A4_LayoutAndDetails.pdf
PDF 226 KB Posted
- Attached to
- Showers Point Romtec Toilet Installation Federal contract opportunity
- Solicitation number
- AG-8197-S-15-0015
About this file
Solicitation Attachment 4
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment0002_ShowersPointRestroomReplacement.pdf | ||
| Amendment0001_ShowersPointRestroomReplacement.pdf | ||
| A3_SitePlan.pdf | ||
| A1_RestroomReplacementSpecifications_ShowersPoint_080715.pdf | ||
| A7_Davis_Bacon_Wage_Determination.pdf | ||
| Solicitation_ShowersPoint_Restroom_Replacement_081015.pdf | ||
| A2_ShowersLocationMap.pdf | ||
| A6_RVHookupDetail.pdf | ||
| A5_ROMTEC_-_Specifications-Drawings_8-7-15_(revised).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Layout and Details Showers Point Group Site Restroom Replacement Coronado National Forest – Santa Catalina Ranger District – August 6, 2015 – Not to Scale
0+00 (top of ramp)
0+24 (bottom of ramp, ~23” fill)
0+50 (turn and start of landing, ~41” fill)
0+67 (centerline of culvert, ~55” fill)
1+00 (landing and culvert, ~31” fill)
1+40 (restroom slab, ~12” fill)
Elev. 97.67’ (Corner of slab. Verify elevation and location.)
~48” of fill at back of new restroom slab
Slab
Concrete walk
Existing grade
4:1 or flatter side slopes Fill
Layout Plan
Typical Concrete Walk Cross Section
Restroom Cross Section
Fill
Existing grade
New Restroom
4:1 or flatter side slopes with riprap as needed
Concrete slab
~48”
~12” fill
8%
8%
8%
2%
2%
+0
Walkway Profile Restroom Slab
Existing retaining walls each side
Notes Stake vehicle/pedestrian access route and restroom for Government approval
+5
+2
+5
+6
+4
Top of ramp
~23” fill
~55” fill
~12” fill
~31” fill
~41” fill
Aggregate
4” 12”
Shoulder
Existing grade
File details come from the government source that posted it. Updated .