section_01720_As-Built_Drawing.doc

DOC document 24 KB Posted

Attached to
RECOVERY: Dinkey Mill - Blue Canyon Helipads
Solicitation number
AG-9702-S-10-0223
Issued by

About this file

Specifications

View the file

Other files

File Type Posted
Attachment 12 Sheet9_HelipadSite_DinkeyMill-Model.pdf PDF
section_03200_Concrete_Reinforcement.rtf RTF text file
section_01511_Temporary Facilities Utilities.rtf RTF text file
section_01300_Shop_Drawings.rtf RTF text file
Attachment 5 Sheet2_DinkeyMVicinitymap-Model.pdf PDF
Attachment 6 Sheet3_BlueCVicinitymap-Model.pdf PDF
section_01700_Contrac_Closeout_ _Cleanup.rtf RTF text file
section_01442_Quality_Control.rtf RTF text file
section_01010_Summary_of_Work.rtf RTF text file
Attachment 4 Sheet1_CoverSheet_DinkeyM BlueCanyon-Model.pdf PDF
Attachment 8 Sheet5_Asphalt AggregateDetails_DinkeyM BlueC-Model.pdf PDF
section_02232_Aggregate Sprc.rtf RTF text file
section_01315_Schedule Reports.rtf RTF text file
section_01505_Mobilization.doc DOC document
Section_16010_Elect_General_Prov.doc DOC document
section_01060_Regulatory_Requirements.rtf RTF text file
section_16030_Codes_Standards.rtf RTF text file
Attachment 9 Sheet6_RebarDetails_DinkeyM BlueC-Model.pdf PDF
Attachment 7 Sheet4_Paving AsphaltDetails_DinkeyM BlueC-Model.pdf PDF
section_03100_Concrete_Formwork.rtf RTF text file
section_02749_hot bituminous plant mix —
section_02001_construction staking.doc DOC document
section_02100_Clearing Demolization.rtf RTF text file
section_16101_Electrical_Systems.doc DOC document
Attachment 13 Sheet10_BlueCanyonSite_Plan Profile-Model.pdf PDF
section_02580_Traffic_Marking.rtf RTF text file
Attachment 10 Sheet7_ HelipadStrippingDetails_DinkeyM BlueC-Model.pdf PDF
Attachment 1 Blue_Canyon Dinkey_Mill Fire Plan.doc DOC document
section_02200_Earthwork Reconditioning of Existing Roadway.rtf RTF text file
Attachment 2 spec_index1.rtf RTF text file
section_16160_Electrical_Service.rtf RTF text file
section_01640_Product_Handling.rtf RTF text file
ATTACHMENT 14 DBA Wage Determination.pdf PDF
Attachment 11 Sheet8_TrafficSignDetails_DinkeyM BlueC-Model.pdf PDF
section_01040_Coordination.rtf RTF text file
section_03300_Cast_In_Place_Concrete.rtf RTF text file
section_01605_Material_Sources.rtf RTF text file
section_01070_Abbreviation and Symbols.rtf RTF text file
section_16153_Wire_ _Cable.rtf RTF text file
AG-9702-S-10-0223 Pages 1-3.pdf PDF
AG-9702-S-10-0223 Pages 4-31.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01720

AS-BUILT DRAWING

PART 1 GENERAL

1.01

DESCRIPTION OF WORK

This Section describes the contractor’s responsibility to providing complete and accurate as-built drawings, meeting the requirements of this Section.

PART 2 PRODUCTS

2.01

MEDIA

Contractor shall be required to update all drawing monthly. The Contractor will be provided five full size (11X17) paper prints of the original drawings and an electronic file with drawings in Auto-CAD 2010 format. The Contractor shall mark one set of original paper prints and make the changes on each sheet of the contract drawings on Auto-CAD 2010. The drawings and the Auto-CAD information, in CD format, shall be returned to the Government. The Contractor shall also provide to the Government at contract closeout a final plot of as-build drawings on .004 clear film and one set of blue line or black line paper prints.

PART 3 EXECUTION

3.01

REQUIREMENTS

The Contractor shall revise the drawing to reflect changes in the project as construction progresses. These drawings shall be updated at least monthly to reflect the approved changes. The paper copy shall be kept current and be available at all times at the project site. If the Contractor fails to keep AS BUILT drawings current, progress payments will be delayed until the requirements of this section are met.

At the close of the project, the Contractor shall provide final drawings conforming to requirements in Part 2.

Each drawing shall contain the words “AS-BUILT” in a conspicuous location and in the same location on each drawing. The Government will review the as-built drawings, and if revisions are required, the revised as-built drawing will be so noted with the revision date indicated. Final payment under this contract will be withheld until receipt of final, approved as-built drawings. (Also see Section 01442, 3.03 RECORDS).

END OF SECTION

DINKEY MILL & BLUE CANYON HELIPADS

SIERRA NATIONAL FOREST

DIVISION 1

01720-1