maid_of_erin_Appendix_A.pdf
PDF 327 KB Posted
- Attached to
- Maid of Erin
- Solicitation number
- AG-82X9-R-18-4003
About this file
Updated Appendix A
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Maid_of_Erin_DxP_Stewardship_Contract_Area_Map.pdf | ||
| Revised_Appendix_B.pdf | ||
| Maid_of_Erin_DxP_Stewardship_Contract_Area_Map.pdf | ||
| Maid_of_Erin_DxP_Stewardship_Vicinity_Map.pdf | ||
| maid_of_erin_DxP_stewardship_Appendix_B_Scaled.doc | DOC document | |
| AG-82X9-R-18-4003.docx | DOCX document | |
| maid_of_erin_DxP_stewardship_Appendix_C.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. XX-XXX-X-XX-XXXX
Maid of Erin DxP Stewardship: Appendix A
APPENDIX A
WORK ACTIVITY ITEMS – TERMS AND SPECIFICATIONS
1. Scope of Work
Appendix A of this solicitation describes the contract requirement and specifications for services for a performance based, fixed price contract for the treatment of non-sawtimber, biomass, and slash. This includes felling, yarding/skidding, decking of and/or removal of the non-sawtimber and biomass material.
The timber harvest and removal requirements of this contract, including all specifications and requirements for construction of temporary roads and road maintenance are outlined in Appendix B and
Appendix C of this solicitation.
2. Project Location and Description
(a) The project area is located on the Leadville Ranger District of the Pike-San Isabel National Forest.
Vicinity and Contract Maps showing project location and access, a brief location description, and other information regarding specific items are contained in the solicitation.
(b) Accessibility – All units may be reached by forest and county roads that are accessible by standard two-wheel drive pickup during normal operating season. The Forest Service assumes no obligation to plow snow or keeps roads open. Spring and fall road conditions usually necessitate the use of a 4-wheel drive vehicle. During the spring break up the Forest Service reserves the right to suspend harvest operations to protect forest road surfaces.
(c) Boundaries – Boundaries are marked above and below stump height with orange paint except in the following areas: Units 1, 4, 6, 12, and 13 - The boundaries that are directly adjacent to Lake County
Road 9C were not painted and are defined as the road’s edge. Units 2 and 3 - The boundaries that are directly adjacent to NFSR 104R were not painted and are defined as the road’s edge. Unit 5 - The boundaries that are directly adjacent to Lake County Road 9C, NFSR 104R, and NFSR104W were not painted and are defined as the road’s edge. Unit 8 - The boundaries that are directly adjacent to
NFSR 104W and NFSR 104UB were not painted and are defined as the road’s edge. Unit 9 - The boundaries that are directly adjacent to Lake County Road 9C, NFSR 104U, NFSR 104W were not painted and are defined as the road’s edge. Unit 14 - The boundaries that are directly adjacent to
NFSR 104U were not painted and are defined as the road’s edge. Unit 15 - The boundaries that are directly adjacent to NFSR 104U and NFSR 104V were not painted and are defined as the road’s edge.
Unit 16 – The boundaries that are directly adjacent to Lake County Road 9C, NFSR 104V, and NFSR
104U were not painted and are defined as the road’s edge. Unit 17 – The boundaries that are directly adjacent to Lake County Road 9C and NFSR 104V were not painted and are defined as the road’s edge.
(d) Restrictions – Timber Removal Specifications will apply. Other project specific restrictions may be included on unit data sheets (listed in sec. 9, Page 8 of this document) or in Appendix B.
3. Contractor-furnished Equipment and Services
(a) The Contractor shall provide sufficiently skilled labor, experienced supervision, transportation, equipment, operating supplies, incidentals and inspection services, except those items listed as
Government-Furnished property, to perform the work in compliance with the contract.
(b) The Contractor shall notify the COR of any changes in work schedule.
4. Definitions
(a) Basal Area- The area, per acre, that is occupied by the cross-section of tree trunks and stems at DBH, expessed is square feet per acre.
(b) Biomass – Trees > 0.1” DBH and < 4.9” DBH.
(c) Cut Tree – Tree designated for cutting.
(d) Cut Tree marking – A method of timber designation whereby all trees marked above and below stump height with blue paint are designated for cutting
(e) DBH (Diameter at Breast Height) – Outside diameter of the tree stem at a point 4-1/2 feet above the ground, measured from the high side of the base of the tree.
(f) Designation by Prescription – A method of timber designation whereby a description of the final outcome of timber cutting is used to prescribe the outcome of stand treatments. A sample area may be marked for demonstration.
(g) DIB (Diameter Inside Bark) - Diameter measurement of a standing tree or log in which the estimated or actual thickness of the bark is discounted.
(h) Erosion control – Activities designed to prevent/reduce the delivery of sediment to area streams as a result of road building and/or timber harvest. Activities typically include grass seeding and/or installation of structures to trap moving sediment.
(i) Hand Pile- A method of piling slash with the use of manual labor. Piling may also be done by other methods.
(j) Hand Treatment – A method of treatment completed using manual labor and equipment such as power saws.
(k) Leave Tree – Any tree that is selected or required to be left standing as provided in the specifications.
(l) Leave Tree Marking – A method of timber designation whereby all conifer trees >5.0” DBH that are not marked with Orange paint above and below stump height are designated for cutting.
(m) Limb and Top Removal – The moving, during yarding/skidding, of cut tree and tops to a designated location at the landing.
(n) Machine Pile – A method of piling slash with the use of mechanized equipment. Piling may also be done by other methods.
(o) Mechanical Treatment – A method of treatment using machinery such as feller bunchers, harvesters, processors etc.
(p) Non-sawtimber – Trees that are > 5.0” DBH to < 6.9” DBH.
(q) Slash - Debris created from work under this contract including all cut trees and their tops, trunks, and limbs.
(r) Sawtimber – Trees that are 7.0” DBH and greater.
(s) Streamcourse - The area along a stream that has riparian vegetation and other riparian characteristics.
Streamcourses are noted on the project maps. They typically require special treatment which may include alteration to the tree cutting, slash treatment, vehicle travel, or fueling of saws.
(t) Stump Height – A point on the bole of the tree from the uphill side that is 12” above the ground for
Sawlog trees and 6” above the ground for non-saw and biomass strees.
(u) Thinning – The cutting of trees in excess of those to be left for future management.
5. Performance Standards
Treatment of Non-Saw, Biomass and Slash.
Proposal may include use of manual and/or ground based equipment to accomplish task. Any non-sawtimber or biomass removed under timber subject to agreement will be according to specifications in
Table 1 – Non-sawtimber and Biomass Removal Specifications, Subject to Agreement.
Table 1: Non-sawtimber and Biomass Removal Specifications, Subject to Agreement
Species Product
Estimated
Quantity
Unit of
Measure
Minimum Specifications
Merchantable Tree Piece Required to be Removed
Diameter
Breast
High
(d.b.h.)
(inches)
Number of
Minimum
Pieces per Tree
Length
(feet)
Diameter
Inside
Bark at
Small End
(inches)
Net
Merch.
Factor
LP
Non-sawtimber Unestimated CCF 5 1 6.5 4 NA
LP Bio
Unestimated
CCF 0.1 1 NA NA NA
5.1 Task: Treatment of Non-sawtimber and Biomass material
Units 2, 5, 6, 8, 9, 15, and 16 - For treatment of all non-sawtimber and biomass material outlined in
Appendix A. All designated non-sawtimber trees shall be cut, yarded, and decked at approved landing locations and slash shall be piled at the landings. All designated biomass trees shall be cut and lopped and scattered in the unit. See Appendix B, WO-K-C.3.5.5# Designation by Prescription, for treatment specifications. Slash specifications are described in Task 5.2- Slash Treatment.
Units 1, 4, 10, 11, 12, 13, 14, and 17 – For treatment of all non-sawtimber and biomass material outlined in Appendix A. Units 1, 4, 10, 11, 12, 13, 14, and 17 all designated non-sawtimber trees not marked with orange paint shall be cut, yarded, and decked at approved landing locations and slash shall be lopped and scattered in the unit. All designated biomass trees not marked with orange paint shall be cut and lopped and scattered in the unit. Slash specifications are described in Task 5.2-
Slash Treatment.
Unit 7 - For treatment of all non-sawtimber and biomass material outlined in Appendix A. Unit 7 all designated non-sawtimber trees not marked with orange paint shall be cut, yarded, and removed. All designated biomass trees not marked with orange paint shall be cut and lopped and scattered in the unit. Slash specifications are described in Task 5.2- Slash Treatment.
Unit 3 – For treatment of all non-sawtimber and biomass material outlined in Appendix A. All designated non-sawtimber and biomass trees shall be cut and lopped and scattered in the unit. See
Appendix B, WO-K-C.3.5.5# Designation by Prescription, for treatment specifications. Slash specifications are described in Task 5.2- Slash Treatment.
Units 1, 2, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, and 17 also require sawtimber cutting and product removal. Treatments are described in Appendix B.
5.1.1 - Non-sawtimber and Biomass designation.
a) Non-sawtimber and Biomass designation. Trees that meet non-sawtimber and biomass definitions in Section 4 are designated for cutting as indicated in 5.1 Task, Appendix B, and on the Unit Data Sheet.
b) Non-sawtimber boles must be stacked parallel to each other with a maximum deck height of 5 feet. Decks will be placed along the perimeter of the landing and in a fashion that allows public access for firewood gathering, or as agreed to with Forest Service.
5.1.2 - Cutting Methods
a) Non-sawtimber cut tree diameter is from 5.0 inches DBH to 6.9 inches DBH. Biomass cut trees include trees > 0.1 inches DBH to < 4.9 inches DBH.
b) Stump height of non-sawtimber and biomass cut trees shall be no higher than 6 inches above ground level. Non-sawtimber and biomass stumps shall be cut parallel to the ground.
c) Trees shall be completely severed from the stump.
d) No cut tree shall be left suspended in or leaning against a leave tree or tree outside the unit boundary.
e) Contractor has the option of removing the designated non-sawtimber and biomass products as timber subject to agreement in units 1, 2, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, and 17.
5.2 TASK: Slash Treatment
Unless specified differently on Unit Data Sheet, slash treatment refers to debris created from work under this contract including all designated cut trees and their tops, trunks, and limbs.
Slash Treatment type by unit is specified in the Unit Data Sheet. Criteria listed below will be followed for the appropriate treatment.
a) No thinning and/or logging slash shall be allowed outside the contract boundary, unless otherwise approved by the Contracting Officer.
b) Contractor shall remove all thinning and/or logging slash:
1) Roads – NFSR 104U, NFSR 104V, NFSR 104W, NFSR 104R, and Lake County Road 9, 9C.
2) Land Survey Monuments – lop and scatter pullback within 10 feet. Machine piles shall be at least 25 feet from land survey monuments and bearing trees.
3) Roads, Trails and Ditches- pullback 25 feet from edge of roads, trails and ditches.
c) Tops and limbs which are lost on the way to the landing due to normal felling, skidding and /or yarding operations are not required to be yarded. Lost material is required to be lopped and scattered to lie within 24” of the ground.
d) Trees which must be cut for landings, skid trails or other approved clearings will have the same slash treatment requirements as existing cut trees.
e) Piling at Landings –All slash from designated non-sawtimber trees in units 2, 5, 6, 8, 9, 15, and
16 will be will be piled at landings per K-G.7# to the following standards:
1. Piles shall be windrowed.
2. Piles shall be reasonably compact and free of soil.
3. Piles will not be more than 20 feet in height, or 30 feet in width.
4. Piles shall be located at least 20 feet from residual timber and 50 feet from protected stream courses. If conditions make it impractical to locate pile so that damage to residual green trees can be avoided, an area will be designated by the Forest Service.
5. All objects that extend for more than 4 feet in any direction from the pile profile will be cut off and returned to the pile.
6. Piling will be accomplished with a grapple type machine that will cause minimal damage to the residual timber.
f) Lop and Scatter – All designated biomass trees and slash from designated biomass trees in units 2, 5, 6, 8, 9, 15, 16, and 17 will be lopped and scattered in the unit to the following standards:
1. Contractor shall cut all exposed limbs from included product to a top diameter of approximately 2 inch diameter inside bark, at which point the top will be cut from the remainder of the stem. The top and boles will not extend over 24 inches in height above the ground.
2. Slash should be scattered to reduce slash concentrations with slash left within 24 inches of the ground and not in piles.
g) Lop and Scatter – All slash from designated non-sawtimber and all biomass trees and slash from designated biomass trees in units 1, 4, 7, 10, 11, 12, 13, 14, and 17 will be lopped and scattered in the unit to the following standards:
1. Contractor shall cut all exposed limbs from included product to a top diameter of approximately 2 inch diameter inside bark, at which point the top will be cut from the remainder of the stem. The top and boles will not extend over 24 inches in height above the ground.
2. Slash should be scattered to reduce slash concentrations with slash left within 24 inches of the ground and not in piles.
h) Lop and Scatter – All designated non-sawtimber and biomass trees and slash from non-sawtimber and biomass trees in Unit 3 will be cut and lopped and scattered in the unit according to the following standards:
1. Contractor shall cut all exposed limbs from included product to a top diameter of approximately 2 inch diameter inside bark, at which point the top will be cut from the remainder of the stem. The top and boles will not extend over 24 inches in height above the ground.
2. Slash should be scattered to reduce slash concentrations with slash left within 24 inches of the ground and not in piles.
6. Government Quality Assurance Surveillance Plan
The Government will inspect completed units as a basis for acceptance and payments, and to provide recommendations to improve work quality while work is in progress. The government reserves the right to use any inspection method it deems appropriate to assure adequate Quality Control. The
Contractor is responsible for providing quality control to assure that work complies with requirements of contract specifications.
All work included in the contract specifications shall be subject to inspections by the Government at periodic intervals during the performance of this contract. Treatment inspections are for the sole benefit of the Government and shall not release the Contractor of the responsibility of providing quality control measures to assure that the work strictly complies with the contract requirements.
The method of inspecting the contractor’s pre-harvest approval of required leave tree mark will be completed using the walk through method.
For sawtimber and non-sawtimber trees, the method of inspecting purchaser cutting of the
Designation by Prescription specifications by the Forest Service will be done using 20 BAF variable plots with at least 1 plot per two acres. Each cutting unit will have at least two plots. Plot locations will be random and determined by a non-biased method across each cutting unit.
For biomass trees, the method of inspecting purchaser cutting of the Designation by Prescription specifications for biomass trees by the Forest Service will be done by 1/50th acre (16.67 feet radius) fixed plots with at least 1 plot per two acres. Each cutting unit will have at least two plots. Plot locations will be random and determined by a non-biased method across each unit.
Each landing will be inspected for slash and non-sawtimber treatment specifications as a separate plot.
Work Quality Percentage
Work quality percentages are derived from data developed from inspection plots. The total number of satisfactory plots divided by the number of plots inspected determines the quality rate. This rate multiplied by 100 provides the work quality percentage.
Example: Number of plots inspected 25
Number of satisfactory plots 23
23 divided by 25 .92
Work Quality Percentage 92%
Acceptance of work will be based on compliance with all Appendix A, 5.0 Performance Standards and
Appendix B, K-C-3.5.5# Designation by Prescription that correspond to the treatment. A minimum basic quality of 85 percent is required to meet the Acceptable Quality Level.
Unsatisfactory Work - If the work quality falls below 85 percent, the COR will immediately notify the
Contractor in writing and direct the Contractor to improve the quality of his work. If the quality of work is not raised to an acceptable level within 30 working days after written notification, the Contracting
Officer may issue a Suspend Work Order to resolve the problem, during which time contract performance time will continue to run. All work that does not meet contract requirements shall be reworked at no cost to the government until it meets contract specifications. If the contractor does not make the necessary corrections, the Contracting Officer may reduce payment based on the percentage of unacceptable work. Disagreement between the parties will be subject to the clause entitled “Disputes”.
In the event that work is performed that is contrary to the requirements in the task order the Government is not liable for costs incurred by the contractor during negligent performance that is without the fault or negligence of the Government.
7. Contractor Plot Inspections
In order to provide quality control to assure that work complies with requirements of contract specifications, the contractor shall maintain a plot system that provides an unbiased sample of thinning and slash treatment quality representing the entire area treated. In addition, each landing will be inspected for slash and non-sawtimber treatment specifications as a separate plot.
For sawtimber and non-sawtimber trees, the method of inspection will be completed using 20 BAF variable plots with at least 1 plot per two acres. Plots should be located systematically on a grid across each unit. Each cutting unit will have a minimum of two plots.
For biomass trees, the method of inspection for biomass trees will be completed using 1/50th acre (16.67 feet radius) fixed plots with at least 1 plot per two acres. Plots should be located systematically on a grid across each unit. Each cutting unit will have a minimum of two plots.
Each plot will be evaluated for compliance with all contract specifications as stated in Appendix A,
5.0 Performance Standard and Appendix B, K-C.3.5.5# Designation by Prescription.
The Government may observe or re-inspect the Contractor’s plots at any time. Plots shall be marked and identifiable on the ground. Contractor shall provide written inspection data by unit that meets contract requirements and a sketch map with plot locations. The Contractor shall use the following form for inspections, unless an alternate form proposed by the Contractor is approved in advance by the CO.
Plot Inspection Forms Flag plot center – Write on flagging the plot number, date, and initials of inspector. Mark plot number on map.
PLOT FORM FOR THINNING AND SLASH TREATMENT QUALITY
Unit
Plot
Coordinates Acceptable
Thinning :
Yes or No
Acceptable
Slash:
Yes or No
Acceptable
Plot:
Yes or No
Comments
Ex. BA, #trees, irregularities
Acceptable Designation by Prescription Thinning Criteria
In units 2, 5, 6, 8, 9, 15, and 16 Designation by Prescription:
For sawtimber and non-sawtimber, in lodgepole pine stand type, trees that range in diameter from 5.0 inches DBH and greater should have the existing basal area reduce by approximately 30% (20%-40% range) resulting in an average residual basal area of 80-120 (60-140 BA range) square feet of live conifer basal area. In aspen stand type, based on the definition of aspen stand type from Appendix B clause K-
C.3.5.5#, no lodgepole pine shall remain on each plot.
For biomass trees, in lodgepole stand type, trees will be spaced so no more than 5 trees remain on each plot. In aspen stand type, based on the definition of aspen stand type from Appendix B clause K-C.3.5.5#, no lodgpole pine shall remain on each plot.
In unit 3 Designation by Prescription:
Non-sawtimber and biomass trees will be spaced so no more than 5 non-sawtimber or biomass trees remain on each plot.
Acceptable Individual Tree Marking Criteria
In units 1, 4, 7, 10, 11, 12, 13, 14, and 17 Leave Tree Marking: No trees designated for cutting shall remain on each plot.
Acceptable Slash Treatment Criteria
Lop and Scatter – All units that have lop and scatter slash treatments will be lopped and scattered in the unit to the following standards:
1. Contractor shall cut all exposed limbs from included product to a top diameter of approximately 2 inch diameter inside bark, at which point the top will be cut from the remainder of the stem. The top and boles will not extend over 24 inches in height above the ground.
2. Slash should be scattered to reduce slash concentrations with slash left within 24 inches of the ground and not in piles.
Thinning will be inspected on a random plot basis. Full payment will be made if 85% of the area meets contract specifications for treatment. Disincentive is Contractor rework to meet the 85% objective or reduced payment if additional performance cannot correct the deficiency.
PLOT FORM FOR LANDING AND NON-SAWTIMBER AND SLASH TREATMENT
Unit
Landing
Coordinates Acceptable
Non-saw treatment :
Yes or No
Acceptable
Slash
Treatment:
Yes or No
Acceptable
Plot:
Yes or No
Comments
Acceptable Limb and Top Removal and Machine Pile Criteria
Piling at Landings – All units that have piling at landings slash treatments shall be piled to the following standards:
1. Piles shall be windrowed.
2. Piles shall be reasonably compact and free of soil.
3. Piles will not be more than 20 feet in height, or 30 feet in width.
4. Piles shall be located at least 20 feet from residual timber and 50 feet from protected stream courses. If conditions make it impractical to locate pile so that damage to residual green trees can be avoided, an area will be designated by the Forest Service.
5. All objects that extend for more than 4 feet in any direction from the pile profile will be cut off and returned to the pile.
6. Piling will be accomplished with a grapple type machine that will cause minimal damage to the residual timber.
Acceptable Non-sawtimber Treatment Criteria
1. In units 1, 2, 4, 5, 6, 8, 9, 10, 11, 12, 13, 14, 15, 16, and 17 non-sawtimber boles are required to be decked at the landing. Non-sawtimber boles must be stacked parallel to each other with a maximum deck height of 5 feet. Decks will be placed along the perimeter of the landing and in a fashion that allows public access for firewood gathering, or as agreed to with Forest Service.
2. In unit 7 non-sawtimber boles are required to be removed. No non-sawtimber boles shall remain at the landing.
8. Performance Work Summary Table for Non-sawtimber treatments
Task Performance
Standard
Quality
Assurance
Process
Acceptable
Quality Level
(AQL)
Incentive/Deduction
Treatment of
Non-sawtimber and
Biomass
All cut trees will meet requirements.
Contractor records and reports and
Government
Random
Verification.
85% of all cut trees will meet the
Quality Standard.
100% payment at unit rate.
Task Performance
Standard
Quality
Assurance
Process
Acceptable
Quality Level
(AQL)
Incentive/Deduction
Slash
Treatment
Slash treated in accordance with specifications stated in the Detailed Unit
Information Sheets.
Contractor records and reports and
Government
Random
Verification.
85% of all slash treated to meet
Quality Standard.
100% payment at unit rate.
Prevention of
Damage to
Physical
Improvements, and Resources to Protect
Any damage to physical improvements is repaired to meet Government
Standards.
Visual
Inspection by
Government
100% of all damages are repaired.
Work not meeting
AQL shall be suspended;
Contractor may be terminated for repetitive failure to meet AQL.
Contractor
Data, Reports, and Plans
Contractor Treatment Plan, Quality Control Plan, and
Safety Plan are followed and Inspection Data is accurate.
Random
Verification by the
Government
90% Compliance with Contractors
Plans and Reports.
Work not meeting
AQL will be suspended;
Contractor may be terminated for repetitive failure.
9. Unit Data Sheet
Unit # Treatment Acres Cutting Prescription Slash
Prescription
1 23
CUT & LOP & SCATTER designated biomass trees, CUT designated non-sawtimber trees, lop and scatter slash, YARD non-sawtimber boles to landing, DECK boles at landing.
Biomass- Lop & Scatter
Non-sawtimber- Lop &
Scatter
2 13
CUT & LOP & SCATTER designated biomass trees, CUT designated non-sawtimber trees, Pile slash, YARD non-sawtimber boles to landing, DECK boles at landing.
Biomass- Lop & Scatter
Non-sawtimber- Piling at the landings.
3 3 MANUAL CUT designated non-sawtimber and biomass trees, LOP & SCATTER Non-sawtimber and
Biomass- Lop & Scatter
4 4
CUT & LOP & SCATTER designated biomass trees, CUT designated non-sawtimber trees, lop and scatter slash, YARD non-sawtimber boles to landing, DECK boles at landing.
Biomass- Lop & Scatter
Non-sawtimber- Lop &
Scatter
5 25
CUT & LOP & SCATTER designated biomass trees, CUT designated non-sawtimber trees, Pile slash, YARD non-sawtimber boles to landing, DECK boles at landing.
Biomass- Lop & Scatter
Non-sawtimber- Piling at the landings.
6 2
CUT & LOP & SCATTER designated biomass trees, CUT designated non-sawtimber trees, Pile slash, YARD non-sawtimber boles to landing, DECK boles at landing.
Biomass- Lop & Scatter
Non-sawtimber- Piling at the landings.
8 22 CUT & LOP & SCATTER designated Biomass- Lop & Scatter biomass trees, CUT designated non-sawtimber trees, Pile slash, YARD non-sawtimber boles to landing, DECK boles at landing.
Non-sawtimber- Piling at the landings.
9 39
CUT & LOP & SCATTER designated biomass trees, CUT designated non-sawtimber trees, Pile slash, YARD non-sawtimber boles to landing, DECK boles at landing.
Biomass- Lop & Scatter
Non-sawtimber- Piling at the landings.
10 5
CUT & LOP & SCATTER designated biomass trees, CUT designated non-sawtimber trees, lop and scatter slash, YARD non-sawtimber boles to landing, DECK boles at landing.
Biomass- Lop & Scatter
Non-sawtimber- Lop &
Scatter
11 5
CUT & LOP & SCATTER designated biomass trees, CUT designated non-sawtimber trees, lop and scatter slash, YARD non-sawtimber boles to landing, DECK boles at landing.
Biomass- Lop & Scatter
Non-sawtimber- Lop &
Scatter
12 2
CUT & LOP & SCATTER designated biomass trees, CUT designated non-sawtimber trees, lop and scatter slash, YARD non-sawtimber boles to landing, DECK boles at landing.
Biomass- Lop & Scatter
Non-sawtimber- Lop &
Scatter
13 6
CUT & LOP & SCATTER designated biomass trees, CUT designated non-sawtimber trees, lop and scatter slash, YARD non-sawtimber boles to landing, DECK boles at landing.
Biomass- Lop & Scatter
Non-sawtimber- Lop &
Scatter
14 2
CUT & LOP & SCATTER designated biomass trees, CUT designated non-sawtimber trees, lop and scatter slash, YARD non-sawtimber boles to landing, DECK boles at landing.
Biomass- Lop & Scatter
Non-sawtimber- Lop &
Scatter
15 2
CUT & LOP & SCATTER designated biomass trees, CUT designated non-sawtimber trees, Pile slash, YARD non-sawtimber boles to landing, DECK boles at landing.
Biomass- Lop & Scatter
Non-sawtimber- Piling at the landings.
16 5
CUT & LOP & SCATTER designated biomass trees, CUT designated non-sawtimber trees, Pile slash, YARD non-sawtimber boles to landing, DECK boles at landing.
Biomass- Lop & Scatter
Non-sawtimber- Piling at the landings.
17 10
CUT & LOP & SCATTER designated biomass trees, CUT designated non-sawtimber trees, lop and scatter slash, YARD non-sawtimber boles to landing, DECK boles at landing.
Biomass- Lop & Scatter
Non-sawtimber- Lop &
Scatter