AG-82X9-S-10-0089 Sumamry of Changes Amend 01.docx

DOCX document 15 KB Posted

Attached to
Herbicide Application and GPS Data Pike National Forest, Colorado
Solicitation number
AG-82X9-S-10-0089
Issued by

About this file

AG-82X9-S-10-0089 Amend 000001 Summary of Changes (SF30 Continuation)

View the file

Other files

File Type Posted
Pre-Bid Questions.docx DOCX document
Exhibit1 Required Treatments Amen01.docx DOCX document
AG-82X9-S-10-0089 Cover Page Amend 01.pdf PDF
Attach J.2 Fire Control Plan.docx DOCX document
Exhibit2 GPS Tolerance.docx DOCX document
AG-82X9-S-10-0089 Herbicide GPS.docx DOCX document
Attach J.3 Wage Determination.docx DOCX document
Exhibit1 Required Treatments.docx DOCX document
Exhibit3 Treatment data Tabledocx.docx DOCX document
Attach J.1 PWS Final.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 000001AG-82X9-S-10-0089
Pike and San Isabel Herbicide Application and GPS Reporting IDIQ Project
Page 2 of 2

SUMMARY OF CHANGES:

Section L paragraph 1.1 last sentence should be edited to read as follows:

The technical proposal must contain Past Performance, Prior Experience, Quality Control Plan, and Work Plan (to include Progress Schedule).

Section M.2.4 added the following statement to the end of the paragraph.

Work plan must include a practical schedule showing the order in which the contractor will perform the work and the dates on which the contractor contemplates starting and completing each task.

Attachment J.1 Replace the Period of Performance paragraph with the following:

1.1.2 PERIOD OF PERFORMANCE. Services covered in this solicitation and resultant contract are to be performed during the field seasons. Work shall occur when the target plants are actively growing and weather conditions allow them to be susceptible to herbicide effects. In 2010, work may begin on or about 30 August 2010. In 2010, the Contractor shall complete all field work by October 31, 2010 and all reports no later than November 30, 2010. Any remaining work will be completed during the 2011 spring and summer. Exact treatment dates and report due dates will be established and coordinated with the COR after contract award. Pre-work and close out meetings will be required.

The Required Treatment for Specific Noxious Weeds has been modified to reflect a more recent label and to show the noxious weeds in priority order for treatment.

Exhibit 1 Required Treatments for Specific Noxious Weeds has been modified to reflect a more recent label and to show the noxious weeds in priority order for treatment.