Wage Decision.pdf
PDF 28 KB Posted
- Attached to
- Nipple Mountain Aggregate - FSRD 665
- Solicitation number
- AG-82x9-S-11-0124
About this file
Attachment No. 3 - DL Wage Decision
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0001.pdf | ||
| FSSS.pdf | ||
| AG-82X9-S-11-0124.pdf | ||
| Fire Plan.pdf | ||
| dwgs.pdf | ||
| specification_list.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: CO100015 10/29/2010 CO15
Superseded General Decision Number: CO20080015
State: Colorado
Construction Type: Highway
Counties: Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Clear Creek, Conejos, Costilla, Crowley, Custer, Delta, Dolores, Eagle, Elbert, Fremont, Garfield, Gilpin, Grand, Gunnison, Hinsdale, Huerfano, Jackson, Kiowa, Kit Carson, La Plata, Lake, Las Animas, Lincoln, Logan, Mineral, Moffat, Montezuma, Montrose, Morgan, Otero, Ouray, Park, Phillips, Pitkin, Prowers, Rio Blanco, Rio Grande, Routt, Saguache, San Juan, San Miguel, Sedgwick, Summit, Teller, Washington and Yuma Counties in Colorado.
HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date 0 03/12/2010 1 06/04/2010 2 08/06/2010 3 10/29/2010
ELEC0012-006 06/01/2009
ALAMOSA, ARCHULETA, BACA, BENT, CHAFFEE, CONEJOS, COSTILLA,
CROWLEY, CUSTER, FREEMONT, HUERFANO, KIOWA, LAS ANIMAS,
MINERAL, OTERO, PROWERS, RIO GRANDE AND SAGUACHE COUNTIES
Rates Fringes
ELECTRICIAN
Electrical work where the total cost is $150,000 or less........................$ 22.85 10.79 Electrical work where the total cost is over $150,000.$ 27.00 10.91
TRAFFIC SIGNALIZATION:
Traffic Signal Installation Zone 1......................$ 23.83 13.75%+4.75 Zone 2......................$ 26.83 13.75%+4.75
TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS
Zone 1 shall be a 35 mile radius, measured from the following addresses in each of the following cities:
Colorado Springs - Nevada & Bijou Denver - Ellsworth Avenue & Broadway Ft. Collins - Prospect & College Grand Junction - 12th & North Avenue Pueblo - I-25 & Highway 50 All work outside of these areas shall be paid Zone 2 rates.
* ELEC0068-013 06/01/2010
CLEAR CREEK, EAGLE, GILPIN, GRAND, JACKSON,LAKE, LOGAN, MORGAN,
PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON AND YUMA COUNTIES
ELECTRICIAN (Excluding traffic signal installation).....$ 31.60 12.32
TRAFFIC SIGNALIZATION:
Traffic Signal Installation Zone 1......................$ 23.83 13.75%+4.75 Zone 2......................$ 26.83 13.75%+4.75
TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS
Zone 1 shall be a 35 mile radius, measured from the following addresses in each of the following cities:
Colorado Springs - Nevada & Bijou Denver - Ellsworth Avenue & Broadway Ft. Collins - Prospect & College Grand Junction - 12th & North Avenue Pueblo - I-25 & Highway 50 All work outside of these areas shall be paid Zone 2 rates.
ELEC0113-006 06/01/2009
CHEYENNE, ELBERT, KIT CARSON, LINCOLN, PARK AND TELLER COUNTIES
Rates Fringes
ELECTRICIAN......................$ 28.80 3%+13.10
TRAFFIC SIGNALIZATION:
Traffic Signal Installation Zone 1......................$ 23.83 13.75%+4.75 Zone 2......................$ 26.83 13.75%+4.75
TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS
Zone 1 shall be a 35 mile radius, measured from the following addresses in each of the following cities:
Colorado Springs - Nevada & Bijou
Denver - Ellsworth Avenue & Broadway
Ft. Collins - Prospect & College
Grand Junction - 12th & North Avenue
Pueblo - I-25 & Highway 50
All work outside of these areas shall be paid Zone 2 rates.
ELEC0969-006 06/01/2009
DOLORES, GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT,
MONTEZUMA, OURAY, PITKIN, RIO BLANCO, ROUTT, SAN JUAN AND SAN
MIGUEL COUNTIES
ELECTRICIAN......................$ 28.00 9.24
TRAFFIC SIGNALIZATION:
Traffic Signal Installation Zone 1......................$ 23.83 13.75%+4.75 Zone 2......................$ 26.83 13.75%+4.75
TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS
Zone 1 shall be a 35 mile radius, measured from the following addresses in each of the following cities:
Colorado Springs - Nevada & Bijou Denver - Ellsworth Avenue & Broadway Ft. Collins - Prospect & College Grand Junction - 12th & North Avenue Pueblo - I-25 & Highway 50 All work outside of these areas shall be paid Zone 2 rates.
ELEC0969-011 06/01/2009
DELTA AND MONTROSE COUNTIES
Rates Fringes
ELECTRICIAN......................$ 21.31 8.92
TRAFFIC SIGNALIZATION:
Traffic Signal Installation Zone 1......................$ 23.83 13.75%+4.75 Zone 2......................$ 26.83 13.75%+4.75
TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS
Zone 1 shall be a 35 mile radius, measured from the following addresses in each of the following cities:
Colorado Springs - Nevada & Bijou Denver - Ellsworth Avenue & Broadway Ft. Collins - Prospect & College Grand Junction - 12th & North Avenue Pueblo - I-25 & Highway 50 All work outside of these areas shall be paid Zone 2 rates.
ENGI0009-006 05/01/2009
Rates Fringes
Power equipment operators:
Bituminous or Asphalt Spreader/Laydown Machine....$ 23.67 9.22 Bulldozer...................$ 23.67 9.22
Crane: 50 tons and under...$ 23.82 9.22 Crane: 51 to 90 tons.......$ 23.97 9.22 Crane: 91 to 140 tons......$ 24.12 9.22 Crane: 141 tons and over....$ 24.88 9.22 Grade Checker...............$ 23.82 9.22 Loader: Barber Green etc.
& Up to and including 6 cubic yards.................$ 23.67 9.22 Loader: Over 6 cubic yards..$ 23.82 9.22 Oiler.......................$ 22.97 9.22 Roller (excluding dirt & soil compaction): Self-propelled all types over 5 tons........................$ 23.67 9.22 Roller (excluding dirt & soil compaction): Self-propelled rubber tires under 5 tons................$ 23.32 9.22 Trackhoe....................$ 23.82 9.22 Water Wagon.................$ 23.82 9.22
SUCO2001-016 12/20/2001
Rates Fringes
Carpenters:
Form Building & Setting (Excluding curbs and gutters)....................$ 15.92 5.38 All Other Work..............$ 16.30 3.71
Concrete Finisher/Cement Mason...$ 15.55 2.85
Groundman (Traffic Signalization).....$ 11.57 3.50
Ironworkers:
Bridgerail (Excluding Guardrail)..................$ 16.76 6.01 Reinforcing.................$ 16.94 6.77
Laborers:
Asphalt/Raker...............$ 12.40 2.92 Common......................$ 12.44 3.53 Concrete Laborer/MasonTender.........$ 12.44 3.10 Formwork (Curbs and gutters only)...............$ 12.92 4.54 Guardrail (Excludes bridgerail).................$ 12.78 3.31 Landscape Laborer (Including Irrigation Work).......................$ 12.21 3.16 Striping-Paint Laborer (Pre-form layout and removal of pavement markings)...................$ 12.90 3.07
Traffic Director/Flagger....$ 9.42 3.21 Traffic/Sign Laborer (Sets cones and barricades, installs permanent signs)..$ 12.39 3.20
PAINTER: Spray Only.............$ 17.54 3.52
Power equipment operators:
Asphalt Plant...............$ 17.23 1.20 Asphalt Screed..............$ 16.21 3.76 Backhoe.....................$ 16.42 4.42 Compactor - Dirt & Soil Only........................$ 16.52 3.13 Grader/Blade................$ 16.39 4.20 Mechanic and or Welder (Includes heavy duty and combination mechanic and welder).....................$ 16.74 4.20 Post Driver/Punch Machine...$ 16.07 4.41 Rotomill Operator...........$ 16.28 4.41 Scraper.....................$ 17.62 3.16
Truck drivers:
Dump........................$ 14.15 3.83 Low Boy.....................$ 15.07 4.56 MultipurposeTruck- Specialty & Hoisting.......$ 14.60 3.49 Pickup (Including Pilot Car)........................$ 14.04 3.49 Truck Mechanic..............$ 15.97 4.61 Water Truck.................$ 14.88 2.07
TEAM0435-003 05/01/2000
Rates Fringes
Truck drivers:
Distributor.................$ 15.80 5.27
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .