SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

866186

USDA FOREST SERVICE

ROCKY MOUNTAIN RESEARCH STATION

240 W PROSPECT STREET

FORT COLLINS CO 80526

82FT

ANTHONY SALAS 970-498-1147

1x 07/24/2017

AG-82FT-S-17-0021

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

HJ ANDREWS EF ELECTRIC HEAT PUMP REPLACEMENT

Proposal Due On or Before 14 AUG 2017, 11:00 AM MT

The magnitude is less than $25,000 - NAICS Code is 238220

Department of Wage Determination General Decision Number: OR170027 07/07/2017 OR27

Electronic submission is required by E-Mail to asalas@fs.fed.us {Paper Reduction

Act-1995} Offeror must be registered in the System for Award Management (SAM)at www.sam.gov

Pre-Proposal Site Visit - Upon Request

Offerors shall submit all questions in writing by August 7, 2017. Questions shall be sent to asalas@fs.fed.us.

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 30 calendar days and complete it within ________________ ________________ calendar days after receiving

08/14/2017

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USDA FOREST SERVICE

ROCKY MOUNTAIN RESEARCH STATION

240 W PROSPECT STREET

FORT COLLINS CO 80526

82FT

ANTHONY O. SALAS

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

AG-82FT-S-17-0021

Electric Heat Pump replacement/upgrade to Dining hall at HJA

Delivery: 07/04/2017

Delivery Location Code: 0453

PNW FORESTRY SCIENCES LABORATORY -

3200 SW JEFFERSON WAY

CORVALLIS OR 97331 US

FOB: Destination

Period of Performance: 08/28/2017 to 09/27/2017

001 Electric Heat Pump replacement/upgrade to Dining hall at HJA

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Solicitation No. AG-82FT-S-17-0021

PART I—THE SCHEDULE

SECTION B--CONSTRUCTION PRICES/COSTS

HJ Andrews EF Electric Heat Pump Replacement Estimated Period of Performance – 30 days from Notice to Proceed

SCHEDULE OF ITEMS

BASE BID ITEMS

HVAC Replacement Serves the Laundry and Bathroom System Item No. Description Method of Unit Quantity Total

Measurement

23 54 00 A Base item- HVAC Replacement Serves the Laundry and Bathroom System

LSQ LS 1 $_____________

23 81 43 A Labor and material for 2 Ton Air Handler & associated parts. LSQ LS 1 $_____________

BASE BID ITEM TOTAL $_____________

OPTIONAL 1 ITEMS

HVAC Replacement Services the Foyer System

Item No. Description Method of Unit Quantity Total

Measurement

23 54 00 B Labor and material for 4 Ton Air Handler & associated parts. LSQ LS 1 $_____________

23 81 43 B Labor and material for 4 Ton Heat Pump & associated parts. LSQ LS 1 $_____________

OPTIONAL 1 ITEMS TOTAL $_____________

OPTIONAL 2 ITEMS

HVAC Replacement Services the Dining/Kitchen System

Item No. Description Method of Unit Quantity Total Measurement

23 54 00 C Labor and material for 5 Ton Air Handler & associated parts. LSQ LS 1 $_____________

23 81 43 C Labor and material for 5 Ton Heat Pump & associated parts. LSQ LS 1 $_____________

OPTIONAL 2 ITEMS TOTAL $_____________

GRAND TOTAL $_____________

SECTION C

DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

SUMMARY OF WORK

PROJECT DESCRIPTION

Project: HJ Andrews EF Electric Heat Pump Replacement

Owner: United States Department of Agriculture, Forest Service Pacific Northwest Research Station, Corvallis Forestry Sciences Lab 3200 SW Jefferson Way, Corvallis, OR 97331

Summary:

A. The contractor shall remove the existing Air Handler in the Utility room and the Air Conditioning unit for the Lanudry/Batrhoom system to the McRae Cafeteria building. The Contractor will also remove the existing R-22 Freon line and reclaim the R-22 refrigerant according to Oregon state law and EPA regulations including the old Air Conditioner and Air Handler.

Install one new 240 Volt Single Phase, 2 Ton Electric Forced Air Handler (cap off the existing propane line) and customize existing duct work to adapt to the new Air Handler.

Install one new 19.1 Seer 240 Volt Single Phase,2 Ton Heat Pump and new refrigerant lines from the Heat Pump to the Air Handler according to manufacturers specifications.

Utilize the existing disconnect at the old Air Conditioning unit for the new Heat Pump.

Run new conductor wire to the new 35 Amp Air Handler Panel per Oregon State Electrical code. Test all equipment after installation. Utilze the existing Carrier Infinity Touch electronic thermostat to operate the HVAC system.

2. HJ Andrews Experimental Forest McRae Cafeteria HVAC Replacement Option 1:

B. The contractor shall remove the existing Air Handler in the Utility room and the Air

Conditioning that operates the Dining/Kitchen system in the McRae Cafeteria building.

The Contractor shall remove the existing R-22 Freon line and reclaim the R-22 refrigerant according to Oregon state law and EPA regulations including the old Air Conditioner and Air Handler. In the Dining/Kitchen System install one new 240 Volt Single Phase, 5 Ton Electric Forced Air Handler (cap off the existing Propane line) and customize existing duct work to adapt to the new Air Handler. Install one new 18 Seer 240 Volt Single Phase, 5 Ton Heat Pump (Carrier 25VNA060A003 or equilivant) and new refrigerant lines from the Heat Pump to the Air Handler according to manufacturers specifications. Utilize the existing disconnect at the old Air Conditioning unit for the new Heat Pump. Run new conductors to the new 90 Amp Air Handler Panel per Oregon Statel Electrical code. Test all equipment after installation. Utilze the existing Carrier Infinity Touch electronic thermostat to operate the HVAC system.

3. HJ Andrews Experimental Forest McRae Cafeteria HVAC Replacement Option 2:

C. The contractor shall remove the existing Air Handler in the Utility room and the Air Conditioning that serves the Foyer in the McRae Cafeteria building. The Contractor will also remove the existing R-22 Freon line and reclaim the R-22 refrigerant according to

Oregon state law and EPA regulations including the old Air Conditioner and Air Handler. Install one new 240 Volt Single Phase,4 Ton Electric Forced Air Handler (cap off the existing propane line) and customize existing duct work to adapt to the new Air Handler. Install one new 18.3 Seer 240 Volt Single Phase, 4 Ton Heat Pump (Carrier 25NAA048A003 or equilivant) and new refrigerant lines from the Heat Pump to the Air Handler according to manufacturers specifications. Utilize the existing disconnect at the old Air Conditioning unit for the new Heat Pump. Run new conductor wire to the new 80 Amp Air Handler Panel per Oregon State Electrical code. Test all equipment after installation. Utilze the existing Carrier Infinity Touch electronic thermostat to operate the HVAC system.

Location:

HJ ANDREWS EXPERIMENTAL FOREST

USFS ROAD 15-130-132

BLUE RIVER, OREGON 97413

541-822-6300

Contractor shall provide all the labor, material, equipment, and services necessary to complete in accordance with the attached Specifications (See Section J Attachments).

452.211-72 Statement of Work/Specifications. (FEB 1988)

ATTACHMENT 1

C-1 SUBMITTALS

Submittals shall include the following unless otherwise required in the specification:

1. Date and revision dates.

2. Project name and contract number.

3. Names of Contractor, subcontractor, supplier, and manufacturer.

4. Specifications section number.

5. Field dimensions and relation to adjacent structures.

6. Applicable standards such as ASTM or Federal Specifications.

7. Contractor's stamp, initial or signature, certifying the review of submittal, verification of field measurements and compliance with contract documents. Provide all submittals within 14 calendar days of contract award unless otherwise required by the specification.

8. Air Handlers and Heat Pumps specifications for all three units.

(End of clause)

C-2 PRODUCT SAMPLES AND/OR SUBMITTALS

The following product samples and/or submittals are required for this project:

Title Referenced by

Specification No Time of Government Approval After Submittal

Title Referenced by

Specification No Time of Government Approval After Submittal

Air Handlers Section 23 54 00 10 days Condensing Units Section 23 62 00 10 days

C-3 SHOP DRAWINGS

The following shop drawings shall be submitted on this project:

Title Referenced by

Specification No Time of Government Approval

None None None

C-4 MATERIAL CERTIFICATIONS AND TESTING REPORTS

The following material certifications and/or testing reports shall be submitted on this project:

Title Referenced by

Specification No Time of Government Approval

None None None

C-5 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS - AGAR 452.211-73

(FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

(b) See the following for the specification lists and special project specifications.

C-12 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10)

(APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than times listed below. The time stated for completion shall include final cleanup of the premises.

C-13 PERIOD OF CONTRACT

Item Estimated Beginning Contract Time (Calendar Days)

1 August 30, 2017 90 Days

Items may run concurrently.

INSPECTION AND ACCEPTANCE (AGAR 452.246-70) (FEB 1988)

(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.

INSPECTION AND TESTING PERFORMED BY GOVERNMENT

The Government will perform sampling, testing and inspection of work in progress where these responsibilities are not expressly assigned to the Contractor by the Forest Service specifications or by the Special Project Specifications.

CONFORMITY WITH DRAWINGS AND SPECIFICATIONS

Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.

SUSPENSIONS OF WORK FOR OTHER THAN GOVERNMENT'S CONVENIENCE

The Contracting Officer may issue orders to suspend the work wholly or in part for such period of time as deemed necessary because of: (1) weather or ground conditions when further prosecution of the work might cause environmental or resource damage to the project, access roads to the project, or adjacent property. Such action would include but not be limited to instances such as siltation of streams, damage to access roads, rutting of project roads which causes otherwise suitable soils to be muddy or unsuitable;

or (2) failure of the Contractor to comply with specifications such as but not limited to placement of frozen material in fills, placing of asphalts at temperatures lower than those specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements, or when conditions exist which do not meet safety requirements. Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage caused by its operation, whether inside or outside project limits, at no cost to the Government. Such suspensions shall not be considered as suspensions for the Convenience of the Government under FAR 52.242-14, Suspension of Work, and shall not qualify for an equitable adjustment.

POST AWARD CONFERENCE (AGAR 452.215-73) (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled and held within 15 days after the date of contract award. The conference will be held at: the HJ ANDREWS EXPERIMENTAL STATION, USFS ROAD 15-130-132, and BLUE RIVER, OREGON 97413.

GOVERNMENT-FURNISHED PROPERTY

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the FAR clauses “52.245-1 -- Government Property”, or “52.245-9 -- Use and Charges” as applicable.

Item No. Description Quantity Delivery Date

1 Carrier Electronic Thermostat 3 On Site

2 Heat Pump Quick disconnects 3 On Site

DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE

The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract. The Contracting Officer should be informed as soon as possible or any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.)

On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

POTENTIAL SAFETY HAZARDS

(a) Data and information furnished or referred to below is for the Contractor's information. The

Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all-inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the worksite.

(b) The following checked activities have been identified by the Government as potential safety hazards.

[ ] Confined space entry.

[ ] Temporary excavation/deep trenching/slope stability.

[ ] Tree falling.

[X] Fall hazard from work heights exceeding six feet.

[ ] Blasting.

[ ] Traffic control on high-volume and/or high-speed and/or limited visibility roads.

[ ] Heavy equipment operation.

[ ] Tree climbing and/or tower climbing.

[ ] Fire hazards.

[X] Hazardous materials handling.

[X] Electrical hazard.

[X] Hydraulic and/or pneumatic and/or other high pressure hazards.

[ ] Mechanical hazards such as pulleys, springs, etc.

[ ] Other __________________________________

INDUSTRIAL CAMPS

Forest Service regulations for Use of Campgrounds prohibit occupancy of developed recreation sites for other than primarily recreation purposes. No industrial camping will be authorized at these sites.

A special use permit is required on National Forest land for industrial camps. These permits are to be obtained by the Contractor through the Contracting Officer. Such permission, if granted, will be without charge to the Contractor but may include use restrictions.

One self-contained camp unit will be allowed at each staging area and equipment or supply dump for use by a watchman.

SALVAGE RIGHTS

No Contractor salvage rights exist under the contract unless specifically provided elsewhere herein.

AIRCRAFT USE

N/A

SPECIAL EQUIPMENT CLEANING REQUIREMENTS

PHYSICAL DATA (FAR 52.236-4) (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the Drawings and in the specifications are the result of site investigations by insert a description of investigational methods used, such as surveys, auger borings, core borings, test pits, probing’s, test tunnels.

(b) Weather conditions: The average temperature for June and July is between 78 degrees and 86 degrees and dry.

(c) Transportation facilities: N/A

AVAILABILITY AND USE OF UTILITY SERVICES (FAR 52.236-14) (APR 1984)

(a) The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract.

LANDSCAPE PRESERVATION

(a) Prevention of Oil Spills. If the Contractor maintains storage facilities for oil or oil products on site, appropriate preventive measures shall be taken to insure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual states. If a spill of petroleum product should occur in water, the Contractor shall take immediate action to clean up or contain the spill, then immediately notify the Engineer and the Oregon Emergency Response System (OERS), telephone 1-800-452-0311 or 1-503-378-4124, and then immediately notify the Contracting Officer.

(b) The Contractor will make every reasonable attempt to preserve the scenic and natural environment along this construction project.

MOISTURE SENSITIVE SOILS

Contractors are cautioned that the roadway structure is designed so that the completed road will support highway legal loads during a limited use season.

VALUE ENGINEERING

Value engineering change proposals which change the service or function of a facility or produce irreconcilable conflicts with management objectives will not be considered.

The following work is excluded from consideration under the Value Engineering clause:

NONE.

PRODUCT SUBSTITUTION

Any modification of items, designs, materials, products or equipment (including Government-Furnished property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.

ROAD USE AND MAINTENANCE

Use of Roads See Special Project Specification 104.021 for use authorization and limitations.

Traffic Control:

The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points, where the project crosses or coincides with an existing road.

CONTROL OF MATERIAL

A. Rights In and Use of Materials: N/A

B. Excavation: N/A

C. Material Sources: N/A

D. Storage and Stockpiling of Materials: Materials shall be stored to assure the preservation of quality and fitness for the work. Stored materials shall be located to facilitate their prompt inspection.

Sites on Forest Service administered land, approved by the Forest Service, may be used for storage purposes and for the placing of Contractor's plant equipment. All storage sites provided by the Forest Service shall be restored at the Contractor's expense. Contractor shall be responsible for making arrangements for storage on other than Forest Service administered lands.

CONSTRUCTION STAKES, LINES, AND GRADES

(a) N/A

PROSECUTION OF WORK

(a) Construction activity shall be limited to the hours between 8:00 a.m. and 5:00 p.m., Monday through Friday, unless other hours are approved in writing by the Engineer. The Contractor shall conduct activities so that interference with the public shall be kept at a minimum. The project site shall be open to public access and free of hazards on weekends. Any activities requiring closure to the public shall be scheduled with the COR at least 7 days in advance.

(b) The Contractor shall use measures and precautions necessary to warn and protect the public and Government personnel during work at the project site. Such actions include, but are not limited to, furnishing and maintaining barricades and signs around the work site and roping off the area.

(c) Blasting Precautions and Methods – There will be no blasting done at the site.

(d) Motorized trail construction equipment: N/A

(e) Seasonal restrictions: N/A

(End of clause)

PROTECTION OF IMPROVEMENTS

Unless otherwise agreed to in writing, Contractor shall remove the existing traffic signs within the work area and reinstall to their approximate existing locations.

SANITATION REQUIREMENTS

STATE PERMITS

Roads in the project work area necessary to complete the project are designated as "within the immediate construction project" for consideration under ORS 767.025 as to the no applicability of PUC requirements.

FINAL CLEANUP

Contractor shall remove and dispose all of its own trash and refuse from the contract area. Material to be removed includes, but is not limited to such as tin cans, aluminum foil, glass, paper, garbage, grease cartridges, etc. This Cleanup is a subsidiary item for which no special payment will be made. All debris shall be disposed of off of National Forest Land and in accordance with State and Local disposal requirements.

PROTECTION OF CULTURAL RESOURCES

Location of known historic or prehistoric sites, buildings, objects, and properties related to American history, architecture, archaeology and culture, such as settler or Indian artifacts, protected by American Antiquities Act of 1906 (16 U.S.C. 431-433), National Historic Preservation Act of 1966 (16 U.S.C. 470) and the Archaeological Resources Protection Act of 1979 (PL 96-95 and 36 CFR 261.9(e)) shall be identified on the ground by Forest Service. Forest Service may unilaterally modify or cancel this contract to protect an area, object of antiquity, artifact, or similar object which is or may be entitled to protection under these Acts regardless of when the area, object or artifact is discovered or identified.

Discovery of such areas or objects by either party shall be promptly reported to the other party.

Contractor shall protect all known and identified historic or prehistoric sites, buildings, objects and properties related to American history, architecture, archaeology and culture against destruction, obliteration, removal or damage during Contractor's Operations. In accordance with 36 CFR 296.14(c), Contractor shall bear costs of restoration, provided that such payment shall not relieve Contractor from civil or criminal remedies otherwise provided by law.

PROTECTION OF HABITAT OF ENDANGERED, THREATENED, AND SENSITIVE

SPECIES

Location of areas needing special measures for protection of plants or animals listed as threatened or endangered under the Endangered Species Act of l973, as amended, or as sensitive by the Regional Forester under authority of FSM 2670, are shown on the Drawings and identified on the ground.

Measures needed to protect such areas have been included elsewhere in this contract or are as follows:

If protection measures prove inadequate, if other such areas are discovered, or if new species are listed as Federally threatened or endangered or as sensitive by the Regional Forester, Forest Service may either cancel or unilaterally modify this contract to provide additional protection regardless of when such facts become known. Discovery of such areas by either party shall be promptly reported to the other party.

METHODS OF MEASUREMENT

One of the following methods of measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item:

(a) Designed Quantities (DQ). These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units SHOWN in the SCHEDULE OF ITEMS may be authorized under any of the following conditions:

(1) As a result of changes in the work authorized by the Contracting Officer.

(2) As a result of the Contracting Officer determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.

(3) As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more.

The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

(b) Staked Quantities (SQ). These quantities are determined from staked measurements prior to construction.

(c) Actual Quantities (AQ). These quantities are determined from measurement of completed work.

(d) Vehicle Quantities (VQ). These quantities are measured or weighed in hauling vehicles.

(e) Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job. They will not be measured.

STATE ELECTRICAL INSPECTION AND COUNTY BUILDING PERMITS

The Contractor shall not obtain an electrical permit or any other building permit or inspection.

Federal law validated by the State Attorney General, Oregon Department of Justice verify that the Federal Government and its Contractors may be exempted from State/Local Building Permits and Fees for projects located on Federal Installations including all federal lands. Contractor State Licenses will not be jeopardized by following this requirement to avoid the State/County permit system. This applies to the prime Contractor and all subcontractors.

SECTION D

PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E

INSPECTIOAND ACCEPTANCE

E-1 FAR 52.246-1 -- Contractor Inspection Requirements.

Contractor Inspection Requirements (Apr 1984) The Contractor is responsible for performing or having performed all inspections and tests necessary to substantiate that the supplies or services furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers’ parts. This clause takes precedence over any Government inspection and testing required in the contract’s specifications, except for specialized inspections or tests specified to be performed solely by the Government.

(End of Clause)

E-2 FAR 52.246-12 -- Inspection of Construction.

Inspection of Construction (Aug. 1996)

(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not --

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may --

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor’s right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

(End of Clause)

SECTION F

DELIVERIES OR PERFORMANCE

F-1 FAR 52.211-10 - Commencement, Prosecution, and Completion of Work (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 calendar days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

F-2 FAR 52.242-14 -- Suspension of Work (Apr 1984)

(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.

(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted

(1) by an act of the Contracting Officer in the administration of this contract, or

(2) by the Contracting Officer’s failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly. However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.

(c) A claim under this clause shall not be allowed --

(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and

(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.

SECTION G

CONTRACT ADMINISTRATION DATA

G-1 Contracting Officer’s Representative

A Contracting Officer's Representative (COR) will be designated after contract award. The contractor will be notified by letter of the name and duties of the COR. The Contractor shall sign and returned to the Contracting Officer prior to start performance.

G-2 Contractor Invoicing

All documents required for payment will be sent through the COR for approval to the following e-mail addresses. Contractors originals shall be available for review when required by the Contracting Officer.

Payment will be delayed if any information and certifications required by FAR52.232-5 Payments under Fixed-Price Construction Contracts is not submitted.

Submit updated “Progress Schedule” with monthly invoice.

Electronic Invoicing “E-Mail” is required.

Contracting Officer: asalas@fs.fed.us Technical Representative: ravila@fs.fed.us mailto:asalas@fs.fed.us mailto:ravila@fs.fed.us

SECTION H

SPECIAL CONTRACT REQUIREMENTS

NOTICE: Section H requirements supersedes any conflicts with the specifications, but includes those requirement in the specifications that do not conflict with this section.

H-1 CONTRACTOR PAYROLLS

Submit electronically weekly.

Payrolls are required to be submitted weekly through the COR for approval (prior to payment approval) to the following e-mail addresses. Contractors originals shall be available for review when required by the Contracting Officer.

Payrolls must contain all information and certifications as required in accordance with FAR. 22.403- 2 Copeland Act., FAR 22.406-6 Payrolls and statements. FAR 52.222-8 Payrolls and Basic Records.

Electronic submission by “E-Mail” is required to all.

Electronic Invoicing “E-Mail” is required.

Technical Representative: ravila@fs.fed.us

H-2 PROGRESS SCHEDULES

Submit with each invoice. No more than 30 days increments.

In addition -Submit One Page Line Graph, Shown in two weeks increments from start date to completion date.

Electronic submission by “E-Mail” is required to all..

Contracting Officer: asalas@@fs.fed.us COR/Technical Representative: ravila@fs.fed.us

Submit updated with Invoice

FAR 52.236-15 Schedules for Construction Contracts.

Schedules for Construction Contracts (Apr 1984)

(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval {TO COR AND CO ) (ONE COPY ELECTRONIC) of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, (at least every 30 days) the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.

(Approval by COR required) mailto:asalas@fs.fed.us mailto:ravila@fs.fed.us mailto:jdlewis@fs.fed.us

(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver (ONE COPY ELECTRONIC) of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.

(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.

(End of clause)

H-3 SUBMITTALS

Individual Request in format of Attachment 3a – Submit as occurs

SummaryReport Required in format of Attachment 3b – Submit 1st and 15th of each month

Submittals shall include the following unless otherwise required in the specification:

9. Date and revision dates.

10. Project name and contract number.

11. Names of Contractor, subcontractor, supplier, and manufacturer.

12. Specifications section number.

13. Field dimensions and relation to adjacent structures.

14. Applicable standards such as ASTM or Federal Specifications.

15. Contractor's stamp, initial or signature, certifying the review of submittal, verification of field measurements and compliance with contract documents. Provide all submittals within 14 calendar days of contract award unless otherwise required by the specification.

16. Lumber specifications for the treated wood used in the retaining wall structure.

In accordance with the Specifications and FAR 52.236-5 Material and Workmanship (Apr 1984)

(a) All equipment, material, and articles incorporated into the work covered by this contract shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. References in the specifications to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may, at its option, use any equipment, material, article, or process that, in the judgment of the Contracting Officer, is equal to that named in the specifications, unless otherwise specifically provided in this contract.

(b) The Contractor shall obtain the Contracting Officer’s approval of the machinery and mechanical and other equipment to be incorporated into the work. When requesting approval, the Contractor shall furnish to the Contracting Officer the name of the manufacturer, the model number, and other information concerning the performance, capacity, nature, and rating of the machinery and mechanical and other equipment. When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer’s approval of the material or articles which the Contractor contemplates incorporating into the work. When requesting approval, the Contractor shall provide full information concerning the material or articles. When directed to do so, the Contractor shall submit samples for approval at the Contractor’s expense, with all shipping charges prepaid. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection.

(c) All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may require, in writing, that the Contractor remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.

H-4 REQUEST FOR INFORMATION (RFI)

Individual Request in format of Attachment 4a – Submit as occurs

SummaryReport Required in format of Attachment 4b – Submit 1st and 15th of each month All project issues that require clarification, modification, changes, or questions will be addressed in writing and identified as a “Request For Information (RFI)”.

Number first RFI #001 dated, stating the details of the questions concerning specifications, drawings, or other related issues to the work.

The RFI log will be maintained on a continious log/sheet –necessary to maintain order and status.

The RFI will be e-mailed to the COR and CO. Responses shall be returned to the contractor.

Electronic submission by “E-Mail” is required.

H-5 LABOR COMPLIANCE

Send Photo of Postings.

. The prime contractor will submit a copy to the Contracting Officer, prior to performance by any subcontractor -In Accordance with FAR 52.222-11 Subcontracts (Labor Standards).

Site Posting Display

Workplace poster requirements: Contractor is required to download and display poster requirements in accordance with the DOL website: www.dol.gov/osbp by FAR clause22.404-10 Posting wage determinations and notice.

In addition union dues notice is required by FAR 52.222-39 – Notification of Employee Rights Concerning Payment of Union Dues.

H-6 SAFETY PLAN (FAR 52.236-13.,Alt I) http://www.dol.gov/osbp

The contractor shall submit plan prior to performance. This plan must be acceptable by the CO and may be returned to contractor to address further safety issues.

H-7 CONTRACTORS QUALITY CONTROL PLAN (FAR 52.246-12

The contractor shall submit plan prior to performance. This plan must be acceptable by the CO and may be returned to contractor to address further quality control.

H-8 SUPERINTENDANCE BY THE CONTRACTOR (FAR 52.236-6)

Provide name of Superintendence, phone number, cell phone, email, Alternate contact Prior to performance. Prior to performance.

H-9 DAILY ACTIVITY LOG BY SUPERINTENDANCE

Submit cumulative 1st and 15 each month with minimum information below.

As part of the Contractors Quality Control - the contract superintendence shall complete for each work day a log of events. This log will be submitted weekly with the payrolls submissions:

The log as a minimum must include:

Business Name of subs on site that day, number workers with sub - hours worked.

Work performed by Prime.

Indicate beginning of Major work and completion of Major work as indicated on the Progress Schedule

SECTION I

CONTRACT CLAUSES

I-1 FAR 52.252-2 - Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) (FAR

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4 (AGAR)

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) http://www.arnet.gov/far/ http://www.usda.gov/procurement/policy/agar.html

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html

I-1 FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.202-1 Definitions (NOV 2013) 52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2015) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.215-2 Audit and Records -- Negotiation (OCT 2010) 52.219-4 Notice of Price Evaluation preference for HUBZone Small Business Concerns (Oct 2014) 52.219-6 Notice of Small Business Set-Aside (NOV 2011) 52.222-3 Convict Labor (JUN 2003) 52.222-6 Construction Wage Rate Requirements (MAY 2014) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (JUN 2010) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (FEB 1988) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (APR 2015) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-36 Affirmative Action for Workers with Disabilities (JUL 2014) 52.222-50 Combating Trafficking in Persons (MAR 2015) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.225-25 Prohibition on Contracting with Entities Engaging in Sanctioned Activities Relating to Iran—Representation and Certification (OCT 2015) 52.227-4…