Exhibit_6_drainage_summary.doc

DOC document 63 KB Posted

Attached to
RECOVERY - Native Surface Reconditioning - Clearwater NF
Solicitation number
AG-82B1-S-09-0039
Issued by

About this file

Plans - Exhibit 6 Drainage

View the file

Other files

File Type Posted
(SF-30).pdf PDF
Supplemental Specifications.pdf PDF
Native Surface. Exp. Qstnr.doc DOC document
Exhibit_5.pdf PDF
Exhibit_1.pdf PDF
Exhibit_3.pdf PDF
WAGE DETERMINATION.txt TXT text file
AG-82B1-S-09-0039.pdf PDF
Exhibit_4.pdf PDF
Exhibit_2.pdf PDF
SF 1442.PDF PDF
Exhibit_7.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT #6 - PROJECT #1

DRAINAGE SUMMARY

NATIVE SURFACE RECONDITIONING

DRAINAGE SUMMARY

DESIGN

AS BUILT

ALLOWABLE ALTERNATIVES

(DIMENSIONS IN INCHES)

ITEM

20301

SEDI-

ITEM

60403

REMARKS

STATION

OR M.P.

LENGTH

(FEET)

STATION

OR M.P.

LENGTH

(FEET)

SKEW

(DEGREES)

STEEL

2 2/3 X ½

SIZE

ALUMINUM

2 2/3 X ½

SIZE

POLY-

ETHYLENE

SIZE

CULVERT

REMOVAL

OUTLET

DITCHES

MENT

DAM

ROLLING

DIPS

DROP

INLET

ROAD 360 (RECONDITIONING)

MP-0.186
50

X

MP-0.730
50

X

MP-0.775
50

X

MP-0.820
50

X

MP-0.840
50

X

MP-0.860
50

X

MP-0.910
50

X

MP-0.970
50

X

MP-1.260
50

X

MP-1.340
50

X

MP-2.200
50

X

MP-2.250
50

File details come from the government source that posted it. Updated .