation.

FOX FIELD AIR ATTACK BASE P a g e | 2

6. The District office will be open for business during the project. The Contractor shall take special care to accommodate the public and the Forest Service personnel passing in and out of the building.

END OF STATMENT

File details come from the government source that posted it. Updated .