AG-9702-S-10-0344-0003.pdf

PDF 82 KB Posted

Attached to
RECOVERY--San Bernardino NF Water Systems
Solicitation number
AG-9702-S-10-0344
Issued by

About this file

Amendment 0003

View the file

Other files

File Type Posted
NOTICE of June 3-ExtendDueDate.docx DOCX document
AG-9702-S-10-0344-0002.pdf PDF
SBNF Water System Improvements Specifications--Revised 17 May 2010.pdf PDF
AG-9702-S-10-0344-0001.pdf PDF
IFB Package.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0003 06/07/2010

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

USDA Forest Service EROC-SW Contracting (Attn: Charles Wallach) 1323 Club Drive Vallejo, CA 94592

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-9702-S-10-0344

9B. DATED (SEE ITEM 11)

05/07/2010

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return one (1) copy to the issuing office. Submit signed solicitation amendments in the same manner as offers, in accordance with Section L instructions.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

See attached SUMMARY OF CHANGES.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT - Attachment to SF 30 2 3

ISSUANCE DATE: 06/07/2010 PROJECT NAME: San Bernardino NF Water System Improvements

AMENDMENT NUMBER: 0003

List below (or on attached sheet, if necessary) each proposed modification identified by Item Number, location of station, etc., giving the reasons for the modifications.

SUMMARY OF CHANGES:

A. Reference SF 1442, page 1 of 45, block 13 a: Offers due date is hereby changed from 06/07/2010 at 2:00 pm to 06/15/2010 at 2:00 pm.

B. The purpose of this amendment is to provide the below Questions and Answers (Q&A).

Q1. What is the existing pipe material’s composition (i.e., PVC, ductile iron, cast iron, etc)?

A1. The type of material can be galvanize steel pipe, PVC, and transient pipe. Some of these water systems were constructed as far back as late early 70's and we do not have accurate as-builts for them.

Q2. Is the depth of the existing pipe sufficient?

A2. No in some instances the existing water line is too shallow. Again, we do not have as-builts.

Q3. Would HDPE with ductile iron fittings be an acceptable alternative to PVC?

A3. Once contract is awarded, the contractor can submit a proposal for alternate method, with documentation showing benefits to the Government for review and approval.

Q4. Would a trenchless process be considered if it reduces the possibility of harm to the environmentally sensitive area?

A4. Because the depth of the existing water line may not be adequate, the trenchless process may not be suitable in some cases. Once contract is awarded the contractor can submit proposal for this alternate method.

Q5. What is the quantity of crack repair and Spalding repair on each tank?

A5. The condition of the tanks vary from site to site. With exception of the tank at Hanna flats, most of the spalling and cracking is minor and it is hard to measure unless you visit each site.

Q6. What is the scope of work for decommissioning wells?

A6. Need to meet minimum Local County standards and requirements for decommissioning of wells.

Q7. What is the power demand and phasing requirements for replacement generator?

A7. Power demand is 21,550 W, phase is single phase, 120/240V.

Q8. Is the high performance coatings required to cover all interior surfaces of tanks or just to water line?

A8. The high performance coating shall cover all interior surfaces of tank.

Q9. Is there existing coatings within the tanks that are getting high performance coatings?

A9. No, the tanks currently do not have a coating or lining.

Q10. What are the dimensions for all tanks needing refurbishing and or coatings?

PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT - Attachment to SF 30 3 3

ISSUANCE DATE: 06/07/2010 PROJECT NAME: San Bernardino NF Water System Improvements

AMENDMENT NUMBER: 0003

List below (or on attached sheet, if necessary) each proposed modification identified by Item Number, location of station, etc., giving the reasons for the modifications.

A10. The exterior dimensions of the concrete tanks are as follows:

10,000 gallons 17'-7" diameter x 9'-1" high 20,000 gallons 21'-6" diameter x 11'-0" high 35,000 gallons 25'-8" diameter x 13'-1" high 75,000 gallons 32'-6" diameter x 15'-3" high

Q11. Please clarify if tanks that are being refurbished and or coated are above ground or below?

A11. All tanks are above ground.

Q12. Vista Grande sec 1800 demo #A remove well house enclosure what size is it and what is it constructed of?

A12. The well house is a block building measuring 6.7' high x 9.8' long x 6.8' wide. Structure has a plywood roof.

Q13. Kenworthy station sec 1800 demo #A underground storage tank what is the dimensions of tank and what is it constructed of?

A13. Measurements are 14'x24'x8' deep and it’s constructed of concrete.

C. All other terms and conditions remain unchanged.

(End of Amendment)