Amendment 000001 SF30
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment F Wage Determination Washington.pdf | ||
| AG-82B1-S-10-0255.pdf | ||
| Attachment C Spec412.pdf | ||
| AG-82B1-S-10-0255 SF1442 Coverpage.pdf | ||
| Attachment D Spec703.pdf | ||
| Attachment B RD 308 Plans and Drawings.pdf | ||
| Attachment E Spec708.pdf | ||
| Attachment A RD 308 Specification.pdf | ||
| Attachment G Wage Determination Idaho.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-82B1-S-10-0255
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
82B1
GOLDEN CO 80401-4720
740 SIMMS STREET
EROC INTERMOUNTAIN
US FOREST SERVICE
82B1
GOLDEN CO 80401-4720
740 SIMMS STREET
EROC INTERMOUNTAIN
US FOREST SERVICE
03/30/2010000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/30/2010
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
TAS::12 1102::TAS for Capital Improvement & Maintenance
CIM-0104-04R "RECOVERY FUNDS" - CIM-0104-28 Lakeview Reeder New Construction &
Reconstruction - Road 308 Relocation
The purpose of this amendment is to change the indentified thickness of the steel for the
Arch Pipe.
Change item 603(01)64C identified on drawing 4 of 33 of the drawing package.
FROM: 64 inch span x 43 inch rise corrugated metal pipe arch (incl. culv. exc.), 0.079 inch thickness for steel or 0.109 inch thickness for aluminum, method C
TO: 64 inch pan x 43 inch rise corrugated metal pipe arch (incl.culv. exc.) 0.109 inch thickness for steel or 0.135 inch thickness for aluminum, method C.AQ/LF
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
WILLIAM M. PFEIFER
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-82B1-S-10-0255/000001
All other terms and conditions remain unchanged
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)