EFkJohnson Culvert SPSs.doc
DOC document 363 KB Posted
- Attached to
- RECOVERY - East Fork Johnson Culvert Replacement
- Solicitation number
- AG-82B1-S-09-0031
About this file
Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CMPA Sign_Construction Detail 2.pdf | ||
| CMPA Armor.pdf | ||
| Wage Determination.txt | TXT text file | |
| CMPA Profile.pdf | ||
| sf 18.pdf | ||
| CMPA Rockweir.pdf | ||
| CMPA Sign_Construction Detail 1.pdf | ||
| CMPA Plan Cover.pdf | ||
| CMPA PROJECT_SUMMARY.pdf | ||
| CMPA Material Sourcemap.pdf | ||
| AG-82B1-S-09-0031.pdf | ||
| CMPA Stream.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
East Fork Johnson Culvert Replacement Supplemental Specifications
Table of Contents 2Preface
101 - Terms, Format, and Definitions 102 - Bid, Award, and Execution of Contract 103 - Scope of Work 104 - Control of Work 105 - Control of Material 106 - Acceptance of Work 107 - Legal Relations and Responsibility To the Public 108 - Prosecution and Progress 109 - Measurement and Payment 151 - Mobilization 155 - Schedules for Construction Contracts 156 - Public Traffic 157 - Soil Erosion Control 201 - Clearing and Grubbing 203 - Removal of Structures and Obstructions 204 - Excavation and Embankment 209 – Structural Excavation 251 - Riprap 322 - Minor Aggregate Courses 602 – Culverts and Drains 622 – Equipment Rental 625 – Turf Establishment 648 - Stream Simulation 670 - Slash Filter 704 - Soil 705 - Rock
Preface
Preface_wo_03_15_2004_m Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
101 - Terms, Format, and Definitions
101.00_nat_08_12_2004
101.01_nat_05_11_2004
101.01 Meaning of Terms.
Add the following:
Delete all references in FP-03 to Transportation Acquisition Regulations (TAR). For Timber Sales, delete all references in FP-03 to Federal Acquisition Regulations (FAR).
101.03_nat_05_17_2004
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
101.04_nat_07_16_2004
101.04 SI Symbols.
Add the following to (b) SI Symbols:
| mp |
| Milepost |
| ppm |
| Part Per Million |
101.04 Definitions.
Delete the following definitions and substitute the following:
Award- No definition Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
101.04 Definitions.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, methods of measurement, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
102 - Bid, Award, and Execution of Contract
102.00_nat_05_17_2004
102 Delete
Delete Section 102 in its entirety.
103 - Scope of Work
103.00_nat_05_17_2004
103.01 Intent of Contract. Delete this subsection and replace with the following:
The intent of the contract is to remove an existing 6-ft round culvert and replace it with a contractor-furnished corrugated metal pipe arch. The project site is in the Johnson Creek watershed on the Superior Ranger District, Lolo National Forest. The existing culvert is located at MP 2.7 on FS Road #540 in Section 30, Township 17 North, Range 25 West, Mineral County, Montana.
This project includes, but is not limited to, clearing and grubbing, constructing a temporary stream bypass, removing and disposing of the existing culvert, structural excavation, furnishing, loading, hauling and installing a 112-in. span by 75-in. rise by approx. 50-ft. long corrugated metal pipe arch, backfilling, compacting, hauling and placing roadway embankment, hauling and placing riprap, placing stream simulation material inside the newly installed culvert, loading, hauling, and placing pit run gravel, placing brush barriers, seeding and mulching, and all other incidental items necessary to complete the work according to the contract.
Delete the remaining subsections in this Section.
104 - Control of Work
104.01_nat_05_11_2004
104 Control of Work:
Delete sections 104.01, 104.02, and 104.04.
104.05_nat_05_17_2004
104.05 Load Restrictions.
Add the following:
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material
105.02_nat_05_11_2004
105.02 Material Sources
Add the following before the first paragraph.
Sources have been designated for this project as follows:
Riprap and Channel Rock/Rock Weirs Source – Government Source – It is anticipated that a small stockpile (approximately 10 c.y.) of suitable riprap will be available within a half mile of the project site. Additional riprap is stockpiled in an existing government pit. The pit is located on the Little Joe Pit road, FSR 18558, which intersects the Little Joe Road, FSR 221 at MP 2.2. The pit is approximately 22 miles from the project site.
Pit Run - Government Source - A Government source for unclassified pit run gravel is available from an existing pit on the McIntyre Road, FSR 18605, MP 1.3, which is approximately 9 miles from the project site.
Streambed Simulation Material- Government Source - Material meeting the gradation requirements for streambed simulation material is to be conserved from structure excavation.
Waste Site – Government Furnished – Waste material is not anticipated on this project, however, a waste site for unsuitable material will be identified within 5 miles of the project site by the CO if necessary.
Under (b) Contractor-located sources add the following:
Prior to any pit development or use of materials, the pit site shall be approved by the CO that the pit site is free of noxious weed as listed on the "All States Noxious Weeds List”.
106 - Acceptance of Work
106.01_nat_08_12_2004
106.01 Conformity with Contract Requirements.
Delete Subsection 106.01 and substitute the following:
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is stricter.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
(1) Sampling method;
(2) Number of samples;
(3) Sample transport;
(4) Test procedures;
(5) Testing laboratories;
(6) Reporting;
(7) Estimated time and costs; and
(8) Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
(1) Have the work accepted at a reduced price; or
(2) Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.07_nat_05_11_2004
106.07 Delete
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public
107.02 Protection and Restoration of Property and Landscape.
Add the following:
All work in live streams shall require a 124 permit, obtained by the Forest Service. All work in live streams shall occur between July 15 to September 1.
107.02_nat_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_04_27_2005
107.06 Contractor’s Responsibility for Work.
Delete the following:
“except as provided in Subsection 106.07”.
107.09_nat_us_05_11_2004
107.09 Legal Relationship of the Parties.
Delete the entire subsection:
107.10_nat_us_02_23_2005
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
· Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
· Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
· Exact time and location of spill including a description of the area involved.
· Containment procedures.
· Summary of any communications contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
· Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress
108.00_nat_05_11_2004
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment
109.02_nat_05_11_2004
109.02 Measurement Terms and Definitions.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
109.03_nat_05_11_2004
109 Deletions
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
Add the following Subsection:
109.10 Methods of Measurement
One of the following methods of measurement for determining final payment is DESIGNATED IN THE SCHEDULE OF ITEMS for each PAY ITEM:
(a) Designed Quantities (DQ). These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units DESIGNATED IN THE SCHEDULE OF ITEMS may be authorized under any of the following conditions:
(1) Changes in the work authorized by the CO.
(2) A determination by the CO that errors exist in the original design that cause a PAY ITEM quantity to change by 15 percent or more.
(3) A written request submitted to the CO showing evidence of errors in the original design that cause the quantity of a PAY ITEM to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is in error.
(b) Stake Quantities (SQ). These quantities are determined from staked measurements prior to construction.
(c) Actual Quantities (AQ). These quantities are determined from measurements of completed work.
(d) Vehicle Quantities (VQ). These quantities are measured or weighed in hauling vehicles.
(e) Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.
151.01_0116_us_02_14_2005
151 - Mobilization Description
151.01. Add the following:
Noxious weed control requirements:
Clean all construction equipment prior to entry onto the project area. Remove all dirt and plant parts and material that could carry noxious weed seeds into the project area. Only construction equipment so cleaned and inspected by the Forest Service will be allowed to operate within the project area. Treat all subsequent move-ins of construction equipment in the same manner as initial move-ins. “Construction equipment” does not include personal vehicles, paving equipment or support equipment that remains on the main travel route.
Prior to the initial move-in, the contractor shall make all construction equipment available for inspection by the Forest Service at an agreed upon location. Provide the Forest Service at least 24 hours advance notification when equipment is ready for inspection
151.03_0116_us_03_30_2005
151.03 Add the following to the first paragraph:
Include all costs associated with the cleaning of equipment in the unit bid price for Mobilization:
155 - Schedules for Construction Contracts
Delete Section 155 in its entirety .
156 - Public Traffic
Delete Section 156 in its entirety and replace with the following:
Description
156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.
Material
156.02 Conform to the MUTCD and the following Sections and Subsections:
Construction sign panels
Retroreflective sheeting
718.01
Temporary concrete barrier
Temporary plastic fence
710.11
Temporary traffic control devices
718.22
156.03 General. The Contractor may close FSR 540 within the project area for up to 10 days. During construction, the Contractor shall post appropriate warning signs at the junction with Old Highway 10. In addition, the contractor shall provide the adequate warning signs or barricades on both sides of the project.
The Contractor shall notify the CO 10 days prior to any road closures for approval.
Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan in accordance with MUTCD Part 6A.01 has been approved. Post construction signs and traffic control devices in conformance with MUTCD. Assure that all required signs are in place and approved prior to beginning work on project.
Do not construct detours outside of the clearing limits or use alternate route detours without the approval of the CO.
156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:
(a) Furnish and install traffic control devices before the start of construction operations.
(b) All detours outside of clearing limits shall be approved in writing by the Contracting Officer as part of the traffic control plan.
(c) Install only those traffic control devices needed for each stage or phase.
(d) Relocate temporary traffic control devices as necessary.
(e) Remove or cover devices that no longer apply to the existing conditions.
(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.
(g) Keep temporary traffic control devices clean.
(h) Remove all temporary traffic control devices upon contract completion or when approved.
156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.07 Do not measure Public Traffic for payment. Compensation is made as an indirect payment.
157 - Soil Erosion Control
157.02_01_08_23_2004
157.02 Materials
Add the following:
Provide bales, wattles, logs and rolls from a certified noxious weed free source.
157.03 General
Add the following:
At least 7 days prior to the start of construction, submit a written plan to the CO for approval that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Include methods to minimize disturbance to the stream and prevent runoff from the construction site entering directly into the stream. The “Soil Erosion Control Plan” must address construction activities that have the potential for stream sedimentation.
157.06 Sediment Retention Structures. Construct sediment retention structures of the following types:
(a) Brush Barrier. Construct brush barriers AS SHOWN ON THE PLANS to filter out sediment generated from surface runoff. Construct ion shall be according to section 670-SLASH FILTER
157.09 Diversions.
Delete the first sentence and replace with the following:
When working in live streams, construct temporary channels, temporary culverts, or sandbags to divert water around disturbed areas and slopes. Earthen dams are prohibited. Excavate according to Section 204.
157.09 Diversions
Add the following:
A stream diversion plan shall be included in the “Soil and Erosion Control Plan.”
201 - Clearing and Grubbing
201.01_nat_us_02_18_2005
201.01 Description
Replace with the following This work consists of clearing and grubbing within clearing limits and other designated areas.
201.04_0116_us_03_01_2006
201.04 Clearing.
Delete subsection (d) and add the following:
(d) Cut and grub all vegetation, regardless of size, that is between the existing road shoulders. Cut trees and brush that are greater than 24” tall and 1” in diameter from the inside shoulder of the existing road, including the ditchline, to the top of the existing cut slope. Cut trees and brush that are greater than 36” tall and 2” in diameter 5’ beyond the outside shoulder
(e) Remove brush from log decks. Deck logs so that logs are piled parallel to one another; can be removed by standard log loading equipment; will not damage standing trees; will not interfere with drainage, and will not roll. Keep logs in log decks free of brush and soil.
(f) Trim tree branches that extend over the road surface and shoulders to attain a clear height of 20 feet. Trim tree limbs as near flush with the trunk as practicable.
(g) Clear individually marked trees according to Section 202.
201.06_nat_us_02_18_2005
201.06 Disposal.
Delete the first sentence of this subsection and substitute the following:
Dispose of merchantable timber designated for removal according to the provisions of the timber sale contract. Dispose of clearing and grubbing debris according to the following methods:
Method A: Bury. Bury debris in trenches and pits in approved areas within the road right-of-way. Do not bury debris inside the roadway prism limits, beneath drainage ditches, or in any areas subject of free-flowing water.
Place debris in alternating layers of 4-feet of debris covered with 2-feet of each material. Distribute stumps, logs, and other large pieces to form a dense mass and minimize air voids. Cover the top layer of buried debris with at least 1-foot of compacted earth. Grade and shape the area. Seed and fertilize disposal areas.
Method B: Chipping. Reconstruction slash may be processed through a chipping machine. Chips shall be deposited on embankment slopes or outside the roadway to a loose depth not exceeding 6-inches. Minor amounts of chips may be within the roadway if they are thoroughly mixed with soil and do not form a layer.
Method C: Scattering. Reconstruction slash, excluding whole stumps, may be scattered outside the clearing limits without damaging trees. All logs shall be limbed. Logs shall be placed away from trees, positioned so they do not roll and are not placed on top of one another. Other construction slash shall be limbed and scattered unless they have been halved (split into two pieces) for stumps up to 18-inch diameter and quartered (split into four pieces) for stumps larger than 18-inch diameter.
Method D: Decking. Unmerchantable Material. Logs not meeting utilization standard set forth in Table A-2 but could be used for firewood, shall be decked in areas designated by the CO. Materials shall be cut into lengths not to exceed 32-feet and all limbs removed. Decks shall be stable and free of brush and soil.
203 - Removal of Structures and Obstructions
203.01_nat_05_12_2004
203.01 Work.
Delete and replace with the following:
This work consists of disposing of clearing slash, salvaging, removing, and disposing of buildings, fences, structures, pavements, bridges, culverts, utilities, curbs, sidewalks, and other obstructions.
203.05 Disposing of Material.
Add the following:
(e): Scattering. Scatter pieces of wood less than 3 inches in diameter and 3 feet in length within the clearing limits. Do not place construction slash in lakes, meadows, streams, or streambeds. Immediately remove construction slash that interferes with drainage structures.
204 - Excavation and Embankment
204.11 Compaction.
Add the following:
(e) Compaction E. Roller Compaction. Adjust the moisture content to a level suitable for compaction. Operate Rollers over the full width of each layer until visual displacement ceases, but not fewer than six passes. Use rollers that meet the following requirements:
(1) Steel wheeled rollers, other than vibratory, capable of exerting a force of not less than 250 pounds per inch of width of the compression roll or rolls.
(2) Vibratory steel wheeled rollers equipped with amplitude and frequency controls with a minimum weight of 6 tons, specifically designed to compact the material on which it is used.
(3) Pneumatic-tired rollers with smooth tread tires of equal size that will provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 psi.
(4) Sheepsfoot, tamping, or grid rollers capable of exerting a force of 250 lbs/inch of width of roller drum.
204.13_nat_05_12_2004
204.13 Sloping, Shaping, and Finishing.
Delete section (d) and add the following:
(d) Finishing. For surfaced roads, remove all material larger than 6 inches from the top 6 inches of the roadbed. For all roads, finish the roadbed to be smooth and uniform, and shaped to conform to the typical sections. Remove unsuitable material from the roadbed and replace it with suitable material.
Ensure that the subgrade for both surfaced and unsurfaced roads is visibly moist during shaping and dressing. Bring low sections, holes, cracks, or depressions to grade with suitable material. Maintain proper ditch drainage.
204.14_nat_05_12_2004
204.14 Disposal of Unsuitable or Excess Material.
Delete the text of the first paragraph and substitute the following:
Dispose of unsuitable or excess material at the Government disposal site designated in Section 105 of these Special Project Specifications. Shape material to drain as directed by the CO.
Measurement
204.16 (e) Waste. Delete this paragraph 209 – Structural Excavation 209.00_01_us_10_11_2006
209.07 Dewatering
Delete the subsection and add the following:
Submit a Dewatering Plan 7 days prior to beginning excavation.
Construct water diversions prior to performing any excavation. Construct diversions using water tight, non-eroding methods. Employ settling basins or other methods so that muddy water is not returned to stream. Install, operate, and remove diversions in a manner that minimizes erosion and sedimentation.
209.10 Backfill.
(a) General.
Add the following:
Replace any pipe that is distorted by more than 5 percent of nominal dimensions, or that is ruptured or broken.
Do not place or backfill pipe that meets any of the following conditions until the excavation and foundation have been approved in writing by the CO:
· Embankment height greater than 6 feet at subgrade centerline.
· Installation in a protected streamcourse.
· Round pipe with a diameter of 48 inches or greater.
· Pipe arches with a span of 50 inches or greater.
· Any box culvert of structure other than pipe culverts.
209.11 Compacting.
Delete the subsection and add the following:
Compact backfill using designated compaction method A, B, C, or D:
Method A. Ensure that backfill density exceeds the density of the surrounding embankment.
Method B. Adjust the moisture content of the backfill material to a moisture content suitable for compaction. Compact each 6 inch layer with a minimum of six passes or until visual displacement ceases using a mechanical tamper, (wacker-packer type or approved equal). For compaction under sections 252, 254, 255, 257, 258 and 262, compact with a vibratory steel wheeled roller with a mass of at least 8 tons.
Method C. Compact each layer of backfill with a minimum of four passes with mechanical tamper, (wacker-packer type, or approved equal).
Method D. Determine optimum moisture content and maximum density according to AASHTO T 99 method C. Adjust the moisture content of the backfill material to a moisture content suitable for compaction. Compact material placed in all layers to at least 95 percent of the maximum density. Determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.
If a compaction method is not designated, use compaction Method B.
209.12 Acceptance.
Sampling and Testing Requirements
Add the following:
Compaction methods (A), (B), and (C) do not require AASHTO T-99 or T-310 test methods for foundation fill.
209.13 See Subsection 109.05
Delete the first sentence and replace with the following:
Do not measure structure excavation, bedding, and backfill for payment.
251 - Riprap
251.00_01_us_10_11_2006
251.01 Description
Delete the first sentence and add the following:
This work consists of furnishing, hauling, and placing of riprap for bank protection, slope protection, drainage structures, erosion control, and other features shown on the plans.
251.02 Material.
Add the following:
When shown on the plans stone from the project site may be utilized.
251.07 Acceptance
Delete sampling and testing requirements of Table 251-1 and certification requirements of Subsection 106.03.
251.09 Payment.
Add the following:
The cost of excavation, embankment and haul required for placement of riprap is incidental to pay items listed in the bid schedule. No payment will be made under Item 251 for these activities.
251.03_nat_us_06_18_2007
Construction Requirements
251.03 General.
Add the following:
Place riprap under or adjacent to structures before placing prefabricated superstructure units or constructing superstructure falsework unless otherwise approved by the CO.
251.08 Measurement.
Add the following:
Payment for excavation and embankment required for placement of riprap is indirectly included in the pay item for riprap.
322 - Minor Aggregate Courses 322.00_nat_us_03_04_2009
Description
322.01 This work consists of constructing one or more courses of aggregate on a prepared surface. Work includes producing aggregate by grid rolling, screening, or crushing methods, or placing pit-run or Government-furnished aggregate.
Surface aggregate grading is designated as shown in Table 703-3.
Subbase and base aggregate grading is designated as shown in Table 703-2.
Screened aggregate grading is designated as shown in Table 703-16.
Material
322.02 Conform to the following Subsections:
Aggregate
703.05
Water
725.01
Construction Requirements
322.03 General. Prepare the surface on which the aggregate course is placed according to Section 204 or 303 as applicable.
Request approval of the roadbed in writing before placing aggregate.
Develop, haul, and apply water in accordance with Section 170.
Submit target values within the gradation ranges shown in Table 703-2 or 703-3 for the required grading. After reviewing the proposed target values the CO will determine the final values for the gradation and notify the Contractor in writing.
No quality requirements or gradation other than maximum size will be required for pit run and grid-rolled material. For grid rolling, use all suitable material that can be reduced to maximum size.
After processing on the road, remove all oversize material from the road and dispose of it as directed by the CO.
If the aggregate is produced and stockpiled before placement, handle and stockpiled according to Section 320. Establish stockpile sites at approved locations.
322.04 Mixing and Spreading. Mix the aggregate and adjust the moisture content to obtain a uniform mixture with a moisture content suitable for the specified compaction method. Spread and shape the mixture on the prepared surface in a uniform layer with no segregation of size, and to a loose depth that will provide the required compacted thickness.
Do not place in layers exceeding 6 inches in compacted thickness for aggregate base and surface courses or twice the maximum particle size for screened aggregate. When more than one layer is necessary, compact each layer according to Subsection 322.05 before placing the next layer. Hauling and leveling equipment shall operate uniformly over the full width.
When placing aggregate over geotextile, place aggregate in a single lift to the full depth specified.
322.05 Compacting. Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.
Compact the aggregate using one of the following methods as specified:
Compaction A. Operating spreading and hauling equipment over the full width of the travelway.
Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).
Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(1).
Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.
Compaction E. Compact to a density of at least 96 percent of the maximum density, as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
Compaction F. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.
Compaction G. Compact to a density of at least 100 percent of the maximum density as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.
322.06 Construction Tolerance. If grade finishing stakes are required, finish the surface to within ±0.10 feet from staked line and grade elevation.
If grade finishing stakes are not required, shape the surface to the required template and check the surface with a 10-foot straightedge. Defective areas are surface deviations in excess of 1/2 inch in 10 feet between any two contacts of the straightedge with the surface.
Correct all defective areas by loosening the material, adding or removing material, reshaping, and compacting.
Ensure that the compacted thickness is not consistently above or below the specified thickness. The maximum variation from the compacted specified thickness is ½ inch.
Ensure that the compacted width is not consistently above the specified width. The maximum variation from the specified width will not exceed +12 inches at any point.
322.07 Maintenance. Maintain the aggregate course to the correct line, grade, and cross‑section by blading, watering, rolling, or any combination thereof until placement of the next course. Correct all defects according to Subsection 322.06.
322.08 Acceptance. See Table 322-1 or Table 322-2 as applicable, for sampling and testing requirements.
Aggregate gradation and surface course plasticity index will be evaluated under Subsection 106.04. If the aggregate is obtained from a Government stockpile then the above characteristics will be evaluated under Subsection 106.02. Other aggregate quality properties will be evaluated under Subsections 106.02 and 106.04. Placement of aggregate courses will be evaluated under Subsections 106.02 and 106.04.
The allowable upper and lower aggregate gradation limits are the Target Value plus or minus the allowable deviations shown in Tables 703-2 and 703-3.
The allowable upper and lower Plasticity index limits for surface courses are stated in 703.05(b).
Preparation of the surface on which the aggregate course is placed will be evaluated under Section 204 or 303 as applicable.
Measurement
322.09 Measure the Section 322 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.
Measure square yard width horizontally to include the top of aggregate width including designed widening. Measure the square yard length horizontally along the centerline of the roadway.
Measure aggregate by the cubic yard in-place once compacted.
Measure thickness perpendicular to the grade of the travelway.
Measure width perpendicular to the centerline.
Payment
322.10 The accepted quantities will be paid at the contract price per unit of measurement for the Section 322 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Table 322-1
Sampling and Testing Requirements
| Reporting Time |
| Before using |
in work
| “ |
| “ |
| “ |
| 48 hours |
Split
Sample
| Yes, when requested |
| “ |
| “ |
| “ |
| Yes |
| Point of Sampling |
| Source of |
material
| “ |
| “ |
| “ |
| From windrow or roadbed after processing or from approved crusher sampling device |
Sampling
Frequency 1 per type & source of material
| “ |
| “ |
| “ |
| 2 per day |
| Test Methods Specifications |
| AASHTO T 96 |
| AASHTO T 104 |
| AASHTO T 210 |
| ASTM D 5821 |
| AASHTO T 2 |
| Category |
| — |
| — |
| — |
| — |
| — |
| Characteristic |
| LA abrasion (coarse) |
| Sodium sulfate soundness loss (coarse & fine) |
| Durability index (coarse & fine) |
| Fractured faces |
| Sample |
| Type of Acceptance (Subsection) |
| Measured and tested |
for conformance
(106.04 & 105) Measured and tested for conformance
(106.04)
| Material or Product |
| Aggregate source quality |
703.05 Subbase, Base, and Surface courses
Table 322-1 (continued)
Sampling and Testing Requirements Reporting
Time
| Before using in work |
| “ |
| “ |
| “ |
| Before placing next layer |
| (1) Minimum of 5 points per proctor. |
Split
| Yes, when requested |
| “ |
| “ |
| “ |
| — |
| Point of Sampling |
| Source of material |
| “ |
| “ |
| “ |
| In-place |
Sampling
| 1 per type and source of material |
| “ |
| “ |
| “ |
| 3 per day |
| Test Methods Specifications |
| AASHTO T 99 (1) |
| R-1 Marshall |
| AASHTO T 180(1) |
| R-1 Marshall |
| AASHTO T 310 or other approved procedures |
| Category |
| — |
| — |
| — |
| — |
| — |
| Characteristic |
| Moisture-density Method D |
| Moisture-density Method E |
| Moisture-density Method F |
| Moisture-density Method G |
| In-place density & moisture content |
| Type of Acceptance (Subsection) |
| Measured and tested |
for conformance (106.04)
| Material or Product |
| Subbase, Base, and Surface |
Table 322-2
Sampling and Testing Requirements
| Reporting Time |
| 48 hours |
Split
Yes
| Point of Sampling |
| From windrow or roadbed after processing or from approved crusher sampling device |
Sampling
2 per day
| Test Methods Specifications |
| AASHTO T 2 |
| Category |
| — |
| Characteristic |
| Sample |
| Type of Acceptance (Subsection) |
| Measured and tested |
for conformance
(106.04 )
| Material or Product |
| Screened Aggregate |
602 – Culverts and Drains
602.03_nat_05_17_2004
602.03 General.
Add the following:
Ensure that the final installed alignment of all pipe allows no reverse grades, and does not permit horizontal alignment to vary from a straight line drawn from center of inlet to center of outlet by more than 2 percent of pipe center length or 1.0 feet, whichever is less.
Delete the second paragraph and Add the following:
The lengths and location of individual culverts “AS SHOWN ON THE PLANS” are approximate. Do not order pipe until culvert locations are staked and a written list of the correct length is approved by the CO.
602.00_01_us_10_12_2006 Add the following:
Clean and paint damaged coating caused by welding, field cutting, or handling in accordance with AASHTO M 36M and ASTM A 849.
602.05 Laying Metal Pipe
Add the following:
Install helically corrugated lock-seam pipe with the seam at the inlet end placed below the horizontal centerline. This requirement also applies to the outlet end when the outlet is less than 5 feet below subgrade.
622 – Equipment Rental
622.02 Rental Equipment
Delete the first two sentences of the first paragraph and add the following:
Hydraulic Excavator. Provide a track mounted hydraulic excavator, less than 15 years old, with at least 90 HP. Bucket must be equipped with a hydraulic "thumb".
Large Dump Truck. Provide a large dump truck with a minimum capacity of 12 cubic yards, less than 15 years old.
622.02_01_us_10_12_2006
625 – Turf Establishment 625.00_01_us_10_12_2006
625.03 General.
Delete this subsection and replace with the following:
Apply turf establishment to the areas shown on the drawings or in the worklists within 7 days of completion of ground disturbing activities. Seeded areas damaged by construction activities shall be reseeded within 10 days of the damage.
Do not seed during windy weather or when the ground is excessively wet, frozen, snow covered.
Assure that all seed and mulch used in the work conforms to the weed free requirements of Section 713.
625.06 Fertilizing.
Delete subsection (b) and replace with the following after subsection (a):
Apply fertilizer at the rate of XXXX pounds per acre. Insure that the fertilizer meets the following chemical analysis:
Nutrient
Percent Nitrogen, N 16% to 24% Phosphorus, P205 16% to 24% Potassium, K 16% to 24%
625.07 Seeding.
Delete the first sentence and add the following.
Apply seed mix by the following methods.
(a) Dry method. Delete the third sentence.
Add the following after subsection (b).
Seed Mix. Furnish and apply the following kinds and amounts pure live seed:
Quantity of Pure
Kind of Seed Live Seed (Lbs/Acre)
1. Annual Ryegrass
6.0
2.
Sheep Fescue
5.0
3.
Redtop
2.0
4. Tufted Hairgrass
2.0
5. Mountain Brome
6. Big Bluegrass
Total 25.0
Determine the pounds of seed to be furnished per acre by dividing the pounds of pure live seed required per acre by the product of the percent purity and percent germination.
| Example |
| 5 lbs. pure live seed/acre = |
| 6.55 lbs. commercial |
0.90 x 0.85 seed per acre; purity = 90% and germination = 85%
625.09 Protecting and Caring for Seeded Areas
Delete the first sentence and add the following:
Protect and care for seeded areas until final acceptance.
625.11 Measurement.
Delete the entire Subsection and replace with the following:
Measure the Section 625 items listed in the bid schedule according to Subsection 109.02.
648 - Stream Simulation
648.00_nat_05_13_2004
Description
648.01 This work consists of placing rock and fill to simulate natural stream profile and streambed though culverts and other structures, and constructing rock weir/step pools and habitat rocks.
Material
648.02 Conform to the following Subsections.
| Foundation Fill |
| 704.01 |
| Stream Bed Simulation Rock |
| 705.08 |
| Channel Rock |
| 705.07 |
Construction Requirements
648.03 General. Place stream simulation rock to form a well-graded, low permeability mass, similar in appearance and texture to the natural streambed. Do not drive metal track or rubber tired equipment directly on metal or concrete structure surfaces.
648.04 Placed Stream Bed Simulation Rock and Habitat Rocks.
(a) Method A, Machine Placed. Place stream simulation rock in one or more layers with a layer depth less than 1 ½ times the maximum dimension of the stream simulation rock. Place stream simulation bedrock by methods that do not cause segregation or damage to the prepared surface. Place or rearrange individual rocks by mechanical methods to obtain a compact low permeability mass matching stream simulation bed details. Fill voids before placing the next lift. habitat rocks as designated.
(b) Method B, End Dumped. Dump stream simulation rock in one or more layers with a layer depth less than 1 ½ times the maximum dimension of the stream simulation rock. Distribute larger rocks throughout the mass of stone. Obtain a uniformly dense, compact, low permeability bed with a surface matching stream simulation bed details. Fill voids before placing the next lift. Place habitat rocks as designated.
(c) Method C, Hand Placed. Place stream simulation rock using hand labor. Material may be hand carried, or carried in wheelbarrows and end dumped to obtain its full thickness. Compact each load using hand operated or hand operated mechanical equipment to obtain a uniformly dense, compact, low permeability bed with a surface matching stream simulation bed details. Fill voids before placing the next lift. Place habitat rocks as designated.
648.05 Foundation fill. Fill all voids left during placement of habitat rocks and stream bed simulation rock adjacent to footings, concrete structures, or corrugated pipes with foundation fill. Use water pressure, metal tamping rods, and similar hand operated equipment to force material into all surface and subsurface voids between the structure and Rocks and between individual Rocks.
648.06 Rock Weirs/Step Pools. Furnish rocks meeting the dimensional requirements SHOWN ON THE DRAWINGS and as directed by the CO. If suitable rocks are not available on site, they must be hauled from the designated riprap source. Excavate and construct the rock weirs as SHOWN ON THE DRAWINGS and as directed by the CO.
648.07 Rock Baffles. Furnish rocks meeting the dimensional requirements SHOWN ON THE DRAWINGS and as directed by the CO. If suitable rocks are not available on site they must be hauled from the designated riprap source. Excavate and construct the rock vortex weirs as SHOWN ON THE DRAWINGS and as directed by the CO.
648.08 Acceptance. Placing stream simulation material will be evaluated under Subsections 106.02 and 106.04.
Measurement
648.09 Measure the items listed in the bid schedule according to Subsection 109.02.
Payment
648.10 The accepted quantities, measured as provided in Subsection 109.02, will be paid at the contract unit price per unit of measurement for Section 638 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05
670 - Slash Filter
670.00_0116_us_03_31_2005
Description
670.01 This work consists of placing construction slash for the purpose of creating a sediment trap or filter to reduce erosion effects from constructed fill slopes at the locations shown on the plans.
Materials
670.02 Description. Conserve suitable material from Section 201, Clearing and Grubbing, or created from non-merchantable timber felled as indicated by the CO. Provide tops, limbs and brush that does not exceed 5 inches in diameter and 10 feet in length. Do not include stumps and root wads.
Construction Requirements
670.03 Clearing. The clearing limits cannot exceed those shown on the plans.
670.04 Performance. Place slash at the toe of the fill, in contact with the ground and with long dimension perpendicular to the slope of the ground. Mat down all material in the windrow with construction equipment to form a compact and uniform slash filter. Use a hydraulic excavator or method approved by the CO to construct the slash filter. Construct slash filters only in areas shown on the plans or designated by the CO. Do not place material in stream channels or locations that interfere with drainage structure function.
Construct the finished cross section of the slash filter to the dimensions SHOWN IN THE DRAWINGS. The top shall not extend closer than 24 inches to the finished subgrade elevation. Reposition or cut off any slash material such as jillpokes which protrude more than 16 inches from the windrow.
Measurement
670.05 The method of measurement, as measured along the toe of the fill and described in Section 109, will be designated on the bid schedule.
Payment
670.06 The accepted quantities will be paid at the contract price per unit of measurement for the section 660 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
704 - Soil
704.02_nat_08_12_2004
704.02 Bedding Material.
Delete Subsection 704.02 and substitute the following:
Furnish a well graded, free draining material free of excess moisture, muck, frozen lumps, roots, sod, or other deleterious material conforming to the following:
(a) Maximum particle size
3 inch or half the corrugation depth, whichever is smaller
(b) Material passing No. 200 sieve, 10% max.
AASHTO T 27 and T 11 705 - Rock 705.07_nat_us_04_17_2008
Add the following:
705.07 Streambed Simulation Rock.
(a) General. Furnish a mixture of soil, gravel, cobble, and boulders to simulate a natural streambed. The cobbles and boulders should be hard, durable rock that conforms to test values in 705.02.
Table 705-5 – Gradation requirements for Streambed Simulation Material, inches or sieve size
| Bed Class |
| 100% passing |
| 84% passing |
| 50% passing |
| 16% passing |
| 10% passing |
| 2 |
| 5 |
| 2 |
| 3/4 |
| 1/4 |
| No. 10 |
| 4 |
| 10 |
| 4 |
| 1 3/4 |
| 1/2 |
| No. 10 |
| 6 |
| 14 |
| 6 |
| 2 1/2 |
| 3/4 |
| No. 10 |
| 8 |
| 22 |
| 8 |
| 3 |
| 1 |
| No. 10 |
| 10 |
| 24 |
| 10 |
| 4 |
| 1 |
| No. 10 |
| 12 |
| 30 |
| 12 |
| 5 |
| 1 1/2 |
| No. 10 |
| 14 |
| 36 |
| 14 |
| 6 |
| 1 3/4 |
| No. 10 |
| 16 |
| 42 |
| 16 |
| 7 |
| 2 |
| No. 10 |
| 20 |
| 48 |
| 20 |
| 8 |
| 3 |
| No. 10 |
| 24 |
| 60 |
| 24 |
| 10 |
| 3 |
| No. 10 |
| 36 |
| 72 |
| 36 |
| 14 |
| 4 |
| No. 10 |
| 48 |
| 96 |
| 48 |
| 18 |
| 6 |
| No. 10 |
705.08_nat_us_04_17_2008
705.08 Channel Rock.
(a) General. Furnish hard, durable rock that consists of intact blocks without open fractures, foliation,…