Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects

FP-03

U.S. Customary Units

U.S. DEPARTMENT

OF TRANSPORTATION

Federal Highway Administration

PREFACE

These Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects are issued primarily for constructing roads and bridges on Federal Highway projects under the direct administration of the Federal Highway Administration. These specifications are cited as "FP-03 U.S. Customary Units" indicating “Federal Project” Standard Specifications issued in 2003 and converted to United States customary measure units. U.S customary units were previously referred to as English units and are the units of measurement customarily used in the U.S. today.

When designated in a contract, the FP-03 becomes part of the contract and binding upon all parties to the contract. All construction contracts of the Federal Highway Administration are also governed by the following regulations:

Federal Acquisition Regulation (FAR), Title 48, Code of Federal Regulations, Chapter 1; and Transportation Acquisition Regulation (TAR), Title 48, Code of Federal Regulations, Chapter 12.

The FAR and TAR regulations are not included in the FP-03. A complete copy of the FAR is available from the Superintendent of Documents, Congressional Sales Office, U.S. Government Printing Office, Washington, DC 20402.

U.S. customary measure units are used in the FP-03 U.S. Customary Units as authorized by the Waiver Request of DOT Metric Policy approved on May 5, 1999.

SIADVANCE \R 1.40(1) (METRIC) TO U .S. CUSTOMARY CONVERSION FACTORS (approximate)

Symbol
When You Know
Multiply By
To Find
Symbol

LENGTH

µm
micrometers
3.9 x 10-5
inches
in
mm
millimeters
0.039
inches
in
m
meters
3.28
feet
ft
m
meters
1.09
yards
yd
km
kilometers
0.621
miles
mi

AREA

mm2
square millimeters
0.0016
square inches
in2
m2
square meters
10.764
square feet
ft2
m2
square meters
1.195
square yards
yd2
ha
hectares
2.47
acres
ac
km2
square kilometers
0.386
square miles
mi2

VOLUME

mL
milliliters
0.034
fluid ounces
fl oz
L
liters
0.264
gallons
gal
m3
cubic meters
35.31
cubic feet
ft3
m3
cubic meters
1.308
cubic yards
yd3

MASS

g
grams
0.035
ounces
oz
kg
kilograms
2.202
pounds
lb
Mg
megagrams
1.1023
short tons
T
(or "t")
(or "metric ton")

(2000 lb)

TEMPERATURE (exact)

ºC
Celsius
1.8C +32
Fahrenheit
ºF

temperature temperature

ILLUMINATION

lx
lux
0.0929
foot-candles
fc
cd/m2
candela/m2
0.2919
foot-Lamberts
fl

MISCELLANEOUS

J
joule
0.7376
foot·poundforce
ft·lbf
N
newtons
0.225
poundforce
lbf
kPa
kilopascals
0.145
poundforce
lbf/in2

per square inch

(1) SI is the symbol for the International System of Units.

Appropriate rounding should be made to comply with Section 4 of ASTM E 380.

TABLE OF CONTENTS

DIVISION 100 GENERAL REQUIREMENTS

Page Section 101

TERMS, FORMAT, AND DEFINITIONS

101.01 Meaning of Terms 101.02 Specifications Format 101.03 Abbreviations 101.04 Definitions Section 102

BID, AWARD, AND EXECUTION OF CONTRACT

102.01 Acquisition Regulations 102.02 Preparation of Bids 102.03 Bid Guarantee 102.04 Individual Surety 102.05 Public Opening of Bids 102.06 Performance and Payment Bonds Section 103

SCOPE OF WORK

103.01 Intent of Contract 103.02 Disputes 103.03 Value Engineering 103.04 Contractor Records 103.05 Partnering Section 104

CONTROL OF WORK

104.01 Authority of the Contracting Officer (CO) 104.02 Authority of Inspectors 104.03 Specifications and Drawings 104.04 Coordination of Contract Documents 104.05 Load Restrictions Section 105

CONTROL OF MATERIAL

105.01 Source of Supply and Quality Requirements 105.02 Material Sources 105.03 Material Source Management 105.04 Storing and Handling Material 105.05 Use of Material Found in the Work

Page Section 106

ACCEPTANCE OF WORK

106.01 Conformity with Contract Requirements 106.02 Visual Inspection 106.03 Certification 106.04 Measured or Tested Conformance 106.05 Statistical Evaluation of Work and Determination of Pay Factor (Value of Work) 106.06 Inspection at the Plant 106.07 Partial and Final Acceptance Section 107

LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

107.01 Laws to be Observed 107.02 Protection and Restoration of Property and Landscape 107.03 Bulletin Board 107.04 Railroad Protection 107.05 Responsibility for Damage Claims 107.06 Contractor's Responsibility for Work 107.07 Furnishing Right-of-Way 107.08 Sanitation, Health, and Safety 107.09 Legal Relationship of the Parties 107.10 Environmental Protection 107.11 Protection of Forests, Parks, and Public Lands Section 108

PROSECUTION AND PROGRESS

108.01 Commencement, Prosecution, and Completion of Work 108.02 Subcontracting 108.03 Determination and Extension of Contract Time 108.04 Failure to Complete Work on Time 108.05 Stop Order Section 109

MEASUREMENT AND PAYMENT

109.01 Measurement of Work 109.02 Measurement Terms and Definitions 109.03 Weighing Procedures and Devices 109.04 Receiving Procedures 109.05 Scope of Payment 109.06 Pricing of Adjustments 109.07 Eliminated Work 109.08 Progress Payments 109.09 Final Payment

DIVISION 150 PROJECT REQUIREMENTS

Page Section Mobilization Construction Survey and Staking Contractor Quality Control Contractor Sampling and Testing Schedules for Construction Contracts Public Traffic Accommodation Traffic During Work Maintaining Roadways During Work Maintaining Roadways During Non-Work Periods Limitations on Construction Operations Nighttime Operations Traffic and Safety Supervisor Soil Erosion Control Watering for Dust Control

DIVISION 200 EARTHWORK

Section Clearing and Grubbing Additional Clearing and Grubbing Removal of Structures and Obstructions Excavation and Embankment Rock Blasting Reserved Earthwork Geotextiles Structure Excavation and Backfill for Selected Major Structures Structure Excavation and Backfill Reserved Roadway Obliteration Linear Grading Subgrade Stabilization

DIVISION 250 SLOPE REINFORCEMENT AND RETAINING WALLS

Section Riprap Special Rock Embankment and Rock Buttress Gabions and Revet Mattresses Crib Walls Mechanically-Stabilized Earth Walls Permanent Ground Anchors Alternate Retaining Walls Reinforced Concrete Retaining Walls Soil Nail Retaining Walls Rock Bolts Rock Dowels

DIVISION 300 AGGREGATE COURSES

Page Section Untreated Aggregate Courses Treated Aggregate Courses Road Reconditioning Aggregate Stabilization Aggregate-Topsoil Course Dust Palliative Reserved Minor Crushed Aggregate Emulsified Asphalt Treated Base Course

DIVISION 400 ASPHALT PAVEMENTS AND SURFACE TREATMENTS

Section Superpave Hot Asphalt Concrete Pavement Hot Asphalt Concrete Pavement By Hveem or Marshall Mix Design Method Hot Asphalt Concrete Pavement Minor Hot Asphalt Concrete Open-Graded Asphalt Friction Course Reserved Reserved Cold Recycled Asphalt Base Course Asphalt Surface Treatment Slurry Seal Asphalt Prime Coat Asphalt Tack Coat Asphalt Pavement Milling Asphalt Pavement Crack and Joint Sealing Paving Geotextiles Continuous Cold Recycled Asphalt Base Course Minor Cold Asphalt Mix

DIVISION 500 RIGID PAVEMENTS

Section Rigid Pavement Rigid Pavement Restoration

DIVISION 550 BRIDGE CONSTRUCTION

Section Driven Piles Structural Concrete Prestressed Concrete Reinforcing Steel Steel Structures Bridge Railing Timber Structures Section Page Dampproofing Waterproofing Removal of Concrete by Hydrodemolition Reserved Temporary Works Painting Bearing Devices Drilled Shafts Shotcrete

DIVISION 600 INCIDENTAL CONSTRUCTION

Section Minor Concrete Structures Culverts and Drains Structural Plate Structures Manholes, Inlets, and Catch Basins Underdrains, Sheet Drains, and Pavement Edge Drains Corrugated Metal Spillways Cleaning, Reconditioning, and Repairing Existing Drainage Structures Paved Waterways Curb and Gutter Horizontal Drains Water Systems Sanitary Sewer Systems Simulated Stone Masonry Surface Lean Concrete Backfill Sidewalks, Drive Pads, and Paved Medians Slope Paving Guardrail Concrete Barriers and Precast Guardwalls Fences, Gates, and Cattle Guards Stone Masonry Monuments and Markers Rental Equipment General Labor Topsoil Turf Establishment Plants, Trees, Shrubs, Vines, and Groundcovers Sod Reserved Rolled Erosion Control Products and Cellular Confinement Systems Reserved Reserved Section Page Reserved Permanent Traffic Control Permanent Pavement Markings Temporary Traffic Control Signal, Lighting, and Electrical Systems Facilities and Services

DIVISION 700 MATERIAL

Section Cement 701.01 Hydraulic Cement 701.02 Masonry and Mortar Cement Section Asphalt Material 702.01 Asphalt Binder 702.02 Cut-Back Asphalt 702.03 Emulsified Asphalt 702.04 Application Temperatures 702.05 Material for Dampproofing and Waterproofing Concrete and Masonry Surfaces 702.06 Recycling Agent 702.07 Asphalt Mastic 702.08 Antistrip Additive 702.09 Evaluation Procedures for Asphalt 702.10 Cold Asphalt Mix Section Aggregate 703.01 Fine Aggregate for Concrete 703.02 Coarse Aggregate for Concrete 703.03 Granular Backfill 703.04 Permeable Backfill 703.05 Subbase, Base, and Surface Course Aggregate 703.06 Crushed Aggregate 703.07 Hot Asphalt Concrete Pavement Aggregate 703.08 Open‑Graded Asphalt Friction Course Aggregate 703.09 Reserved 703.10 Asphalt Surface Treatment Aggregate 703.11 Slurry Seal and Micro-Surfacing Aggregate 703.12 Choker Aggregate 703.13 Blotter 703.14 Aggregate for Aggregate-Topsoil Course 703.15 Sand 703.16 Aggregate for Lean Concrete Backfill 703.17 Superpave Asphalt Concrete Pavement Aggregate 703.18 Shotcrete Aggregate 703.19 Recycled Asphalt Pavement

Page Section Soil 704.01 Foundation Fill 704.02 Bedding Material 704.03 Backfill Material 704.04 Structural Backfill 704.05 Topping 704.06 Unclassified Borrow 704.07 Select Borrow 704.08 Select Topping 704.09 Bed Course 704.10 Select Granular Backfill 704.11 Reserved 704.12 Crib Wall Backfill Section Rock 705.01 Gabion and Revet Mattress Rock 705.02 Riprap Rock 705.03 Rock for Masonry Structures 705.04 Rock for Special Rock Embankment 705.05 Rock for Buttresses 705.06 Stone Curbing Section Concrete And Plastic Pipe 706.01 Non-Reinforced Concrete Pipe 706.02 Reinforced Concrete Pipe 706.03 Perforated Concrete Pipe 706.04 Reinforced Arch-Shaped Concrete Pipe 706.05 Reinforced Elliptically-Shaped Concrete Pipe 706.06 Reinforced D‑Load Concrete Pipe 706.07 Precast Reinforced Concrete Box Sections 706.08 Plastic Pipe Section Metal Pipe 707.01 Ductile Iron Culvert Pipe 707.02 Metallic-Coated Corrugated Steel Pipe 707.03 Aluminum-Alloy Corrugated Pipe 707.04 Asphalt-Coated Pipe 707.05 Steel Structural Plate Structures 707.06 Aluminum-Alloy Structural Plate Structures 707.07 Asphalt-Coated Structural Plate Structures 707.08 Polymer-Coated Steel Pipe 707.09 Fiber-Bonded Asphalt Coated Steel Pipe 707.10 Slotted Drain Pipe 707.11 Metallic-Coated Spiral Rib Pipe Section Page 707.12 Aluminum-Alloy Spiral Rib Pipe 707.13 Concrete-Lined Corrugated Steel Pipe 707.14 Invert-Paved Corrugated Steel Pipe Section Paint 708.01 General 708.02 Paint for Timber Structures 708.03 Paint for Concrete and Masonry Block Structures 708.04 Paint for Steel Structures 708.05 Penetrating Stain Section Reinforcing Steel And Wire Rope 709.01 Reinforcing Steel 709.02 Wire Rope or Wire Cable 709.03 Prestressing Steel Section Fence And Guardrail 710.01 Barbed Wire 710.02 Woven Wire 710.03 Chain Link Fence 710.04 Fence Posts and Bollards 710.05 Fence Gates 710.06 Metal Beam Rail 710.07 Box Beam Rail 710.08 Steel-Backed Timber Rail 710.09 Guardrail Posts 710.10 Guardrail Hardware 710.11 Temporary Plastic Fence Section Concrete Curing Material And Admixtures 711.01 Curing Material 711.02 Air-Entraining Admixtures 711.03 Chemical Admixtures 711.04 Latex Modifier 711.05 Concrete Coloring Agent Section Joint Material 712.01 Sealants, Fillers, Seals, and Sleeves 712.02 Joint Mortar 712.03 Watertight Gaskets 712.04 Reserved 712.05 Mortar for Masonry Beds and Joints

Page Section Roadside Improvement Material 713.01 Topsoil 713.02 Agricultural Limestone 713.03 Fertilizer 713.04 Seed 713.05 Mulch 713.06 Plant Material 713.07 Cellular Confinement Systems 713.08 Miscellaneous Planting Material 713.09 Reserved 713.10 Sod 713.11 Pegs for Sod 713.12 Stabilizing Emulsion Tackifiers 713.13 Erosion Control Bales, Wattles, Logs, and Rolls 713.14 Sandbags 713.15 Erosion Control Culvert Pipe 713.16 Silt Fence 713.17 Temporary Rolled Erosion Control Products 713.18 Permanent Rolled Erosion Control Products Section Geotextile And Geocomposite Drain Material 714.01 Geotextile 714.02 Geocomposite Drains Section Piling 715.01 Untreated Timber Piles 715.02 Treated Timber Piles 715.03 Concrete Piles 715.04 Steel Shells 715.05 Steel Pipes 715.06 Steel H-Piles 715.07 Sheet Piles 715.08 Pile Shoes 715.09 Splices Section Material For Timber Structures 716.01 Untreated Structural Timber and Lumber 716.02 Hardware 716.03 Treated Structural Timber and Lumber 716.04 Structural Glued Laminated Timber

Page Section Structural Metal 717.01 Structural Steel 717.02 Steel Forgings 717.03 Pins and Rollers 717.04 Castings 717.05 Welded Stud Shear Connectors 717.06 Steel Pipe 717.07 Galvanized Coatings 717.08 Sheet Lead 717.09 Steel Grid Floors 717.10 Bearings 717.11 Polyetrafluoroethylene (PTFE) Surfaces for Bearings 717.12 Structural Aluminum Alloy 717.13 Aluminum Alloy for Bridge Rail 717.14 Aluminum Bolt Heads and Nuts 717.15 Aluminum Welding Wire 717.16 Elastomeric Compression Joint Seals Section Traffic Signing And Marking Material 718.01 Retroreflective Sheeting 718.02 Reserved 718.03 Plywood Panels 718.04 Steel Panels 718.05 Aluminum Panels 718.06 Plastic Panels 718.07 Extruded Aluminum Panels 718.08 Signposts 718.09 Object Marker and Delineator Posts 718.10 Hardware 718.11 Letters, Numerals, Arrows, Symbols, and Borders 718.12 Delineator and Object Marker Retroreflectors 718.13 Conventional Traffic Paint 718.14 Waterborne Traffic Paint 718.15 Epoxy Markings 718.16 Polyester Markings 718.17 Thermoplastic Markings 718.18 Preformed Plastic Markings 718.19 Glass Beads 718.20 Raised Pavement Markers 718.21 Temporary Pavement Markings 718.22 Temporary Traffic Control Devices 718.23 Epoxy Resin Adhesives Section Reserved

Page Section Structural Wall And Stabilized Embankment Material 720.01 Mechanically-Stabilized Earth Wall Material 720.02 Gabion and Revet Mattress Material 720.03 Metal Bin Type Crib Walls Section Electrical And Illumination Material 721.01 Electrical Material 721.02 Lighting Material Section Anchor Material 722.01 Anchorage Devices 722.02 Ground Anchors 722.03 Rock Bolts 722.04 Soil Nails Section Reserved Section Reserved Section Miscellaneous Material 725.01 Water 725.02 Calcium Chloride, Calcium Chloride Flakes, and Magnesium Chloride 725.03 Lime 725.04 Pozzolans 725.05 Mineral Filler 725.06 Precast Concrete Curbing and Wheelstops 725.07 Clay or Shale Brick 725.08 Concrete Brick 725.09 Concrete Masonry Units 725.10 Cellular Concrete Blocks 725.11 Precast Concrete Units and Accessories 725.12 Frames, Grates, Covers, and Ladder Rungs 725.13 Corrugated Metal Units 725.14 Protective Coatings for Concrete 725.15 Polyvinyl Chloride (PVC) Pipe for Water Distribution Systems 725.16 Polyethylene (PE) Pipe for Water Distribution Systems 725.17 Cast Iron Soil Pipe and Fittings 725.18 Seamless Copper Water Tube and Fittings 725.19 Plastic Lining 725.20 Lignosulfonate 725.21 Epoxy Resin Adhesives 725.22 Grout 725.23 Reserved Section Page 725.24 Color Coating 725.25 Explosives and Blasting Accessories 725.26 Mineral Slurry (Drillers Mud) 725.27 Form Liner 725.28 Aluminum-Impregnated Caulking Compound 725.29 Reinforcing Fibers

DIVISION 100

GENERAL REQUIREMENTS

Section 101. – TERMS, FORMAT, AND DEFINITIONS

101.01 Meaning of Terms. These specifications are generally written in the imperative mood. In sentences using the imperative mood, the subject, "the Contractor," is implied. Also implied in this language are "shall," "shall be," or similar words and phrases. In material specifications, the subject may also be the supplier, fabricator, or manufacturer supplying material, products, or equipment for use on the project.

Wherever "directed," "required," "prescribed," or other similar words are used, the "direction," "requirement," or "order" of the Contracting Officer is intended. Similarly, wherever "approved," "acceptable," "suitable," "satisfactory," or similar words are used, the words mean "approved by," "acceptable to," or "satisfactory to" the Contracting Officer.

The word "will" generally pertains to decisions or actions of the Contracting Officer.

101.02 Specifications Format. These specifications are divided into 10 Divisions.

Division 100 consists of general contract requirements for which no direct payment is made. The requirements contained in Division 100 are applicable to all contracts.

Division 150 consists of project contract requirements that are applicable to all contracts. Work under Division 150 is paid for directly or indirectly according to Subsection 109.05 and the Section ordering the work. When there is no pay item in the bid schedule, no direct payment is made.

Divisions 200 through 600 consist of construction contract requirements for specific items of work. Work under these Divisions is paid for directly or indirectly according to Subsection 109.05 and the Section ordering the work. When there is no pay item in the bid schedule, no direct payment is made.

Division 700 contains the material requirements for Divisions 150 through 600. No direct payment is made in Division 700. Payment for material is included as part of the work required in Divisions 150 through 600.

The first three digits of the pay item number in the Bid Schedule identify the Section under which the work is performed.

101.03 Abbreviations. Whenever these abbreviations are used in the specifications, they represent the following:

(a) Acronyms.

AA — Aluminum Association AAN — American Association of Nurserymen AAR — Association of American Railroads AASHTO — American Association of State Highway and Transportation Officials ACI — American Concrete Institute ACPA — American Concrete Pavement Association ADA — Americans with Disabilities Act AGC — Associated General Contractors of America AI — Asphalt Institute AIA — American Institute of Architects AISC — American Institute of Steel Construction AISI — American Iron and Steel Institute AITC — American Institute of Timber Construction ANSI — American National Standards Institute APWA — American Public Works Association ARA — American Railway Association AREA — American Railway Engineering Association ARTBA — American Road and Transportation Builders Association ASCE — American Society of Civil Engineers ASCII — American Standard Code for Information Interchange ASLA — American Society of Landscape Architects ASTM — American Society for Testing and Materials ATSSA — American Traffic Safety Services Association AWPA — American Wood Preservers Association AWS — American Welding Society AWWA — American Water Works Association CFR — Code of Federal Regulations CO — Contracting Officer and all representatives CRSI — Concrete Reinforcing Steel Institute FAR — Federal Acquisition Regulations (48 CFR Chapter 1) FHWA — Federal Highway Administration FICA — Federal Insurance Contributions Act FLH — Federal Lands Highways FSS — Federal Specifications and Standards FTMS — Federal Test Method Standard FUTA — Federal Unemployment Tax Act GSA — General Services Administration IEEE — Institute of Electrical and Electronic Engineers ISO — International Organization for Standardization ISSA — International Slurry Surfacing Association ITE — Institute of Transportation Engineers MIL — Military Specifications MPI — Master Painters Institute MUTCD — Manual on Uniform Traffic Control Devices (for Streets and Highways) NCHRP — National Cooperative Highway Research Program NEMA — National Electrical Manufacturer's Association NFPA — National Forest Products Association NIST — National Institute of Standards and Technology OSHA — Occupational Safety and Health Administration PCA — Portland Cement Association PCI — Prestressed Concrete Institute PVC — Polyvinyl Chloride PTI — Post‑Tensioning Institute SAE — Society of Automotive Engineers SF — Standard Form SI — International System of Units SSPC — Steel Structures Painting Council TAR — Transportation Acquisition Regulations (48 CFR Chapter 12) UL — Underwriter's Laboratory U.S. — United States of America USC — United States Code USGS — United States Geological Survey USPS — United States Postal Service

(b) SI symbols.

A ampere electric current cd candela luminous intensity ºC degree Celsius temperature d day time g gram mass h hour time H Henry inductance ha hectare area Hz hertz (s-1) frequency J joule (N•m) energy K kelvin temperature L liter volume lx lux illuminance m meter length m2 square meter area m3 cubic meter volume min minute time N newton (kg•m/s2) force Pa pascal (N/m2) pressure s second time t metric ton mass V volt (W/A) electric potential W watt (J/s) power Ω ohm V/A electric resistance º degree plane angle minute plane angle second plane angle

(c) SI prefix symbols.

E exa P peta T tera G giga M mega k kilo c centi 10-2 m milli 10-3 µ micro 10-6 n nano 10-9 p pico 10-12 f femto 10-15 a atto 10-18

(d) Slope notation (vertical : horizontal). For slopes flatter than 1V:1H, express the slope as the ratio of one unit vertical to a number of units horizontal. For slopes steeper than 1V:1H, express the slope as the ratio of a number of units vertical to one unit horizontal.

101.04 Definitions. The following definitions apply to this contract:

Award — The written acceptance of a bid by the CO.

Backfill — Material used to replace or the act of replacing material removed during construction. Material placed or the act of placing material adjacent to structures.

Base — The layer or layers of material placed on a subbase or subgrade to support a surface course.

Bid — A written offer by a bidder to perform work at a quoted price.

Bidder — Any individual or legal entity submitting a bid.

Bid Guarantee — A form of security assuring that the bidder will not withdraw a bid within the period specified for acceptance and will execute a written contract and furnish required bonds.

Bid Schedule — The prepared schedule included with the bid forms, containing the estimated quantities of pay items for which unit bid prices are invited.

Bridge — A structure more than 20 feet long, including supports, spanning and providing passage over a depression, waterway, railroad, highway, or other obstruction.

Clear Zone — The portion of the roadside, including the shoulder, available for the safe use by an errant vehicle in which the driver may regain control of the vehicle. Recommended distances for the clear zone are in the AASHTO Roadside Design Guide.

Commercial Certification — See Subsection 106.03.

Construction Limits — The limits on each side of the project that establish the area disturbed by construction operations and beyond which no disturbance is permitted. Typically the construction limits are the same as the clearing limits, except when additional clearing is required.

Contract — The written agreement between the Government and the Contractor setting forth the obligations of the parties for the performance of and payment for the prescribed work.

Contracting Officer (CO) — An official of the Government with the authority to enter into, administer, and terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the CO acting within the limits of their authority as delegated by the CO.

Contract Modification — Any written change in the terms of the contract. Contract modifications are of the following forms:

(a) Administrative change. A unilateral contract change, in writing, that does not affect the substantive rights of the parties (e.g., a change in the paying office or the appropriation data).

(b) Change order. A written order, signed by the CO, directing the Contractor to make a change that FAR Clause 52.243-4 Changes authorizes the CO to order without the Contractor's consent.

(c) Supplemental agreement. A contract modification that is accomplished by the mutual action of the parties.

Contractor — The individual or legal entity contracting with the Government for performance of prescribed work.

Contract Time — The specified time allowed for completion of all contract work.

Crashworthy — A highway feature is crashworthy if it was successfully crash tested under the NCHRP Report 350, Recommended Procedures for the Safety Performance Evaluation of Highway Features or earlier comparable criteria or if it was accepted through analysis by FHWA, based on similarity to other crashworthy features. A list of crashworthy highway features is available on the FHWA Safety website.

Cross-Section — A vertical section of the ground or structure at right angles to the centerline or baseline of the roadway or other work.

Culvert — Any structure, not classified as a bridge, that provides an opening under the roadway.

Day — Each and every day shown on the calendar, beginning and ending at midnight.

Density — Mass per unit volume of material. Specific gravity multiplied by the unit mass of water.

Detour — A temporary rerouting of public traffic onto alternate existing roadways in order to avoid the work or part of the work.

Diversion — A temporary rerouting of public traffic onto a temporary alignment within the project limits in order to bypass the work or a portion of the work.

Drawings — Design sheets or fabrication, erection, or construction details submitted to the Government by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.

Government — The Government of the United States of America.

Highway, Street, or Road — A general term denoting a public way for purposes of vehicular travel, including the entire area within the right‑of‑way.

Layer — See "lift."

Lift — Defined as follows:

(a) When placing and compacting soils and aggregates, a lift is any single, continuous layer of material that receives the same compactive effort throughout during a single work operation.

(b) When installing culvert pipe less than or equal to 48 inches in diameter, the backfill material placed on both sides of the pipe is considered to be contained in the same lift when the material is placed to the same elevation on both sides of the culvert, the compactive effort applied to one side of the culvert is the same as that applied to the other, and the compactive effort is applied to both sides of the pipe in a continuous operation.

Material — Any substances specified or necessary to satisfactorily complete the contract work.

Maximum Particle Size — The smallest sieve opening through which all particles in the material will pass.

Measurement — The process of identifying the dimensions, quantity, or capacity of an item. See Section 109 for measurement methods, terms, and definitions.

Notice to Proceed — Written notice to the Contractor to begin the contract work.

Pavement Structure — The combination of subbase, base, paving geotextiles, and surface courses placed on a subgrade to support and distribute the traffic load to the roadbed.

Pay Item — A specific item of work for which a unit and price is provided in the contract.

Payment Bond — The security executed by the Contractor and surety or sureties and furnished to the Government to ensure payments as required by law to all persons supplying labor or material according to the contract.

Performance Bond — The security executed by the Contractor and surety or sureties furnished to the Government to guarantee completion of the contract work.

Plans — The contract plans furnished by the Government showing the location, type, dimensions, and details of the work.

Production Certification — See Subsection 106.03.

Professional Engineer — Engineers who hold valid State licenses permitting them to offer engineering services directly to the public, who are experienced in the work for which they are responsible, who take legal responsibility for their engineering designs, and who are bound by a code of ethics to protect the public health.

Profile Grade — The trace of a vertical plane intersecting a particular surface of the proposed road construction located as shown on the plans, usually along the longitudinal centerline of the roadbed. Profile grade means either elevation or gradient of the trace according to the context.

Project — The specific section of the highway or other property on which construction is to be performed under the contract.

Right‑of‑Way — Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Roadbed — The graded portion of a highway prepared as a foundation for the pavement structure and shoulders.

Roadside — All area within the right-of-way excluding the traveled way and shoulders.

Roadway — In general, the portion of a highway, including shoulders, for vehicular use. A divided highway has two or more roadways. In construction specifications, the portion of a highway within the construction limits.

Roadway Prism — The volume defined by the area between the original terrain cross-section and the final design cross-section multiplied by the horizontal distance along the centerline of the roadway.

Roller Pass — One trip of a roller in one direction over any one spot.

Shoulder — The portion of the roadway contiguous to the traveled way for accommodation of stopped vehicles, for emergency use, and for lateral support of the pavement structure.

Sieve — See AASHTO M 92.

Solicitation — The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.

Special Contract Requirements — Additions and revisions to the standard specifications applicable to an individual project.

Specifications — The written requirements for performing work.

Standard Forms — Numbered forms issued by the General Services Administration for use as contract documents.

Standard Plans — Detailed plans approved for repetitive use and included as part of the plans.

Standard Specifications — The Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects approved for general application and repetitive use.

Station — (1) A measure of distance used for highways and railroads. A station is equal to 100 feet. (2) A precise location along a survey line.

Structures — Bridges, culverts, catch basins, drop inlets, retaining walls, cribbing, manholes, endwalls, buildings, sewers, service pipes, underdrains, foundation drains, and other constructed features that may be encountered in the work.

Subbase — The layer or layers of material placed on a subgrade to support a base.

Subcontract — The written agreement between the Contractor and an individual or legal entity prescribing the performance of a specific portion of the work.

Subcontractor — An individual or legal entity with which the Contractor sublets part of the work. This includes all subcontractors in any tier.

Subgrade — The top surface of a roadbed upon which the pavement structure, shoulders, and curbs are constructed.

Substantial Completion — The point at which the project is complete such that it can be safely and effectively used by the public without further delays, disruption, or other impediments. For conventional bridge and highway work, the point at which all bridge deck, parapet, pavement structure, shoulder, drainage, sidewalk, permanent signing and markings, traffic barrier, safety appurtenance, utility, and lighting work is complete.

Substructure — All of the bridge below the bearings of simple and continuous spans, skewbacks of arches, and tops of footings of rigid frames including backwalls, wingwalls, and wing protection railings.

Suitable Material — Rock or earth material that will provide stable foundations, embankments, or roadbeds, and is reasonably free of organic matter, roots, muck, sod, or other detrimental material. Suitable material may require drying or adding water, root picking, and other methods of manipulation before use. Suitable material includes the classifications of materials for which the project was designed.

Superintendent — The Contractor's authorized representative in responsible charge of the work.

Superstructure — The entire bridge except the substructure.

Surety — An individual or corporation legally liable for the debt, default, or failure of a Contractor to satisfy a contract obligation.

Surface Course — The top layer or layers of a pavement structure designed to accommodate the traffic load and resist skidding, traffic abrasion, and weathering.

Target Value (TV) — A number established as a center for operating a given process. Once established, adjustments should be made in the process as necessary to maintain a central tendency about the target value. Test results obtained from a well-controlled process should cluster closely around the established target value and the mean of the test results should be equal to or nearly equal to the established target value.

Traveled Way — The portion of the roadway designated for the movement of vehicles, including curve widening, exclusive of shoulders.

Unsuitable Material — Material not capable of creating stable foundations, embankments, or roadbeds. Unsuitable material includes muck, sod, or soils with high organic contents.

Work — The furnishing of all labor, material, equipment, and other incidentals necessary to successfully complete the project according to the contract.

Section 102. — BID, AWARD, AND

EXECUTION OF CONTRACT

102.01 Acquisition Regulations. Bid, award, and execution of the contract are governed by the FAR and TAR.

102.02 Preparation of Bids. Follow the requirements of FAR Clause 52.214-18 Preparation of Bids — Construction.

Execute and submit all required standard forms, bid schedules, and solicitation provisions contained in the solicitation as part of the bid.

Complete SF 1442, Solicitation, Offer, and Award, and sign as follows:

(a) Individuals. Sign your individual signature. For individuals doing business as a firm, follow the individual signature with the individual's typed, stamped, or printed name and the words, "an individual doing business as (name of firm) ."

(b) Partnerships. Submit a list of all partners having authority to bind the partnership. One of the listed partners must sign on behalf of the partnership.

(c) Corporations. Sign in the corporate name, followed by the word "by" and the signature and title of the person authorized to sign. Submit evidence from the corporation that the person signing has authority to bind the corporation.

(d) Joint ventures. Submit a copy of the Joint Venture agreement. Sign the SF 1442 according to the Joint Venture agreement.

(e) Limited liability company. Sign in the company name, followed by the word “by” and the signature of the person authorized to sign. Submit evidence that the individual executing the document has authority to bind the company.

(f) Agents. When an agent signs, other than as stated in (a) through (e) above, furnish satisfactory evidence that the agent has authority to bind the bidder.

Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit bid price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern.

When the words "lump sum" appear as a unit bid price, insert an amount bid for each lump sum pay item.

When the words "contingent sum" or a fixed rate appears as a unit bid price, include the Government inserted amount bid for the item in the total bid amount.

Total all of the amounts bid for each pay item and show the total bid amount.

The quantities shown in the bid schedule are approximate, unless designated as a contract quantity, and are used for the comparison of bids. Payment will be made for the actual quantities of work performed and accepted or material furnished according to the contract. The scheduled quantities may be increased, decreased, or deleted. Bid schedule quantities are considered the original contract quantities.

102.03 Bid Guarantee. Follow the requirements of FAR Clause 52.228‑1 Bid Guarantee.

(a) General. Submit a bid guarantee of 20 percent of the amount of the bid or $3 million, whichever is less. Submit the bid guarantee on SF 24, Bid Bond. If the bid guarantee is other than a corporate or individual surety, sign the SF 24 as the principal and make a statement on the form pledging the security. Make checks or money orders payable to the agency issuing the solicitation.

(b) Power of attorney. A corporate surety shall submit a current power of attorney for the signing agent or attorney-in-fact with each SF 24.

(c) Evidence of guarantee assistance. A surety that has a guarantee of assistance from the Small Business Administration shall submit a copy of its "Surety Bond Guarantee Agreement" with each SF 24. In addition, submit a power of attorney for the surety representative identified in the agreement.

102.04 Individual Surety. Follow the requirements of FAR Clause 52.228-11 Pledges of Assets.

Complete and date the SF 28, Affidavit of Individual Surety, after the solicitation date. The individual surety shall personally sign the SF 28. Execution by power of attorney is not acceptable. Bidders cannot serve as their own surety. Assets named shall be committed to the project with a bank designated to serve as trustee.

After reviewing the SF 28, the surety may be requested to provide further documentation with respect to any of its assets, debts, or encumbrances. The information may be required to be furnished under oath. Failure of the surety to respond with the requested documentation within 7 days of receipt of the request is cause for rejection of the surety.

Any material misstatement by the surety, overstatement of assets (either as to ownership or value) or understatement of liabilities is cause for rejection of the surety. Substitution of individual sureties to support a bid bond after the bid opening will not be permitted.

102.05 Public Opening of Bids. Bids will be publicly opened at the time specified in the SF 1442. Their contents will be made public information. The Government reserves the right to reject bids as set forth in the FAR, Part 14.

102.06 Performance and Payment Bonds. Follow the requirements of FAR Clause 52.228-15 Performance and Payment Bonds – Construction. Furnish a performance bond and a payment bond each in the penal amount of 100 percent of the original contract price.

Use SF 25, Performance Bond, and SF 25A, Payment Bond, for submitting the bonds.

The requirements contained in Subsections 102.03 and 102.04 relating to power of attorney, evidence of guarantee assistance, and individual sureties also apply to performance and payment bonds.

Section 103. — SCOPE OF WORK

103.01 Intent of Contract. The intent of the contract is to provide for the construction and completion of the work described. The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.

103.02 Disputes. Follow the requirements of FAR Clause 52.233‑1 Disputes.

When requesting a CO's decision on an interpretation of contract terms for the recovery of increased costs, quantify the amount and, if required by FAR Clause 52.233-1, certify the amount. Include an explanation of the interpretation of contract terms, the contract clause under which the claim is made, all supporting documentation, and adequate cost data to support the amount claimed.

103.03 Value Engineering. Follow the requirements of FAR Clause 52.248‑3 Value Engineering — Construction.

Before undertaking significant expenditures, provide the CO with a written description of the value engineering change proposal (VECP) concept. Within 14 days, the CO will inform the Contractor as to whether the concept appears to be viable or if the concept is unacceptable. If the CO indicates that the concept appears to be viable, prepare and submit the formal VECP proposal.

103.04 Contractor Records. Upon request, provide records related to the contract to the Government for up to 3 years after final payment and for longer periods as provided by law.

Include a provision in all subcontracts at all tiers giving the Government the same rights as provided above with respect to the subcontractor's records.

103.05 Partnering. To facilitate this contract, the Government offers to participate in a formal partnership with the Contractor. This partnership draws on the strengths of each organization to identify and achieve reciprocal goals. Partnering strives to resolve problems in a timely, professional, and non-adversarial manner. If problems result in disputes, partnering encourages, but does not require, alternative dispute resolution instead of the formal claim process. The objective is effective and efficient contract performance to achieve a quality project within budget and on schedule.

Acceptance of this partnering offer by the Contractor is optional, and the partnership is bilateral.

If the partnering offer is accepted, mutually agree with the Government on the level of organizational involvement and the need for a professional to facilitate the partnering process. Engage the facilitator and other resources for key Contractor and Government representatives to attend a partnership development and team-building workshop usually between the time of award and the notice to proceed. Hold additional progress meetings upon mutual agreement.

The direct cost of partnering facilities, professional facilitation, copying fees, and other miscellaneous costs directly related to partnering meetings will be shared by the Contractor and Government. Secure and pay for facilities, professional fees, and miscellaneous requirements. Provide invoices to the Government. The Government will reimburse the Contractor for 50 percent of the agreed costs incurred for the partnering process. The Government’s share will not exceed $5,000.

Each party is responsible for making and paying for its own travel, lodging, and meal arrangements. The time allowed for completion of the project is not affected by partnering.

Section 104. — CONTROL OF WORK

104.01 Authority of the Contracting Officer (CO). The CO may delegate authority to representatives to decide on acceptability of work, progress of work, suspension of work, interpretation of the contract, and acceptable fulfillment of the contract. The term "CO" includes all authorized representatives of the CO, including inspectors, acting within the limits of their authority as delegated by the CO.

104.02 Authority of Inspectors. Inspectors are authorized to inspect all work including the preparation, fabrication, or manufacture of material for the project. The inspector is not authorized to alter or waive contract requirements, issue instruction contrary to the contract, act as foreman for the Contractor, or direct the Contractor's operations. The inspector has authority to identify non-conforming work until the issue can be referred to and decided by the CO. The inspector may take necessary action to prevent imminent and substantial risk of death or injury including stopping work.

104.03 Specifications and Drawings. Follow the requirements of FAR Clause 52.236-21 Specifications and Drawings for Construction.

(a) General. Prepare drawings as necessary to construct the work. Drawings include, but are not limited to, layouts that show the relative position (vertical and horizontal as appropriate) of work to be performed, fabrication details for manufactured items and assemblies, installation and erection procedures, details of post-tensioning and other systems, detailed trench and excavation procedures that conform to OSHA requirements, traffic control implementation drawings, and methods for performing work near existing structures or other areas to be protected. Show all the drawing dimensions in United States customary units.

Limit drawings to a maximum size of 24 by 36 inches. Include on each drawing and calculation sheet, the project number, name, and other identification as shown in the contract.

Furnish 5 sets of drawings and supporting calculations for acceptance before performing work covered by the drawings. If drawings are returned for revision, correct and resubmit for acceptance. Allow 40 days per submission for railroad structures and 30 days per submission for all other structures. The review time as specified is applied separately to each drawing submitted. The CO may request additional specific drawings for unique situations in order to clarify layout, construction details, or methodology. If drawings must be resubmitted, the time for acceptance starts over. Obtain written approval before changing or deviating from the accepted drawings.

(b) Specific requirements for concrete and miscellaneous structures.

(1) Furnish drawings for the following:

(a) Site-specific layouts for all wall types and gabion installations;

(b) Gabion and revet mattress details and installation procedures;

(c) Forms and falsework for reinforced concrete box culverts less than or equal to 6 feet in height;

(d) Fabrication drawings for bridge railings and parapets;

(e) Fabrication drawings for prestressed members;

(f) Fabrication and installation drawings for expansion joint assemblies;

(g) Fabrication drawings for bearing assemblies;

(h) Construction joint location and concrete deck placement sequences not shown on the plans;

(i) Erection diagrams for Soil-Corrugated Metal Structure interaction systems (multi-plate structures);

(j) Structural steel fabrication drawings;

(k) Utility hangar details; and

(l) Fabrication and installation drawings for precast items.

(2) Furnish drawings that bear the seal and signature of a professional engineer proficient in the pertinent design field for the following:

(a) Erection plans;

(b) Reinforced soil slopes details;

(c) MSE wall and crib wall details;

(d) Details and installation procedures for proprietary wall systems;

(e) Temporary bridge structures for public use;

(f) All bridge forms except for railings, parapets, and components less than 6 feet in height;

(g) Shoring systems and cofferdams greater than 6 feet in height;

(h) All shoring systems that support traffic loadings;

(i) Forms and falsework for all structures greater than 6 feet in height;

(j) Post-tensioning systems;

(k) Ground anchors, soil nail, and rock bolt assembly details, layout, and installation and testing procedures;

(l) Tie back wall details; and

(m) Alternate retaining wall details.

(3) Furnish drawings that bear the seal and signature of a professional engineer who is proficient in forms and falsework design and licensed in the state where the project will be constructed for the following:

(a) Falsework for any structure with a span exceeding 16 feet;

(b) Falsework for any structure with a height exceeding 14 feet; and

(c) Falsework for structures where traffic, other than workers involved in constructing the structure, will travel under the structure.

104.04 Coordination of Contract Documents. The FAR, TAR, special contract requirements, plans, and standard specifications are contract documents. A requirement in one document is binding as though occurring in all the contract documents. The contract documents are intended to be complementary and to describe and provide for a complete contract. In case of discrepancy, calculated and shown dimensions govern over scaled dimensions. The contract documents govern in the following order:

(a) Federal Acquisition Regulations;

(b) Transportation Acquisition Regulations;

(c) Special contract requirements;

(d) Plans; and

(e) Standard specifications.

104.05 Load Restrictions. Follow the requirements of FAR Clause 52.236‑10 Operations and Storage Areas, paragraph (c).

Comply with all legal load restrictions when hauling material and equipment on public roads to and from the project. A special permit does not relieve the Contractor of liability for damage resulting from the moving of material or equipment.

Unless otherwise permitted, do not operate equipment or vehicles that exceed the legal load limits over new or existing structures, or pavements within the project except those pavements intended to be removed.

Section 105. — CONTROL OF MATERIAL

105.01 Source of Supply and Quality Requirements. Follow the requirements of FAR Clause 52.236-5 Material and Workmanship.

Select sources and provide acceptable material. Notify the CO of all proposed sources before delivery to the project to expedite material inspection and testing. Do not incorporate material requiring submittal into the work until approved.

Material may be approved at the source of supply before delivery to the project. Approval does not constitute acceptance. If an approved source does not continue to supply acceptable material during the life of the project, further use of that source may be denied.

105.02 Material Sources.

(a) Government-provided sources. The Government will acquire the permits and rights to remove material from provided sources identified in the contract and to use such property for a plant site and stockpiles. Test reports and available historical performance data verifying the presence of acceptable material are available upon request.

Do not perform work within a Government-provided source until a plan of operation for the development of the source is accepted. Perform all work necessary to produce acceptable material including site development, preparation, erosion control, and restoration.

The quality of material in provided sources is acceptable in general, but may contain layers or pockets of unacceptable material. It is not feasible to ascertain from samples the quality of material for an entire deposit, and variations may be expected. Determine the quantity and type of equipment and work necessary to select and produce acceptable material.

Strip and stockpile the overburden. After operations are complete, move all waste back into the…