AG-82B1-S-10-0351 Val_Verde_Demo_Dwgs.pdf

PDF 2 MB Posted

Attached to
Val Verde Guard Station Demolition Federal contract opportunity
Solicitation number
AG-82B1-S-10-0351
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Intermountain

About this file

AG-82B1-S-10-0351 Val_Verde_Demo_Dwgs

View the file

Other files for this federal contract opportunity

Other files attached to Val Verde Guard Station Demolition, newest first.
File Type Posted
AG-82B1-S-10-0351 Amendment 0003 SF 30.pdf PDF
AG-82B1-S-10-0351 Amendment 0002 SF 30.pdf PDF
AG-82B1-S-10-0351 Amendment 0001.pdf PDF
AG-82B1-S-10-0351 General Decision Number CO20100011.pdf PDF
AG-82B1-S-10-0351 Amendment 0001.pdf PDF
AG-82B1-S-10-0351 Experience Questionnaire.pdf PDF
AG-82B1-S-10-0351 Final_Specs.pdf PDF
AG-82B1-S-10-0351 Body.pdf PDF
AG-82B1-S-10-0351 SF 18.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rocky Mountain Region

RIO GRANDE NATIONAL FOREST

Forest Service

U.S. Department of Agriculture

VAL VERDE GUARD STATION

Rio Grande County, Colorado

DEMOLITION

N

E

S

W

Project Location

COLORADO STATE LOCATION MAP

NOT TO SCALE

LEGEND

RIO GRANDE NATIONAL FOREST

Craig

Gunnison

Grand Junction

Montrose

Durango

Colorado

Springs

Pueblo

Burlington

Walsenburg

Salida

Alamosa

COLORADO

I-70

I-70

I-25

I-25

Saguache

I-25

Monte Vista

DENVER

ROCKY MOUNTAIN REGION

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

RE

E P A

R TM N OFT AG

D

ICU LT

U R E

NONE

Sheet Title

RIO GRANDE NATIONAL FOREST

Project Name

Forest

Scale

TITLE SHEET

of

Sheet 1

Forest Engineer

Signature Title Date

The design and review of this project has been accomplished by qualified personnel and the design is consistent with current policy and direction.

Archeologist

Signature Title Date

Designed by:

The design objectives have been accomplished, the project will serve intended uses, all appropriate NEPA requirements have been met, and the design is consistent with approved resource planning documents and is in the program

District Ranger

Signature Title Date of work.

Forest Supervisor

Signature Title Date

Approved by:

VAL VERDE GUARD STATION

DEMOLITION

Photos

Photos

INDEX TO SHEETS

Vicinity Map

Title Sheet

DIVIDE RANGER DISTRICT

M.Figgs

M.Figgs

Reviewed

Checked

Design

Drawn

A.Burbank

A.Burbank

Revisions:

Date

Date

Date

Initials

Initials

Initials

No.

No.

No.

General Notes 5

Civil Engineer

DateSignature Title

ROCKY MOUNTAIN REGION

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

RE

E P A

R TM N OFT AG

D

ICU LT

U R E

NONE

Sheet Title

RIO GRANDE NATIONAL FOREST

Project Name

M.Figgs

M.Figgs

Reviewed

Checked

Design

Drawn Forest

Scale

VICINITY MAP

of

Sheet 2

VAL VERDE GUARD STATION

DEMOLITION

Site

A.Burbank

A.Burbank

Revisions:

Date

Date

Date

Initials

Initials

Initials

No.

No.

No.

FSR 28

Monte Vista

CO State Highway 15

Forest Service Boundary

County Road

2S

FOREST SERVICE

RE

E P A

R TM N OFT AG

D

ICU LT

U R E

NONE

Sheet Title

RIO GRANDE NATIONAL FOREST

Project Name

Reviewed

Checked

Design

Drawn Forest

Scale

PHOTOS

of

Sheet 3

VAL VERDE GUARD STATION

DEMOLITION

M.Figgs

M.Figgs

A.Burbank

A.Burbank

Revisions:

Date

Date

Date

Initials

Initials

Initials

No.

No.

No.

Guard Station Exterior Guard Station Exterior

Guard Station Exterior Collapsed Roof Section

FOREST SERVICE

RE

E P A

R TM N OFT AG

D

ICU LT

U R E

NONE

Sheet Title

RIO GRANDE NATIONAL FOREST

Project Name

M.Figgs

M.Figgs

Reviewed

Checked

Design

Drawn Forest

Scale

PHOTOS

of

Sheet 4

DEMOLITION

VAL VERDE GUARD STATION

A.Burbank

A.Burbank

Revisions:

Date

Date

Date

Initials

Initials

Initials

No.

No.

No.

Stove to be Removed and Disposed of Asbestos Flooring

Asbestos Flooring Asbestos Flooring

FOREST SERVICE

RE

E P A

R TM N OFT AG

D

ICU LT

U R E

NONE

Sheet Title

VAL VERDE GUARD STATION

RIO GRANDE NATIONAL FOREST

DEMOLITION

Project Name

M.Figgs

M.Figgs

Reviewed

Checked

Design

Drawn Forest

Scale

GENERAL NOTES

of

Sheet 5 A.Burbank

A.Burbank

Revisions:

Date

Date

Date

Initials

Initials

Initials

No.

No.

No.

Notes

1. Building in poor structural condition. Ensure adequate safety measures are in place to prevent an unexpected collapse of part or all of the structure, as per specs.

2. Building contains vinyl flooring that has tested positive for asbestos.

3. Submit a Plan of Action for asbestos material remediation, prepared by an asbestos consultant licensed with the

State of Colorado, as per specs.

4. Submit copies of all asbestos licenses for all personnel involved in asbestos remediation work, as per specs.

5. Submit a schedule of demolition activites and coordinate hazardous material remediation sequences with this schedule, as per specs.

6. Provide temporary protection to ensure safe passage of people around the building demolition area, as per specs.

7. Remove all demolished materials from the site and legally dispose of them in an EPA approved landfill, as per specs. Submit all landfill receipts.

8. Scrape and properly dispose of top 2" of topsoil after all building demolition activities are complete. Replace with borrow topsoil, as per specs.

9. Uniformly rough grade area of demolished construction to a smooth surface, free of irregular surface changes.

Provide a smooth transition between adjacent existing grades and new grades, as per specs.

10. Seed all areas disturbed by demolition activities, as per specs.

11. Comply with all Local, State, and Federal regulations concerning building demolition, hazardous waste remediation, and hazardous waste disposal, as per specs.

12. All construction shall be done in such a way as to minimize impacts on the adjacent landscape.

Pg1
Pg2
Pg3
Pg4
Pg7

File details come from the government source that posted it. Updated .