AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
A0002
3. EFFECTIVE DATE
08/29/2013
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USDA Forest Service Intermountain Region 324 25th Street Ogden Ut 84401 Brian Wharton see block 6
8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)
All interested vendors
9A. AMENDMENT OF SOLICITATION NO.
AG-84M8-S-13-0011
9B. DATED (SEE ITEM 11)
08/02/2013
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
Reed Valley Stewardship
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET
FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
REQUEST FOR PROPOSAL (RFP AG-84M8-S-13-0011),REED VALLEY STEWARDSHIP IS AMENDED AS FOLLOWS:
Include the six missing pages from The Reed Valley Road Package.
See Attached Questions and Clarifications.
All other items remain the same.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or Print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
BRIAN J. WHARTON
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B UNITED STATES OF AMERICA
/S/ Brian Wharton
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
08/29/2013
NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53.243
Reed Valley Stewardship 8.29.2013
Questions
1. What is distance from the North cinder pit to road 30196? North Pit to 30196, Approximately
4.6 miles.
2. What is the is the distance from the south cider pit to road 30240? South Pit to 30240, Approximately 1.5 miles.
These values are only estimates. It is recommended that potential bidders verify this estimate on their own.
3. While at the site visit, we were briefed that item #6, aspen regeneration (125 acres) is a clear cut area, but the activity scope states differently. So which is the one to use to bid on?
The activity scope represents the service side of the aspen treatments. This is the site prep/lop and scatter of the trees smaller than 5" DBH. Material larger than 5" DBH is dealt with on the timber sale side, with mandatory removal of trees larger than 5" DBH, except those few large pine, spruce and Douglas-fir larger than 24" that are already marked. These two activities in conjunction represent the clearcut treatment
Road # 30240
From To Depth CY
76+45 80+20 6" 97
89+76 91+44 6" 44
92+61 94+35 6" 45
110+14 112+78 4" 46
228+36 233+58 12" 271
233+95 235+69 6" 45
236+54 239+87 6" 86
241+03 245+15 4" 71
247+63 247+63 Hole 30
260+09 264+00 12" 203
ROAD TOTALS 938
ROAD # 30381
From To Depth CY
102+56 102+86 6" 8
140+80 140+80 HOLE 20
149+71 149+71 HOLE 20
179+99 181+58 6" 41
188+20 190+76 6" 66
229+32 229+52 4" 4
ROAD TOTALS 159
Road # 30196
From To Depth CY
0+89 4+38 6" 90
7+07 7+39 6" 8
9+08 11+51 FILL 30
14+99 15+73 6" 19
17+16 17+84 6" 18
18+26 19+27 6" 26
23+49 24+18 6" 18
28+40 30+09 6" 44
ROAD TOTALS 253
Road # 30196
From To
0+00 30+10
Road # 30240
From To
201+59 258+77
CLEARING SUMMARY
ROAD # FROM TO WIDTH ACRES
30196 5+43 12+24 4
0.127 23+12 30+09 4
30381 246+16 249+86 4 0.034
TOTAL 0.161
Road # 30381
From To
0+00 102+56
102+86 179+99
181+58 188+20
190+76 229+32
229+52 277+25
331+32 442+40
Road # 30240
STA Dia Length
154+44 18" 30'
Road # 30381
STA Dia Length
140+80 36" 40'
Road # 30196
Station Const. Rehab
7+76 X
13+72 X
14+78 X
15+84 X
18+26 X
21+75 X
26+55 X
Road # 30240
Station Const. Rehab
54+70 x
76+14 x
101+53 x
103+70 x
112+78 x
125+82 x
127+20 x
133+21 x
173+71 x
186+17 x
189+18 x
203+38 x
209+08 x
213+95 x
217+43 x
220+55 x
233+58 x
235+70 x
241+03 x
245+15 x
247+63 x
249+21 x
260+09 x
Road # 30381 New Dips
Station Const. Rehab
1+50 x
5+89 x
12+75 x
50+67 x
64+60 x
83+59 x
86+28 x
98+15 x
132+10 x
138+88 x
190+76 x
196+85 x
201+72 x
206+69 x
217+12 x
221+86 x
227+09 x
233+53 x
242+47 x
246+16 x
249+86 x
253+19 x
Road # 30381 Rehab Dips (1 of 2)
Station Const. Rehab
29+72 x
37+80 x
60+87 x
69+16 x
72+02 x
74+65 x
76+50 x
81+52 x
92+82 x
104+22 x
111+62 x
118+32 x
124+92 x
148+63 x
150+32 x
154+07 x
164+05 x
167+74 x
171+97 x
175+82 x
180+68 x
186+17 x
Road # 30381 Rehab Dips (2 of 2)
Station Const. Rehab
195+73 x
206+66 x
211+51 x
216+69 x
223+34 x
226+61 x
231+95 x
236+43 x
237+75 x
243+19 x
245+30 x
359+56 x
380+95 x
402+91 x
408+67 x
410+15 x
415+69 x
420+50 x
| Reed_Valley_Road_Package_with_signatures.pdf |
| ReedValleySignedCover |
| Reed Valley STWD Road Package_Vicinity Map_2 |
| Reed Valley STWD Road Package_Cross Section_3 |
| Reed Valley STWD Road Package-Summary_Sheet |
| Reed Valley STWD Road Package_Culvert Summary_5 |
| Reed Valley STWD Road Package_Dip Summary_6 |
File details come from the government source that posted it. Updated .