AG-82B1-S-10-0351 Amendment 0003 SF 30.pdf

PDF 87 KB Posted

Attached to
Val Verde Guard Station Demolition Federal contract opportunity
Solicitation number
AG-82B1-S-10-0351
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Intermountain

About this file

AG-82B1-S-10-0351 Amendment 0003 SF 30 Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Val Verde Guard Station Demolition, newest first.
File Type Posted
AG-82B1-S-10-0351 Amendment 0002 SF 30.pdf PDF
AG-82B1-S-10-0351 Amendment 0001.pdf PDF
AG-82B1-S-10-0351 General Decision Number CO20100011.pdf PDF
AG-82B1-S-10-0351 Amendment 0001.pdf PDF
AG-82B1-S-10-0351 Experience Questionnaire.pdf PDF
AG-82B1-S-10-0351 Val_Verde_Demo_Dwgs.pdf PDF
AG-82B1-S-10-0351 Final_Specs.pdf PDF
AG-82B1-S-10-0351 Body.pdf PDF
AG-82B1-S-10-0351 SF 18.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-82B1-S-10-0351

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

82B1

GOLDEN CO 80401-4720

740 SIMMS STREET

EROC INTERMOUNTAIN

US FOREST SERVICE

82B1

GOLDEN CO 80401-4720

740 SIMMS STREET

EROC INTERMOUNTAIN

US FOREST SERVICE

05/20/2010000003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/07/2010

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

TAS::11 1102::TAS - RECOVERY - Val Verde GS Demolition on the Rio Grande National Forest

LIST OF CHANGES: The purpose of this amendment is to provide answers to the questions that have been asked.

1. Would like to know if water and power will be available for asbestos abatement?

There are no water or electricity services offered at the project site. Due to the location of the project site, there is no opportunity to develop them from local utilities.

The Contractor will be required to provide these services if deemed necessary.

2. As for the air monitoring requirements.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

LINDA SPITZLER

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-82B1-S-10-0351/000003

That will be determined after the Contractor submits the Hazardous Material Plan of Action prior to start of demolition/abatement work.

That plan can include any necessary air monitoring methods that the Contractor will use(or lack of methods if the State of Colorado does not require them, with the cited regulation as part of the plan), and must be approved by the

CO prior to work.

3. We would also like to know the approximate location of the guard house.

There is a site map in the drawings posted on

FedBizOpps.gov. There is also a brief description of the work location in the Specs -

Section 01010-1-1.2-A

4. Are electrical power and normal household pressurized water available at the site?

No water or electricity utilities on site.

5. What is the square footage of the building?

What is the sq. ft. of the linoleum in the building?

Square footage of building (all flooring in building is vinyl) is 600 sq. ft. This is on the

Schedule of Items on page 5 of 61 in the

Solicitation.

6. Where is the building located?

A site map is attached to the drawings.

7. Is the building structurally safe for workers to be inside?

As stated in the specs - Section 02221-1-1.6, and the drawings - page 5 of 5, the Government is unsure of the structural condition of the building. The Contractor is required to perform, or to engage a Professional Engineer licensed to practice in Colorado to perform, an engineering survey of the condition of the building to determine its stability. Section 02221 of the specs describes this entire portion of the project.

8. An outside shower with a drain pipe extending underground as well as a water lined coming from below ground into the building were found on site. How should the Contractor handle these?

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-82B1-S-10-0351/000003

The shower should be demolished and removed with the entire structure, and the two lines should be cut off and capped 6" below grade.

ALL ELSE REMAINS THE SAME. THE DATE AND TIME FOR

RECEIPT OF QUOTATIONS REMAIN THE SAME.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)