Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Long Abstract Kendall.xls | XLS spreadsheet | |
| Amendment 3.pdf | ||
| Amendment 2.pdf | ||
| Amendment 0001.pdf | ||
| Amendment 0001 Attachement.pdf | ||
| AG-7442-S-09-0050.pdf | ||
| TX178_dvb.htm | HTM file | |
| Page3drawings.pdf | ||
| Page2drawings.pdf | ||
| Page5drawings.pdf | ||
| Page10drawings.pdf | ||
| Page9drawings.pdf | ||
| CoverSheetdrawings.pdf | ||
| Page6drawings.pdf | ||
| Page1drawings.pdf | ||
| Page7drawings.pdf | ||
| Page4drawings.pdf | ||
| Page8drawings.pdf | ||
| Kendall County_Specs.pdf | ||
| AG-7442-S-09-0050.pdf | ||
| Salado 15R Crack Repair-001.pdf | ||
| Salado 15R Crack Repair-000.pdf | ||
| TX41_dvb.htm | HTM file | |
| Salado 15R Crack Repair-002.pdf | ||
| AG-7442-S-09-0049.pdf |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(210-VI-NEH, May 2001 3-1
Construction Specification 3—Structure Removal
1. Scope The work shall consist of the removal, salvage, and disposal of structures (including fences) from the designated areas.
2. Marking Method 1—Each structure or structure part to be removed will be marked with stakes, flags, paint, or other suitable method.
Method 2—The area boundaries from which structures must be removed will be marked using stakes, flags, paint, or other suitable method. Structures to remain undisturbed or to be salvaged will be designated by special markings.
3. Removal Method 1—All structures designated for removal in the contract shall be removed to the specified extent and depth.
Method 2—Within the areas so marked, all visible and buried structures identified shall be removed to the specified extent and depth.
4. Salvage Structures or structure parts that are designated to be salvaged shall be carefully removed and neatly placed in the specified or approved storage location. Salvaged structures that are capable of being disassembled shall be dismantled into individual members or sections. Such structures shall be neatly and systematically match marked with paint before disassembly. All connectors and other parts shall be marked to indicate their proper location within the structure and shall be fastened to the appropriate structural member or packed in suitable containers.
Material from fences designated to be salvaged shall be placed outside the work area on the property on which the fence was originally located. Fence wire shall be rolled into uniform rolls of suitable size and neatly piled with other salvaged materials. Posts and rails shall be neatly stacked.
5. Disposal of refuse materials Refuse materials resulting from structure removal shall be disposed of in a manner and at locations specified in section 7 of this specification or in an acceptable manner and at locations approved by the contracting officer. Disposal by burning shall be in accordance with local rules and regulations.
6. Measurement and payment Method 1—For items of work for which specific unit prices are established by the contract, payment for the removal of each structure unit, except fences, is made at the contract unit price. Fences removed or removed and salvaged are measured to the nearest linear foot. Payment for fence removal or removal and salvage is made at the contract unit prices for each type and size of fence.
Such payment will constitute full compensation for all labor, equipment, tools, applicable permits and associated fees for burning and disposal of refuse, and all other items necessary and incidental to the completion of the work.
Method 2—For items of work for which specific lump sum prices are established by the contract, payment for structure removal is made at the contract lump sum price.
AG-7442-S-09-0049
Salado Creek Site 15R - RCC Repair 1 of 35
(210-VI-NEH, May 2001 3-2
Such payment will constitute full compensation for all labor, equipment, tools, applicable permits and associated fees for burning and disposal of refuse, and all other items necessary and incidental to the completion of the work.
All Methods—The following provisions apply to all methods of measurement and payment.
Compensation for any item of work described in the contract, but not listed as a contract line item number in the bid schedule, is included in the payment for the item of work to which it is made subsidiary. Such items and items to which they are made subsidiary are identified in section 7 of this specification.
Salado Creek Site 15R - RCC Repair 2 of 35
NRCS-7/23/2009 3-3
TX-SALADO 15R – RCC CRACK REPAIR
7. Items of work and construction details In Section 2, Marking, method 1 shall apply.
In Section 3, Removal, method 1 shall apply.
Items of work to be performed in conformance with this specification and the construction details therefore are:
a. Subsidiary Item, Structure Removal
(1) This item shall consist of removing all designated fences to the minimal extent necessary to perform the work.
(2) The limits of fences to be removed shown on the drawings are approximate. The actual limits of fences required to be removed will be designated on the site at the time of the showing of the site to prospective bidders.
(3) Salvage of fence materials is required. In the event that fence materials are damaged during removal, they are to be replaced with equal or better materials in accordance with Construction Specification 91.
(4) Separate payment will not be made for this item of work. Compensation for this item will be included in the payment for the bid item for Mobilization and Demobilization.
Salado Creek Site 15R - RCC Repair 3 of 35
(210-VI-NEH, May 2001 5-1
Construction Specification 5—Pollution Control
1. Scope The work consists of installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities.
2. Material All material furnished shall meet the requirements of the material specifications listed in section 8 of this specification.
3. Erosion and sediment control measures and works The measures and works shall include, but are not limited to, the following:
Staging of earthwork activities—The excavation and moving of soil materials shall be scheduled to minimize the size of areas disturbed and unprotected from erosion for the shortest reasonable time.
Seeding—Seeding to protect disturbed areas shall occur as soon as reasonably possible following completion of that earthwork activity.
Mulching—Mulching to provide temporary protection of the soil surface from erosion.
Diversions—Diversions to divert water from work areas and to collect water from work areas for treatment and safe disposition. They are temporary and shall be removed and the area restored to its near original condition when the diversions are no longer required or when permanent measures are installed.
Stream crossings—Culverts or bridges where equipment must cross streams. They are temporary and shall be removed and the area restored to its near original condition when the crossings are no longer required or when permanent measures are installed.
Sediment basins—Sediment basins collect, settle, and eliminate sediment from eroding areas from impacting properties and streams below the construction site(s). These basins are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Sediment filters—Straw bale filters or geotextile sediment fences trap sediment from areas of limited runoff. Sediment filters shall be properly anchored to prevent erosion under or around them. These filters are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Waterways—Waterways for the safe disposal of runoff from fields, diversions, and other structures or measures. These works are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Other—Additional protection measures as specified in section 8 of this specification or required by Federal, State, or local government.
4. Chemical pollution The contractor shall provide watertight tanks or barrels or construct a sump sealed with plastic sheets to dispose of chemical pollutants, such as drained lubricating or transmission fluids, grease, soaps, concrete mixer wash water, or asphalt, produced as a by-product of the construction activities. At the completion of the construction work, sumps shall be removed and the area restored to its original condition as specified in section 8 of this specification. Sump removal shall be conducted without causing pollution.
Sanitary facilities, such as chemical toilets, or septic tanks shall not be located next to live streams, wells, or springs. They shall be located at a distance sufficient to prevent contamination of any water source. At the completion of construction activities, facilities shall be disposed of without causing pollution as specified in section 8 of this specification.
Salado Creek Site 15R - RCC Repair 4 of 35
(210-VI-NEH, May 2001 5-2
5. Air pollution The burning of brush or slash and the disposal of other materials shall adhere to state and local regulations.
Fire prevention measures shall be taken to prevent the start or spreading of wildfires that may result from project activities. Firebreaks or guards shall be constructed and maintained at locations shown on the drawings.
All public access or haul roads used by the contractor during construction of the project shall be sprinkled or otherwise treated to fully suppress dust. All dust control methods shall ensure safe construction operations at all times. If chemical dust suppressants are applied, the material shall be a commercially available product specifically designed for dust suppression and the application shall follow manufacturer's requirements and recommendations. A copy of the product data sheet and manufacturer's recommended application procedures shall be provided to the engineer 5 working days before the first application.
6. Maintenance, removal, and restoration All pollution control measures and temporary works shall be adequately maintained in a functional condition for the duration of the construction period. All temporary measures shall be removed and the site restored to near original condition.
7. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, each item is measured to the nearest unit applicable. Payment for each item is made at the contract unit price for that item. For water or chemical suppressant items used for dust control for which items of work are established in section 8 of this specification, measurement for payment will not include water or chemical suppressants that are used inappropriately or excessive to need. Such payment will constitute full compensation for the completion of the work.
Method 2—For items of work for which lump sum prices are established in the contract, payment is made as the work proceeds and supported by invoices presented by the contractor that reflect actual costs. If the total of all progress payments is less than the lump sum contract price for this item, the balance remaining for this item will be included in the final contract payment. Payment of the lump sum contract price will constitute full compensation for completion of the work.
Method 3—For items of work for which lump sum prices are established in the contract, payment will be prorated and provided in equal amounts on each monthly progress payment estimate. The number of months used for prorating shall be the number estimated to complete the work as outlined in the contractor's approved construction schedule. The final month's prorate amount will be provided with the final contract payment. Payment as described will constitute full compensation for completion of the work.
All Methods—The following provisions apply to all methods of measurement and payment.
Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items, and the items to which they are made subsidiary, are identified in section 8 of this specification.
Salado Creek Site 15R - RCC Repair 5 of 35
NRCS-7/23/2009 5-3
8. Items of Work and Construction Details
Items of work to be performed in conformance with this specification and the construction details therefore are:
a. Subsidiary Item, Pollution Control
(1) This item shall consist of performing all work and furnishing all materials necessary to accomplish the work defined in Section 1 of this specification.
(2) Separate payment will not be made for this item of work. Compensation of this item is included in the payment for the appropriate items for Grouted Rock Riprap, Concrete Grout, and Concrete Crack Repair for Injection Grouting (including addititve items if exercised).
Salado Creek Site 15R - RCC Repair 6 of 35
(210-VI-NEH, May 2001 8-1
Construction Specification 8—Mobilization and Demobilization
1. Scope The work consists of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the contract. It does not include mobilization and demobilization for specific items of work for which payment is provided elsewhere in the contract.
Mobilization will not be considered as work in fulfilling the contract requirements for commencement of work.
2. Equipment and material Mobilization shall include all activities and associated costs for transportation of contractor's personnel, equipment, and operating supplies to the site; establishment of offices, buildings, and other necessary general facilities for the contractor's operations at the site; premiums paid for performance and payment bonds including coinsurance and reinsurance agreements as applicable; and other items specified in section 4 of this specification.
Demobilization shall include all activities and costs for transportation of personnel, equipment, and supplies not required or included in the contract from the site; including the disassembly, removal, and site cleanup of offices, buildings, and other facilities assembled on the site specifically for this contract.
This work includes mobilization and demobilization required by the contract at the time of award. If additional mobilization and demobilization activities and costs are required during the performance of the contract as a result of changed, deleted, or added items of work for which the contractor is entitled to an adjustment in contract price, compensation for such costs will be included in the price adjustment for the item or items of work changed or added.
3. Payment Payment will be made as the work proceeds, after presentation of paid invoices or documentation of direct costs by the contractor showing specific mobilization and demobilization costs and supporting evidence of the charges of suppliers, subcontractors, and others. When the total of such payments is less than the lump sum contract price, the balance remaining will be included in the final contract payment.
Payment of the lump sum contract price for mobilization and demobilization will constitute full compensation for completion of the work.
Payment will not be made under this item for the purchase costs of materials having a residual value, the purchase costs of materials to be incorporated in the project, or the purchase costs of operating supplies.
Salado Creek Site 15R - RCC Repair 7 of 35
NRCS-7/23/2009 8-2
4. Items of Work and Construction Details
Items of work to be performed in conformance with this specification and the construction details therefore are:
a. Bid Item 1, Mobilization And Demobilization
(1) This item shall consist of performing all items of work for mobilization and demobilization as required by Sections 1 and 2 of this specification.
(2) The demobilization operation shall include but not be limited to the following items of work:
(a) All debris, trash, tires, equipment, equipment parts, chains, cables, and other such items resulting from the construction operation shall be removed from the worksite and disposed of in an approved sanitary land fill of the Contractor's own choosing.
(b) All disturbed areas shall be bladed or smoothed to blend the area with the surrounding land surface. The bladed or smoothed surface shall be free of abrupt mounds, windrows, depressions or other irregularities that would prevent the safe operation of ordinary farm equipment thereon.
The finished surface shall prevent diversion of surface runoff and shall prevent standing or ponding water.
(c) Roadways shall be maintained to their preconstruction conditions.
Access roads shall be left in a rut-free condition. Vegetation damaged by construction traffic shall be replaced.
(3) The items of work subsidiary to this bid item are:
(a) Structure Removal, Fences as specified in Construction Specification 3.
(b) Chain Link Fence as specified in Construction Specification 91.
Salado Creek Site 15R - RCC Repair 8 of 35
(210-VI-NEH, May 2001 62-1
Construction Specification 62—Grouted Rock Riprap
1. Scope The work consists of furnishing, transporting, and the installation of grouted rock riprap revetments and blankets, including filter or bedding where specified.
2. Material Rock for riprap shall conform to the requirements of Material Specification 523, or, if so specified, shall be obtained from designated sources. It shall be free from dirt, clay, sand, rock fines, and other material not meeting the required gradation limits.
At least 30 days before rock is delivered from other than designated sources, the contractor shall designate, in writing, the source from which rock material will be obtained and provide information satisfactory to the engineer that the material meets contract requirements. The contractor shall provide the engineer free access to the source for the purpose of obtaining samples for testing. The size and grading of the rock shall be as specified in section 13 of this specification.
Rock from approved sources shall be excavated, selected, and processed to meet the specified quality and grading requirements at the time the rock is installed.
When specified in section 13 of this specification or when requested by the contracting officer, a gradation quality control check shall be made by the contractor and subject to inspection by the engineer.
The test shall be performed at the work site in accordance to ASTM D 5519 Test Method B Size, Size- Range Grading, on a test pile of representative rock. The weight or size of the test pile shall be large enough to ensure a representative gradation of rock from the source and to provide test results within a 5 percent accuracy.
Based on a specific gravity of 2.65 (typical of limestone and dolomite), and assuming the individual rock is shaped midway between a sphere and a cube, typical size/weight relationships are:
Sieve size Approx. weight Weight of of rock test pile
16 inches 300 pounds 6,000 pounds 11 inches 100 pounds 2,000 pounds 6 inches 15 pounds 300 pounds
The results of the test shall be compared to the gradation required for the project. Test pile results that do not meet the construction specifications shall be cause for the rock to the rejected. The test pile that meets contract requirements shall be left on the job site as a sample for visual comparison. The test pile shall be used as part of the last rock riprap to be placed.
Filter or bedding aggregates, when required, shall conform to Material Specification 521, Aggregates for Drainfill and Filters, unless otherwise specified.
Portland cement shall conform to the requirements of Material Specification 531 for the specified type.
Pozzolan conforming to Specification ASTM C 618, Class C or F, in amounts not to exceed 25 percent based on absolute volume, may be substituted for an equivalent amount of portland cement in the grout mixture unless otherwise specified in section 13 of this specification.
Aggregates shall conform to the requirements of Material Specification 522, Aggregates for Portland
Salado Creek Site 15R - RCC Repair 9 of 35
(210-VI-NEH, May 2001 62-2
Cement Concrete, except that the grading for coarse aggregate shall be as specified in section 13 of this specification.
Water shall be clean and free from injurious amounts of oils, acid, alkali, organic matter, or other deleterious substances.
Air-entraining admixtures shall conform to the requirements of Material Specification 533, Chemical Admixtures for Concrete.
Curing compound shall conform to the requirements of Material Specification 534, Concrete Curing Compound.
Other admixtures, when required, shall be as specified in section 13 of this specification.
Geotextiles shall conform to the requirements of Material Specification 592.
3. Subgrade preparation The subgrade surface on which the grouted rock riprap, filter, bedding, or geotextile is to be placed shall be cut or filled and graded to the lines and grades shown on the drawings. When fill to subgrade lines is required, it shall consist of approved material and shall conform to the requirements of the specified class of earthfill.
Rock riprap, filter, bedding, or geotextile shall not be placed until the foundation preparation is completed and the subgrade surface has been inspected and approved.
4. Placement of rock riprap Method 1 Equipment-placed rock—The rock riprap shall be placed by equipment on the surface and to the depth specified. It shall be installed to the full section thickness in one operation and in such a manner as to avoid serious displacement of the underlying material. The rock for riprap shall be delivered and placed in a manner that ensures that the riprap in place shall be reasonably homogeneous with the larger rocks uniformly distributed and firmly in contact one to another with the smaller rocks and spalls filling the voids between the larger rocks. Some hand placing may be required to provide a neat and uniform surface.
Rock riprap shall be placed in a manner to prevent damage to structures. Hand placing is required as necessary to prevent damage to any new and existing structures.
Method 2 Hand-placed rock—The rock riprap shall be placed by hand on the surface and to the depth specified. It shall be securely bedded with the larger rocks firmly in contact one to another without bridging. Spaces between the larger rocks shall be filled with smaller rocks and spalls. Smaller rocks shall not be grouped as a substitute for larger rock. Flat slab rock shall be laid on its vertical edge except where it is installed like paving stone and the thickness of the rock equals the specified depth of the riprap section.
5. Filter or bedding When the contract specifies filter, bedding, or geotextile beneath the rock riprap, the designated material shall be placed on the prepared subgrade surface as specified. Compaction of filter or bedding aggregate is not required, but the surface of such material shall be finished reasonably smooth and free of mounds, dips, or windrows.
Salado Creek Site 15R - RCC Repair 10 of 35
(210-VI-NEH, May 2001 62-3
6. Design of the grout mix The mix proportions for the grout mix shall be as specified in the construction details in section 13 of this specification. During installation, the engineer may require adjustment of the mix proportions whenever necessary. The mix shall not be altered without the approval of the engineer.
7. Handling and measurement of grout material Material shall be stockpiled and batched by methods that prevent segregation or contamination of aggregates and ensure accurate proportioning of the mix ingredients.
Except as otherwise provided in section 13 of this specification, cement and aggregates shall be measured as follows:
• Cement shall be measured by weight or in bags of 94 pounds each. When cement is measured in bags, no fraction of a bag shall be used unless weighed.
• Aggregates shall be measured by weight. Mix proportions shall be based on the batch weight of each aggregate saturated, surface-dry weight plus the weight of surface moisture it contains at the time of batching.
• Water shall be measured, by volume or by weight, to an accuracy within 1 percent of the total quantity of water required for the batch.
• Admixtures shall be measured within a limit of accuracy of plus or minus 3 percent.
8. Mixers and mixing The mixer, when operating at capacity, shall be capable of combining the ingredients of the grout mix into a thoroughly mixed and uniform mass and of discharging the mix with a satisfactory degree of uniformity.
The mixer shall be operated within the limits of the manufacturer's guaranteed capacity and speed of rotation.
The time of mixing after all cement and aggregates have been combined in the mixer shall be a minimum of 1 minute for mixers having a capacity of 1 cubic yard or less. For larger capacity mixers, the minimum time shall be increased 15 seconds for each cubic yard or fraction thereof of additional capacity. The batch shall be so charged into the mixer that some water will enter in advance of the cement and aggregates, with the balance of the mixing water introduced into the mixer before a fourth of the total minimum mixing time has elapsed.
When ready-mix grout is furnished, the contractor shall furnish to the engineer at the time of delivery a ticket showing the time of loading and the quantities of material used for each load of grout mix delivered.
No mixing water in excess of the amount required by the approved job mix shall be added to the grout mix during mixing or hauling or after arrival at the delivery point.
9. Conveying and placing The grout mix shall be delivered to the site and placed within 1.5 hours after the introduction of the cement to the aggregates. In hot weather or under conditions contributing to accelerated stiffening of the concrete, the time between the introduction of the cement to the aggregates and complete discharge of the grout batch shall be a maximum of 45 minutes. The engineer may allow a longer time provided the setting time of the grout is increased a corresponding amount by the addition of an approved set retarding
Salado Creek Site 15R - RCC Repair 11 of 35
(210-VI-NEH, May 2001 62-4 admixture. In any case concrete shall be conveyed from the mixer to the final placement as rapidly as practicable by methods that prevent segregation of the aggregates, loss of mortar, displacement of the rock riprap, or a combination of these.
Grout mix shall not be allowed to free fall more than 5 feet unless suitable equipment is used to prevent segregation.
The grout mix shall not be placed until the rock riprap has been inspected and approved by the engineer for the placement of grout.
Rock to be grouted shall be kept moist for a minimum of 2 hours before grouting.
The rock riprap shall be flushed with water before placing the grout to remove the fines from the rock surfaces. The rock shall be kept moist before the grouting and without placing in standing or flowing water. Grout placed on inverts or other nearly level areas may be placed in one operation. On slopes, the grout shall be placed in two nearly equal applications consisting of successive lateral strips about 10 feet in width starting at the toe of the slope and progressing upward. The grout shall be delivered to the place of final deposit by approved methods and discharged directly on the surface of the rock. A metal or wood splash plate is used to prevent displacement of the rock directly under the grout discharge. The flow of grout shall be directed with brooms, spades, or baffles to prevent grout from flowing excessively along the same path and to assure that all intermittent spaces are filled. Sufficient barring shall be conducted to loosen tight pockets of rock and otherwise aid in the penetration of grout to ensure the grout fully penetrates the total thickness of the rock blanket. All brooming on slopes shall be uphill. After the grout has stiffened, the entire surface shall be rebroomed to eliminate runs and to fill voids caused by sloughing. The surface finish, following the completion of grout installation, shall consist of one-third of the rock extended above the level of grout. The exposed rock will not have a plastered appearance.
After completion of any strip or panel, no individual(s) or equipment shall be permitted on the grouted surface for 24 hours. The grouted surface shall be protected from injurious action by the sun, rain, flowing water, mechanical injury, or other potential damaging activity.
10. Curing and protection The completed finished surface shall be prevented from drying for a minimum curing period of 7 days following placement. Exposed surfaces shall be maintained in a moist condition continuously for the 7-day curing period or until curing compound has been applied as specified in this section. Moisture shall be maintained by sprinkling, flooding, or fog spraying or by covering with continuously moistened canvas, cloth mats, straw, sand, or other approved material. Water or moist covering shall be used to protect the grout during the curing process without causing damage to the grout surface by erosion or other mechanisms that may cause physical damage.
The grouted rock may be coated with an approved curing compound as an alternative method to maintaining a continuous moisture condition during the curing period. The compound shall be sprayed on the moist grout surface as soon as free water has disappeared and all surface finishing has been completed.
The compound shall be applied at a minimum uniform rate of 1 gallon per 175 square feet of surface and shall form a continuous adherent membrane over the entire surface. Curing compound shall not be applied to surfaces requiring bond to subsequently placed grout and/or concrete. If the membrane is damaged during the curing period, the damaged area shall be resprayed at the rate of application specified for the original treatment.
Salado Creek Site 15R - RCC Repair 12 of 35
(210-VI-NEH, May 2001 62-5
Grout mix shall not be placed when the daily minimum temperature is less than 40 degrees Fahrenheit unless facilities are provided to ensure that the temperature of the material is maintained at a minimum temperature of 50 degrees Fahrenheit and not more than 90 degrees Fahrenheit during placement and the curing period. Grout mix shall not be placed on a frozen surface. When freezing conditions prevail, rock to be grouted must be covered and heated to within a range of 50 to 90 degrees Fahrenheit for a minimum of 24 hours before placing grouting material.
11. Inspecting and testing fresh grout The grout material shall be checked and tested throughout the grouting operation. Sampling of fresh grout shall be conducted in conformance with ASTM C 172. The volume of each batch will be determined by methods prescribed in ASTM C 138.
The engineer shall have free access to all parts of the contractor's plant and equipment used for mixing and placing grout during the period of the contract. Proper facilities shall be provided for the engineer to sample material and view processes implemented in the mixing and placing of grout as well as for securing grout test samples. All tests and inspections shall be conducted so that only a minimum of interference to the contractor's operation occurs.
For ready-mixed grout, the contractor shall furnish to the engineer a statement-of-delivery ticket for each batch delivered to the site. The ticket shall provide as a minimum: weight in pounds of cement, aggregates (fine and coarse), water; weight in ounces of air-entraining agent; time of loading; and the revolution counter reading at the time batching was started.
12. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, the volume of grouted rock riprap, including filter layers or bedding, is determined to the nearest cubic yard from the specified thickness shown on the drawings and the area on which acceptable placement has been installed. Payment for grouted rock riprap is made at the contract unit price. Such payment is considered full compensation for all labor, material, equipment, and all other items necessary and incidental to the completion of the grouted rock riprap, filter layers and bedding, and geotextile material.
Method 2—For items of work for which specific unit prices are established in the contract, the volume of riprap and the volume of filter layers or bedding is determined to the nearest cubic yard from the specified thickness shown on the drawings and the area in which acceptable placement has been installed.
The volume of grout is determined from the calculated batch volume and the number of mixed batches delivered to the site and placed in accordance with the specification. The area of geotextile is determined to the nearest square yard from measurements of geotextile material installed according to the contract requirements. Payment is made at the contract unit price for each type of rock riprap, filter or bedding, concrete grout, and geotextile. Such payment is considered full compensation for all labor, material, equipment, and all other items necessary and incidental to the completion of the work.
Method 3—For items of work for which specific unit prices are established in the contract, the quantity of each type of rock riprap placed within the specified limits is computed to the nearest 0.1 ton by actual weight. The quantity of each type of filter or bedding aggregate delivered and placed within the specified limits is computed to the nearest 0.1 ton. For each load of rock riprap placed as specified, the contractor shall furnish to the engineer a statement-of-delivery ticket showing the weight to the nearest 0.1 ton. For each load of filter or bedding aggregate, the contractor shall furnish to the engineer a statement-of-delivery ticket showing the weight to the nearest 0.1 ton. The volume of grout is determined from the calculated batch volume and the number of mixed batches delivered to the site and placed in accordance with the specifications and drawings. The area of geotextile is determined to the nearest square yard from measurements of geotextile material installed according to the contract requirements. Payment
Salado Creek Site 15R - RCC Repair 13 of 35
(210-VI-NEH, May 2001 62-6 is made at the contract unit price for each type of rock riprap, filter or bedding, concrete grout, and geotextile. Such payment is considered full compensation for all labor, material, equipment, and all other items necessary and incidental to the completion of the work.
Salado Creek Site 15R - RCC Repair 14 of 35
NRCS-7/23/2009 62-7
13. Items of Work and Construction Details In Section 4, Placement of Rock Riprap, Method 1 shall apply. Rubber tired or rubber tracked equipment may be allowed on the rock riprap. The rock riprap areas traversed by equipment shall be limited and the surface protected to prevent damage to the underlying rock riprap. At no time shall equipment be allowed to damage or destroy the existing rock riprap. Damaged riprap shall be replaced at the Contractor’s expense.
In Section 6, Design of Grout Mix, Cement shall be Type II or Type V. The concrete grout design mix shall be as follows:
Cement ………………………....564 lb. per cu yd Fine Aggregate ………………...1616 lb. per cu yd Coarse Aggregate ……………...1248 lb. per cu yd Water …………………………..48 gal per cu yd
The fine and coarse aggregates shall be graded as follows:
Fine Aggregate Sieve Percent Passing 3/8” 100 No. 4 95 to 100 No. 8 80 to 100 No. 16 50 to 85 No. 30 25 to 60 No. 50 10 to 30 No. 100 2 to 10
Coarse Aggregate Sieve Percent Passing 1/2” 100 3/8” 85 to 100 No. 4 10 to 30 No. 8 0 to 10 No. 16 0 to 5
Additional water shall be added at the job site only as approved. Type A, water reducing admixture meeting the requirements of Material Specification 533 shall be added to the job mix to improve workability. Adjustment of the water content in the design mix shall be made in accordance with the recommendations of the manufacturer of the admixture.
Salado Creek Site 15R - RCC Repair 15 of 35
NRCS-7/23/2009 62-8
Items of work to be performed in conformance with this specification and the construction details
a. Bid Item 2, Grouted Rock Riprap
(1) This item shall include all work necessary to reposition the existing rock riprap to repair the auxiliary spillway outlet channel to the lines, grades, and locations shown on the drawings.
(2) In Section 12, Measurement and payment, none of the methods apply. The tonnage or volume of rock riprap repositioned shall not be measured. Payment for this bid item will include the reshaping/repositioning of the existing rock to achieve the lines and grades shown on the construction drawings. Such payment is considered full compensation for all labor, material, equipment, and all other items necessary and incidental to the completion of the work.
(3) The existing rock riprap that has been displaced shall be repositioned in such a way that an even distribution of large, medium, and small rock fragments interlock to form a relatively homogeneous mass that resembles the adjacent rock riprap located outside the work limits.
(4) Damaged geotextile underlayment shall be repaired in accordance with Construction Specification 95 prior to placing rock riprap.
(5) The items of work subsidiary to this bid item are:
(a) Pollution Control as specified in Construction Specification 5.
(b) Geotextile as specified in Construction Specification 95.
b. Bid Item 3, Concrete Grout for Rock Riprap
(1) This item shall consist of furnishing, transporting, and placing concrete grout for the construction of the grouted rock riprap as shown on the drawings.
(2) In Section 12, Measurement and payment, none of the methods apply. The volume of concrete grout is determined from the calculated batch volume and the number of mixed batches delivered to the site and placed in accordance with this specification. Payment is made at the contract unit price for this item. Such payment is considered full compensation for all labor, material, equipment, and all other items necessary and incidental to the completion of the work.
(3) The grouting depth within the grouted rock riprap shall be from subgrade of the rock riprap to within 12” of the finished grade to the extents shown in the construction drawings.
(4) The finished appearance of the grouted rock riprap surface shall resemble the adjacent loose rock riprap. Spillage and/or grout that is adhered to the exposed portion of the rock riprap shall be cleaned/removed once the grout has set stiff enough not be damaged or eroded by cleaning/removal methods. Set retarders shall only be used upon approval of the Engineer.
(5) Set retarders (if use is allowed by the Engineer) shall be environmentally friendly and not pose an environmental risk.
(6) Placement of the grout with a pump truck is acceptable.
Salado Creek Site 15R - RCC Repair 16 of 35
NRCS-7/23/2009 62-9
(7) Concrete grout shall be protected against freezing during the first 24 hours after placement.
(8) The items of work subsidiary to this bid item are:
(a) Pollution Control as specified in Construction Specification 5.
Salado Creek Site 15R - RCC Repair 17 of 35
(210-VI-NEH, May 2001) 91-1
Construction Specification 91—Chain Link Fence
1. Scope The work consists of furnishing and installing chain link fencing complete with all posts, braces, gates, and all other appurtenances.
2. Material The material for the chain link fence shall be as follows:
Galvanized Chain link fence fabric shall conform to the requirements of ASTM A 392, 2-inch mesh and 9-gauge galvanized steel wire. Zinc coating shall be class 2.
Posts and fence framework shall conform to the requirements of ASTM F 1043 Group 1A, for Heavy Industrial Fence. Coatings shall be a type A galvanized coating for internal and external surfaces. Steel pipe posts shall conform to the requirements of ASTM F 1043 and F 1083.
Fence fittings shall conform to the requirements of ASTM F 626. Fittings shall be galvanized steel. Wire ties and clips shall be 9-gauge.
Gates, gateposts, and gate accessories shall conform to the requirements of ASTM F 900. Coating shall be the same as selected for adjoining fence and framework.
Barbed wire shall be 12.5 gauge and shall conform to the requirements of ASTM A 121, chain link fence grade.
Galvanized and PVC coated Chain link fence fabric shall conform to the requirements of ASTM F 668 for class 2a or 2b, 2-inch mesh, and 9-gauge galvanized steel wire. The fabric shall have a polymer top coating of the color specified in section 6.
Posts and fence framework shall conform to the requirements of ASTM F 1043 Group 1A, for Heavy Industrial Fence. Coatings shall be a type A galvanized coating for internal and external surfaces and covered with a polymer top coating of color as specified in section 6.
Fence fittings shall conform to the requirements of ASTM F 626. Fittings shall be galvanized steel with a polymer top coating of color as specified in section 6.
Any damage to the coating shall be repaired in accordance with the manufacturer's recommendations, or the damaged fencing material shall be replaced. The contractor shall provide the engineer a copy of the manufacturer's recommended repair procedure and materials before correcting damaged coatings.
3. Installing fence posts Unless otherwise specified, line posts shall be placed at intervals of 10 feet measured from center to center of adjacent posts. In determining the post spacing, measurement is made parallel with the ground surface.
Posts shall be set in concrete backfill in the manner shown on the drawings.
Posts set in the tops of concrete walls shall be grouted into preformed holes to a depth of 12 inches.
All corner posts, end posts, gateposts, and pull posts shall be embedded, braced, and trussed as shown
Salado Creek Site 15R - RCC Repair 18 of 35
(210-VI-NEH, May 2001) 91-2 on the drawings or in accordance with appropriate industry practice if not otherwise shown or specified.
4. Installing wire fabric Fencing fabric shall not be stretched until at least 4 days after the posts are grouted into walls or 7 days after the posts are set in the concrete backfill.
Fencing fabric shall be installed on the side of the posts designated on the drawings.
The fabric shall be stretched taut and securely fastened, by means of tie clips, to the posts at intervals not exceeding 15 inches and to the top rails or tension wires at intervals not exceeding 2 feet. Care shall be taken to equalize the fabric tension on each side of each post.
Barbed wire shall be installed as shown on the drawings and shall be pulled taut and fastened to each post or arm with the tie wires or metal tie clips.
5. Measurement and payment Method 1—The length of fence is measured to the nearest 0.1 foot along the fence, including gates.
Payment is made at the contract unit price for the specified height of fence. Such payment constitutes full compensation for all labor, material, equipment, and all other items necessary and incidental to the completion of the work.
Method 2—The length of fence is measured to the nearest 0.1 foot along the fence, excluding gate openings.
Payment is made at the contract unit price for the specified height of fence. The number of each size and type of gate installed is determined. Payment is made at the contract unit price for that type and size of gate. Such payment constitutes full compensation for all labor, material, equipment, and all other items necessary and incidental to the completion of the work.
All methods—The following provisions apply to all methods of measurement and payment.
Compensation for any item of work described in the contract, but not listed in the bid schedule, is included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 6 of this specification.
Salado Creek Site 15R - RCC Repair 19 of 35
NRCS-7/23/2009 91-3
6. Items of Work and Construction Details
a. Subsidiary Item, Chain Link Fence
(1) This item shall consist of furnishings all materials required and all work necessary for replacement of the chain-link safety fence at the locations shown on the drawings.
(2) Salvaged fence materials shall be approved by the Engineer prior to placement.
(3) The requirements for sampling, inspection and test procedures outlined in the applicable Federal Specification RR-F-221f, “Fencing, Wire (Barbed Wire, Woven Wire and Netting), Fence Post and Accessories” dated July 12, 1968, and Interim Federal Specification Rr-F-001901, “Fencing, Wire and Post, Metal (Chain Link Fence Fabric)” is waived by the Contracting Officer. A material certification for the fence posts, chain-link fabric and accessories shall include the supplier’s certified statement that the materials furnished meet the requirements of the applicable Federal Specifications.
(4) Separate payment will not be made for this item of work. Compensation for this item will be included in the payment for the bid item for Mobilization and Demobilization.
Salado Creek Site 15R - RCC Repair 20 of 35
(210-VI-NEH, May 2001) 94-1
Construction Specification 94—Contractor Quality Control
1. Scope The work consists of developing, implementing, and maintaining a quality control system to ensure that the specified quality is achieved for all materials and work performed.
2. Equipment and materials Equipment and material used for quality control shall be of the quality and condition required to meet the test specifications cited in the contract. Testing equipment shall be properly adjusted and calibrated at the start of operations and the calibration maintained at the frequency specified. Records of equipment calibration tests shall be available to the engineer at all times. Equipment shall be operated and maintained by qualified operators as prescribed in the manufacturer's operating instructions, the references specified, and as specified in section 10 of this specification. All equipment and materials used in performing quality control testing shall be as prescribed by the test standards referenced in the contract or in section 10.
All equipment and materials shall be handled and operated in a safe and proper manner and shall comply with all applicable regulations pertaining to their use, operation, handling, storage, and transportation.
3. Quality control system Method 1—The contractor shall develop, implement, and maintain a system of quality control to provide the specified material testing and verification of material quality before use. The system activities shall include procedures to verify adequacy of completed work, initiate corrective action to be taken, and document the final results. The identification of the quality control personnel and their duties and authorities shall be submitted to the contracting officer in writing within 15 calendar days after notice of award.
Method 2—The contractor shall develop, implement, and maintain a system adequate to achieve the specified quality of all work performed, material incorporated, and equipment furnished before use. The system established shall be documented in a written plan developed by the contractor and approved by the contracting officer. The system activities shall include the material testing and inspection needed to verify the adequacy of completed work and procedures to be followed when corrective action is required.
Daily records to substantiate the conduct of the system shall be maintained by the contractor.
The quality control plan shall cover all aspects of quality control and shall address, as a minimum, all specified testing and inspection requirements. The plan provided shall be consistent with the planned performance in the contractor's approved construction schedule. The plan shall identify the contractor's onsite quality control manager and provide an organizational listing of all quality control personnel and their specific duties. The written plan shall be submitted to the contracting officer within 15 calendar days after notice of award. The contractor shall not proceed with any construction activity that requires inspection until the written plan is approved by the contracting officer.
All methods—The quality control system shall include, but not be limited to, a rigorous examination of construction material, processes, and operation, including testing of material and examination of manufacturer's certifications as required, to verify that work meets contract requirements and is performed in a competent manner.
4. Quality control personnel
Method 1—Quality control activities shall be accomplished by competent personnel. A competent person is: One who is experienced and capable of identifying, evaluating, and documenting that materials
Salado Creek Site 15R - RCC Repair 21 of 35
(210-VI-NEH, May 2001) 94-2 and processes being used will result in work that complies with the contract; and, who has authority to take prompt action to remove, replace, or correct such work or products not in compliance. Off-site testing laboratories shall be certified or inspected by a nationally recognized entity. The Contractor shall submit to the Contracting Officer, for approval, the names, qualifications, authorities, certifications, and availability of the competent personnel who will perform the quality control activities.
Method 2—Quality control activities shall be accomplished by competent personnel who are separate and apart from line supervision and who report directly to management. A competent person is one who is experienced and capable of identifying, evaluating, and documenting that material and processes being used will result in work that complies with the contract, and who has authorization to take prompt action to remove, replace, or correct such work or products not in compliance. Offsite testing laboratories shall be certified or inspected by a nationally recognized entity. The contractor shall submit to the contracting officer, for approval, the names, qualifications, authorities, certifications, and availability of the competent personnel who will perform the quality control activities.
5. Post-award conference The contractor shall meet with the contracting officer before any work begins and discuss the contractor's quality control system. The contracting officer and the contractor shall develop a mutual understanding regarding the quality control system.
6. Records The contractor's quality control records shall document both acceptable and deficient features of the work and corrective actions taken. All records shall be on forms approved by the contracting officer, be legible, and be dated and signed by the competent person creating the record.