AG-82X9-S-10-0089 Sumamry of Changes Amend 01.docx
DOCX document 15 KB Posted
- Solicitation number
- AG-82X9-S-10-0089
About this file
AG-82X9-S-10-0089 Amend 000001 Summary of Changes (SF30 Continuation)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Bid Questions.docx | DOCX document | |
| Exhibit1 Required Treatments Amen01.docx | DOCX document | |
| AG-82X9-S-10-0089 Cover Page Amend 01.pdf | ||
| Attach J.2 Fire Control Plan.docx | DOCX document | |
| Exhibit2 GPS Tolerance.docx | DOCX document | |
| AG-82X9-S-10-0089 Herbicide GPS.docx | DOCX document | |
| Attach J.3 Wage Determination.docx | DOCX document | |
| Exhibit1 Required Treatments.docx | DOCX document | |
| Exhibit3 Treatment data Tabledocx.docx | DOCX document | |
| Attach J.1 PWS Final.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| Amendment 000001 | AG-82X9-S-10-0089 |
| Pike and San Isabel Herbicide Application and GPS Reporting IDIQ Project | |
| Page 2 of 2 |
SUMMARY OF CHANGES:
Section L paragraph 1.1 last sentence should be edited to read as follows:
The technical proposal must contain Past Performance, Prior Experience, Quality Control Plan, and Work Plan (to include Progress Schedule).
Section M.2.4 added the following statement to the end of the paragraph.
Work plan must include a practical schedule showing the order in which the contractor will perform the work and the dates on which the contractor contemplates starting and completing each task.
Attachment J.1 Replace the Period of Performance paragraph with the following:
1.1.2 PERIOD OF PERFORMANCE. Services covered in this solicitation and resultant contract are to be performed during the field seasons. Work shall occur when the target plants are actively growing and weather conditions allow them to be susceptible to herbicide effects. In 2010, work may begin on or about 30 August 2010. In 2010, the Contractor shall complete all field work by October 31, 2010 and all reports no later than November 30, 2010. Any remaining work will be completed during the 2011 spring and summer. Exact treatment dates and report due dates will be established and coordinated with the COR after contract award. Pre-work and close out meetings will be required.
The Required Treatment for Specific Noxious Weeds has been modified to reflect a more recent label and to show the noxious weeds in priority order for treatment.
Exhibit 1 Required Treatments for Specific Noxious Weeds has been modified to reflect a more recent label and to show the noxious weeds in priority order for treatment.