amendment3 for Delay of Bids and Summit Pit_operations.docx

DOCX document 12 KB Posted

Attached to
Road Construction Federal contract opportunity
Solicitation number
AG-82B1-S-10-0288
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Intermountain

About this file

Attachment to Amend 003

View the file

Other files for this federal contract opportunity

Other files attached to Road Construction, newest first.
File Type Posted
amend 004 0288 signed.pdf PDF
amendment for Blasting amend 004.docx DOCX document
amend003.0288.signedpdf.pdf PDF
amend01 signedpdf.pdf PDF
amend 002 0288.pdf PDF
Attach Amend 01.docx DOCX document
amend 002 0288.pdf PDF
fire precautions.doc DOC document
AG-82B1-S-10-0288.doc DOC document
Wage Determination —
WARREN WAGON SHT 1 - 22.pdf PDF
FSSS FP-03 WARRENWAGONROAD FINAL.pdf PDF
Specification change.docx DOCX document
AG-82B1-S-10-0288.pdf PDF
FS ARRA SIGN DETAILS 2apr09.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

May 11, 2010

Warren Wagon Road Project Amendment 003 AG-82B1-S-10- 0288

1. Delay of bid submittals: The Bid submittal date is delayed for one week to May 20, 2010 2:00pm mdt. The reason for this delay is to research the blasting requirements. There will be another amendment in the next few days that will modify the blasting requirements that were added to Section C in amendment 002.

2 Work allowed in Summit Pit:

Section 105.02 and sheet 2 of the drawings . The contract states that the Summit Pit is to be used for the disposal of unsuitable or excess excavated material only. For this amendment, add the following:

“The Summit Pit may be used as a work area to process the excavated material into Riprap and select granular backfill and crushed aggregate (if the contractor is able to produce the crushed rock that meets the specifications from the excavated material). Machinery and sorting equipment may be set up in the Summit Pit only in the existing disturbed area and the existing cleared area at the Summit Pit. Material cannot be borrowed from the Summit Pit. “