A3_SitePlan.pdf
PDF 302 KB Posted
- Attached to
- Showers Point Romtec Toilet Installation Federal contract opportunity
- Solicitation number
- AG-8197-S-15-0015
About this file
Solicitation Attachment 3
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment0002_ShowersPointRestroomReplacement.pdf | ||
| Amendment0001_ShowersPointRestroomReplacement.pdf | ||
| A6_RVHookupDetail.pdf | ||
| A5_ROMTEC_-_Specifications-Drawings_8-7-15_(revised).pdf | ||
| A7_Davis_Bacon_Wage_Determination.pdf | ||
| Solicitation_ShowersPoint_Restroom_Replacement_081015.pdf | ||
| A4_LayoutAndDetails.pdf | ||
| A2_ShowersLocationMap.pdf | ||
| A1_RestroomReplacementSpecifications_ShowersPoint_080715.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site Plan - Showers Point Group Site Restroom Replacement Coronado National Forest – Santa Catalina Ranger District – August 6, 2015
Remove existing restroom building, retaining wall, concrete slabs, and sidewalk up to restroom
Existing Parking Area
Remove concrete sidewalk
(250 LF)
Install Government-furnished Romtec restroom building. Construct concrete slabs. FFE to be verified in field.
Provide compacted fill to construct building pad.
To Organization Ridge Road and Mt.
Lemmon Hwy
Install 36” culvert. Place riprap at inlet and outlet.
Install new underground wastewater tank at host site with pumpout port and RV connection (see detail). Location shall be staked in field by Government.
Existing Group Site Ramada
Existing Group Site Ramada
Existing Group Site Ramada
Install new concrete walks (ORAR). Sta 0+00 TO 0+24: 9’W x 6”deep.
Sta 0+24 to 0+50: 8’W x 6” deep. Sta 0+50 to 1+40: 5’W x 4” deep.
Remove gate and install removable bollard
Remove trash bin and re-install in location approved by Government
Replace hydrant
Concrete Walks:
1. Reinforce Sta 0+00 to 0+50 of with #4 rebar at 12” oc each way.
2. Reinforce remainder of walks and slabs around restroom building with fibermesh.
3. Place all concrete on 4” of compacted aggregate base.
4. Walkways (vertical and horizontal alignment) and toilet location shall be staked for approval by engineer.
Vehicle/Pedestrian Access Route.
Fill slopes shall be 4:1 or flatter.
2 trees will be removed by USFS to improve contractor access
NORTH
No Scale
Install concrete slab around restroom.
Install water line extension. 1” PEX. Sawcut and remove asphalt on ramp
Sawcut existing sidewalk in location as directed by Government.
Place fill where required. 4:1 or flatter.
Sidewalk to remain
Install 18” culvert. Place riprap at inlet and outlet.
Install valve box with 2 ball valves (to serve hose bib and daylight drain).
Install riprap on slopes
Install drain line to daylight