QUESTIONS AND ANSWERS

View the file

Other files for this federal contract opportunity

Other files attached to JACOB LAKE WORK CENTER WATER SYSTEM RENOVATION, newest first.
File Type Posted
AMD_2_sf_30.pdf PDF
Amendment_1.pdf PDF
JLWC-WaterSystemRenoSpecs.docx DOCX document
SF1442.pdf PDF
JLWC-WaterSystemRenovationDrawings.pdf PDF
Wage_Determination.docx DOCX document
AG-94TZ-S-14-0040.rtf RTF text file
Past_Performance_Questionnaire.docx DOCX document
KAIBAB_FIRE_PLAN.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jacob Lake Work Center Water System Renovation

Site Visit – project questions and answers

Question: What is the pay item for the RV water connection shown on Sheet 5 detail 2 and Sheet 4 note 2?

Answer: Include RV water connection and shown on sheet 5 detail 2 as part of pay item 02641(01).

Question: What type of pipe is required for the foundation drain on sheet 7 detail 1?

Answer: Types of approved pipe are listed in section 2.5 in Specification 02610, page 24.

Question: Is the contractor required to maintain all survey markers?

Answer: The contractor will be responsible to maintain survey markers secured in the ground. This does not include temporary markers placed in moveable concrete tubes above ground.

Question: Will the contractor be required to remove building shutoff valves if they are existing inside the building?

Answer: No, external building shutoff valves shall be replaced per Sheet 4 note 1. Valves inside buildings will not be removed or disturbed.

Question: Does valve V21 include a 1” drain valve and a 4” gate valve?

Answer: Yes, construct V21 per Sheet 4 detail 8, and details 6/5 and 6/6.

As described in the specifications: Sheet 4 note 7 is included as part of the base bid, and not an additive item.