Attachment 03 General Decision Number UT20080104.mht

MHT file 8 KB Posted

Attached to
Lucerne Campground Reconstruction Federal contract opportunity
Solicitation number
AG-84N8-S-11-0024
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

General decision Number UT100104

Text of this file

From: <Saved by Windows Internet Explorer 8> Subject:

Date: Tue, 26 Apr 2011 12:30:59 -0600 MIME-Version: 1.0 Content-Type: text/html;

charset="Windows-1252" Content-Transfer-Encoding: 7bit Content-Location: http://www.wdol.gov/wdol/scafiles/davisbacon/UT104.dvb X-MimeOLE: Produced By Microsoft MimeOLE V6.00.2900.5931

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">

<HTML><HEAD>

<META content="text/html; charset=windows-1252" http-equiv=Content-Type> <META name=GENERATOR content="MSHTML 8.00.6001.19046"></HEAD> <BODY><PRE>General Decision Number: UT100104 01/21/2011 UT104

Superseded General Decision Number: UT20080104

State: Utah

Construction Type: Highway

County: Daggett County in Utah.

Modification Number Publication Date 0 03/12/2010 1 04/23/2010 2 07/09/2010 3 10/08/2010 4 10/29/2010 5 11/19/2010 6 12/31/2010 7 01/21/2011

ENGI0003-058 07/01/2010

Rates Fringes

OPERATOR: Power Equipment

(1) Mechanic................$ 27.11 13.26 (2a)Blade/Grader............$ 25.45 13.26

(3) Front End Loader (Over 5 cu. yds.), Backhoe Loader Combination..........$ 24.93 13.26

(4) Asphalt Laydown Machine, Asphalt Paver, Front End Loader (2 to 5

cu. yds.), Oil Distributor..$ 23.93 13.26

(5) Asphalt Roller, Front End Loader (Under 2 cu.

yds.).......................$ 22.93 13.26

(6) Screed..................$ 21.97 13.26

(7) Roller(Dirt and Grade Compaction).................$ 21.06 13.26 Crane (Under 35 tons)-3...$ 25.26 13.26 Crane (35 to 100 tons)-2...$ 26.55 13.26 Crane (Over 100 tons)-1....$ 27.89 13.26

IRON0027-003 07/01/2009

Rates Fringes

IRONWORKER, STRUCTURAL

(Excluding Fence Erection and Guard Rail Installation).........$ 26.61 11.60

IRON0847-001 01/01/2010

Rates Fringes

IRONWORKER, REINFORCING..........$ 26.61 11.60

LABO0295-034 07/01/2008

Rates Fringes

LABORER

(3)Chain/Concrete Saw, Jackhammer/Tamper...........$ 18.01 5.40 (4)Asphalt Raker, Asphalt Shoveler....................$ 18.16 5.40 (5)Hand Held Drill..........$ 20.75 5.40

PLAS0568-002 07/01/2010

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 22.61 6.55

SUUT2008-058 09/10/2008

Rates Fringes

CARPENTER, Includes Form Work....$ 15.85 2.50

ELECTRICIAN, Including Traffic Signal Installation......$ 20.62 4.44

INSTALLER - GUARDRAIL............$ 12.84 2.69

LABORER (Fence Erector)..........$ 12.47 2.84

LABORER: Common or General......$ 12.27 2.58

LABORER: Flagger................$ 9.49 2.37

LABORER: Landscape..............$ 14.45 2.79

LABORER: Mason Tender - Cement/Concrete..................$ 14.25 1.59

LABORER: Pipelayer..............$ 15.52 2.79

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 19.85 5.78

OPERATOR: Broom.................$ 19.60 7.41

OPERATOR: Bulldozer.............$ 21.20 1.59

OPERATOR: Crusher...............$ 24.64 4.76

OPERATOR: Oiler.................$ 19.36 5.79

OPERATOR: Rotomill..............$ 21.91 7.26

OPERATOR: Scraper...............$ 21.51 5.57

PAINTER, Including Parking Lot and Highway Line Striping....$ 14.05 1.62

SIGN Installer (Permanent and Temporary Road Signs)............$ 12.27 2.73

Traffic Control: Sets Cones and Barrels......................$ 13.09 2.73

TRUCK DRIVER.....................$ 16.33 5.24

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in he matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

</PRE></BODY></HTML>

Other files for this federal contract opportunity

Other files attached to Lucerne Campground Reconstruction, newest first.
File Type Posted
Amendment 03.docx DOCX document
Amendment 02 Site Visit Notes.docx DOCX document
Attachment 01 Specifications 05022011.doc DOC document
amendment 01.doc DOC document
AG-84N8-S-11-0024.rtf RTF text file
Attachment 01Specifications.docm DOCM document
Attachment 02 Drawings.pdf PDF
Attachment 04 General Decision Number UT20080076.mht MHT file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .