Wage_Determination.docx

DOCX document 22 KB Posted

Attached to
JACOB LAKE WORK CENTER WATER SYSTEM RENOVATION Federal contract opportunity
Solicitation number
AG-94TZ-S-14-0040
Issued by
Department of Agriculture Forest Service R3-Southwestern Region

About this file

WAGE DETERMINATIONS

View the file

Other files for this federal contract opportunity

Other files attached to JACOB LAKE WORK CENTER WATER SYSTEM RENOVATION, newest first.
File Type Posted
Questions_from_site_visit_for_JLWC_Water_System_Renovation.doc DOC document
AMD_2_sf_30.pdf PDF
Amendment_1.pdf PDF
AG-94TZ-S-14-0040.rtf RTF text file
Past_Performance_Questionnaire.docx DOCX document
KAIBAB_FIRE_PLAN.pdf PDF
JLWC-WaterSystemRenoSpecs.docx DOCX document
SF1442.pdf PDF
JLWC-WaterSystemRenovationDrawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: AZ140017 01/17/2014 AZ17

Superseded General Decision Number: AZ20130017

State: Arizona

Construction Type: Heavy HEAVY CONSTRUCTION, Includes Water and Sewer Lines and Heavy Construction on Treatment Plant Sites

County: Coconino County in Arizona.

HEAVY CONSTRUCTION PROJECTS (DOES NOT INCLUDE DAM CONSTRUCTION)

Modification Number Publication Date 0 01/03/2014 1 01/17/2014

ELEC0640-006 09/01/2012

Rates Fringes

ELECTRICIAN......................$ 25.64 3%+7.71

ENGI0428-006 07/29/2013

Rates Fringes

Power Equipment Operator Group 1.....................$ 20.99 9.34 Group 2.....................$ 24.26 9.34 Group 3.....................$ 25.34 9.34 Group 4.....................$ 26.37 9.34

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Small Self-Propelled Compactor (with blade), Roller Operator, Front End Loader (3 cy & less), Bobcat/Skidsteer/Skid Loader, Oiler

GROUP 2: Backhoe (less than 1 cyl), Self-Propelled Compactor (with blade), Bulldozer, Grader/Blade (rough), Front End Loader 3cy- less than 6 cu yd), Scraper

GROUP 3: Backhoe (up to 10 cu yd), Excavator/Trackhoe, Grader/Blade (finish), Front End Loader (6 cy-10cy)

GROUP 4: Backhoe (10 cu yd and over), Front End Loader (10 cy and over)

* IRON0075-009 01/01/2014

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 26.52 21.02

Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson Zone 2: 050 to 100 miles - Add $4.00 Zone 3: 100 to 150 miles - Add $5.00 Zone 4: 150 miles & over - Add $6.50

LABO0383-003 11/01/2013

Rates Fringes

LABORER (Common or General)......$ 17.61 4.35

PAIN0086-002 04/01/2013

Rates Fringes

PAINTER (Brush Only).............$ 19.35 4.75

TEAM0104-002 09/01/2013

Rates Fringes

TRUCK DRIVER

Group 2.....................$ 16.37 1.50+a Group 3.....................$ 16.83 1.50+a Group 4.....................$ 18.08 1.50+a Group 5.....................$ 17.20 1.50+a Group 6.....................$ 18.87 1.50+a

FOOTNOTE:

a. Health & Welfare $655.86 per month.

TRUCK DRIVER CLASSIFICATIONS:

GROUP 2: 2 or 3 axle Dump, Water Truck under 2500 gal.

GROUP 3: 4 axle Dump, Water Truck Drive- (2500 gal but less than 4000 gal) GROUP 4: 5 axle Dump, Water Truck 4000 gal and over GROUP 5: 6-axle Dump GROUP 6: 7-axle Dump, 8-axle Dump

SUAZ2012-005 05/17/2012

Rates Fringes

CARPENTER (Form Work Only).......$ 20.58 2.83

CARPENTER, Excludes Form Work....$ 21.86 5.37

CEMENT MASON/CONCRETE FINISHER...$ 18.71 2.12

IRONWORKER, REINFORCING..........$ 20.66 13.59

LABORER: Asphalt Raker/Shoveler/Spreader..........$ 15.69 4.42

LABORER: Concrete Saw (Hand Held/Walk Behind)................$ 17.00 4.55

LABORER: Grade Checker..........$ 18.14 4.55

LABORER: Irrigation.............$ 12.50 0.00

LABORER: Mason Tender - Cement/Concrete..................$ 14.59 4.20

LABORER: Pipelayer..............$ 14.92 3.46

LABORER: Power Tool Operator....$ 16.55 4.20

OPERATOR: Crane.................$ 20.76 4.42

OPERATOR: Drill.................$ 23.99 7.60

OPERATOR: Forklift..............$ 19.86 4.75

OPERATOR: Mechanic..............$ 20.92 5.15

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 17.07 3.20

OPERATOR: Screed................$ 16.82 2.52

OPERATOR: Tractor...............$ 24.43 7.70

OPERATOR: Trencher..............$ 18.28 4.26

OPERATOR: Broom/Sweeper..........$ 15.40 2.45

PAINTER: Pavement Marking/Parking Lot Striping.....$ 19.94 4.10

PAINTER: Roller and Spray.......$ 20.19 4.45

TRUCK DRIVER: Flatbed Truck.....$ 14.15 1.48

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.

0000/9999: weighted union wage rates will be published annually each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .