FR627_Specs.pdf
PDF 208 KB Posted
- Attached to
- FR 627 Erosion and Pavement Repair
- Solicitation number
- AG-94TZ-S-17-0011
About this file
Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| sf-30_amendment-2.doc | DOC document | |
| AG-94TZ-S-17-0011-0001.pdf | ||
| Statement_of_Work.pdf | ||
| WageDetermination.pdf | ||
| Solicitation.pdf | ||
| FirePlan.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
FOR
FR 627 Erosion and Pavement Repair
01000-1
DIVISION 1 - GENERAL REQUIREMENTS
PROJECT COORDINATION - 01000
PART 1 - GENERAL
1.1 - Description
This work shall consist of coordination with government agencies and the general public.
1.2 - Related Sections
01010 - Summary of Work
PART 2 - PRODUCTS
None
PART 3 - EXECUTION
3.1 - Government Agencies
All permits necessary for construction and occupancy of the project shall be obtained by the Contractor.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement
Work under this section will not be measured for payment, but is included in all other items in the contract.
4.2 - Payment
Separate payment will not be made.
END OF SPECIFICATION 01000
01010-1
DIVISION 1 - GENERAL REQUIREMENTS
SUMMARY OF WORK - 01010
1.1 - Location
The project is located on the Mesa Ranger District, of the Tonto National Forest, T7N, R8E, Section 36 as shown on the location map included in the package. The site can be accessed via Hwy 87. Exit west onto FR 627 towards the Sunflower administrative site. The project site is near the interesection with FR 25.
1.2 - Site Work
A section of FR 627 has been experiencing significant erosion on the outlet side of a box culvert near the intersection with FR 25. Several years back the Sunflower Fire created erosion issues in the area and this may have been a delayed response to the change in the drainage behaviors.
As you can see from the attached photos, the right side of the box culvert on the outlet side was not constructed with a wing wall. Our assumption is that it was stable enough that the original design didn’t call for it. The direction of flow immediately turns to the left as well.
The objective of this repair is to stabilize the slope, build it back up to the shoulder of the road, remove a portion the existing pavement and subbase and replace it with new subbase and pavement.
The project calls for removal of 100 feet of the paved roadway, with a full width of approximately 32 feet. The removal will be centered on the culvert. The exact location will be marked during the pre-con meeting. The existing pavement that is removed will be hauled off to a landfill that accepts this material that is outside the forest lands.
Construction will consist of placing large Class III rip rap at the base of the outlet slope and backfilling it with the recovered subbase from the roadway where the asphalt was removed. The rip rap will be placed, in the current void, to interlock and will continue up the slope to the midpoint of the box culvert. The remained of the slope will be placed in 12” lifts with water and compaction until the elevation reaches the existing shoulder.
The contractor will prepare the subbase to allow for a new 6” lift of aggregate base to be placed and compacted. Any additional spoils will be place somewhere adjacent to the project as designated by the COR.
01010-2
The 100 foot section of asphalt will be per MAG A standards with a 3” thickness. The transitions into the existing asphalt will be milled down by 1” to provide and overlap.
Tack coats will also be used to create a better seal.
Access to the outlet will be delineated through an existing gate just north of the culvert. A backhoe is the only anticipated equipment to be needed in the outlet area of the culvert. Forest Service will get the requisite clearances to provide this access.
1.3 - Facilities and Services
A construction work camp will not be allowed. A Contractor’s staging and storage area will be allowed where approved by the CO. Transportation to and from the work site for personnel and materials will be at Contractor’s expense.
Electricity and potable water are not available at the site. Water for construction and dust control is not available from National Forest lands. Development, hauling and placement of water shall be considered incidental to other pay items.
1.4 - Material Sources
All materials are available from commercial sources.
1.5 - Subsurface Soils and Investigations
No auger borings were made in the area. Contractor shall undertake any site investigations necessary to ascertain the subsurface conditions.
1.6 - Clean-up and Disposal
Disposal of construction debris and waste shall be off National Forest land and in compliance with local laws regarding disposal of waste material.
1.7 - Precautionary Measures
Protection of Work:
The Contractor shall take precautions necessary to protect all work during the construction period and shall maintain adequate protection during severe weather conditions to prevent damage to the work or materials.
Safety:
The Contractor is responsible for safeguarding the public, the Contractor's employees, existing facilities, and Forest resources from contract operations.
Signs, lights, barricades and other devices, as necessary, shall be erected and maintained during operations and at night and weekends as necessary.
Precautions such as lowering tractor blades and safely storing materials shall be practiced to prevent injury to others in the area.
01010-3
Security:
No security shall be provided by the government. The contractor shall take all precautions deemed necessary to secure the worksite, improvements and equipment. A security trailer with guards shall be permitted.
END OF SPECIFICATION 01010
01101-1
DIVISION 1 GENERAL
ABBREVIATIONS - 01101
Organizations & Standards
Whenever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows. Reference to a specific standard of specification shall mean the latest edition or amendment in effect on date of invitation to bid.
AASHTO--American Association of State Highway and Transportation Officials
ACI--American Concrete Institute
AISC--American Institute of Steel Construction
AISI--American Iron and Steel Institute
AITC--American Institute of Timber Construction
ANSI--American National Standards Institute
APA--American Plywood Association
API--American Petroleum Institute
ASME--American Society of Mechanical Engineers
ASTM--American Society for Testing and Material
ATCC--American Type Culture Collection
AWPA--American Wood Preservers Association
AWPB--American Wood Preservers Bureau
AWS--American Welding Society
AWWA--American Water Works Association
CFR--Code of Federal Regulations
CRSI--Concrete Reinforcing Steel Institute
CS--Commercial Standard issued by U.S. Department of Commerce
01101-2
DEMA--Diesel Engine Manufacturers Association
FAR--Federal Acquisition Regulation
FED SPEC. or FS-- Federal Specifications
FSS--Federal Specifications and Standards
GSA--General Services Administration
MAG—Maricopa Association of Governments
MIL--Military Specifications
MSHA--Mine Safety and Health Administration
MUTCD--Manual on Uniform Traffic Control Devices
NBFU--National Board of Fire Underwriters
NBS--National Bureau of Standards
NEMA--National Electrical Manufacturers Association
NESC--National Electrical Safety Code
NFPA--(Fire)--National Fire Protection Association
NFPA--(Forest)--National Forest Products Association
NWMA--National Woodwork Manufacturers Association
OSHA--Occupational Safety and Health Administration
PCA--Portland Cement Association
PCI--Prestressed Concrete Institute
PS--Product Standard issued by the U.S. Department of Commerce
PTI--Post-Tensioning Institute
RIS-Redwood Inspection Service
SAE--Society of Automotive Engineers
01101-3
SF--Standard Form
SSPC--Steel Structures Painting Council
UL--Underwriter's Laboratories, Inc.
USASI--United States of America Standards Institute
WCLIB--West Coast Lumber Inspection Bureau
WWPA--Western Wood Products Association
Pay Items & Pay Units
ABBREVIATIONS
Aluminum . . . . . . . . . . . . . . . . . . . . AL.
Asphalt . . . . . . . . . . . . . . . . . . . . ASP.
Barbed Wire . . . . . . . . . . . . . . . . . . B.W.
Bituminous Coated Corrugated Steel Pipe . . . . B.C.C.S.P. OR B.C.C.S. PIPE
Bituminous Surface Treatment BST Cement . . . . . . . . . . . . . . . . . . . . . CEMT.
Cement Treated . . . . . . . . . . . . . . . . . CEMT.-T.
Cement Treated Base . . . . . . . . . . . . . . CTB Clearing & Grubbing . . . . . . . . . . . . . . CLEAR & GRUB Compaction . . . . . . . . . . . . . . . . . . . CMPCT.
Concrete . . . . . . . . . . . . . . . . . . . . CONC.
Corrugated Metal Pipe . . . . . . . . . . . . . CMP Corrugated Steel Pipe . . . . . . . . . . . . . C.S.P.
Corrugated Steel Pipe Arch . . . . . . . . . . . C.S.P. ARCH Cubic Yard . . . . . . . . . . . . . . . . . . . C.Y.
Cubic Yard Mile . . . . . . . . . . . . . . . . C.Y.MI.
Diameter . . . . . . . . . . . . . . . . . . . . DIA.
Each . . . . . . . . . . . . . . . . . . . . . . EA.
Emulsified . . . . . . . . . . . . . . . . . . . EMLSFD.
Erosion and Pollution Control . . . . . . . . . E&P CONTROL Fabricated . . . . . . . . . . . . . . . . . . . FABR.
Finish Floor Elevation . . . . . . . . . . . . . F.F.E.
Foundation . . . . . . . . . . . . . . . . . . . FOUND.
Furnished . . . . . . . . . . . . . . . . . . . FURN.
Gallon . . . . . . . . . . . . . . . . . . . . . GAL.
Grade . . . . . . . . . . . . . . . . . . . . . GR.
Height . . . . . . . . . . . . . . . . . . . . . HT.
High Strength . . . . . . . . . . . . . . . . . H. STRENGTH Horizontal . . . . . . . . . . . . . . . . . . . HOR.
01101-4
Hour . . . . . . . . . . . . . . . . . . . . . . HR.
Linear Foot . . . . . . . . . . . . . . . . . . L.F.
Liquid . . . . . . . . . . . . . . . . . . . . . LIQ.
Loading . . . . . . . . . . . . . . . . . . . . LD.
Lump Sum . . . . . . . . . . . . . . . . . . . . L.S.
Material . . . . . . . . . . . . . . . . . . . . MAT'L Maximum . . . . . . . . . . . . . . . . . . . . MAX.
Method . . . . . . . . . . . . . . . . . . . . . M.
Mile . . . . . . . . . . . . . . . . . . . . . . MI.
Minimum . . . . . . . . . . . . . . . . . . . . MIN.
One Thousand Feet Board Measure . . . . . . . . MFBM One Thousand Gallons . . . . . . . . . . . . . . M.GALS.
One Thousand Gallons Mile . . . . . . . . . . . M.GALS.MI.
One Thousand Square Feet . . . . . . . . . . . . M.S.F.
Polyvinylchloride . . . . . . . . . . . . . . . PVC Pounds . . . . . . . . . . . . . . . . . . . . . LBS.
Reflectorized . . . . . . . . . . . . . . . . . REFLECT.
Section . . . . . . . . . . . . . . . . . . . . SEC.
Square Foot . . . . . . . . . . . . . . . . . . S.F.
Square Yard . . . . . . . . . . . . . . . . . . S.Y.
Station . . . . . . . . . . . . . . . . . . . . STA.
Station Yard . . . . . . . . . . . . . . . . . . STA. YD.
Strand . . . . . . . . . . . . . . . . . . . . . S.
Structural . . . . . . . . . . . . . . . . . . . STRUCT.
Structural Steel . . . . . . . . . . . . . . . . S. STEEL Stump . . . . . . . . . . . . . . . . . . . . . STMP Target Value . . . . . . . . . . . . . . . . . . TV Thickness . . . . . . . . . . . . . . . . . . . TH.
Ton Mile . . . . . . . . . . . . . . . . . . . . T.M.
Tops and Limbs . . . . . . . . . . . . . . . . . T&L Utilization of Timber . . . . . . . . . . . . . UOT Vertical . . . . . . . . . . . . . . . . . . . . VERT.
Welded Wire Fabric . . . . . . . . . . . . . . . W.W.F.
White . . . . . . . . . . . . . . . . . . . . . WH.
Width . . . . . . . . . . . . . . . . . . . . . W.
With . . . . . . . . . . . . . . . . . . . . . . W/ Without . . . . . . . . . . . . . . . . . . . . W/O Woven wire . . . . . . . . . . . . . . . . . . . W.W.
Yellow . . . . . . . . . . . . . . . . . . . . . YE.
END OF SPECIFICATION 01101
01102-1
DIVISION 1 - GENERAL
DEFINITIONS - 01102
Wherever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:
Adjustment in Contract Price. "Adjustment in contract price" shall mean "equitable adjustment" as used in the Federal Acquisition Regulations.
Arch Pipe. A culvert section, usually formed of bolted structural plates, that is an arc of a circle (usually one-half or less); that is, a bottomless culvert.
Base Course. The layer or layers of specified or selected material of designed thickness placed on a subbase or subgrade to support a surface course.
Bearings. The portion of a beam, girder, or truss that transmits the bridge superstructure load to the substructure.
Berm. Curb or dike constructed to control runoff water or traffic flow.
Change. "Change" means "Change Order" as used in the Federal Acquisition Regulations.
Clearing Limits. The limits of clearing as designated on the ground or on the drawings.
Conduit. A natural or artificial channel for carrying fluids, as water pipes, canals, and aqueducts.
Construction Slash. All vegetative material not meeting utilization standards, such as tops and limbs, timber, brush, and grubbed stumps associated with construction or reconstruction of a facility.
Contracting Officer (CO). The person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.
Contractor. The individual, partnership, joint venture, or corporation undertaking the execution of the work under the terms of the contract and acting directly or through their agent, employees, or subcontractors.
Controlled Felling. Directing the placement of trees in felling by wedges, jacks, cable tension, or distribution of holding wood or any combinations of these which will ensure that trees are dropped into previously cleared areas, or clear of any objects that are to remain.
01102-2
Culvert. A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually constructed entirely below the elevation of the traveled way.
Cushion Material. Native or imported material generally placed over rocky sections of unsurfaced roads to provide a usable and maintainable traveled way.
Defect. A failure to meet a requirement with respect to a single quality characteristic.
Drawings. The documents, including plan and profile sheets, cross sections, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials showing details for construction of a facility.
Embankment. A structure of soil, aggregate, or rock material placed on the prepared ground surface and constructed to subgrade.
Engineer. The Contracting Officer's Representative (COR) responsible for onsite administration of the contract.
Equipment. All machinery and equipment, together with the necessary supplies for upkeep and maintenance, as well as tools and apparatus necessary for the proper construction and acceptable completion of the work.
Excess Excavation. Material from the excavation in excess of that needed for construction of designed roadways and facilities.
Forest Service. The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Gauge. The term "gauge" when used in connection with the measurement of plates will mean the U.S. Standard Gauge, except when reference is made to the measurement of metal sheets used in the manufacture of corrugated metal, pipe, metal plate culverts and arches, and metal cribbing, then the term means the "gauge" or "thickness" specified in AASHTO M 36, M 167, M 196, and M 219, as applicable. When the term "gauge" refers to the measurement of wire, it will mean the wire gauge specified in AASHTO M 32.
Government Land. National Forest System lands, and other lands controlled or administered by the Forest Service or by other Federal agencies.
Inspector. The Government-authorized representative designated in writing by the CO or COR responsible for detailed inspection.
Job-Mix Formula. The percentage of each material in a mixture intended for a particular use.
01102-3
Laboratory. A testing laboratory of the Government or any other testing laboratory approved by the Contracting Officer.
Materials. Any substance specified for use in the construction of the project and its appurtenances.
Maximum Density. The highest density that can be obtained under stated conditions.
Measurement. Determining and expressing the quantities of work or materials.
Multi-Beam Girder. A precast, prestressed concrete member where the concrete deck is precast as an integral part of the member.
Neat Line. A line defining the proposed or specified limits of an excavation or structure.
Nominal Dimensions or Weights. The numerical values shown on the drawings or in the specifications as measurements of material to be used in the construction.
Nominal Maximum Particle Size. The largest sieve size listed in the applicable specification upon which any material is permitted to be retained.
Overbreak. Material beyond the neat line of an excavation that is removed in the process of excavation, usually by blasting.
Pavement Structure. Subbase, base, or surface course, or combination thereof, placed on a subgrade to support the traffic load and distribute it to the roadbed.
Pipe. A culvert that is circular (round) in cross-section.
Pipe-Arch. A pipe that has been factory-deformed from a circular shape such that the width (or span) is larger than the vertical dimension (or rise).
Profile Grade. The trace of a vertical plane, as shown on the drawings, intersecting the top surface at the centerline of the proposed facility construction.
Random Sampling. Sampling at times or locations determined in advance by the use of a table of random numbers.
Reasonably Close Conformity. Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.
01102-4
Roadway. The portion of the road within the limits of excavation and embankment, including slope rounding.
Schedule of Items. A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, methods of measurement, unit price, and amount.
Second Samples. A sample taken when the initial sample indicates that the material is defective.
Sidewalk. The portion of the roadway constructed primarily for pedestrian use.
Specifications. A description of the technical requirements for a material, product, or service that includes criteria for determination whether these requirements are met.
Standard Specifications. Specifications approved for general application and repetitive use.
Subbase. The layers of specified or selected material of designed thickness placed on a subgrade to support a base course.
Subgrade. The layers of roadbed that bring it up to the top surface, upon which subbase, base, or surface course is constructed. For roads without base course or surface course, that portion of roadbed prepared as the finished wearing surface.
Tackifier. Binder for vegetative mulch.
Target Value. The percentage of each material in a mixture intended for a particular use from which allowable variations are measured.
Unit of Measurement. The unit and fractions of units shown in the Schedule of Items.
Unsuitable Material. The material excavated during roadway construction that is not usable in embankment and must be disposed of or that can be used only in certain locations or for limited purposes.
END OF SPECIFICATION 01102
01103-1
MEASUREMENT AND PAYMENT - 01103
1.1 – Requirements
Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered incidental to and included in the payment of the pay items in the
SCHEDULE OF ITEMS.
1.2 – Payment
One of the following methods of measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item.
(a) Designed Quantities (DQ): These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units of the originally contemplated work will not be made unless authorized under one or more of the following conditions:
(1) As a result of changes authorized by the Contracting Officer in the originally contemplated work. Minor changes to adjust balance points, etc., will not be considered changes in quantities.
(2) As a result of the Contracting Officer determining that errors exist in the original design data used to determine designed quantities, that cause a pay item to change by 15 percent.
(3) As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design data used to determine design quantities that cause a pay item total to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
Final payment will be made for the designed quantities at the unit price shown in the SCHEDULE OF ITEMS, subject to the Variation in Quantities Provision.
(b) Actual Quantities (AQ): These quantities are determined from measurements of completed work.
01103-2
(c) Lump Sum Quantities (LSQ): These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured.
1.3 - Units of Measurement:
Payment will be by units defined and determined according to U.S. Standard measure.
END OF SPECIFICATION 01103
01300 - 1
SUBMITTALS - 01300
1.1 - Requirements
It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item. Contractor shall allow ten days for processing of submittals by the Government.
Submittals may also be referred to as shop drawings.
1.2 - Manufacturer's Literature and Shop Drawings
Submit two (2) copies to the Engineer for approval on the items required herein.
Submittal specifications are to be submitted in the following format:
A. The specifications and salient qualities of the item specified in the contract.
B. The specifications and salient qualities of the submittal item.
C. A listing of the differences and a comparison between the two, including but not limited to the structural qualities, operational qualities, any modifications necessary to accomplish installation of unit, and guarantee and warranty.
D. A cost comparison between the specified and submitted item(s) with the cost reduction benefit to the government or adequate justification for a cost increase to the government.
01300-2
Submittals will be waived if contractor furnishes exact item used for design when manufacturer's model, size, etc. are shown in the contract.
Submittals are required per the following sections:
1. 01410 – Quality Control and Quantity Measurement Contractor's Representative Designation Project Schedule Quality Control Plan As-built Drawings Certificates-of-Compliance Quantity Measurements Test Results
2. 02270 – Riprap
Certificate-of-Compliance
3. 02304 – Aggregate Base
Certificates of Compliance Delivery Tickets
4. 02511 – Asphalt Concrete Surfacing
Job-Mix Formula Certificate-of-Compliance Weight Tickets Quality Control Test Results
5. 09900 – Painting and Graffiti Protection Paint Samples
END OF SPECIFICATION 01300
01410-1
QUALITY CONTROL AND QUANTITY MEASUREMENT - 01410
This work shall consist of providing quality control in conformance with the Inspection of Construction provisions of this contract to ensure compliance with the drawings, specifications, and provisions of the contract, and measuring the quantities of completed work in conformance with the provisions of the applicable specification. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.
1.2 - Related Work Specified Elsewhere
General Provisions FAR 52.236-5, Material and Workmanship General Provisions FAR 52.236-6, Superintendence by the Contractor General Provisions FAR 52.246-12, Inspection of Construction
1.3 - Submittals
Submittals under this section shall be furnished to the Engineer. Submittals include, but are not limited to the following:
Contractor's Representative Designation Project Schedule Quality Control Plan As Built Drawings Certificates-of-Compliance Quantity Measurements
None
3.1 - Contractor's Representative
Submit a letter to the Contracting Officer stating the name of the on-the-job superintendent or representative for the Contractor and the duties and authorities of the representative during work under this contract.
01410-2
3.2 - Project Schedule
Submit a project schedule stating information such as proposed dates of completion of various elements of construction.
3.3 - Quality Control Plan
The Quality Control Plan shall consist of the following:
(1) Authorities and responsibilities of inspection and testing personnel.
(2) Experience and qualifications of inspection and testing personnel to be assigned and name and location of any (for hire) testing facility to be used.
The Contractor's proposed quality control plan for all items requiring quality control shall be submitted to the CO for review prior to the Contractor commencing work. Within 10 days of receipt of the plan, the CO shall notify the Contractor whether the plan adequately covers quality control requirements. Construction work shall not be performed prior to Contractor's receipt of written approval of the proposed plan. The Contractor shall submit to the CO, in writing, any proposed changes in the approved quality control plan. Proposed changes shall not be put into effect until approved in writing by the CO.
All work shall comply with local applicable codes and codes referenced in individual sections of the technical specifications.
3.4 - Sampling, Testing, Inspection, and Measurement of Quantities
The Contractor shall provide and maintain appropriate measuring and testing devices, equipment, and supplies to accomplish the required measurement, testing, and inspection in a timely manner. Tests, measurements, and certifications shall be made as required by the drawings and specifications. The Contractor shall take samples and perform inspections and tests necessary to achieve the quality of construction required by the contract and make required measurements of work under this contract performed onsite or offsite. Sampling and testing frequency for specific items shall be specified in the related section.
The Contractor shall maintain current records of all inspections and tests performed. The following information will be acceptable to the Government:
PROJECT NAME:________________________CONTRACT
No._____________________
Pay Item No. Test Date Location Standard Results Test By (Initials)
01410-3
The Contractor shall engage inspection and testing agencies which are prequalified as complying with the recommendations of "Independent Laboratory Qualification" by the American Council of Independent Laboratories, and which specialize in the types of inspections and tests to be preformed.
The Contractor shall protect construction exposed by or for quality control service activities and protect repaired construction. Upon completion of inspection and testing repair damaged construction and restore substrates and finishes to eliminate deficiencies.
The Contractor is responsible for repair and protection of inspected work, whether inspection is performed by the Contractor or by the Government.
The Contractor shall certify in writing that all inspections and tests were performed in accordance with specifications.
3.5 - Certificates and Measurements
Certification:
The Contractor shall furnish certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite produced materials incorporated into the work meet the applicable requirements SHOWN ON THE DRAWINGS or stated in the specifications.
Incidental purchases needed to remedy minor shortages of material shall be certified by the Contractor.
Measurements:
The Contractor shall make all measurements for computation of quantities for all work items except those specified for payment by Designed Quantity (DQ). The Contractor shall compute the quantities for periodic progress payments; the Engineer will compute the quantities for the final payment based on measurements taken by the Contractor. All Contractor measurements are subject to verification. The Contractor shall submit all field notes, calculation sheets, and other data used to determine quantities. The Contractor shall certify in writing as to the accuracy of the measurements and computations submitted.
The following format or one containing the following information will be acceptable to the Government:
PROJECT NAME:_______________________CONTRACT No.__________________
Quantity or Pay Item Date Measurement Test By (Initials)
01410-4
3.7 - Materials
The contractor shall furnish certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite produced materials incorporated into the work meet the applicable requirements SHOWN ON THE DRAWINGS or stated in the specifications.
Incidental purchases needed to remedy minor shortages of material shall be certified by the contractor. Earth, aggregate, and concrete material shall be certified and accurately completed indicating weights, volumes, and batch times where appropriate.
When the material sources are not designated as Government-furnished or the Contractor elects not to use designated sources, the Contractor shall be responsible for furnishing materials that produce an end product equivalent in performance to that originally designated and that meets contract specifications.
There will be no separate measurement for this section.
This work is incidental to other items in the contract and direct separate item payment will not be made.
END OF SPECIFICATION 01410
01601 - 1
MOBILIZATION - 01601
This work shall consist of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.
NONE
NONE
Progress payments will be made as follows:
The Contractor can request payment for performance and payment bonds. The amount of the premium, including coinsurance and reinsurance agreements, will be paid upon receipt of evidence of full payment to the surety. When separate payment for bonding cost is made, the bonding cost will be subtracted from the total contract amount for this pay item and the balance paid in accordance with the progress payment schedule outlined below.
(a) When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.
(b) When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.
(c) Upon completion of all work on the project, any unpaid amount for mobilization will be paid.
01601 - 2
Any bonding costs in excess of the total contract amount of this pay item will be paid under one or more other pay items under this contract as determined by the Contracting Officer. In no circumstance will the total amount of this contract be increased as a result of bonding costs exceeding the total contract amount of this pay item.
The total of all payments shall not exceed the original contract amount for this item.
Payment will be made under:
PAY ITEM DESCRIPTION PAY UNIT
01601(01) Mobilization (Including Bonding Cost) . . . . . . . . . . . . . . . . LS
END OF SPECIFICATION 01601
01740 - 1
CLEANING - 01740
1.1 – Clean up
A. The work site shall be maintained in a neat condition durning construction. The work site shall be kept free from accumulation of waste materials and rubbish resulting from the work.
B. If work is stopped or delayed for an extended period of time, the Contractor shall clean up the site as determined by the C.O.
C. Before final acceptance of the project, the Contractor shall remove all waste materials and rubbish resulting from the work.
Not Used
PART 3 - EXECUTION
Not Used
Cleaning will not be measured for payment.
This work is incidental to other items in this contract and direct payment for Cleaning will not be made.
END OF SECTION - 01740
02071-1
DIVISION 2 - SITE WORK
REMOVAL OF STRUCTURES AND OBSTRUCTIONS - 02071
This section specifies work requiring the removal and disposal of all structures and obstructions within the project limits which have been SHOWN ON THE
DRAWINGS.
Existing structures and improvements which are to become an integral part of the planned improvements shall remain even though not specifically noted.
1.2 - Material Classification
Material to be excavated is unclassified.
1.3 - Related Work Specified Elsewhere
02224 - Excavation, Embankment and Backfill
None.
3.1 – Removal of Obstructions
Remove all obstructions SHOWN ON THE DRAWINGS. Removal shall include all associated footings or foundations to a depth of no less than 2 feet unless otherwise SHOWN ON THE DRAWINGS OR NOTED IN THE
SPECIFICATIONS.
3.2 – Removal of Vault Toilets
Work shall consist of pumping out toilet vault and removing the building structure, toilet vault, concrete pad, and all debris associated with the toilet. Prior to removing the vault after being pumped, contractor to apply sufficient lime to adsorb the remaining material in the vault. The vault shall be pumped by a licensed septic tank contractor prior to removal.
02071-2
3.3 – Backfill and Disposal
All voids left after removal, not being incorporated into the work, shall be backfilled and compacted in accordance with Section 02224.
All materials removed and designated for disposal AS SHOWN ON THE DRAWINGS OR NOTED IN THE SPECIFICATIONS shall be removed from National Forest Lands and disposed of in accordance with local regulations regarding disposal of construction waste.
Measurement will be one existing vault toilet building and vault, eight concrete tables, and six 4x4 concrete structures, completed and accepted, including removal, backfill, and disposal AS SHOWN ON THE DRAWINGS.
The accepted quantities will be paid for at the contract unit price for each item listed in the SCHEDULE OF ITEMS.
All work required for the complete removal and disposal of items SHOWN ON THE DRAWINGS or listed in the Specifications is included. Separate payment will not be made under other items.
Pay Item Description Pay Unit
02071 (01) Removal of Structure and Obstructions..……….. LS
END OF SPECIFICATION 02071
02224-01
EXCAVATION, EMBANKMENT AND BACKFILL - 02224
This section specifies excavation, embankment, backfill, delivery and placement of imported fill material, watering, compaction, disposal of excess or unsuitable excavated material, and final grading.
1.2 - Material Classification
Material to be excavated is unclassified. Contractor may expect to encounter boulders of varying size during any excavation below existing grade.
1.3 - Related Work Specified Elsewhere
02071 – Removal of Structures and Obstructions 02705 – Metal Ramada 02710 – Metal Pipe Rail 02840 – Road Closure Devices 02841 – Signs
1.4 - Submittals
Plan and profile sheets of the proposed grading for Rock Road with sections every 50 feet will be provided to the CO for review and appoval prior to commencing construction of Rock Road. Plan and profile sheets shall be prepared under the direction of a professional engineer using the existing topography supplied by the Forest Service. Plans will be sealed by a registered professional engineer.
2.1 - Backfill and Imported Fill Material
Backfill and Imported Fill Material shall be processed natural material in accordance with MAG Specification 702. – Base Materials; subsection 702.3.
2.2 - Water
Water shall be reasonably clean and free of hazardous substances. Water is not available at the site. Water shall be obtained from a commercial source.
02224-02
3.1 - Excavation
All suitable excavated materials shall be used in construction of embankments, slopes, and backfill.
No excavated material shall be placed in lakes or live streams.
Rocks too large to be incorporated into embankments shall be broken for incorporation into the embankment or removed from National Forest Lands and disposed of in accordance with local regulations regarding disposal of construction waste.
3.2 - Backfill
General backfill shall be placed in horizontal layers not exceeding 12 inches (loose measure) and compacted. Each embankment layer shall be leveled and smoothed before compaction and placement of subsequent layers. Compaction shall be as shown in Section 3.7.
Finished surfaces shall be reasonably smooth, compacted, and shall drain without ponding.
Backfilling Adjacent to Concrete: Remove all forms and clean the excavated area of all debris. Remove any standing water from excavation. Obtain approval from CO prior to placement of backfill. Do not backfill until concrete has been in place for a minimum of 7 days and has attained sufficient strength to withstand imposed loads.
3.3 - Embankment
Embankment shall be placed in horizontal layers not exceeding 12 inches (loose measure) and compacted.
Bring all embankments to suitable elevations above grade to provide for anticipated settlement, shrinkage, and required compaction.
Embankment material shall not be dropped on any structure.
3.4 - Grading
All areas covered by the project including excavation and embankment areas and adjacent transition areas, shall be uniformly graded so that finished surfaces are at elevations indicated and approved by the CO. Slope grade away from structures a minimum of ¼-inch per foot unless otherwise indicated to provide drainage away from structures.
02224-03
3.5 - Excess Excavated Material
Excess excavated material shall be placed where needed by other parts of the contract AS SHOWN ON THE DRAWINGS or removed from National Forest Lands and disposed of in accordance with local regulations regarding disposal of construction waste.
3.6 - Haul
Haul within the project site is incidental to excavation.
3.7 - Compaction
Backfill, embankments, and the top 1 foot of excavation sections shall be compacted to at least 95 percent of the maximum density as determined by AASHTO T 99, Method C or D. The material shall have the moisture content needed for effective compaction.
Backfill adjacent to concrete shall be compacted to at least 95 percent of the maximum density as determined by AASHTO T 99, Method C or D. Compaction shall be done with mechanical tampers only.
The density of the embankment material shall be determined during the progress of the work in accordance with AASHTO T 191, T 205 or T 238; T 217, T 239, T 255;
and T 224.
3.8 - Testing
No testing will be required.
Measurement is for the tonnage of imported fill material delivered and placed AS
SHOWN ON THE DRAWINGS.
Measurement for Rock Road excavation and embankment is necessary work to meet plan and profile plan provided by the contractor and approved by the Engineer. The work will be paid on a actual quantities basis for volume of excavation required by the approved plan and profile sheets for Rock Road.
Preparation of the plan and profile sheets will be paid on a lump sum basis.
Measurement for onsite grading, excavation, backfill and embankment is incidental to other pay items in this specification.
02224-04
The accepted quantities will be paid for at the contract unit price for each item listed in the SCHEDULE OF ITEMS.
02224 (01) Excavation, Backfill and Embankment…………LS
END OF SPECIFICATION 02224
02270-1
RIPRAP - 02270
This work shall consist of furnishing and placing riprap on prepared slopes as
SHOWN ON THE DRAWINGS.
02224 - Excavation, Embankment, and Backfill
Certificate-of-compliance that materials meet the durability and specific gravity requirements.
2.1 – Riprap
Rock used for riprap shall be commercially supplied, and be hard angular rock meeting the following requirements for durability absorption ratio as defined below.
Durability Absorption Ratio Acceptability
Greater than 23 Passes
10 to 23 Passes only if Durability Index is 52 or greater
Less than 10 Fails
The durability index and percent absorption shall be determined by AASHTO T 210 and AASHTO T 85 respectively. The minimum apparent specific gravity of rock shall be 2.5 as determined by AASHTO T 85.
02270-2
Neither the breadth nor thickness of any piece of riprap shall be less than one-third its length. Rock shall be free from overburden, spoil, shale, and organic material;
shall meet the following gradation requirements; and shall be used at the locations
SHOWN ON THE DRAWINGS:
Approximate
Percent of Mass Cubic Dimension Rock by Mass (pounds) (inches)
Class 2: 20 . . . 55 to 110. . . 8 to10 30 . . . . 22 to 55. . . 6 to 8 40 . . . . 2 to 22. . . 3 to 6 10 . . . . 0 to 2 . . 0 to 3
Class 3: 20 . . . . 220 to 330 . . 14 to 16
30 . . . . 110 to 220. . . 10 to 14 40 . . . . 11 to 110. . . 5 to 10 10 . . . . 0 to 11 . . 0 to 5
Each load of riprap shall be well graded from the smallest to the maximum size specified.
Control of gradation will be by visual inspection.
3.1 - General
The riprap blanket shall be constructed to its full thickness as the placement proceeds up the slope. Foundation beds and slopes shall be approved before placing riprap.
Riprap shall be placed to produce a well-keyed mass of rock with the least practicable amount of void spaces. Rocks shall be placed with their longitudinal axes normal to the embankment face and arranged so each rock above the foundation course has a three-point bearing on the underlying rocks. The foundation course is the course placed on the slope in contact with the surface.
Bearing shall not be on smaller rocks that may be used for filling voids.
The finished riprap slopes shall present a reasonably uniform and regular surface, free from humps and depressions, and not steeper than SHOWN ON THE
DRAWINGS.
Class 3 riprap will be used for bank erosion AS SHOWN ON THE DRAWINGS.
02270-3
Class 2 riprap will be used for curb openings AS SHOWN ON THE
DRAWINGS.
The number of units completed and accepted in the final work will be measured to the neat lines SHOWN ON THE DRAWINGS or directed by the CO. No adjustment will be made for compaction of material or placement of material outside the neat lines.
The accepted quantities will be paid for at the contract unit price for each pay item shown in the SCHEDULE OF ITEMS.
Payment will be made under:
02270(01) Riprap, Class 3 . . . . . . . . . . . . . . . . . TON
END OF SECTION 02270
02304-1
AGGREGATE BASE - 02304
This work shall consist of furnishing, hauling, and placing aggregate base on an approved subgrade, including under concrete at the locations SHOWN
ON THE DRAWINGS.
02224 - Excavation, Embankment and Backfill 03301 - Cast-In-Place Concrete
The Contractor shall submit to the CO written Certification of Compliance that the aggregate meets the required specifications. Written certification shall contain information as to the size, type, and gradation of the aggregate.
The Contractor shall submit the aggregate base delivery tickets and test results.
2.1 - Aggregate
Aggregate shall be commercially supplied, crushed stone, slag, or gravel with at least 50% by weight retained on the No. 4 sieve having at least one mechanically fractured face.
Gradation: Sieve Size Percent Passing
1 ½ inch 100 1 inch 95-100 3/4 inch 70 - 98 No. 4 36 - 60 No. 8 25 - 47 No. 30 12 - 31 No. 200 3 - 8
02304-2
Quality Requirements:
Percent Wear, T96: max. loss 9% (100 rev.), 40% (500 rev.)
Plasticity Index, T90: 6 maximum
2.2 - Water
Water shall be reasonably clean and free of hazardous substances. Water is not available on-site. Water shall be obtained from a commercial source.
3.1 - Preparation of Subgrade
The subgrade surface shall be prepared in accordance with Specification 02224 – Excavation, Embankment, and Backfill and shall be approved in writing by the CO prior to placement of aggregate.
3.2 - Mixing and Placing
Aggregate shall be moistened or dried to a uniform moisture content suitable for compaction. When satisfactorily mixed, the aggregate shall be spread in a uniform layer, with no segregation of size, and to a loose depth that shall have the required thickness when compacted.
3.3 - Compaction
Aggregate base shall be compacted in maximum 4-inch layers until the nominal thickness of the aggregate base, as SHOWN ON THE DRAWINGS, is reached.
Each layer of aggregate shall be compacted to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, Method C or D.
The surface of each layer shall be smoothed during the compaction operations to remove irregularities and produce a smooth, even surface.
3.4 - Testing
No testing is required except for aggregated placed beneath areas to receive asphalt concrete. Testing to confirm proper in-place compaction shall be done for every 100 tons of aggregate placed at the site.
02304-3
3.5 - Water Application
Equipment used for dust control and watering operations of the aggregate shall provide uniform and controlled application of water without ponding or washing.
Measurement will be based on the amount of aggregate placed within the project site AS SHOWN ON THE DRAWINGS.
The accepted quantities will be paid for at the contract unit price for each item listed in the SCHEDULE OF ITEMS.
02304(01) Aggregate Base .......................................................... TON
END OF SPECIFICATION 02304
02511-1
ASPHALT CONCRETE SURFACING- SMALL JOBS - 02511
This work shall consist of furnishing an aggregate and bituminous material mixed in a plant, hauling the bituminous mixture to the point of application, and spreading and compacting the bituminous mixture on a prepared surface, including quality control and testing. Refer to Section 321 – Asphalt Concrete Pavement of the Uniform Standard Specifications for Public Works Construction by MAG, latest revision is included in its entirety by reference.
01410 - Quality Control and Quantity Measurement
Job-Mix Formula Certificate-of-Compliance for Asphalt Concrete Bill of Lading Certified Weight Tickets Quality Control Test Results
2.1 – Asphalt Concrete
Refer to MAG specification 710 for asphalt concrete requirements. Submit ¾ inch mix design for review and approval.
3.1 – Asphalt Concrete Paving
Refer to MAG specification 321 for asphalt concrete paving installation requirements, including quality control and testing requirements.
Measurement will be the number of units completed and accepted.
02511-2
The accepted quantities will be paid for at the contract unit price of each pay item
Payment will be made under:
02511(01) Asphalt Pavement – 3” Course. . . . . . .TON
END OF SPECIFICATION 02511
09900-1
SECTION 9 - FINISHING
PAINTING and GRAFFITI PROTECTION - 09900
1.1 - Scope
This section covers furnishing all labor, materials and equipment necessary to apply specified paints. The term "paint" shall include linings, enamels, paints, sealers, catalysts, thinners, and other organic or inorganic paint products.
None.
Prepare 8" x 8" samples of top coat finish when requested by the CO. When possible apply finishes on identical materials to which they will be applied on project.
Identify each sample as to finish, formula, color name and number and sheen name and gloss units.
2.1 - Product Delivery, Storage and Handling
Deliver material to the site in the original containers with labels intact and seals unbroken.
Storage location and method shall be approved by the CO. Remove cloths and waste material which may constitute a fire hazard from the project site daily.
2.2 - Paint Schedule
Exposed Metal (gates, fee stations, etc.): One coat of zinc-rich primer (gray) and two
(2) coats Frazee "Aro-Plate" semi-gloss enamel. Color shall be # 151 "Padre Brown"
Exposed wood members (recreation sign posts, site entrance sign, etc.): One coat primer and two (2) coats Frazee "Aro-Plate" semi-gloss enamel. Color shall be # 151 "Padre Brown"
09900-2
3.1 - Preparation of Surfaces
Surfaces to be painted shall be free of dirt, dust, scale, or any other substance which may interfere with the adhesion of the specified coating.
3.2 - Application
Samples: Contractor shall submit samples as requested. Colored finishes shall not be applied until colors are approved by the CO.
Apply materials in strict accordance with manufacturer's recommendations.
Finished surfaces shall be free from runs, drops, ridges, waves, laps, brush marks and other blemishes. Welds shall receive special attention to assure their receiving a coating of the required thickness. Apply additional coatings when undercoats, primers and other conditions show through final coat of paint, until paint film is of uniform finish, color and appearance. Special care shall be taken not to injure or spatter adjacent work.
Should adjacent work be injured or spattered, it shall be cleaned and the original finish restored. Furnish and lay dropcloths in all areas where painting is being done over concrete slabs.
Cloth, cotton wastes, or other materials which constitute a fire hazard shall be placed in closed metal containers or be destroyed at the end of each day's work.
Environmental Conditions: Surfaces shall be painted only when they are free from moisture. No painting on exterior surfaces shall be done with less than 72 hours of actual drying weather after a rain, nor during periods of dew or fog. Receiving surfaces shall be properly dried out before proceeding with the work. No painting shall be done when temperature is below 45 degrees F., except when specifically directed otherwise in writing by the CO.
The work specified herein will not be measured for payment.
The accepted quantities will be paid for at the contract unit price of each pay item
09900-3
09900(01) Centerline Striping . . . . . . . . .. . . . . . .LF
END OF SPECIFICATION 09900
| Title |
| 01000_PrjCoord |
| 01010_SumWrk |
| 01101_Abbrev |
| 01102_Defin |
| 01103_MeasPay |
| 01300_Submittals |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .