Addendum to FAR 52.212-1.doc

DOC document 39 KB Posted

Attached to
RECOVERY** Cassia Division Aggregate Supply - Sawtooth NF
Solicitation number
AG-82B1-S-10-0305
Issued by

About this file

Instructions to Offerors

View the file

Other files

File Type Posted
0001.agg —
Aggregate supply Syn-Sol.doc DOC document
Site Map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum to FAR 52.212-1 Instructions to Offerors—Commercial

A. Offerors are required to submit proposals in 2 volumes and shall be in the format provided in this addendum, failure to submit proposals in the required format may render the proposal “non-responsive” and may not be considered for award. Each Volume shall be separated within the proposal package and should not be a continuation of the previous Volume. Proposals can be issued on offeror’s letterhead and must include the solicitation number. Proposals that exceed page restrictions may not be considered for award; a cover page and summary may be included and do not count against page restrictions.

1. Volume I, Technical Approach (10 page maximum)

a. Volume I shall contain the technical approach.

TECHNICAL PROPOSAL

(1) Qualifications and Experience. Describe the organizational capabilities of your firm and your ability to meet the requirements outlined in this solicitation. Describe/supply information that demonstrates successful performance of past projects of a similar nature.

(2) Proposed product. Describe the characterstics of the proposed product(s) to be supplied to include any drawings, pictures, etc to appropriately demonstrate the products ability to meet the requirements outlined in the solicitation.

2. Volume II, Price (2 page maximum)

a. Volume II shall contain your proposed total price. USFS intends to award a single firm-fixed price contract for these supplies/services; Offerors shall propose a firm-fixed price to perform/deliver all of the services/supplies outlined in the solicitation.

b. Price proposals shall be submitted in the following format inclusive of all costs, profit, overhead, etc. associated with the effort:

SCHEDULE OF ITEMS

ROCK SUPPLY FOR MINIDOKA RD

SAWTOOTH NATIONAL FOREST

ITEM
DESCRIPTION
METHOD OF MEASURE
EST. QUAN-TITY
UNIT PRICE
TOTAL COST
001
1 ½” Minus Aggregate for Base Course
CY
1000
$
$
002
¾” Minus Aggregate Surface Course
CY
1600
$
$
TOTAL
$

File details come from the government source that posted it. Updated .