Addendum to FAR 52.212-1.doc
DOC document 39 KB Posted
- Solicitation number
- AG-82B1-S-10-0305
About this file
Instructions to Offerors
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0001.agg | — | |
| Aggregate supply Syn-Sol.doc | DOC document | |
| Site Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum to FAR 52.212-1 Instructions to Offerors—Commercial
A. Offerors are required to submit proposals in 2 volumes and shall be in the format provided in this addendum, failure to submit proposals in the required format may render the proposal “non-responsive” and may not be considered for award. Each Volume shall be separated within the proposal package and should not be a continuation of the previous Volume. Proposals can be issued on offeror’s letterhead and must include the solicitation number. Proposals that exceed page restrictions may not be considered for award; a cover page and summary may be included and do not count against page restrictions.
1. Volume I, Technical Approach (10 page maximum)
a. Volume I shall contain the technical approach.
TECHNICAL PROPOSAL
(1) Qualifications and Experience. Describe the organizational capabilities of your firm and your ability to meet the requirements outlined in this solicitation. Describe/supply information that demonstrates successful performance of past projects of a similar nature.
(2) Proposed product. Describe the characterstics of the proposed product(s) to be supplied to include any drawings, pictures, etc to appropriately demonstrate the products ability to meet the requirements outlined in the solicitation.
2. Volume II, Price (2 page maximum)
a. Volume II shall contain your proposed total price. USFS intends to award a single firm-fixed price contract for these supplies/services; Offerors shall propose a firm-fixed price to perform/deliver all of the services/supplies outlined in the solicitation.
b. Price proposals shall be submitted in the following format inclusive of all costs, profit, overhead, etc. associated with the effort:
SCHEDULE OF ITEMS
ROCK SUPPLY FOR MINIDOKA RD
SAWTOOTH NATIONAL FOREST
| ITEM |
| DESCRIPTION |
| METHOD OF MEASURE |
| EST. QUAN-TITY |
| UNIT PRICE |
| TOTAL COST |
| 001 |
| 1 ½” Minus Aggregate for Base Course |
| CY |
| 1000 |
| $ |
| $ |
| 002 |
| ¾” Minus Aggregate Surface Course |
| CY |
| 1600 |
| $ |
| $ |
| TOTAL |
| $ |
File details come from the government source that posted it. Updated .