Questions_from_site_visit_for_JLWC_Water_System_Renovation.doc
DOC document 23 KB Posted
- Attached to
- JACOB LAKE WORK CENTER WATER SYSTEM RENOVATION Federal contract opportunity
- Solicitation number
- AG-94TZ-S-14-0040
About this file
QUESTIONS AND ANSWERS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMD_2_sf_30.pdf | ||
| Amendment_1.pdf | ||
| JLWC-WaterSystemRenoSpecs.docx | DOCX document | |
| SF1442.pdf | ||
| JLWC-WaterSystemRenovationDrawings.pdf | ||
| Wage_Determination.docx | DOCX document | |
| AG-94TZ-S-14-0040.rtf | RTF text file | |
| Past_Performance_Questionnaire.docx | DOCX document | |
| KAIBAB_FIRE_PLAN.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jacob Lake Work Center Water System Renovation
Site Visit – project questions and answers
Question: What is the pay item for the RV water connection shown on Sheet 5 detail 2 and Sheet 4 note 2?
Answer: Include RV water connection and shown on sheet 5 detail 2 as part of pay item 02641(01).
Question: What type of pipe is required for the foundation drain on sheet 7 detail 1?
Answer: Types of approved pipe are listed in section 2.5 in Specification 02610, page 24.
Question: Is the contractor required to maintain all survey markers?
Answer: The contractor will be responsible to maintain survey markers secured in the ground. This does not include temporary markers placed in moveable concrete tubes above ground.
Question: Will the contractor be required to remove building shutoff valves if they are existing inside the building?
Answer: No, external building shutoff valves shall be replaced per Sheet 4 note 1. Valves inside buildings will not be removed or disturbed.
Question: Does valve V21 include a 1” drain valve and a 4” gate valve?
Answer: Yes, construct V21 per Sheet 4 detail 8, and details 6/5 and 6/6.
As described in the specifications: Sheet 4 note 7 is included as part of the base bid, and not an additive item.