appendix_k.pdf

PDF 3 MB Posted

Attached to
Front Range Long Term Stewardship Contract Federal contract opportunity
Solicitation number
AG-82X9-S-08-0120
Issued by
Department of Agriculture Forest Service R2-Rocky Mountain Region

About this file

Appendix K Cost Estimating Guiide for Road Construction

View the file

Other files for this federal contract opportunity

Other files attached to Front Range Long Term Stewardship Contract, newest first.
File Type Posted
Stand Data for Long John Task Order.doc DOC document
AR_Stand_Data_Tables09.doc DOC document
attachment1.pdf PDF
amendment1_questions_answers_Bob_edits.doc DOC document
FRLTSC_road_maintenance_level_and_temp_road_milage_11042008.xls XLS spreadsheet
crystal4_taskorder.pdf PDF
task_order_manual_james_creek.doc DOC document
task_order_trout_creek.doc DOC document
jamesck_manual_taskorder_page2.pdf PDF
jamescrk_mechanical_taskorder.pdf PDF
lonetree_taskorder.pdf PDF
task_order_lontree_10312007.doc DOC document
task_order_crystal_4.doc DOC document
task_order_long_john_09292008_fy09.doc DOC document
task_order_ridgewood_2_10142008_fy09.doc DOC document
task_order_girl_scout_09292008_fy09.doc DOC document
task_order_harris_park_10142008_fy09.doc DOC document
ar_general_LTSC HANDOUT10_06_08.doc DOC document
LTSC HANDOUT.doc DOC document
304-02_Rock_Crossing.pdf PDF
task_order_lontree_10312007.doc DOC document
lonetree_contract_map103107.pdf PDF
task_order_trout_creek.doc DOC document
jamesck1_contract_map110707.pdf PDF
task_order_manual_james_creek.doc DOC document
task_order_crystal_4.doc DOC document
task_order_harris_park_09182008_fy09.doc DOC document
task_order_girl_scout_09182008_fy09.doc DOC document
task_order_ridgewood_2_09182008_fy09.doc DOC document
ridgewood_2_task_order_final_09252009.pdf PDF
harris_park_task_order_final_09252009.pdf PDF
task_order_long_john_09182008_fy09.doc DOC document
long_john_task_order_final_09252009.pdf PDF
howard_2_task_order_final_09252009.pdf PDF
frltsc_solicitation_final.pdf PDF
Recontouring.pdf PDF
Road Maintenance_T_814 - Drainage Excavation.pdf PDF
temp rd drainage structure.pdf PDF
Road Maintenance_T_803 - Typical Surface Blading Section.pdf PDF
appendix_j_arnf_final.pdf PDF
appendix_f_map2.pdf PDF
temp rd construction.pdf PDF
appendix_d_final.pdf PDF
appendix_B_final.pdf PDF
Road Maintenance_T_815_ Culvert Installation_2.pdf PDF
Road Maintenance_T_814- Leadoff Ditch.pdf PDF
appendix_A_final.pdf PDF
appendix_h.doc DOC document
Road Maintenance_T_815- Culvert Installation Details.pdf PDF
appendix_g.doc DOC document
Show all 50

Front Range Long Term Stewardship Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of

Agriculture

Forest Service

Intermountain Southwestern

Rocky Mountain Regions

Engineering

Cost Estimating Guide for Road Construction

March 2007

2007 Cost Guide Regional Contacts:

Region 2 Region 3 Region 4

Jeff Moll Marjorie Apodaca Ken Goddard

(303) 275-5199 (505) 842-3852 (801) 625-5792

2007 Cost Guide Revision Team:

Region 2 Region 3 Region 4

Greg Bohls Gary Miller Dave Woras Black Hills NF Apache Sitgreaves NF Boise NF

(605) 642-4622 ext. 3653 (928) 333-6272 (208) 392-3731

COST ESTIMATING GUIDE FOR ROAD CONSTRUCTION

March 2007

TABLE OF CONTENTS

SECTION SECTION TITLE PAGE

GENERAL INFORMATION

Table of Weights and Measures General Information and Instructions

ENGINEER'S ESTIMATE

Engineer's Estimate Wage Rates…………………………………………………………… 15

DAVIS-BACON/PURCHASER WAGE RATE ADJUSTMENT

Davis-Bacon/Purchaser Wage Rate Adjustments Time Estimates & Scheduling……………………………

PROJECT REQUIREMENTS

151 Mobilization 152 Construction Survey and Staking 153 Contractor Quality Control 154 Contractor Sampling and Testing……………………………………… 34 156 Public traffic 157 Soil Erosion Control……… 170 Develop Water Supply and Watering

CLEARING AND EARTHWORK

201 Clearing and Grubbing 202 Individual Removal of Trees…….…………………………………….. 44 Clearing and Grubbing for Existing Roadbeds 203 Removal of Structures and Obstructions 204 Excavation and Embankment Haul……………………………………………………………………. 52 208 Structure Excavation and Backfill for Selected Major Structures… 211 Roadway Obliteration………………… 212 Linear Grading………………………………………………………… 56

SLOPE REINFORCEMENT AND RETAINING WALLS

251 Riprap 253 Gabions and Revet Mattresses 255 Mechanically – Stabilized Earth Walls 257 Alternate Retaining Walls 262 Reinforced Soil Embankment…………………………………………. 64

AGGREGATE COURSES

303 Road Reconditioning…………… 306 Dust Palliative……………………………………………………….. 67 322 Minor Aggregate Courses…………………………………………….. 69

ASPHALT PAVEMENT AND DUST PALLIATIVE

400 Asphalt Pavements - General 403 Hot Asphalt Concrete Pavement 409 Asphalt Surface Treatment……………………………………………. 76 410 Slurry Seal……………………………………………………………... 78 411 Asphalt Prime Coat…………………………………………………….. 78 412 Asphalt Tack Coat 414 Asphalt Pavement Crack and Joint Sealing…………………………… 78 415 Paving Geotextiles 430 Asphalt Pavement Patching…………………………………………… 79

BRIDGE CONSTRUCTION

Regional Bridge Contacts………………

DRAINAGE AND INCIDENTAL CONSTRUCTION

601 Minor Concrete Structures 602 Culverts and Drains…………………………… 603 Structural Plate Structures………………………………………..……. 88 604 Manholes, Inlets and Catch Basins 605 Underdrains, Sheet drains, and Pavement Edge Drains 606 Corrugated Metal Spillways 607 Cleaning, Reconditioning, & Repairing Existing Drainage Structures... 90 609 Curb and Gutter………………………………………………..…..… 90 615 Sidewalks, Drive Pads, and Paved Medians……………………..……. 90 617 Guardrail 618 Concrete Barriers and Precast Guardwalls……………………………. 91 619 Fences, Gates and Cattle Guards 621 Monuments and Markers 622 Rental Equipment……… 624 Top Soiling… 625 Turf Establishment 629 Rolled Erosion Control Products & Cellular Confinement Systems….. 104 633 Permanent Traffic Control 634 Permanent Pavement Markings 650 Road Closure Devices 651 Development of Pits and Quarries……………………

TEMPORARY ROAD COST ESTIMATING

Cost Estimating for Temporary Roads

(03/2007) - 5

GENERAL INFORMATION

AND INSTRUCTIONS

General Information

(03/2007) - 6

TABLES OF WEIGHTS AND MEASURES

Linear Measure

1 inch = 2.54 centimeters 12 inches = 1 foot = 0.3048 meter 3 feet = 1 yard = 0.9144 meter 5 1/2 yards or 16 1/2 feet = 1 rod (or pole or perch) = 5.029 meters 40 rods = 1 furlong = 201.17 meters 8 furlongs or 1,760 yards or 5,280 feet = 1 (statute) mile = 1,609.3 meters 3 miles = 1 (land) league = 4.83 kilometers

Square Measure

1 square inch = 6.45 square centimeters 144 square inches q= square foot = 929 square centimeters 9 square feet q= square yard = 8361 square centimeters 30 1/4 square yards q= square rod (or square pole or square perch) = 25.29 square meters 160 square rods or 4,840 sq yards or 43,560 sq ft c= acre = 0.4046 hectares 640 acres q= square mile = 259 hectares or 2.59 square kilometers

Cubic Measure

1 cubic inch = 16,387 cubic centimeters 1,728 cubic inches = 1 cubic foot = 0.0283 cubic meter 27 cubic feet = 1 cubic yard = 0.7646 cubic meter (in units for cordwood, etc.)

16 cubic feet = 1cord foot 8 cord feet = 1 cord = 3.625 cubic meters

Dry Measure

1 pint = 33.60 cubic inches = 0.5505 liter 2 pints = 1 quart = 67.20 cubic inches = 1.1012 liters 8 quarts = 1 peck = 537.61 cubic inches = 8.8096 liters 4 pecks = 1 bushel = 2,150.42 cubic inches = 35.2383 liters 1 British dry quart = 1.032 U.S. dry quarts

Liquid Measure

1 gill = 4 fluid ounces = 7.219 cubic inches = 0.1183 liter (See next table) 4 gills = 1 pint = 28.875 cubic inches = 0.4732 liter 2 pints = 1 quart = 57.75 cubic inches = 0.9463 liter 4 quarts = 1 gallon = 231 cubic inches = 3.7853 liters

The British imperial gallon (4 imperial quarts) = 277.42 cubic inches = 4.546 liters. The barrel in Great Britain equals 36 imperial gallons, in the United States, usually 31 1/2 gallons.

Avoirdupois Weight (The grain, equal to 0.0648 gram, is the same in all three tables of weight)

1 dram or 27.34 grains = 1.772 grams 16 drams or 437.5 grains = 1 ounce = 28.3495 grams 16 ounces or 7,000 grains = 1 pound = 453.59 grams 100 pounds = 1 hundredweight = 45.36 kilograms 2,000 pounds = 1 ton = 907.18 kilograms

In Great Britain, 14 pounds (6.35 kilograms) = 1 stone, 112 pounds (50.80 kilograms) = 1 hundred weight, and 2,240 pounds (1,016.05 kilograms) = 1 long ton.

(03/2007) - 7

THE METRIC SYSTEM

Linear Measure

10 millimeter = 1 centimeter = 0.3937 inch 10 centimeters = 1 decimeter = 3.937 inches 10 decimeters = 1 meter = 39.37 inches or 3.28 feet 10 meters = 1 decameter = 393.7 inches 10 decameters = 1 hectometer = 328 feet 1 inch 10 hectometers = 1 kilometer = 0.621 mile 10 kilometers = 1 myriameter = 6.21 miles

Square Measure

100 square millimeters = 1 square centimeter 0.15499 square inch 100 square centimeters = 1 square decimeter 15.499 square inches 100 square decimeters = 1 square meter 1,549.9 square inches or 1.196 square yards 100 square meters = 1 square decameter 119.6 square yards 100 square decameters = 1 square hectometer 2.471 acres 100 square hectometers = 1 square kilometer 0.386 square mile

Land Measure

1 square meter = 1 centiare = 1,549.9 square inches 100 centiares = 1 are = 119.6 square yards 100 ares = 1 hectare = 2.471 acres 100 hectares = 1 square kilometer = 0.386 square mile

Volume Measure

1,000 cubic millimeters = 1 cubic centimeter = .06102 cubic inch 1,000 cubic centimeters = 1 cubic decimeter = 61.02 cubic inches 1,000 cubic decimeters = 1 cubic meter = 35.314 cubic feet

Weights

10 kilograms = 1 myriagram = 22.046 pounds 10 myriagrams = 1 quintal = 220.46 pounds 10 quintals = 1 metric ton = 2,204.6 pounds

(03/2007) - 8

General Information and Instructions

Significant changes in the 2007 Cost Guide:

In the Engineer’s Estimate section, a table of adjustment factors to be applied to the unit costs published in the Guide has been added. The purpose of these adjustment factors in Table 3 is to compensate for the difference between Davis-Bacon wage rates across the states within the Regions covered by the Guide.

The unit costs published in the Guide were developed using Idaho Zone 1 wage rates and equipment rates. The Davis-Bacon wage rate adjustments must be applied to all unit costs published in the Guide if the project is outside Idaho Zone 1.

In addition, an adjustment factor table to compensate for differences in equipment hourly rates appears in the Engineer’s Estimate section. For projects in Colorado, Idaho, Kansas, Nebraska, or Nevada no adjustment is necessary. See Table 4 in the Engineer’s Estimate section.

The maps previously used to show the Davis-Bacon wage rate zones have been removed. A description of the zones by counties appears in the Engineer’s Estimate section for each state.

A section for Temporary Road Cost Estimating has been added and follows Section 600 in this Guide.

1. Revisions and Updates. There is one annual revision of the Cost Guide that is typically published in February.

The Forest Service has adopted the FP-03 (Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. This has resulted in a major change in the cost guide and required a set of FSSS (Forest Service Supplemental Specifications) so that the specifications will conform to the Forest Service contract requirements. As a result the descriptions of the specification items have changed for some of the items and many of the specification numbers have changed. The items have also been rearranged. However, the content of the information in this cost guide has changed very little except for the updated costs. The FP-03 and FSSS are available in either Metric or US Customary (English) units.

Verify that cost estimates allow for all work required by the various FSSS in the contract. Since the FSSS are being modified over time, unit costs shown in this guide may not accurately reflect the work required.

2. Time and Equipment (Construction) Estimates. On some items, it may be necessary to develop estimates by "time and equipment." When making time and equipment estimates, be sure to include allowances for:

A. Supervision. On very small jobs this may be provided by an operator/supervisor at essentially no additional cost.

B. Taxes on purchase of material. Also, allow for delivery cost to job site.

C. Bonding cost (may be included in Section 151 Mobilization).

D. "Standby time" for equipment and operators that are part of a "spread" performing a segment of work, but who are not working at full capacity all the time, averages 2 to 2 1/2 percent of the total contract cost. For example, during placement of aggregate, a grader, roller and water truck are needed. The grader and roller may be operating full time; the water truck only part time. The estimate should include standby time for the water truck to compensate for having it available on the job during the entire time of placing aggregate.

E. Support Equipment - fuel trucks, pickups, crew transportation, etc.

F. Permits.

Please note that the labor and equipment rates shown in the Cost Guide include applicable "payroll loading" and profit and overhead costs.

(03/2007) - 9

3. Unit Costs. The estimator should round off the unit price to avoid creating accounting errors when processing contract payments. For example, clearing costs generally should be rounded to the nearest $10 per acre, excavation costs should be rounded to the nearest $.10 per CY, and CMP costs are rounded to $.50/LF. Quantities should never be carried out further than the nearest one-hundredth (0.01), and generally no further than the nearest one-tenth (0.1), depending on accuracy of measurements and cost or value of the item.

4. Use of Average Cost in Project. Use average cost for individual roads within the project whenever possible unless there are significant variations in the character of work from one road to another. Variations are sometimes appropriate for clearing, excavation, hauling, or other unique situations. In these situations, each road should have separate and distinct unit costs for those items; otherwise, the use of overall project unit costs may create problems with design changes, alternate facilities, etc.

5. Profit and Risk Factor. The profit and risk factor used in this Cost Guide is 10 percent. All unit prices shown in the Guide include this allowance, including the wage and equipment rates.

6. Section Number. The Specifications are referred to by Section Numbers in FP-03. The Section Numbers are further broken down by paragraphs with decimal points (i.e. 213.08). Supplemental Specifications are referred to as Forest Service Supplemental Specifications (FSSS). The FSSS’s replace or modify the parent specification.

7. Pay Item Number. Pay item numbers and descriptions are found in the Spec Manager database in Lotus Notes rather than in the FP-03 book.

8. Public Works & Timber Sale Estimates. All engineer's estimates for road construction are to be prepared as if construction is to be accomplished by a public works contract. Unit costs for work items listed in this cost guide utilize Davis-Bacon wages.

9. Davis-Bacon (D-B) /Purchaser Wage Rate Adjustments: To arrive at Specified Road Construction Cost, the engineer's cost estimate shall be adjusted by the estimated cost difference between the applicable Davis-Bacon wage rates and the local prevailing wage rates using the appropriate labor factor given for the labor percentages shown for each work item. These adjustments are mandatory and will be used for all timber sale contracts having specified road construction. Note that some work items are not normally performed by a Timber Sale Purchaser but are subcontracted. No reduction should be made for these items, if the subcontractor is likely to pay Davis-Bacon wage rates. Reductions will be made for those situations where it is unlikely that D-B wages are paid. Refer to FSH 7709.56-7.54 (Preconstruction Handbook) for more information, and refer to Labor Rates in the Engineer’s Estimate section of this Guide for D-B wage information. An example of this may be dust palliative treatments. For additional information, see section entitled Davis-Bacon/Purchaser Wage Rate Adjustments.

10. Fuel Prices. Fuel costs can be quite variable over a period of time due to geopolitical conditions. Equipment Rates in Section 622 and elsewhere in this Guide may need to be adjusted by the estimator to compensate for these variations. Other machinery/equipment that uses fuel or propane such as asphalt plant dryers, generators, etc. may also cost more/less to operate. The overall effect on the typical road construction project is that 30-40% fuel price increases will increase the total cost of construction about 2-5%. The estimator should be aware of big (10% plus) fuel price increases/decreases that would affect the unit bid prices shown in this Guide. Fuel price variations will have more effect on items that are equipment oriented such as excavation, than those that are material and labor oriented such as signs.

11. Use of Costs Other Than Shown in the Cost Guide. When local experience indicates unit costs are different than those shown in this Guide, local costs should be considered. Cost deviations from this Guide shall be documented and included in the project file.

12. Small Quantity Adjustments. Estimates should consider all roads that are included in a contract package that are within a five mile radius as one project for the purposes of small quantity adjustments. Therefore, small quantity factors should not be applied to individual road costs when the individual roads are part of a larger group of road projects in the same vicinity and part of the same contract. On the other hand, where small quantities are involved, estimators should increase allowances due to the inefficiencies generally encountered in small projects. Of particular concern are projects where small quantities of aggregate are involved. Mobilization of equipment may outweigh the direct costs of the aggregate, short road construction projects also have a relatively high mobilization cost for transport of dozers and excavators.

(03/2007) - 10

13. Purchaser Engineering. Recent changes in Forest Service FRP budgets have introduced or revised several concepts for timber sale roads: post-award engineering (PAE) including possible purchaser survey and/or design, restricted public use of haul routes, deposits for engineering work on road reconstruction, converting some planned short-term specified roads to temporary roads that remain open for a short period after purchasers use, and use of salvage sale funding for engineering work. Estimator should refer to specific C-provision requirements when estimating purchaser engineering costs.

14. Change Orders & Design Changes. The principles, costs, etc. listed in this Guide can be used to assist in determining unit costs for contract design changes and change orders; however, site specific and project related information should be used to the maximum extent possible.

15. New FP-03 Specifications. All costs in this guide are associated with the FP-03 and FSSS specifications. Many of the items in the new Specifications have changed and users of this guide should verify that the costs are associated with the same or correct type of work.

16. Electronic Copy of the Cost Guide. This cost guide can be found on the intranet at http://fsweb.r4.fs.fed.us/. Click on STAFFS, then ENGINEERING under the RESOURCES Staff, then TRANSPORTATION, and PLANNING and DEVELOPMENT. Click on the 2007 R2/R3/R4 Cost Guide link to download the complete guide.

The cost guide is available for downloading by the general public at: www.fs.fed.us/r4/, click on Projects & Plans, then on the Cost Estimating Guide link to download.

The cost guide will be updated whenever new data is available or as corrections are needed. The annual update takes place in February of each year.

17. Summary. This is a guide and not a cookbook. Estimators need to use judgment and knowledge of the specific project and local conditions when preparing cost estimates.

Others sources for cost estimation procedures and data (use the most current version available):

RS Means Heavy Construction Cost Data Equipment Watch Rental Rate Blue Book for Construction Equipment Caterpillar Handbook – for production rates and equipment capabilities

End of General Information

(03/2007) - 11

ENGINEER'S ESTIMATE

Engineer's Estimate

(03/2007) - 12

The preliminary estimated unit costs published in this guide may need to be adjusted. Determine the area and/or zone and adjust the unit costs per instructions of this section. All unit costs in this guide were calculated using Idaho Zone1 hourly wage rates and Idaho hourly equipment rates. Due to the differences in Davis-Bacon wage rates across the 3 Regions, and variances in equipment rates, cost adjustments may be needed.

1. Determination of Wage Rate Area/Zone

A. ARIZONA

In Arizona, Davis-Bacon wage rates published in this guide apply to the entire state.

B. CALIFORNIA

In California, Davis-Bacon wage rates published in this guide apply to all the counties contained within Region 4.

C. COLORADO

In Colorado, Davis-Bacon wage rates published in this guide are divided into 2 Zones.

Zone 1 includes the following counties: Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Clear Creek, Conejos, Costilla, Crowley, Custer, Delta, Dolores, Eagle, Elbert, Fremont, Garfield, Gilpin, Grand, Gunnison, Hinsdale, Huerfano, Jackson, Kiowa, Kit Carson, La Plata, Lake, Las Animas, Lincoln, Logan, Mineral, Moffat, Montezuma, Montrose, Morgan, Otero, Ouray, Park, Phillips, Pitkin, Prowers, Rio Blanco, Rio Grande, Routt, Saguache, San Juan, San Miguel, Sedgwick, Summit, Teller, Washington and Yuma counties.

Zone 2 includes the following counties: Adams, Arapahoe, Boulder, Denver, Douglas, El Paso, Jefferson, Larimer, Mesa, Pueblo and Weld counties.

D. IDAHO

In Idaho, Davis-Bacon wage rates published in this guide are divided into 2 Zones within Region 4 as described below.

Zone 1: That area within the State of Idaho located within 30 miles on either side of I-84 from the Oregon-Idaho State Line on the West to the Intersection of I-84 and I-86 in Cassia County, then following I-86 to Pocatello, then following I- 15 to Idaho Falls, then following State Highway #20 - 10 miles north to the intersection with Moody Road then following I-15 south from the city of Pocatello to a point 10 miles South of the Southern Boundary of Bannock County extended to the West.

Zone 2: The remaining area of that portion of the State of Idaho south of Parallel 46 (the Washington-Oregon State Line extended eastward to Montana) that is not included in Zone 1 as described above. An additional $1.50 per hour was added to the Zone 1 base wage rates, before adding in fringes and adjustments for overhead and profit and risk.

E. KANSAS

In Kansas, Davis-Bacon wage rates published in this guide apply to all the counties contained within Region 2 administered land.

F. NEBRASKA

In Nebraska, Davis-Bacon wage rates published in this guide apply to all the counties contained within Region 2 administered land.

G. NEVADA

In Nevada, Davis-Bacon wage rates published in this guide are divided into 2 Zones, Las Vegas and Carson City. Special hourly rate adjustments apply depending upon the distance from the project to the reference point of the zone.

Las Vegas Zone: Includes the following counties: Clark, Esmeralda, Lincoln, and Nye counties.

(03/2007) - 13

Carson City Zone: Includes the following counties: Churchill, Douglas, Elko, Eureka, Humboldt, Lander, Lyon, Mineral, Pershing, Storey, Washoe, White Pine, and Carson City counties.

Nevada area pay applies to all three categories in Las Vegas area and in the Carson City area. Add the appropriate adjustments to wage rates when work falls within the listed areas. The rates adjustments required by the Nevada Wage Determination were modified to include overhead costs and profit and risk.

Adjustments for Las Vegas Zone - Mileage is road miles from City Hall, Las Vegas

Las Vegas Power Equip

Las Vegas Labor Las Vegas Truck Driver

Area 1 0 - 20 miles 0 - 30 miles 0 - 30 miles Area 2 20 - 40 miles $2.98 30–50 miles $2.23 30–50 miles $1.49 Area 3 40 - 60 miles $4.46 50 - 70 miles $3.72 50 - 70 miles $2.98 Area 4 > 60 miles $5.21 > 70 miles $4.84 70 - 80 miles $4.46

Laughlin Area $3.35 > 80 miles $5.21 Laughlin Area $4.46 Mesquite Area $4.46

Adjustments for Carson City Zone - Mileage is road miles from the County Courthouse in Washoe County

Carson City Power Equip/Truck Driver

Labor

Area 1 0 - 50 miles Area 2 50 - 150 miles $2.98 $2.23 Area 3 150 - 300 miles $4.46 $2.98 Area 4 > 300 miles $5.95 $4.46

H. NEW MEXICO

In New Mexico, Davis-Bacon wage rates published in this guide are divided into 2 Zones.

Zone 1 includes the following counties: Bernalillo, Los Alamos, Dona Ana, and Sante Fe counties

Zone 2 includes the following counties: Catron, Hidalgo, San Juan, Chaves, Cibola, Colfax, Curry, De Baca, Eddy, Grant, Guadalupe, Harding, Lea, Lincoln, Luna, McKinley, Mora, Otero, Quay, Rio Arriba, Roosevelt, San Miguel, Sandoval, Sierra, Socorro, Taos, Torrance, Union, and Valencia counties.

(03/2007) - 14

I. SOUTH DAKOTA

In South Dakota, Davis-Bacon wage rates published in this guide are divided into 2 Zones.

Zone 1 includes the following counties: Lincoln, Minnehaha and Pennington counties

Zone 2 includes the following counties: Aurora, Beadle, Bennett, Bon Homme, Brookings, Brown, Brule, Buffalo, Butte, Campbell, Charles Mix, Clark, Clay, Codington, Corson, Custer, Davison, Day, Deuel, Dewey, Douglas, Edmunds, Fall River, Faulk, Grant, Gregory, Haakon, Hamlin, Hand, Hanson, Harding, Hughes, Hutchinson, Hyde, Jackson, Jerauld, Jones, Kingsbury, Lake, Lawrence, Lyman, Marshall, McCook, McPherson, Meade, Mellette, Miner, Moody, Perkins, Potter, Roberts, Sanborn, Shannon, Spink, Stanley, Sully, Todd, Tripp, Turner, Union, Walworth, Yankton and Ziebach counties.

J. UTAH

In Utah, Davis-Bacon wage rates published in this guide are divided into 2 Zones.

Zone 1 includes the following counties: Davis, Juab, Millard, Morgan, Salt Lake, Sanpete, Sevier, Summit, Utah, and Weber counties.

Zone 2 includes the following counties: Beaver, Box Elder, Cache, Carbon, Daggett, Duchesne, Emery, Uintah, Garfield, Grand, Iron, Kane, Piute, Rich, San Juan, Tooele, Wasatch, Washington and Wayne counties.

K. WYOMING

In Wyoming, Davis-Bacon wage rates published in this guide are divided into 2 Zones.

Zone 1 includes the following counties: Albany, Big Horn, Campbell, Carbon, Converse, Crook, Fremont, Goshen, Hot Springs, Johnson, Lincoln, Niobrara, Park, Platte, Sheridan, Sublette, Sweetwater, Teton, Uinta, Washakie and Weston counties.

Zone 2 includes the following county: Natrona county.

The wage rates shown in Tables 1 and 2 below include basic hourly rates; fringe benefits; an overhead factor to cover Worker’s Compensation and Unemployment Insurance costs which varies by state, Social Security Taxes (7.65%), Risk Insurance and Public Liability costs (2.02%), Overhead costs (16%); and 10% profit and risk. Wage rates are subject to change at any time. The zone contracting specialists can provide the latest wage information.

The Equipment Size Classification tables are used when certain wage zones within individual states require paying different wage rates based on size of equipment being operated. This only applies to dozers, front end loaders, and trucks. Where there is no difference in rates, “same” appears in the table.

(03/2007) - 15

TABLE 1 – HOURLY WAGE RATES

JOB CLASSIFICATION AZ CA CO ID KS NE NV

ZONE 1 2 1 2 LV

CAR-

SON

CITY

Foreman 43.21 74.44 41.80 42.02 43.21 45.38 23.71 23.81 69.71 62.86 General Laborer 24.45 46.25 22.11 28.58 37.66 39.83 13.65 13.05 46.53 38.49 Chainsaw Operator 25.00 47.66 25.93 29.64 38.17 40.33 15.09 17.60 46.84 38.86 Powderman 27.28 47.66 38.78 39.04 37.95 40.12 17.61 18.23 47.12 39.68 Wagon Drill Operator 38.81 65.36 38.78 39.04 41.07 43.24 16.89 18.23 47.27 39.23 Asphalt Spreader Operator 40.35 63.40 38.59 38.59 41.07 43.24 19.40 19.41 66.59 58.25 Backhoe Operator 40.35 68.26 28.94 28.94 41.32 43.48 17.97 15.48 66.59 59.53 Dozer Operator (1) 34.15 67.24 38.59 38.59 41.56 43.73 17.97 18.23 66.42 58.25 Dozer Operator (2) 40.35 67.24 38.59 38.59 41.56 43.73 17.97 20.12 66.59 58.25 Front End Loader Operator (1) 38.81 67.24 38.59 38.59 41.07 43.24 17.97 17.92 66.42 59.24 Front End Loader Operator (2) 40.35 69.29 38.81 38.81 41.56 43.73 17.97 19.02 66.59 59.24 Grader Operator 40.35 71.48 28.68 38.81 41.56 43.73 20.12 18.90 66.73 59.53 Roller Operator 40.35 51.32 38.59 38.59 40.62 42.79 16.89 15.80 66.10 57.00 Heavy Duty Mechanic 35.41 67.24 29.20 38.81 41.56 43.73 20.84 20.35 65.40 58.72 Hydraulic Excavator Operator 40.35 70.38 38.81 38.81 41.56 43.73 19.40 19.72 66.59 59.88 Truck Driver (1) 28.28 53.29 24.96 27.57 39.19 41.35 17.25 15.17 50.95 40.67 Truck Driver (2) 29.06 53.73 24.96 28.07 39.45 41.61 17.97 17.05 51.09 40.98

Equipment Size Classifications for TABLE 1

EQUIPMENT AZ CA CO ID KS NE LV---– NV -----CC

Dozer (1) <D5 same same same same <D5 <D5 same

Dozer (2) >=D5 same same same same >=D5 >=D5 same

Front End Loader (1)

3-6 CY <= 4 CY <= 6 CY < 4 CY same <= 4 CY < 1.5 CY < 1.5 CY

Front End Loader (2)

7-10 CY >4 CY > 6 CY 4 - 7 CY same >4 CY 1.5 – 6 CY 1.5 – 6 CY

Truck (1) <=4 axle

<= 8 CY <= 14

CY

< 16 CY <4 axle <4 axle < 12 CY < 12 CY

Truck (2) >5 axle

> 8 CY >14 CY 16 – 30

CY

>3 axle >3 axle 12 –16 CY 12 –16 CY

(03/2007) - 16

TABLE 2 – HOURLY WAGE RATES

JOB CLASSIFICATION NM SD UT WY

ZONE 1 2 1 2 1 2 1 2

Foreman 16.40 16.73 32.88 32.82 45.97 41.13 35.27 34.75 General Laborer 8.51 8.90 19.64 19.60 20.45 21.30 17.73 19.46 Chainsaw Operator 8.96 9.35 21.15 21.12 21.74 22.21 21.33 24.97 Powderman 8.96 9.35 24.25 24.34 22.19 23.81 21.33 24.97 Wagon Drill Operator 8.96 9.35 24.25 24.34 26.98 41.18 29.78 30.31 Asphalt Spreader Operator 13.22 13.55 27.22 27.22 31.19 35.99 29.78 30.31 Backhoe Operator 13.22 13.55 26.48 26.01 31.44 34.81 31.06 31.05 Dozer Operator (1) 12.32 12.65 24.25 24.34 36.46 36.19 24.85 29.35 Dozer Operator (2) 13.22 13.55 26.48 26.01 39.68 37.23 29.78 30.31 Front End Loader Operator (1) 12.32 12.65 24.25 24.34 37.68 36.88 24.85 29.35 Front End Loader Operator (2) 13.22 13.55 26.48 26.01 37.68 36.88 29.78 30.31 Grader Operator 13.22 13.55 28.16 27.90 40.90 37.06 31.06 31.05 Roller Operator 12.32 12.65 24.25 24.34 29.07 31.03 24.85 27.83 Heavy Duty Mechanic or Welder

13.44 13.77 29.85 29.79 39.41 34.74 32.34 31.79

Hydraulic Excavator Operator 13.44 13.77 29.85 29.79 33.42 34.39 29.78 30.31 Truck Driver (1) 10.38 10.68 20.74 20.88 27.14 29.19 28.14 26.54 Truck Driver (2) 10.68 10.98 24.38 24.55 30.88 30.26 24.85 25.38

Equipment Size Classifications for TABLE 2

EQUIPMENT NM SD UT WY

Dozer (1) < D4 < D4 <= D7 < D4

Dozer (2) D4 and up D4 and up > D7 D4 and up

Front End Loader (1) < 2 CY < 1.25 CY <= 10 CY < 1.5 CY

Front End Loader (2) 2 –10 CY >= 1.25CY > 10 CY 1.5 – 3.5 CY

Truck (1) 8 – 16 CY <4 axle <= 8 CY < 7 CY

Truck (2) > 16 CY >3 axle 8 –14 CY 7 – 13 CY

2. Adjustment factors for the Unit Costs

Adjust the preliminary estimated unit prices in this guide by multiplying them by the appropriate factors in the following Tables 3 and 4.

The wage rate adjustment factors in Table 3 are based on the appropriate Davis Bacon wage rates with fringes and overhead loading for a mixed work force of equipment operators, laborers, and truck drivers.

(03/2007) - 17

TABLE 3 – UNIT COST ADJUSTMENT FACTORS FOR PUBLIC WORKS DAVIS-BACON ZONES

LABOR

% A

R

IZ

O N

A a ll

C O

LO

R

A D

O

Z on e

C A

LI

F

O R

N

IA

LA

S V

E G

A S

A re a m ile s

C O

LO

R

A D

O

Z on e

U T

A H a ll

ID

A

H O

Z on

K A

N S

A S al l

N E

B R

A S

K A a ll

LA

S

V E

G A

S A re a

0-m ile s

LA

U G

H

LI

N A re

M

S Q

U

IT

E A re a

C A

R S

O N

A re a m

R S

O N

A re a

-3 m

R S

O N

A re a m

N

W M

E X

IC

O

S O

U T

H D

A K

O T

A

W Y

O M

IN

G

Z on

W Y

O M

IN

G

Z on

5 0.99 1.03 0.99 1.00 0.97 1.02 1.01 1.02 1.02 0.97 0.98 0.98 0.99

10 0.99 1.05 0.98 1.01 0.95 1.05 1.03 1.03 1.04 0.93 0.96 0.97 0.97

15 0.98 1.08 0.97 1.01 0.92 1.07 1.04 1.05 1.06 0.9 0.94 0.95 0.96

20 0.97 1.11 0.96 1.01 0.89 1.10 1.06 1.07 1.07 0.86 0.93 0.93 0.94

25 0.97 1.14 0.96 1.01 0.86 1.12 1.07 1.09 1.09 0.83 0.91 0.92 0.93

30 0.96 1.16 0.95 1.02 0.84 1.14 1.08 1.10 1.11 0.79 0.89 0.90 0.91

35 0.95 1.19 0.94 1.02 0.81 1.17 1.10 1.12 1.13 0.76 0.87 0.88 0.90

40 0.95 1.22 0.93 1.02 0.78 1.19 1.11 1.14 1.15 0.72 0.85 0.87 0.88

45 0.94 1.24 0.92 1.02 0.75 1.22 1.13 1.15 1.17 0.69 0.83 0.85 0.87

50 0.94 1.27 0.91 1.03 0.73 1.24 1.14 1.17 1.19 0.65 0.82 0.84 0.85

55 0.93 1.30 0.90 1.03 0.70 1.26 1.15 1.19 1.20 0.62 0.80 0.82 0.84

60 0.92 1.32 0.89 1.03 0.67 1.29 1.17 1.20 1.22 0.58 0.78 0.80 0.82

65 0.92 1.35 0.88 1.03 0.64 1.31 1.18 1.22 1.24 0.55 0.76 0.79 0.81

70 0.91 1.38 0.87 1.04 0.62 1.34 1.20 1.24 1.26 0.51 0.74 0.77 0.79

75 0.90 1.41 0.87 1.04 0.59 1.36 1.21 1.26 1.28 0.48 0.72 0.75 0.78

80 0.9 1.43 0.86 1.04 0.56 1.38 1.22 1.27 1.30 0.44 0.70 0.74 0.76

85 0.89 1.46 0.85 1.04 0.53 1.41 1.24 1.29 1.31 0.41 0.69 0.72 0.75

90 0.88 1.49 0.84 1.05 0.51 1.43 1.25 1.31 1.33 0.37 0.67 0.70 0.73

95 0.88 1.51 0.83 1.05 0.48 1.46 1.27 1.32 1.35 0.34 0.65 0.69 0.72

100 0.87 1.54 0.82 1.05 0.45 1.48 1.28 1.34 1.37 0.30 0.63 0.67 0.70

(03/2007) - 18

(03/2007) - 19

The equipment rate factors in Table 4 are used to adjust for regional cost differences listed in the Equipment Watch Rental Rate Blue Book.

TABLE 4 – UNIT COST ADJUSTMENT FACTORS FOR EQUIPMENT RATE DIFFERENCES

No adjustment is necessary for Colorado, Idaho, Kansas, Nebraska, or Nevada

% LABOR AZ, NM, UT CA, SD, WY

5 0.97 1.05

10 0.97 1.05 15 0.97 1.04 20 0.98 1.04 25 0.98 1.04 30 0.98 1.04 35 0.98 1.03 40 0.98 1.03 45 0.98 1.03 50 0.99 1.03 55 0.99 1.02 60 0.99 1.02 65 0.99 1.02 70 0.99 1.02 75 0.99 1.01 80 0.99 1.01 85 1 1.01 90 1 1.01 95 1 1

100 1 1

3. Examples

·Example No. 1:

New Mexico For Item 60250 - 18" culvert (new construction) Percent labor = 25% Cost Guide unit cost = $24.00/LF Adjusted Davis-Bacon cost = CG unit cost x D-B adjust factor x equipment adjust factor = $24.00 x 0.83 x 0.98= $19.50/LF

(03/2007) - 20

Example No. 2:

California For Item 60250 - 18" culvert Percent Labor = 35% Cost Guide unit cost = $24.00/lf

Adjusted Davis-Bacon cost = $24.00 x 1.19 x 1.03 = $29.40/LF

End of Engineers Estimate

(03/2007) - 21

Davis-Bacon/Purchaser Wage Rate Adjustments

Davis-Bacon/Purchaser Wage Rate Adjustment

(03/2007) - 22

Davis-Bacon/Purchaser Wage Rate Adjustments

All road construction projects must first be estimated as if being built by public works contracts using Davis-Bacon wage rates.

For Timber Sale Contracts, the engineer's estimate must then be adjusted to take into account the difference between Davis- Bacon wage rates and the local wage rates paid by timber purchasers. This adjusted construction cost is called the Total Estimated Road Construction Cost. The method to use for the cost adjustment is explained below.

The following labor percentage ranges shown in Tables 1 and 2 are typical and include equipment operators, truck drivers and laborers. The actual percentage selected should be documented. Use of percentages different than those indicated and the reason for the selection should also be documented.

TABLE 1

Work Item

Percent Labor

Low Percent Factors

High Percent Factors

151-Mobilization

33-62

Short travel distance with few pieces of equipment to dismantle and reassemble.

Long travel distance, many pieces of equipment to move, dismantling and assembly of equipment, semi-permanent structures, platforms, etc., to erect for project support

201-Clearing and Grubbing

41-56

Small timber, light ground cover, gentle terrain, good soils, scattering, accessible to equipment.

Large timber, heavy ground area, difficult terrain, poor soils and rock, pile and burn, inaccessible to equipment.

204-Excavation and Embankment This item may be broken down as follows:

Movement Dirt Slope, Rounding, and Benching Compaction Scarification Drill and Blast Traffic Control Station-Yard Overhaul Yd3-mile Overhaul

25-45

Gentle terrain, good soils, wide poor soils and tolerances, no blasting

Difficult terrain, rock, close tolerance, blasting, and haul.

209-Structure Excavation and Backfill

35-45

Gentle terrain, good soils, easy equipment access, no dewatering.

Difficult terrain, poor soils and rock, equipment access difficult, dewatering required.

(03/2007) - 23

TABLE 2

Work Item

Percent Labor

Low Percent Factors

High Percent Factors

251-Riprap Hand-Placed Machine-Placed Sacked Wire-Enclosed

253-Gabions

25-35

303-Road Reconditioning

322-Minor Aggregate Course

25-45

Crushed pit rock, wide gradation tolerance

Crushed quarry rock, close gradation tolerance.

400-Asphalt Pavement

20-30

Large project, road mix, wide tolerance

Small project, plant mix, close tolerance, labor intensive.

550-Bridge Construction

20-30

No reduction if purchaser is not equipped to perform.

Requires analysis of equipment, labor, and materials

602-Culverts and drains

45-60

Gentle terrain, easily available bedding and backfill material.

Steep pipe grade, poor gradation for bedding and backfill material.

605-Underdrains (Installation Only) Backfill Filter Cloth Special Granular Backfill

606-Corrugated Spillways Installation Only

619-Fences, Gates and Cattleguards Metal gates and cattlequards Fence and wire gates

10-15

625-Turf Establishment

35-70

Hydromulch, flat slopes, large project.

Hand-placed mulch, steep slopes, small project.

The amount of labor involved in work items not shown above must be determined by analysis of labor, materials, and equipment for the item.

(03/2007) - 24

See individual items in text of Cost Guide for other labor percentages. Note that contract items (items not normally accomplished by woods crews such as engineering and asphalt items) are not to be reduced, if the subcontractor is expected to pay Davis-Bacon wage rates. See Labor Rates in the Engineer’s Estimate section of this Guide for D-B wage rate information.

Table 3 below is just for reference and lists the reduction percentages to be applied to the labor costs for each work item based on the state where the project is located. Table 4 on the following page provides the unit costs adjustment factors to apply to the Engineer’s Estimate (Davis-Bacon wages) unit costs based on the percent labor involved and the work zone. An example calculation follows the table.

TABLE 3

State

Reduction

Arizona No Adjustment Kansas No Adjustment South Dakota No Adjustment

California No Adjustment Nebraska No Adjustment Utah 63 Percent

Colorado 25 Percent Nevada No Adjustment Wyoming No Adjustment

Idaho 45 Percent New Mexico No Adjustment

To determine the Estimated Road Construction Cost allowance for any item, the following procedure must be followed:

1. Determine the Davis Bacon wage rate area and/or zone. For instructions, see the previous section of this guide, Engineer's Estimate.

2. Determine labor percentage for applicable item in the body of this Guide or from the table on the previous page.

3. Select the appropriate unit cost adjustment factor from Table 4 on the next page.

(03/2007) - 25

TABLE 4 - PURCHASER UNIT COST ADJUSTMENT FACTOR FOR WAGE DIFFERENTIALS

LABOR %

AZ CA CO ID KS NE NV NM SD UT WY

5 1.00 1.00 0.99 0.98 1.00 1.00 1.00 1.00 1.00 0.97 1.00 10 1.00 1.00 0.98 0.96 1.00 1.00 1.00 1.00 1.00 0.94 1.00 15 1.00 1.00 0.96 0.93 1.00 1.00 1.00 1.00 1.00 0.91 1.00 20 1.00 1.00 0.95 0.91 1.00 1.00 1.00 1.00 1.00 0.87 1.00 25 1.00 1.00 0.94 0.89 1.00 1.00 1.00 1.00 1.00 0.84 1.00 30 1.00 1.00 0.93 0.87 1.00 1.00 1.00 1.00 1.00 0.81 1.00 35 1.00 1.00 0.91 0.84 1.00 1.00 1.00 1.00 1.00 0.78 1.00 40 1.00 1.00 0.90 0.82 1.00 1.00 1.00 1.00 1.00 0.75 1.00 45 1.00 1.00 0.89 0.80 1.00 1.00 1.00 1.00 1.00 0.72 1.00 50 1.00 1.00 0.88 0.78 1.00 1.00 1.00 1.00 1.00 0.69 1.00 55 1.00 1.00 0.86 0.75 1.00 1.00 1.00 1.00 1.00 0.65 1.00 60 1.00 1.00 0.85 0.73 1.00 1.00 1.00 1.00 1.00 0.62 1.00 65 1.00 1.00 0.84 0.71 1.00 1.00 1.00 1.00 1.00 0.59 1.00 70 1.00 1.00 0.83 0.69 1.00 1.00 1.00 1.00 1.00 0.56 1.00 75 1.00 1.00 0.81 0.66 1.00 1.00 1.00 1.00 1.00 0.53 1.00 80 1.00 1.00 0.80 0.64 1.00 1.00 1.00 1.00 1.00 0.50 1.00 85 1.00 1.00 0.79 0.62 1.00 1.00 1.00 1.00 1.00 0.46 1.00 90 1.00 1.00 0.78 0.60 1.00 1.00 1.00 1.00 1.00 0.43 1.00 95 1.00 1.00 0.76 0.57 1.00 1.00 1.00 1.00 1.00 0.40 1.00

100 1.00 1.00 0.75 0.55 1.00 1.00 1.00 1.00 1.00 0.37 1.00

4. Determine Estimated Road Construction Cost for applicable item by multiplying the public works cost by the labor factor determined in No. 3.

Example:

Public works excavation cost $1.75/cy Project location: Idaho Excavation: labor percentage (from Table 1) 25 percent Unit cost adjustment factor (from Table 4) 0.89 Estimated road construction cost $1.75 * 0.89 = $1.56/cy

(03/2007) - 26

TIME ESTIMATES FOR ROAD CONSTRUCTION PROJECTS

Care must be exercised when determining time estimates. The final time estimate should not be made until all contract clauses are known, including applicable C provisions for timber sale contracts. Be sure to consider operating season limitations.

Project access and sequencing must also be considered.

Except in unusual circumstances, the time estimate should not exceed two (2) full construction seasons. This may require increasing the size of the crew and the amount of equipment used in the estimate. In addition, this may require the adjustment of some cost items and contract clauses. For projects that will require more than one construction season to complete, be sure to allow for the cost of the mobilization of equipment and personnel for each operating season.

When the construction of specified roads in a timber sale contract can be turned back to the Forest Service, consider the effect on the road completion date. Allow sufficient time for the Forest Service to prepare a public works contract, receive a satisfactory bid, and have the road construction work completed by the “Road Completion Date” stated in the Timber Sale Contract. A minimum of 150 days should be allowed to prepare, solicit, and award a Public Works contract.

Whenever the Total Estimated Road Construction Cost for a timber sale is $50,000 or more, consider the possibility of a turnback. Use the following form to track the various time components associated with a turnback and to determine if the proposed road completion date to be included in the timber sale contract is attainable.

(03/2007) - 27

TIME ESTIMATING AND SCHEDULING

Road completion date will be set by determining the timber sale advertisement date and adding the following:

Timber Sale (T.S.) Advertisement Date ________

1. Sale Advertising Period 30 Days

Timber Sale Bid Opening Date ________

2. Period specified in the T.S. advertisement to allow the F.S. to solicit and award a

P.W. Contract for the road construction. (150 days minimum is recommended. See note below)

* 150 Days

Public Works Construction Award Date _________

3. Additional time needed between P.W. contract award date and date construction could start.

10 Days

Public Works Construction Start Date ________

4. Total calendar days elapsed time allowed for completion of road construction Public Works contract.

Days

Computed Construction Completion Date ________

5. Additional time for expected excusable delays for P.W. contracts. This time will only be added to determine the road completion date in a Timber Sale (C5.13#) not to determine contract time for a Public Works contract.

Days

Final Road Completion Date ________

Planned Timber Sale Termination Date ________

* The time permissible may vary by local policy. Check with the Timber staff to see if there are any Regional supplements that may dictate the maximum time period.

The time period is comprised of the following items:

80 days for Engineering to convert the timber sale road contract to Public Works format, including modification of supplemental specifications, development of contract documents, and to submit road package to Administrative Services.

Additionally, Job Codes must be set up, Work Plan developed, and IAS data entry and approval process must be completed 10 days to prepare contract documents and posting Fedbizopps.gov by AQM 15 days notice to public prior to solicitation.

30 days advertising period.

15 days to evaulate bids and make award Consider additional time if access to project for pre-bid tour is not available due to inclement weather or other restrictions.

(03/2007) - 28

End of Davis-Bacon/Purchaser Wage Rate Adjustment

(03/2007) - 29

PROJECT REQUIREMENTS

Project Requirements

(03/2007) - 30

SECTION 151 - MOBILIZATION (Labor 30-60 percent)

Mobilization costs are those for preparatory work and operation including bonding and tasks necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations which must be performed or costs incurred including obtaining permits.

Average bids reflect that mobilization costs are 6 percent to 10 percent of the total project cost. Smaller projects tend to show mobilization as a higher percentage of the total project cost. The number of move-ins and operating seasons will increase this percentage. Listed are normal percentages for mobilization.

$ 50,000 - $ 600,000 = 9% 600,000 - 899,999 = 8% 900,000 - 1,999,999 = 7% 1,200,000 - over = 6%

These percentages consider a normal project to have two construction seasons. If specialized pieces of equipment or machines are required, the percentage should be increased. If the time and equipment method is used calculate mobilization, make allowances for obtaining permits, insurance, bonds, and moving personnel and materials to the job site.

Roading Costs:

Roading costs can be used for time and equipment jobs, particularly for reconstruction projects. The method for calculating these types of move-in costs would be to determine the time to move to the project site and begin productive operation, then affix proper standby rates, usually 45 to 55 percent of listed rental rates, plus wage rates. For projects of this type and others where mobilization can be readily figured in as an integral part of the listed pay item, it may be unnecessary to include a separate mobilization pay item in the contract. Average roading costs are listed below for some standard equipment:

Equipment Ave. Speed (Mi./Hr)

$ per mile

Grader, Motor Patrol (CAT 12H) 20 5.50

Loaders, CAT 950G 20 5.22

Dump Trucks, 10-12 CY 30 3.35

Water Trucks, 4000 GAL 30 2.95

Service Trucks, 1 TON 30 2.01 Lowboys

35 TON

50 TON

4.63 4.76

Example: Location, Idaho (Area 1, Zone 2)

Total of all pay items without Section 151 = $110,000 Rock Crusher required:

Cost (151) $110,000 x .09 = 9,900

Crusher Movein/Moveout (Section 322) = 9,000 Total Cost Allowance Section 151 = $ 18,900 Total Engineer's Estimate $110,000 + $18,900 = $128,900

Mobilization should not exceed 10% of $128,900, or $12,900 (rounded), so place $12,900 under Section 151 and $6,000 under Section 322.

(03/2007) - 31

SECTION 152 - CONSTRUCTION SURVEY AND STAKING (Contract Item)

A. Road Location. There are no recent costs for this item at the present time.

B. Preliminary Survey. P-Line costs are generally dependent on survey standards, project access (drive, walk, camp, etc), terrain, vegetation density and time schedule. Establishment of spike camps can add costs to a project, long walks or difficult vehicle access can also increase the survey costs.

Detailed surveys of existing roads generally run higher than new construction due to the presence of cut/fill slopes, culverts, and other features. Reestablishment of old P-Line can be estimated to cost about $740/mile, based on using a 2 person crew and a production rate of 1.5 miles per day.

Survey costs for A/E negotiated survey and design contracts should be estimated using the recent contract costs if known.

Additional fieldwork may include items such as material and clearing classification, special site investigation, and stream flow estimates. The engineering firm will normally have a higher overhead cost because a business engaged in survey and design work usually has more office equipment, computers, etc. than a firm specializing in only survey work.

Hourly crew costs below are from RS Means Crew Cost Data Table for Crew A-7. The two-person field party consists of an instrument person and rod person, and is suitable for level loop surveys. The three-person field party consists of a party chief along with an instrument person and rod person, and is suitable for P-line surveys and slope staking.

Wages and Per Diem

a. Fieldwork Per Hour Two-person field party $107 Three-person field party $159 Supervision person $68

b. Per diem $40/person-day

c. Transportation $.50/mile

d. Motel, camp expenses Variable, depends on project location

(approximately $50/day)

(03/2007) - 32

The following production rates should be used as a guide in estimating fieldwork:

1. Brushing: Three-person crew. The production for brushing is dependent upon density of stems and will vary with the requirements of the contract:

Density of stems Miles per day Extra heavy 0.35 Heavy 0.5 Medium 0.7 Light 1.0 Extra light 1.5

2. P-line survey: Three-person crew. This work includes collection of traverse and cross section data needed for low volume road design. The production for P-line survey is dependent upon the precision of survey and number of points of intersection (PI's) per mile, and the width of the cross-section swath. For average conditions consider a production rate of a half mile per day of completed work. Costs for completed surveys range from $2150 - $4150 per mile, including supplies(stakes, paint, flagging, etc.), and travel expenses(per diem, mileage, etc.) based on easy terrain and minimal brush.

P-Line Survey Production Rates

PI's per mile Average Spacing(ft)

Miles per Day

176 30 0.35 132 40 0.45 106 50 0.55 88 60 0.68

3. Traverse: Three-person crew. The production for traverse is dependent upon the precision of survey and number of points of intersection (PI's) per mile. This cost estimate is broken down according to the precision desired. It is, therefore, mandatory for the estimator to know the precision required before making the estimate. The chaining difficulty is constant with the number of PI's per mile on which this cost guide will be based. For average conditions consider a production rate of a half mile per day of completed work.

Survey Accuracy Standard Refer to FSH 7709.56, pg 3.9--2 for precision standards

Precision A,B Precision C,D Precision E,F PI's per mile Miles per Day Miles per Day Miles per Day

60 to 70 0.5 0.6 50 to 60 0.6 0.7 40 to 50 0.3 0.7 0.8 30 to 40 0.5 0.8 0.9 20 to 30 0.6 0.9 1.0 10 to 20 0.9 1.0 1.1 5 to 10 1.0

4. Levels: Two-person crew. The production for levels is mainly dependent upon the precision of survey. Therefore, this cost guide is based on average production figures for a given precision. The estimator should use his/her own judgment and adjust these figures if they do not fit the individual project.

Accuracy Standard Miles per day A, B 0.5 C,D 0.7 E, F 1.0

(03/2007) - 33

5. Cross Sections: Three-person crew. Cross sections are generally constant in production between 0.4 mile to 0.7 mile per day. The brushing for extra heavy and heavy brush are figured in the brushing estimate. Therefore, this item will consider the slope only. If the estimator has unusual circumstances, he/she should adjust the production figures accordingly.

Slope Miles per day 50 percent + 0.4

30 to 50 percent 0.6 0 to 30 percent 0.7

6. Supervision: Allow 1 day per week of survey crew time for supervisory engineer @ $540 per day.

7. Allow move-in/move-out costs, supplies, transportation @ $0.50 per mile.

8. Checking Notes-office work. All notes need to be office checked for completeness. Traverse and level notes need office work in recording and computation for angles and elevation. There is no per diem allowance for this work. Allow 1 to 2 hours per mile for one person at a rate of $52 per hour.

9. Materials Investigation and Testing. See Section 153 or 154 for unit costs.

C. Road Design. (Includes classification, plan & profile, cross sections, and plan-in-hand reviews) Ranges from $2,400 to 3,100 per mile for new construction.

D. Site Surveys. (Cost per site) $2,600 to $5,000 per site. Includes setting control, topo data collection, and plotting site plan.

E. Corner Search, Monumenting, and Boundary Marking & Posting. Contact the Forest Land Survey staff for costs associated with this type of work.

F. Construction Staking:

The base cost for Method II – Catchpoint Measurement Method, is $3,000 per mile. This is based on using a 3 person crew, completing 0.5 miles per day, 120 points per mile, staking cut and fill catchpoints, and setting one RP stake per side. Includes costs for stakes, paint, markers, flagging, travel, and per diem. Average project -- assume camp is within 10 miles of project and access is at the beginning of each job and each job is two miles in length.

Add $85.00 per culvert for culvert staking using the computed Method I. This is based on an allowance of 30 minutes per culvert.

Average base prices should be multiplied by the following factors to determine final…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .