Construction_Drawings_Binder.pdf

PDF 2 MB Posted

Attached to
One Mile Campground Electrical Improvements
Solicitation number
AG-82X9-S-09-0176
Issued by

About this file

Drawings

View the file

Other files

File Type Posted
02130_clearing.doc DOC document
sf_30.rtf RTF text file
return.pdf PDF
Construction_Specs_Binder.pdf PDF
CONSTRUCTION_RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOCATION MAP

ALAMOSA

STEAMBOAT

SPRINGS

NEW MEXICO

BUENA

SYMBOL

U.S. HIGHWAY

STATE HIGHWAY

DESCRIPTION

INTERSTATE HIGHWAY

MONTROSE

CORTEZ

UTAH

DURANGO

GUNNISON

GRAND

JUNCTION

GLENWOOD

SPRINGS

CRAIG

WYOMING

LIMON

OKLAHOMA

SPRINGS

WALSENBURG

COLORADO

TRINIDAD

CANON

CITY

PUEBLO

SALIDA

KANSAS

DENVER

FT. COLLINS

STERLING

NEBRASKA

GRANBY

MONTE VISTA

VAIL

RIFLE

Colorado

SCALE OF KILOMETERS

50 0 50 100

SCALE OF MILES

50 50 100 150

MEEKER

DILLON

1 T1 TITLE SHEET

2 E1 EXISTING OVERALL SITE PLAN

3 E2 ELECTRICAL SITE PLAN UNITS 15 TO 25 (BASE BID)

4 E3 ELECTRICAL SITE PLAN UNITS 1 TO 14 (OPTIONAL BID ITEM)

5 E4 PANELBOARDS, PHOTOS, AND DETAILS

6 E5 ONE-LINE DIAGRAM

TITLE SHEETFOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

ROCKY MOUNTAIN REGION

R2

Sheet Title: Sub Sheet:

Sheet

OF

Project No:

TL

TNEMT

R

A P

E D

UCIRGAFO

E R

U

Checked:

Design:

Date:

Drawn:

UNITED STATES DEPARTMENT OF AGRICULTURE

CONSTRUCTION DOCUMENTS FOR

FOREST SERVICE

INDEX

SHEET SHEET

SUB

TITLE OF SHEET

ROCKY MOUNTAIN REGION

PROJECT SITE

No. 1

No. 3

No. 2

Revisions:

Date

Date

Date Initials

Initials

Initials

ONE MILE CAMPGROUND ELECTRICAL

GRAND MESA, UNCOMPAHGRE, GUNNISON NFs

GUNNISON RANGER DISTRICT

T1

ONE MILE CAMPGROUND

TCM

TCM

5/2009

GMUG

6/ /0 :3

JK

EH

M R K

EN

G\

PR

OJ

EC

TS

\G

MU

G\

SL

OT

_R

IV

ER

_A

CC

ES

S\

DW

GS

\T

IT

LE

-S

HT

.D

WG

90% REVIEW

PROJECT

LOCATION

DELTA

CEDAREDGE VISTA

116 FOREST DEVELOPMENT ROAD

TO

SAGUACHE

THIS PROJECT

SOAP CREEK

RED BRIDGE

THE GATE

GUNNISON

SPRING

CREEK

CEMENT

CREEK

ROSY

LANE

ONE

MILE

TAYLOR

CANYON

ALMONTALMONT

NORTH

BANK

GUNNISON

RIVER

MORROW POINT

RESERVOIR

WEST ELK LOOP

SCENIC BYWAY

TO

MONTROSE

TO CRESTED

BUTTE

TO LAKE

CITY

TO

SALIDA

Date

Date

Date

Date

Date

Date

Date

Recommended By:

Forest Landscape Architect

Accessibility Coordinator

Forest Engineer

Project Manager for Director of Engineering

Forest Supervisor

I Have Reviewed the Technical Aspects of These Drawings:

Approved By:

These drawings comply with the Forest Plan and project specific NEPA documentation.

These drawings comply with the applicable technical requirements and engineering standards as delegated to this position.

/S/CHIARA_PALAZZOLO

/S/TODD_MICHAEL

/S/CHIARA_PALAZZOLO

/S/TOM_CONDOS

/S/TERRY_WONG

/S/CHARLES_S_RICHMOND

/S/VERONICA_MITCHELL

DateFacility Engineer

/S/TOM_CONDOS

CDI Manager

05/05/09

05/05/09

05/05/09

05/05/09

05/05/09

05/12/09

05/05/09

05/13/09

T a y l o r

R i v e r

R a n g e r

D i s t r i c t

N a t i o n a l

F o r e s t

O N E

M I L E

C A M P G R O U N D

SHEET 27 OF 27

N o

D a t e

B y

D e s c r i p t i o n

R E V I S I O N

E L E C T R I C A L

D I S T R I B U T I O N

P L A N

F O R E S T

S U P E R V I S O R

R E C R E A T I O N

S T A F F

D I S T R I C T

R A N G E R

F O R E S T

E N G I N E E R

L A N D S C A P E

A R C H I T E C T

C I V I L

E N G I N E E R I N G

Z O N E

E N G I N E E R

F O R E S T

S E R V I C E

R O C K Y

M O U N T A I N

R E G I O N

U

S

D E P A R T M E N T

O F

A G R I C U L T U R E

Ro ad

W

W

Well/Pump house

Unit 24

Unit 25

Existing toilet

Toilet Building "A"

FDR

Unit 23

Unit 22

Unit 21

Toilet Building "B"

Unit 20

Unit 19

Solid Waste Station No.2

Unit 18

Unit 17

Unit 16

Unit 15

Unit 14

Unit 12

H4

H3

H1

H2

P

Unit 13

Unit 11

Unit 10

Unit 9

Unit 8

Unit 7

H5

P

P

P H7

H6

Unit 6

Unit 5

Unit 4

Unit 3

Unit 2

Unit 1

30 amp receptacle

23 1/2"

24"

PEDESTAL DETAIL

No Scale

NOTE:

Place both power and water utilities in the same trench wherever possible.

Place the water line 12 inches above the electric cable. Use Identification

Tape for both.

All underground buried cable to be type USE-XLPE

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

20 amp GFI outlet

100 Amp Power Outlet Pedestal

HP-UP04-41G as manufactured by

Unicorn Electric Products

P.O. Box 6470, Anaheim CA 92816

(714) 524-8989 or approved equal

Transformer and meter post by GVE

Fused Disconnects by contractor

P

Size as shown below:

From Fused disconnect to Unit 8 - AWG 300 MCM cu

From Fused disconnect to Unit 20 - AWG 300 MCM cu

From Unit 8 to Unit 1 - AWG 1/0 cu

From Unit 20 to Unit 25 - AWG 1/0 cu

Install two disconnects with 50 AMP fuses

ELECTRICAL DISTRIBUTION PLAN

G U N N I S O N

KEYED NOTES

EXISTING 50 KVA TRANSFORMER WITH DOUBLE METER SET

EXISTING UNDERGROUND SECONDARY CONDUCTORS, TYP.

EXISTING 30/20 AMP RV PEDESTAL, TYP.

EXISTING WATER LINE, TYP

EXISTING HYDRANT, TYP

ASPHALT ROAD, TYP

GRAVEL SPUR, TYP

DRA

FT

Checked:

Design:

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

ROCKY MOUNTAIN REGION

TL

TNEMT

R

A P

E D

UCIRGAFO

E R

U R2

Forest

Date:

Drawn:

Sheet Title: Sub Sheet:

Sheet

OF

Project No:

ONE MILE CAMPGROUND

GRAND MESA, UNCOMPAHGRE, AND

GUNNISON NATIONAL FORESTS

GUNNISON RANGER DISTRICT 5/2009 6

EXISTING OVERALL SITE PLAN

T. MICHAEL

T. MICHAEL

GMUG NF E1

5/

/0

:1

TC

MI

CH

AE

L

R

K

EN

G\

PR

OJ

EC

TS

\G

MU

G\ 1_

MI

LE

-C G\

EL

EC

TR

IC

AL

\D

WG

S\

E1 -E

2_

EL

EC

_S

IT

E.

DW

G

XR

EF

S:

K

EN

G\

PR

OJ

EC

TS

\G

MU

G\

1_

MI

LE

-C

G\

EL

EC

TR

IC

AL

\D

WG

S\ X-

PR

OJ

EC

T-

DA

TA

.D

WG

K:

\E

NG

\P

RO

JE

CT

S\

GM

UG

\1

_M

IL

E-

CG

\E

LE

CT

RI

CA

L\

DW

GS

\L

MI

LE

LC

T.

DW

G;

GENERAL NOTES

1. EXISTING POWER AND WATER UTILITIES ARE IN THE SAME

TRENCH, WATER LINE IS 12 INCHES ABOVE POWER, FIELD

LOCATE UTILITIES PRIOR TO EXCAVATION.

2. PROTECT EXISTING UTILITIES, EQUIPMENT, BUILDINGS, AND

TREES FROM DAMAGE.

3. EXISTING EQUIPMENT, UTILITIES, BUILDINGS, AND TREES HAVE

BEEN TAKEN FROM EXISTING DRAWINGS AND FIELD SURVEYS.

CONFIRM EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF

WORK. NOTIFY CONTRACTING OFFICER OF ANY DISCREPANCIES.

4. MAIN ROAD THROUGH CAMPGROUND HAS ASPHALT SURFACE.

RV SPURS/SITES HAVE GRAVEL SURFACE.

100 0 100

SCALE OF FEET

SEE E3 FOR

OPTIONAL BID

ITEM WORK,

UNITS 1 TO 14

SEE E2 FOR

BASE BID ITEM

WORK, UNITS 15

TO 25

y l o r

R i v e r

R a n g e r

D i s t r i c t

N a t i o n a l

F o r e s t

O N E

M I L E

C A M P G R O U N D

SHEET 27 OF 27

N o

D a t e

B y

D e s c r i p t i o n

R E V I S I O N

E L E C T R I C A L

D I S T R I B U T I O N

P L A N

F O R E S T

S U P E R V I S O R

R E C R E A T I O N

S T A F F

D I S T R I C T

R A N G E R

F O R E S T

E N G I N E E R

L A N D S C A P E

A R C H I T E C T

C I V I L

E N G I N E E R I N G

Z O N E

E N G I N E E R

F O R E S T

S E R V I C E

R O C K Y

M O U N T A I N

R E G I O N

U

S

D E P A R T M E N T

O F

A G R I C U L T U R E

Ro ad

W

W

Well/Pump house

Unit 24

Unit 25

Existing toilet

Toilet Building "A"

FDR

Unit 23

Unit 22

Unit 21

Toilet Building "B"

Unit 20

Unit 19

Solid Waste Station No.2

Unit 18

Unit 17

Unit 16

Unit 15

Unit 14

Unit 12

H4

H3

H1

H2

P

Unit 13

Unit 11

Unit 10

Unit 9

Unit 8

Unit 7

H5

P

P

P H7

H6

Unit 6

Unit 5

Unit 4

Unit 3

Unit 2

Unit 1

30 amp receptacle

23 1/2"

24"

PEDESTAL DETAIL

No Scale

NOTE:

Place both power and water utilities in the same trench wherever possible.

Place the water line 12 inches above the electric cable. Use Identification

Tape for both.

All underground buried cable to be type USE-XLPE

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

20 amp GFI outlet

100 Amp Power Outlet Pedestal

HP-UP04-41G as manufactured by

Unicorn Electric Products

P.O. Box 6470, Anaheim CA 92816

(714) 524-8989 or approved equal

Transformer and meter post by GVE

Fused Disconnects by contractor

P

Size as shown below:

From Fused disconnect to Unit 8 - AWG 300 MCM cu

From Fused disconnect to Unit 20 - AWG 300 MCM cu

From Unit 8 to Unit 1 - AWG 1/0 cu

From Unit 20 to Unit 25 - AWG 1/0 cu

Install two disconnects with 50 AMP fuses

ELECTRICAL DISTRIBUTION PLAN

G U N N I S O N

T

KEYED NOTES

INSTALL "PANEL A" WITH METER SOCKET APPROXIMATELY

FIVE FEET FROM TRANSFORMER, INSTALL CONDUIT IN

TRENCH WITH MINIMUM 3'-0" BURIAL FROM TRANSFORMER

TO PANEL, UTILITY COMPANY TO INSTALL CONDUCTORS.

TRANSFORMER INSTALLED BY UTILITY COMPANY

EXISTING UNDERGROUND SECONDARY CONDUCTORS AND

WATER, TYP.

NEW SECONDARY CONDUCTORS, TYP.

EXISTING 30/20 AMP RV PEDESTAL, TYP.

REMOVE EXISTING 30/20 AMP RV PEDESTAL AND

CONDUCTORS, INSTALL 50/30/20 AMP PEDESTAL IN SAME

LOCATION, ROUTE NEW CONDUCTORS TO PEDESTAL.

INSTALL TRENCH AND BACKFILL FOR PRIMARY CONDUCTORS

WITH MINIMUM 3'-0" COVER, UTILITY COMPANY TO INSTALL

CONDUIT AND PRIMARY CONDUCTORS, COORDINATE

TRENCHING WITH UTILITY COMPANY.

SEE E3 FOR CONTINUATION

REMOVE LOOP FEED FROM SITE 18 GOING TO SITE 17,

ABANDON CONDUCTORS BELOW GROUND.

SPLICE NEW CONDUCTORS TO EXISTING CONDUCTORS TO

TOILET BUILDING, REMOVE LOOP FEED TO SITE 21, ABANDON

CONDUCTORS BELOW GROUND.

REMOVE LOOP FEED FROM SITE 20 PEDESTAL GOING TO

SITE 19, ABANDON CONDUCTORS BELOW GROUND, SPLICE

NEW CONDUCTORS TO CONDUCTORS BETWEEN SITE 20 AND

SITE 19 TO FEED SITE 19.

SPLICE NEW CONDUCTORS TO CONDUCTORS FEEDING WELL

PUMP HOUSE, ABANDON CONDUCTORS FEEDING SITE 23

BELOW GROUND.

EXISTING 50 KVA TRANSFORMER AND DOUBLE METER SET,

COORDINATE TRENCH REQUIREMENTS AND CONNECTION

LOCATION WITH UTILITY COMPANY.

CUT AND PATCH ASPHALT WHERE CONDUCTORS CROSS

ASPHALT ROAD.

DRA

FT

Checked:

Design:

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

ROCKY MOUNTAIN REGION

TL

TNEMT

R

A P

E D

UCIRGAFO

E R

U R2

Forest

Date:

Drawn:

Sheet Title: Sub Sheet:

Sheet

OF

Project No:

ONE MILE CAMPGROUND

GRAND MESA, UNCOMPAHGRE, AND

GUNNISON NATIONAL FORESTS

GUNNISON RANGER DISTRICT 5/2009 6

ELECTRICAL SITE PLAN

UNITS 15 TO 25 (BASE BID ITEM)

T. MICHAEL

T. MICHAEL

GMUG NF E2

5/

/0

:1

TC

MI

CH

AE

L

R

K

EN

G\

PR

OJ

EC

TS

\G

MU

G\ 1_

MI

LE

-C G\

EL

EC

TR

IC

AL

\D

WG

S\

E1 -E

2_

EL

EC

_S

IT

E.

DW

G

XR

EF

S:

K

EN

G\

PR

OJ

EC

TS

\G

MU

G\

1_

MI

LE

-C

G\

EL

EC

TR

IC

AL

\D

WG

S\ X-

PR

OJ

EC

T-

DA

TA

.D

WG

K:

\E

NG

\P

RO

JE

CT

S\

GM

UG

\1

_M

IL

E-

CG

\E

LE

CT

RI

CA

L\

DW

GS

\L

MI

LE

LC

T.

SCALE OF FEET

12060060

GENERAL NOTES

1. VERIFY EXISTING CONDUCTOR SIZE AND CIRCUITING BEFORE

STARTING CONSTRUCTION.

2. EXISTING POWER AND WATER UTILITIES ARE IN THE SAME

TRENCH, WATER LINE IS LOCATED 12 INCHES ABOVE POWER,

FIELD LOCATE UTILITIES PRIOR TO EXCAVATION.

3. PROTECT EXISTING UTILITIES, EQUIPMENT, BUILDINGS, AND

TREES FROM DAMAGE.

4. EXISTING EQUIPMENT, UTILITIES, BUILDINGS, AND TREES HAVE

BEEN TAKEN FROM EXISTING DRAWINGS AND FIELD SURVEYS.

CONFIRM EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF

WORK. NOTIFY CONTRACTING OFFICER OF ANY DISCREPANCIES.

5. SEE ELECTRICAL ONE LINE DIAGRAMS ON SHEET E5 FOR

CONDUCTOR SIZES.

6. ELECTRIC COMPANY: GUNNISON COUNTY ELECTRIC

ASSOCIATION (GCEA), CONTACT CHICO DOMINGUEZ

970-641-7340.

7. EXISTING RV PEDESTALS ARE 30/20 AMP PEDESTALS.

8. SEE TRENCH DETAILS ON E4, BURY SECONDARY CONDUCTORS

IN SAME TRENCH AS PRIMARY CONDUIT WHERE POSSIBLE.

9. HAND DIG AROUND EXISTING CONDUCTORS AND WATER LINE

WHERE NEW WORK APPROACHES EXISTING BURIED UTILITIES.

PATCH OR REPLACED UTILITIES DAMAGED DURING

CONSTRUCTION CONTRACT.

10. RESEED DISTURBED AREAS AND TRENCHING.

11. MAIN ROAD THROUGH CAMPGROUND IS ASPHALT, RV

SPURS/SITES ARE GRAVEL, ROUTE TRENCHES MINIMUM 1'-0"

OFF THE SHOULDER TO MINIMIZE DISTURBING ASPHALT.

12. INSTALL GRAVEL REPAIR WHERE TRENCHING CROSSES RV

SPURS.

13. INSTALL SPLICE BOXES TO PROVIDE ACCESS TO FIELD

SPLICES.

PH2

E4

PH1

E4 y l o r

R i v e r

R a n g e r

D i s t r i c t

N a t i o n a l

F o r e s t

O N E

M I L E

C A M P G R O U N D

SHEET 27 OF 27

N o

D a t e

B y

D e s c r i p t i o n

R E V I S I O N

E L E C T R I C A L

D I S T R I B U T I O N

P L A N

F O R E S T

S U P E R V I S O R

R E C R E A T I O N

S T A F F

D I S T R I C T

R A N G E R

F O R E S T

E N G I N E E R

L A N D S C A P E

A R C H I T E C T

C I V I L

E N G I N E E R I N G

Z O N E

E N G I N E E R

F O R E S T

S E R V I C E

R O C K Y

M O U N T A I N

R E G I O N

U

S

D E P A R T M E N T

O F

A G R I C U L T U R E

Ro ad

W

W

Well/Pump house

Unit 24

Unit 25

Existing toilet

Toilet Building "A"

FDR

Unit 23

Unit 22

Unit 21

Toilet Building "B"

Unit 20

Unit 19

Solid Waste Station No.2

Unit 18

Unit 17

Unit 16

Unit 15

Unit 14

Unit 12

H4

H3

H1

H2

P

Unit 13

Unit 11

Unit 10

Unit 9

Unit 8

Unit 7

H5

P

P

P H7

H6

Unit 6

Unit 5

Unit 4

Unit 3

Unit 2

Unit 1

30 amp receptacle

23 1/2"

24"

PEDESTAL DETAIL

No Scale

NOTE:

Place both power and water utilities in the same trench wherever possible.

Place the water line 12 inches above the electric cable. Use Identification

Tape for both.

All underground buried cable to be type USE-XLPE

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

20 amp GFI outlet

100 Amp Power Outlet Pedestal

HP-UP04-41G as manufactured by

Unicorn Electric Products

P.O. Box 6470, Anaheim CA 92816

(714) 524-8989 or approved equal P

Size as shown below:

From Fused disconnect to Unit 8 - AWG 300 MCM cu

From Fused disconnect to Unit 20 - AWG 300 MCM cu

From Unit 8 to Unit 1 - AWG 1/0 cu

From Unit 20 to Unit 25 - AWG 1/0 cu

ELECTRICAL DISTRIBUTION PLAN

G U N N I S O N

T

DRA

FT

Checked:

Design:

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

ROCKY MOUNTAIN REGION

TL

TNEMT

R

A P

E D

UCIRGAFO

E R

U R2

Forest

Date:

Drawn:

Sheet Title: Sub Sheet:

Sheet

OF

Project No:

ONE MILE CAMPGROUND

GRAND MESA, UNCOMPAHGRE, AND

GUNNISON NATIONAL FORESTS

GUNNISON RANGER DISTRICT 5/2009 6

ELECTRICAL SITE PLAN

UNITS 1 TO 14 (OPTIONAL BID ITEM)

T. MICHAEL

T. MICHAEL

GMUG NF E3

5/

/0

:1

TC

MI

CH

AE

L

R

K

EN

G\

PR

OJ

EC

TS

\G

MU

G\ 1_

MI

LE

-C G\

EL

EC

TR

IC

AL

\D

WG

S\

E1 -E

2_

EL

EC

_S

IT

E.

DW

G

XR

EF

S:

K

EN

G\

PR

OJ

EC

TS

\G

MU

G\

1_

MI

LE

-C

G\

EL

EC

TR

IC

AL

\D

WG

S\ X-

PR

OJ

EC

T-

DA

TA

.D

WG

K:

\E

NG

\P

RO

JE

CT

S\

GM

UG

\1

_M

IL

E-

CG

\E

LE

CT

RI

CA

L\

DW

GS

\L

MI

LE

LC

T.

PH1

E3

SCALE OF FEET

12060060

KEYED NOTES

INSTALL "PANEL B" WITH METER SOCKET APPROXIMATELY

FIVE FEET FROM TRANSFORMER, INSTALL CONDUIT IN

TRENCH WITH MINIMUM 3'-0" BURIAL FROM TRANSFORMER

TO PANEL, UTILITY COMPANY TO INSTALL CONDUCTORS.

TRANSFORMER INSTALLED BY UTILITY COMPANY

EXISTING UNDERGROUND SECONDARY CONDUCTORS AND

WATER, TYP.

NEW SECONDARY CONDUCTORS, TYP.

EXISTING 30/20 AMP RV PEDESTAL, TYP.

REMOVE EXISTING 30/20 AMP RV PEDESTAL, INSTALL

50/30/20 AMP PEDESTAL IN SAME LOCATION, ROUTE NEW

CONDUCTORS TO PEDESTAL.

INSTALL TRENCH AND BACKFILL FOR PRIMARY CONDUCTORS

IN TRENCH WITH MINIMUM 3'-0" COVER, UTILITY COMPANY

TO INSTALL CONDUIT AND PRIMARY CONDUCTORS,

COORDINATE TRENCHING WITH UTILITY COMPANY.

SEE E2 FOR CONTINUATION (BASE BID)

EXISTING 50 KVA TRANSFORMER AND DOUBLE METER SET.

COORDINATE TRENCH REQUIREMENTS AND CONNECTION

LOCATION WITH UTILITY COMPANY.

REMOVE LOOP FEED FROM SITE 10 PEDESTAL GOING TO

SITE 13 PEDESTAL, SPLICE NEW CONDUCTORS TO SITE 13

CONDUCTORS

REMOVE LOOP FEED FROM SITE 5 PEDESTAL GOING TO

TOILET BUILDING "A" AND TO SITE 4 PEDESTAL, CONNECT

NEW CONDUCTORS TO SITE 5 PEDESTAL, ABANDON

CONDUCTORS BETWEEN SITE 5 PEDESTAL AND TOILET

BUILDING "A".

REMOVE LOOP FEED FROM SITE 6 PEDESTAL GOING TO

TOILET BUILDING "A", CONNECT NEW CONDUCTORS TO SITE 6

PEDESTAL, ABANDON CONDUCTORS BETWEEN SITE 6 AND

TOILET BUILDING "A".

REMOVE LOOP FEED FROM SITE 8 PEDESTAL GOING TO SITE

9 PEDESTAL, SPLICE NEW CONDUCTORS TO SITE 9

CONDUCTORS.

REMOVE LOOP FEED FROM SITE 13 PEDESTAL GOING TO

SITE 11 PEDESTAL, ABANDON CONDUCTORS BELOW GROUND.

REMOVE LOOP FEED FROM SITE 11 PEDESTAL GOING TO

SITE 13 PEDESTAL, ABANDON CONDUCTORS BELOW GROUND.

REMOVE LOOP FEEDS FROM TOILET BUILDING "A" TO SITES

5 AND 6, ABANDON CONDUCTORS BELOW GROUND, SPLICE

NEW CONDUCTORS TO CONDUCTORS FEEDING TOILET

BUILDING "A".

REMOVE LOOP FEED FROM SITE 3 PEDESTAL GOING TO SITE

2 PEDESTAL, ABANDON CONDUCTORS BELOW GROUND.

CUT AND PATCH ASPHALT WHERE CONDUCTORS CROSS MAIN

ROAD.

SPLICE NEW CONDUCTORS TO EXISTING CONDUCTORS GOING

TO SITE 4 PEDESTAL.

GENERAL NOTES

1. VERIFY EXISTING CONDUCTOR SIZE AND CIRCUITING BEFORE

STARTING CONSTRUCTION.

2. EXISTING POWER AND WATER UTILITIES ARE IN THE SAME

TRENCH, WATER LINE IS LOCATED 12 INCHES ABOVE POWER,

FIELD LOCATE UTILITIES PRIOR TO EXCAVATION.

3. PROTECT EXISTING UTILITIES, EQUIPMENT, BUILDINGS, AND

TREES FROM DAMAGE.

4. EXISTING EQUIPMENT, UTILITIES, BUILDINGS, AND TREES HAVE

BEEN TAKEN FROM EXISTING DRAWINGS AND FIELD SURVEYS.

CONFIRM EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF

WORK. NOTIFY CONTRACTING OFFICER OF ANY DISCREPANCIES.

5. SEE ELECTRICAL ONE LINE DIAGRAMS ON SHEET E5 FOR

CONDUCTOR SIZES.

6. ELECTRIC COMPANY: GUNNISON COUNTY ELECTRIC

ASSOCIATION (GCEA), CONTACT CHICO DOMINGUEZ

970-641-7340.

7. EXISTING RV PEDESTALS ARE 30/20 AMP PEDESTALS.

8. SEE TRENCH DETAILS ON E4, BURY SECONDARY CONDUCTORS

IN SAME TRENCH AS PRIMARY CONDUIT WHERE POSSIBLE.

9. HAND DIG AROUND EXISTING CONDUCTORS AND WATER LINE

WHERE NEW WORK APPROACHES EXISTING BURIED UTILITIES.

PATCH OR REPLACED UTILITIES DAMAGED DURING

CONSTRUCTION CONTRACT.

10. RESEED DISTURBED AREAS AND TRENCHING.

11. MAIN ROAD THROUGH CAMPGROUND IS ASPHALT, RV

SPURS/SITES ARE DIRT. ROUTE TRENCHES MINIMUM 1'-0" OFF

THE SHOULDER TO MINIMIZE DISTURBING ASPHALT.

12. INSTALL GRAVEL REPAIR WHERE TRENCHING CROSSES RV

SPURS.

13. INSTALL SPLICE BOXES TO PROVIDE ACCESS TO FIELD

SPLICES.

36005

1320012,4801440014400

10800

TOTAL B: 27,600 VA, 230 AMP

TOTAL A: 26,880 VA, 224 AMP

TOTAL DEMAND AMPS 123

TOTAL DEMAND VA 29,400

TOTAL CONNECTED AMPS 227

TOTAL CONNECTED VA 54,480

PANEL "B" (OPTIONAL BID ITEM)

POLE NO.AMPTYPEMIN. WIRE SIZES

A

DESCRIPTION &

RAIN PROOF

CBLOAD

22,000 A.I.R.

B

DESCRIPTION &LOADCB

TYPEPOLENO. AMP MIN. WIRE SIZES

VA LOAD PER LEG

A B

SUBTOTAL

VOLTS: 120/240 - 1 PHASE, 3 WIRE

MAIN CB, SURFACE MOUNT

MAIN CB AMPS 200

BUS AMPS 200

7 = SPACE

6 = SPARE

5 = MISCELLANEOUS

LOAD TYPES:

4 = KITCHEN

3 = MOTORS

2 = RECEPTACLES

1 = LIGHTS

= GFI CIRCUIT BREAKER

7 8

2 100 5 SITES #1, #2

15 110SITES #6, #7, #8

55 180SITES #9, #10

5 140SITE #5

5 180SITES #3, #4

1 40

1 302880 TOILET A

54005

14400144001188012600

TOTAL B: 26,280 VA, 219 AMP

TOTAL A: 27,000 VA, 225 AMP

TOTAL DEMAND AMPS 141

TOTAL DEMAND VA 33,840

TOTAL CONNECTED AMPS 222

TOTAL CONNECTED VA 53,280

PANEL "A" (BASE BID ITEM)

POLE NO.AMPTYPEMIN. WIRE SIZES

A

DESCRIPTION &

RAIN PROOF

CBLOAD

22,000 A.I.R.

B

DESCRIPTION &LOADCB

TYPEPOLENO. AMP MIN. WIRE SIZES

VA LOAD PER LEG

A B

SUBTOTAL

VOLTS: 120/240 - 1 PHASE, 3 WIRE

MAIN CB, SURFACE MOUNT

MAIN CB AMPS 200

BUS AMPS 200

7 = SPACE

6 = SPARE

5 = MISCELLANEOUS

LOAD TYPES:

4 = KITCHEN

3 = MOTORS

2 = RECEPTACLES

1 = LIGHTS

= GFI CIRCUIT BREAKER

7 8

2 100 5 SITES #21, #22

15 80SITES #18, #19

55 270SITES #24, #25, WELL

5 170SITE, 20, TOILET B

2 50

SITE #23

7200 SITES #13

MINIMUM SEPARATION AWAY FROM PRIMARY

ELECTRICAL CABLE OR CABLES, MAINTAIN 12"

DETECTABLE MARKING TAPE, TYP

MOUND BACKFILL 6" ABOVE

IN OPEN FIELD CONDITIONS

FINISHED GRADE

SUBSEQUENT BACKFILL

INITIAL BACKFILL

NOTE: NOT ALL UTILITIES

ARE IN EACH TRENCH.

PRIMARY POWER CONDUIT

3'-0 MIN BURIAL

2'-0" MIN BURIAL

OVER SECONDARY

VARIES

4-8"

POWER CONDUIT

TRENCH DETAIL

NOT TO SCALE

OVER PRIMARY CONDUIT

4" BEDDING FOR CABLES

4" BEDDING FOR CONDUIT MINIMUM SEPARATION AWAY FROM PRIMARY

ELECTRICAL CABLE OR CABLES, MAINTAIN 12"

DETECTABLE MARKING TAPE, TYP

OR GRAVEL TO MATCH EXISTING MATERIAL,

PATCH WITH HOT BITUMINOUS PAVEMENT

SUBSEQUENT BACKFILL

INITIAL BACKFILL

NOTE: NOT ALL UTILITIES

ARE IN EACH TRENCH.

PRIMARY POWER CONDUIT

3'-0 MIN BURIAL

2'-0" MIN BURIAL

OVER SECONDARY

VARIES

4-8"

POWER CONDUIT

PAVED TRENCH DETAIL

NOT TO SCALE

OVER PRIMARY CONDUIT

4" BEDDING FOR CABLES

4" BEDDING FOR CONDUIT

EXISTING PAVEMENT OR GRAVEL

THICKNESS, AND GRADE

1'-0"

MIN

DRA

FT

Checked:

Design:

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

ROCKY MOUNTAIN REGION

TL

TNEMT

R

A P

E D

UCIRGAFO

E R

U R2

Forest

Date:

Drawn:

Sheet Title: Sub Sheet:

Sheet

OF

Project No:

ONE MILE CAMPGROUND

GRAND MESA, UNCOMPAHGRE, AND

GUNNISON NATIONAL FORESTS

GUNNISON RANGER DISTRICT 5/2009 6

PANELBOARDS, PHOTOS, AND

DETAILS

T MICHAEL

T MICHAEL

GMUG NF E4

IM

AG

ES

K:

\E

NG

\P

RO

JE

CT

S\

GM

UG

\1 _M

IL

E-

CG

\E

LE

CT

RI

CA

L\

DW

GS

\S

IT

E_

.J

PG

K:

\E

NG

\P

RO

JE

CT

S\

GM

UG

\1 _M

IL

E-

CG

\E

LE

CT

RI

CA

L\

DW

GS

\1

M_

TR

AN

SF

OR

ME

R.

JP

5/

/0

:1

TC

MI

CH

AE

L

R

K

EN

G\

PR

OJ

EC

TS

\G

MU

G\ 1_

MI

LE

-C G\

EL

EC

TR

IC

AL

\D

WG

S\

E3 -E

4_

EL

EC

_D

WG

S.

DW

G

XR

EF

S:

K

EN

G\

PR

OJ

EC

TS

\G

MU

G\

1_

MI

LE

-C

G\

EL

EC

TR

IC

AL

\D

WG

S\ X-

PR

OJ

EC

T-

DA

TA

.D

WG

KEYED NOTES

EXISTING TRANSFORMER AND DOUBLE METER.

EXISTING RV PEDESTAL2

EXISTING TRANSFORMER AND METER

PH1

E2

TRAILER SITE 17

PH2

E2

GENERAL NOTES

1. POWER TO RV SITES #11, #12, #14, #15, #16, AND

#17 PROVIDED BY EXISTING TRANSFORMER AND DOUBLE

METER SET.

M

G

G F I

SITE 14

G

G F I

SITE 12

G

G F I

SITE 11

G

G F I

SITE 13

G

G F I

SITE 10

G

G F I

SITE 9

G

G F I

SITE 8

G

G F I

SITE 7

G

G F I

SITE 6

G

G F I

SITE 5

G

G F I

SITE 4

G

G F I

SITE 3

G

G F I

SITE 2

G

G F I

SITE 1

TOILET A

G

G F I

SITE 16

G

G F I

SITE 15

G

G F I

SITE 17

G

G F I

SITE 18

G

G F I

SITE 19

G

G F I

SITE 20

G

G F I

SITE 21

G

G F I

SITE 22

G

G F I

SITE 23

G

G F I

SITE 24

M

TOILET BUILDING B WELL PUMP HOUSE

G

G F I

SITE 25

M

G

G F I

SITE 14

G

G F I

SITE 12

G

G F I

SITE 11

G

G F I

SITE 13

G

G F I

SITE 10

G

G F I

SITE 9

G

G F I

SITE 8

G

G F I

SITE 7

G

G F I

SITE 6

G

G F I

SITE 5 SITE 4 SITE 3 SITE 2 SITE 1

TOILET A

G

G F I

SITE 16

G

G F I

SITE 15

G

G F I

SITE 17

G

G F I

SITE 18

G

G F I

SITE 19

SITE 21 SITE 22 SITE 23

G

G F I

SITE 24

M

TOILET BUILDING B

WELL PUMP HOUSE

G

G F I

SITE 25

N G

30/1

40/1

PANEL "B"

80/1

200/2 MCB

100/2

110/1

80/1

N G

50/2

100/2

70/1

200/2 MCB

80/1

70/2 G

G F I

PANEL "A"

G

G F I

SITE 20

G

G F I

G

G F I

G

G F I

G

G F I

40/1

M

M

G

G F I

G

G F I

G

G F I

G

G F I

DRA

FT

Checked:

Design:

FOREST SERVICE

U.S. DEPARTMENT OF AGRICULTURE

ROCKY MOUNTAIN REGION

TL

TNEMT

R

A P

E D

UCIRGAFO

E R

U R2

Forest

Date:

Drawn:

Sheet Title: Sub Sheet:

Sheet

OF

Project No:

ONE MILE CAMPGROUND

GRAND MESA, UNCOMPAHGRE, AND

GUNNISON NATIONAL FORESTS

GUNNISON RANGER DISTRICT 5/2009 6

ONE-LINE DIAGRAMS

T MICHAEL

T MICHAEL

GMUG NF E5

IM

AG

ES

K:

\E

NG

\P

RO

JE

CT

S\

GM

UG

\1 _M

IL

E-

CG

\E

LE

CT

RI

CA

L\

DW

GS

\S

IT

E_

.J

PG

K:

\E

NG

\P

RO

JE

CT

S\

GM

UG

\1 _M

IL

E-

CG

\E

LE

CT

RI

CA

L\

DW

GS

\1

M_

TR

AN

SF

OR

ME

R.

JP

5/

/0

:1

TC

MI

CH

AE

L

R

K

EN

G\

PR

OJ

EC

TS

\G

MU

G\ 1_

MI

LE

-C G\

EL

EC

TR

IC

AL

\D

WG

S\

E3 -E

4_

EL

EC

_D

WG

S.

DW

G

XR

EF

S:

K

EN

G\

PR

OJ

EC

TS

\G

MU

G\

1_

MI

LE

-C

G\

EL

EC

TR

IC

AL

\D

WG

S\ X-

PR

OJ

EC

T-

DA

TA

.D

WG

EXISTING ONE LINE DIAGRAM

NOT TO SCALE

REVISED ONE LINE DIAGRAM

NOT TO SCALE

KEYED NOTES

EXISTING 50 KVA TRANSFORMER.

EXISTING 30/20 AMP RV PEDESTAL, TYP

EXISTING DOUBLE METER SET NEXT TO TRANSFORMER.

EXISTING DIRECT BURIAL, 4/0 ALUMINUM CONDUCTORS,

TYP

REMOVE 30/20 AMP RV PEDESTAL FOR INSTALLATION

OF NEW PEDESTAL, ABANDON CONDUCTORS.

REMOVE LOOPED CONDUCTOR FEEDING OUT TO

EXISTING PEDESTALS.

METERED 200 AMP SERVICE PANEL, COORDINATE

INSTALLATION WITH UTILITY COMPANY.

SPLICE NEW CONDUCTORS TO EXISTING CONDUCTORS,

INSTALL SPLICE BOX TO PROVIDE ACCESS.

50 KVA TRANSFORMER BY UTILITY COMPANY

PROVIDE TRENCHING AND BACKFILL FOR UTILITY

CONDUIT, 3" CONDUIT AND CONDUCTORS FROM

EXISTING TRANSFORMER TO NEW TRANSFORMER

PROVIDED AND INSTALLED BY UTILITY COMPANY.

INSTALL 3-4/0 COPPER CONDUCTORS IN 3" CONDUIT

FROM TRANSFORMER TO SERVICE ENTRANCE PANEL.

50/30/20 AMP RV PEDESTAL

8'-0" GROUND ROD WITH #6 COPPER CONDUCTOR

CONNECTED TO GROUND LUG OF RV PEDESTAL, WHERE

ROCK IS ENCOUNTERED BURY ROD IN A TRENCH THAT

IS AT LEAST 30 INCHES DEEP.

#2 COPPER GROUNDING ELECTRODE CONDUCTOR TO

GROUND ROD, BOND TO NEUTRAL, SIZE ROD IN

ACCORDANCE WITH NEC.

#6 COPPER TO SUPPLEMENTAL GROUND ROD, LOCATE

AT LEAST 6 FEET FROM GROUND ROD, SIZE ROD IN

ACCORDANCE WITH NEC.

4 4

5 5

6 6

6 6

6 6

DIRECT BURIAL CABLE, 2-4/0 ALUMINUM WITH #2 GROUND.

DIRECT BURIAL CABLE, 2-#6 ALUMINUM WITH #6 GROUND.

DIRECT BURIAL CABLE, 3-2/0 ALUMINUM WITH #2 GROUND.

DIRECT BURIAL CABLE, 3-4/0 ALUMINUM WITH #2 GROUND.

DIRECT BURIAL CABLE, 3-1/0 ALUMINUM WITH #6 GROUND.

DIRECT BURIAL CABLE, 3-#2 ALUMINUM WITH #2 GROUND.

DIRECT BURIAL CABLE, 2-#4 ALUMINUM WITH #4 GROUND.

12 12

GENERAL NOTES

1. EXISTING INFORMATION SHOWN ON THE DRAWINGS HAS

BEEN TAKEN FROM LIMITED FIELD OBSERVATIONS. FIELD

VERIFY EXISTING CONDITIONS AND UTILITIES PRIOR TO

BEGINNING WORK.

2. INSTALL SPLICE BOXES TO PROVIDE ACCESS TO FIELD

SPLICES.

20 21

13 12

TITLE-SHT.pdf
TITLE SHEET
E1-E2_ELEC_SITE
E1-OVERALL_SITE
E2-SITE-BASE
E3-SITE-OPTIONAL
E3-E4_ELEC_DWGS
E4_PANELS
E5_ONE-LINE DIAGRAM

File details come from the government source that posted it. Updated .