AG-82B1-S-10-0356-000001.pdf

PDF 21 KB Posted

Attached to
RECOVERYFISH CREEK LOOP SURFACING PROJECT
Solicitation number
AG-82B1-S-10-0356
Issued by

About this file

Replace Pages 6 and 10 of original solicitation

View the file

Other files

File Type Posted
SF 30.pdf PDF
SF 1442-AG-82B1-S-10-0356.pdf PDF
Experience Questionnaire.pdf PDF
ATTACHMENT C - ID15-WD-6-4-2010.pdf PDF
ATTACHMENT B -Fish Creek Loop Plans.pdf PDF
AG-82B1-S-10-0356.pdf PDF
ATTACHMENT A -FSSS Specs Fish Creek Loop.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION#: AG-82B1-S-10-0356

AMENDMENT #: 000001

REPLACES PAGE 6 OF 60

SECTION C - DESCRIPTION AND SPECIFICATIONS

C-1 – PROJECT DESCRIPTION AND LOCATION

(a) Description of Work: Fish Creek Loop Surfacing Project (Roads 4600/2000) This project consists of road reconditioning and aggregate placement on up to 10.53 miles of Forest Roads 4600 (High Camp Road) and 2000 (Square Cabin Road). The project begins at the junction of Forest Road 4600 (MP 0.00) and Forest Road 221 (MP 6.8) and continues 3.8 miles down Forest Road 4600 to the junction with Forest Road 2000. The project continues

6.73 miles on Forest Road 2000 and ends at the junction of Forest Road 2000 (MP 0.00) and Forest Road 221 (MP 7.0).

(b) Project location: This project is located approximately 6.8 miles south of Grangeville on Road 221. The project start is at the intersection of Forest Road 4600.

(c) Price Range: $250,000 and $500,000.

(d) Pre bid Tour: none

(e) Pre bid Conference: no

(f) Start of Work: The count of contract time will begin upon award and run continuously with no shutdown for normal winter season. It is the intent of this solicitation that, unless otherwise agreed, the work will occur during the late summer/early fall of 2010.

(g) Period of Performance (See Part I, section F, Clause 52.212-3)

(h) Government-Furnished Property ( Also See Section I, FAR 52.245-4)

C-2 - STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND

BRIDGES ON FEDERAL HIGHWAY PROJECTS FP-03 U.S. Customary Units (U.S.

DEPARTMENT OF TRANSPORTATION, Federal Highway Administration) (2003) Standard Specifications for Construction of Roads & Bridges on Federal Highway Projects (FP-03) are included by reference only. The requirements contained in these Standard Specifications are hereby made a part of this solicitation and any resultant contract. 2 Copies of the Standard Specifications for Construction of Roads & Bridges on Federal Highway Projects (FP-03) are available http://www.wfl.fhwa.dot.gov/design/specs/fp03.htm.

REPLACES PAGE 10 OF 60

PART 1 – THE SCHEDULE

SECTION F – DELIVERIES OR PERFORMANCE

F-1 - 52.252-2 CLAUSES INCORPORATED BY REFERENCE

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://www.arnet.gov/far/

I. FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES:

52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)

52.242.14 SUSPENSION OF WORK (APR 1984)

F-2 - FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF

WORK (APR 1984) ALTERNATE I (APR 1984)

The Contractor shall be required to (a) commence work under this contract in accordance with approved work schedule, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 DAYS AFTER NOTICE TO PROCEED. The time stated for completion shall include final cleanup of the premises.