AG-82B1-S-10-0351 Amendment 0003 SF 30.pdf
PDF 87 KB Posted
- Attached to
- Val Verde Guard Station Demolition Federal contract opportunity
- Solicitation number
- AG-82B1-S-10-0351
About this file
AG-82B1-S-10-0351 Amendment 0003 SF 30 Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-82B1-S-10-0351 Amendment 0002 SF 30.pdf | ||
| AG-82B1-S-10-0351 Amendment 0001.pdf | ||
| AG-82B1-S-10-0351 General Decision Number CO20100011.pdf | ||
| AG-82B1-S-10-0351 Amendment 0001.pdf | ||
| AG-82B1-S-10-0351 Experience Questionnaire.pdf | ||
| AG-82B1-S-10-0351 Val_Verde_Demo_Dwgs.pdf | ||
| AG-82B1-S-10-0351 Final_Specs.pdf | ||
| AG-82B1-S-10-0351 Body.pdf | ||
| AG-82B1-S-10-0351 SF 18.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-82B1-S-10-0351
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
82B1
GOLDEN CO 80401-4720
740 SIMMS STREET
EROC INTERMOUNTAIN
US FOREST SERVICE
82B1
GOLDEN CO 80401-4720
740 SIMMS STREET
EROC INTERMOUNTAIN
US FOREST SERVICE
05/20/2010000003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/07/2010
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
TAS::11 1102::TAS - RECOVERY - Val Verde GS Demolition on the Rio Grande National Forest
LIST OF CHANGES: The purpose of this amendment is to provide answers to the questions that have been asked.
1. Would like to know if water and power will be available for asbestos abatement?
There are no water or electricity services offered at the project site. Due to the location of the project site, there is no opportunity to develop them from local utilities.
The Contractor will be required to provide these services if deemed necessary.
2. As for the air monitoring requirements.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
LINDA SPITZLER
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-82B1-S-10-0351/000003
That will be determined after the Contractor submits the Hazardous Material Plan of Action prior to start of demolition/abatement work.
That plan can include any necessary air monitoring methods that the Contractor will use(or lack of methods if the State of Colorado does not require them, with the cited regulation as part of the plan), and must be approved by the
CO prior to work.
3. We would also like to know the approximate location of the guard house.
There is a site map in the drawings posted on
FedBizOpps.gov. There is also a brief description of the work location in the Specs -
Section 01010-1-1.2-A
4. Are electrical power and normal household pressurized water available at the site?
No water or electricity utilities on site.
5. What is the square footage of the building?
What is the sq. ft. of the linoleum in the building?
Square footage of building (all flooring in building is vinyl) is 600 sq. ft. This is on the
Schedule of Items on page 5 of 61 in the
Solicitation.
6. Where is the building located?
A site map is attached to the drawings.
7. Is the building structurally safe for workers to be inside?
As stated in the specs - Section 02221-1-1.6, and the drawings - page 5 of 5, the Government is unsure of the structural condition of the building. The Contractor is required to perform, or to engage a Professional Engineer licensed to practice in Colorado to perform, an engineering survey of the condition of the building to determine its stability. Section 02221 of the specs describes this entire portion of the project.
8. An outside shower with a drain pipe extending underground as well as a water lined coming from below ground into the building were found on site. How should the Contractor handle these?
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-82B1-S-10-0351/000003
The shower should be demolished and removed with the entire structure, and the two lines should be cut off and capped 6" below grade.
ALL ELSE REMAINS THE SAME. THE DATE AND TIME FOR
RECEIPT OF QUOTATIONS REMAIN THE SAME.