SF30_AmendmentNo2_Rock_Crusher.doc

DOC document 75 KB Posted

Attached to
Overhaul/Recondition FAHR Rock Crusher
Solicitation number
AG-8173-S-10-0007
Issued by

About this file

AMENDMENT NO. 2 CHANGES THE WARRANTY REQUIREMENTS

View the file

Other files

File Type Posted
SF30_AmendmentNo1_Rock_Crusher.doc DOC document
MODIFIED_RETURN_PACKET_RockCrusher2010.doc DOC document
Modified_RFP_Overhaul_RockCrusher2010.doc DOC document
RETURN_PACKET_RockCrusher2010.doc DOC document
RFP_Overhaul_RockCrusher2010.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE

PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1
1
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
Amendment No. 2
1/11/10
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE
USDA FS Apache-Sitgreaves National Forests
SAME

Acquisition Management (AQM)

PO Box 640 30 S Chiricahua Drive

Springerville, AZ 85938

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
(()
9A. AMENDMENT OF SOLICITATION NO.
FORMDROPDOWN

AG-8173-S-10-0007

9B. DATE (SEE ITEM 11)

FORMDROPDOWN

12/9/09

10A. MODIFICATION OF CONTRACT/ORDER

NO.

,
FORMDROPDOWN

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE
FORMDROPDOWN

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FORMCHECKBOX

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not ex-tended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning one copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(()
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MDE IN THE CON-

FORMDROPDOWN

TRACT ORDER NO. IN ITEM 10A.

FORMDROPDOWN

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying offices, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

FORMDROPDOWN

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

FAR 52.243-1 Changes--Fixed Price (AUG 1987)--Alternate I (APR 1984)

FORMDROPDOWN

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section heading, including solicitation/contract subject matter where feasible.)

AG-8173-S-10-0007
OVERHAUL / RECONDITION FAHR ROCK CRUSHER

.The purpose of Amendment No.2 is to: . . I. Deadline Date for offers REMAINS January 21, 2010 1630 local time.

II. Change the Warranty of Repair requirements from 1000 hours to 60 days or equivalent number of hours that are within reason of industry standards.

Except as provided herein, all terms and conditions of this document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
,
WARREN L. ABBOTT, Contracting Officer
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C DATE SIGNED

BY

1/11/2010

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070
Automated STANDARD FORM 30 (REV 10-83)

FAR (48 CFR) 52.243

In lieu of STANDARD FORM 30 BACK

File details come from the government source that posted it. Updated .