Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment0002_ShowersPointRestroomReplacement.pdf | ||
| A3_SitePlan.pdf | ||
| A1_RestroomReplacementSpecifications_ShowersPoint_080715.pdf | ||
| A7_Davis_Bacon_Wage_Determination.pdf | ||
| Solicitation_ShowersPoint_Restroom_Replacement_081015.pdf | ||
| A4_LayoutAndDetails.pdf | ||
| A2_ShowersLocationMap.pdf | ||
| A6_RVHookupDetail.pdf | ||
| A5_ROMTEC_-_Specifications-Drawings_8-7-15_(revised).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT CODE
PAGE OF
PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
08/19/2015
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE
USDA FOREST SERVICE
Coronado National Forest
300 West Congress
Tucson, AZ 85701
8197 7. ADMINISTERED BY (If other than Item 6) Code
8. NAME & ADDRESS OF CONTRACTOR (No., Street, county, State and ZIP Code)
9A. AMENDMENT OF SOLICIATION NO.
AG-8197-S-15-0015
9B. DATED (SEE ITEM 11)
08/07/2015
10A. MODIFICATION OF CONTRACT/ORDER NO.
CODE
FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACT/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority)
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SHOWERS POINT GROUP SITE RESTROOM REPLACMENT
See Page 2 for Amendment Specifics
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Mark Hostetler - CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
/S/MARK HOSTETLER
(Signature of Contracting Officer)
16C. DATE SIGNED
08/19/2015
NSN 7540-01-152-8070 STANDARD FORM 30 (REV. 10-83)
Previous edition unusable Prescribed by GSA FAR (48 CFR) 53.243
1) The purpose of this amendment is to make the following changes and clarifications to the statement of work and specifications:
Additional Information
Water for construction activities is available from a hose bib at the site through October 31. If Contractor would like higher water flow, they may draw water from the tank located at Whitetail Campground, which is located 1.2 miles up Catalina Highway, through November 15.
Rock from stone walls that will be demolished may be incorporated into fills on site.
The existing restroom has been tested by the USFS and does not contain asbestos or lead-based paint.
Clarification
Per specification 02020 Earthwork: “Excavation is unclassified. For bidding purposes, Contractor may assume that a medium sized backhoe or track excavator can complete excavation without the use of a rock hammer.” Should major rock excavation issues be encountered, this would be considered a differing site condition and an equitable adjustment would be considered.
Changes to Specifications
Specification 01010 Scope of Work, 1.8 Special Construction Requirements, add item L: Riprap rock shall match colors of surface rock naturally found at the site. Rock shall be imported to site from an off-mountain source. Rock shall not be quarry stone.
Specification 01040 Submittals, Part 2 C, add item 6: Riprap rock
Specification 02010 Demolition and Clearing, 3.4 Removal, Item F Restroom demolition Correction: Restroom vaults do not contain chemicals.
Specification 10010 Restrooms, 3.1 General, Item F Correction: Furnish doorstops and door sweeps on all doors
Changes to Schedule of Items
Item 10, Culvert, 24” should be corrected to read Culvert, 36”.