Attachment B RD 308 Plans and Drawings.pdf
PDF 8 MB Posted
- Attached to
- RECOVERY: LAKEVIEW REEDER ROAD RELOCATION Federal contract opportunity
- Solicitation number
- AG-82B1-S-10-0255
About this file
Attachment B Plans and Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 000001 SF 30.pdf | ||
| Attachment C Spec412.pdf | ||
| Attachment F Wage Determination Washington.pdf | ||
| AG-82B1-S-10-0255.pdf | ||
| AG-82B1-S-10-0255 SF1442 Coverpage.pdf | ||
| Attachment D Spec703.pdf | ||
| Attachment E Spec708.pdf | ||
| Attachment A RD 308 Specification.pdf | ||
| Attachment G Wage Determination Idaho.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROAD 308 RELOCATIONROAD 308 RELOCATIONROAD 308 RELOCATIONROAD 308 RELOCATION
VICINITYVICINITYVICINITYVICINITY
MAPMAPMAPMAP
33333333
ROAD LOCATION WARNING SIGN PERIOD OF USE
1362 JCT BOP N
1362 JCT BOP S
ROAD CONSTRUCTION AHEAD (W20-1)
HEAVY TRUCK TRAFFIC (FW11-9a) MATERIAL, OR WATER HAUL
ROAD CONSTRUCTION
SIGNSIGNSIGNSIGN
PLANPLANPLANPLAN
33333333
ROAD CONSTRUCTION
308 JCT EOP N
308 JCT EOP S
ROAD CONSTRUCTION
ROAD CONSTRUCTION
MATERIAL, OR WATER HAUL
MATERIAL, OR WATER HAUL
MATERIAL, OR WATER HAUL
ROAD CONSTRUCTION AHEAD (W20-1)
HEAVY TRUCK TRAFFIC (FW11-9a)
ROAD CONSTRUCTION AHEAD (W20-1)
HEAVY TRUCK TRAFFIC (FW11-9a)
ROAD CONSTRUCTION AHEAD (W20-1)
HEAVY TRUCK TRAFFIC (FW11-9a)
308 PIT LOCATION MATERIAL, OR WATER HAULHEAVY TRUCK TRAFFIC (FW11-9a)
CULVERTCULVERTCULVERTCULVERT
QUANTITY SUMMARYQUANTITY SUMMARYQUANTITY SUMMARYQUANTITY SUMMARY
TYPICAL SECTIONSTYPICAL SECTIONSTYPICAL SECTIONSTYPICAL SECTIONS
GENERAL NOTESGENERAL NOTESGENERAL NOTESGENERAL NOTES
REGION ONEREGION ONEREGION ONEREGION ONE
RRRREEEEGGGGIIIIOOOONNNN OOOONNNNEEEE
PITPITPITPIT
DEVELOPMENTDEVELOPMENTDEVELOPMENTDEVELOPMENT
24242424
DITCH, TURN-OUT, AND DITCH, TURN-OUT, AND DITCH, TURN-OUT, AND DITCH, TURN-OUT, AND
SEDIMENT BASIN DETAILSSEDIMENT BASIN DETAILSSEDIMENT BASIN DETAILSSEDIMENT BASIN DETAILS
26262626
DRAWDRAWDRAWDRAW
DETAILDETAILDETAILDETAIL
27272727
STRAW WATTLESTRAW WATTLESTRAW WATTLESTRAW WATTLE
DETAILDETAILDETAILDETAIL
28282828
CULVERT CULVERT CULVERT CULVERT
INSTALLATIONINSTALLATIONINSTALLATIONINSTALLATION
29292929
COUPLING DETAILCOUPLING DETAILCOUPLING DETAILCOUPLING DETAIL
SHEET 1 OF 3SHEET 1 OF 3SHEET 1 OF 3SHEET 1 OF 3
30303030
SHEET 2 OF 3SHEET 2 OF 3SHEET 2 OF 3SHEET 2 OF 3
31313131
SHEET 3 OF 3SHEET 3 OF 3SHEET 3 OF 3SHEET 3 OF 3
32323232
STAKING NOTESSTAKING NOTESSTAKING NOTESSTAKING NOTES
REFERENCE DRAWINGREFERENCE DRAWINGREFERENCE DRAWINGREFERENCE DRAWING
File details come from the government source that posted it. Updated .