A3_SitePlan.pdf

PDF 302 KB Posted

Attached to
Showers Point Romtec Toilet Installation Federal contract opportunity
Solicitation number
AG-8197-S-15-0015
Issued by
Department of Agriculture Forest Service R3-Southwestern Region

About this file

Solicitation Attachment 3

View the file

Other files for this federal contract opportunity

Other files attached to Showers Point Romtec Toilet Installation, newest first.
File Type Posted
Amendment0002_ShowersPointRestroomReplacement.pdf PDF
Amendment0001_ShowersPointRestroomReplacement.pdf PDF
A6_RVHookupDetail.pdf PDF
A5_ROMTEC_-_Specifications-Drawings_8-7-15_(revised).pdf PDF
A7_Davis_Bacon_Wage_Determination.pdf PDF
Solicitation_ShowersPoint_Restroom_Replacement_081015.pdf PDF
A4_LayoutAndDetails.pdf PDF
A2_ShowersLocationMap.pdf PDF
A1_RestroomReplacementSpecifications_ShowersPoint_080715.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site Plan - Showers Point Group Site Restroom Replacement Coronado National Forest – Santa Catalina Ranger District – August 6, 2015

Remove existing restroom building, retaining wall, concrete slabs, and sidewalk up to restroom

Existing Parking Area

Remove concrete sidewalk

(250 LF)

Install Government-furnished Romtec restroom building. Construct concrete slabs. FFE to be verified in field.

Provide compacted fill to construct building pad.

To Organization Ridge Road and Mt.

Lemmon Hwy

Install 36” culvert. Place riprap at inlet and outlet.

Install new underground wastewater tank at host site with pumpout port and RV connection (see detail). Location shall be staked in field by Government.

Existing Group Site Ramada

Existing Group Site Ramada

Existing Group Site Ramada

Install new concrete walks (ORAR). Sta 0+00 TO 0+24: 9’W x 6”deep.

Sta 0+24 to 0+50: 8’W x 6” deep. Sta 0+50 to 1+40: 5’W x 4” deep.

Remove gate and install removable bollard

Remove trash bin and re-install in location approved by Government

Replace hydrant

Concrete Walks:

1. Reinforce Sta 0+00 to 0+50 of with #4 rebar at 12” oc each way.

2. Reinforce remainder of walks and slabs around restroom building with fibermesh.

3. Place all concrete on 4” of compacted aggregate base.

4. Walkways (vertical and horizontal alignment) and toilet location shall be staked for approval by engineer.

Vehicle/Pedestrian Access Route.

Fill slopes shall be 4:1 or flatter.

2 trees will be removed by USFS to improve contractor access

NORTH

No Scale

Install concrete slab around restroom.

Install water line extension. 1” PEX. Sawcut and remove asphalt on ramp

Sawcut existing sidewalk in location as directed by Government.

Place fill where required. 4:1 or flatter.

Sidewalk to remain

Install 18” culvert. Place riprap at inlet and outlet.

Install valve box with 2 ball valves (to serve hose bib and daylight drain).

Install riprap on slopes

Install drain line to daylight