Specifications.pdf
PDF 36 KB Posted
- Attached to
- Oak Island, Chambers County, Texas EWP
- Solicitation number
- AG-7442-S-08-0046
About this file
Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Long Abstract.xls | XLS spreadsheet | |
| CORRECTED Bid Schedule.pdf | ||
| AG-7442-S-08-0046.pdf | ||
| 96-0223_sca.htm | HTM file | |
| drawing.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
l
Chambers County EWP Page 1 of 2 Debris Removal & Disposal
Construction Specification 8—Mobilization and Demobilization
1. Scope The work consists of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the contract. It does not include mobilization and demobilization for specific items of work for which payment is provided elsewhere in the contract. Mobilization will not be considered as work in fulfilling the contract requirements for commencement of work.
2. Equipment and material Mobilization shall include all activities and associated costs for transportation of contractor's personnel, equipment, and operating supplies to the site; establishment of offices, buildings, and other necessary general facilities for the contractor's operations at the site; premiums paid for performance and payment bonds including coinsurance and reinsurance agreements as applicable; and other items specified in section 4 of this specification.
Demobilization shall include all activities and costs for transportation of personnel, equipment, and supplies not required or included in the contract from the site; including the disassembly, removal, and site cleanup of offices, buildings, and other facilities assembled on the site specifically for this contract.
This work includes mobilization and demobilization required by the contract at the time of award. If additional mobilization and demobilization activities and costs are required during the performance of the contract as a result of changed, deleted, or added items of work for which the contractor is entitled to an adjustment in contract price, compensation for such costs will be included in the price adjustment for the item or items of work changed or added.
3. Payment Payment will be made as the work proceeds, after presentation of paid invoices or documentation of direct costs by the contractor showing specific mobilization and demobilization costs and supporting evidence of the charges of suppliers, subcontractors, and others. When the total of such payments is less than the lump sum contract price, the balance remaining will be included in the final contract payment. Payment of the lump sum contract price for mobilization and demobilization will constitute full compensation for completion of the work.
Payment will not be made under this item for the purchase costs of materials having a residual value, the purchase costs of materials to be incorporated in the project, or the purchase costs of operating supplies.
Chambers County EWP Page 2 of 2
4. Items of work and construction details
a. Payment as described in Section 3
Payment shall be lump sum, submitted at the end of the project.
b. BID ITEM #1, Mobilization and Demobilization
(1) The work shall consist of the mobilization and demobilization of the Contractors forces and equipment necessary for performing the work required under the contract.
(2) As part of this bid item the Contractor shall furnish, install and maintain all barricades, warning signs, traffic control devices, etc.
necessary to control traffic and provide for public safety when operations interfere with traffic flow or take place on the right-of-way of any public roadway. The Contractor’s traffic control system shall comply with the requirements of the Texas Manual on Uniform Traffic Control Devices for Streets and Highways as well as any local restrictions enacted by Chambers County.
(3) Each job site shall be considered a hardhat area. All persons, including operators, are required to wear a hardhat while operations are in progress. This item shall also include posting each job site as a construction area with signage at all entry points.
The sign shall measure at least 4 feet by 6.5 feet with red letters at least 6 inches high and white background. The signs shall read
“NRCS EWP PROJECT – WORK AREA – HARDHATS
REQUIRED BEYOND THIS POINT”. The sign shall be have a professional appearance. All hardhats must meet ANSI Z89.1 Class G, E, C Type I.
(4) This item shall include providing an individual on each job site’s work crew who has a current first aid certificate from the Mine Safety and Health Administration, American Red Cross, or other state approved organization.
(5) This item shall include providing one moisture-proof, dust-tight, 16-unit American Red Cross approved first aid kit for every 25 employees on each job site. These first aid kits must be located in accessible, well-identified locations at the job site and be replenished as contents are used or become ineffective or outdated.
(6) This item shall include providing a chemical toilet (port-a-potty) for each work crew. This item may be provided on a mobile mount so as to facilitate movement from one location to another easily.
Chambers County EWP Page 1 of 8
CONSTRUCTION SPECIFICATION - 430. IKE STORM DEBRIS REMOVAL
1. Scope
This item will consist of the removal and disposal of all storm debris including downed and damaged trees, hanging tree limbs, brush, logs, tree limbs, building materials, rubbish, flood debris, foreign materials and other obstructions from the identified drainage ways shown on the attached drawings or as referenced in Section 8 of this specification.
Within this specification, the term “Contracting Officer” shall mean the Contracting Officer or his/her designated representative.
Within this specification, the term “Improved Property” shall include homes, lawns, landscaped areas, parks, athletic fields, parking lots, businesses, streets, etc.
2. Access
Access routes shall be from highways and/or county roads shown on the drawings or as designated by the Contracting Officer unless alternate routes are obtained by the Contractor and approved by the Contracting Officer.
3. Work Limits
Work limits shall extend horizontally the full width of the drainage channel segment including the immediate bank area and whatever distance horizontally specified in each site sketch. The limits of work shall extend vertically from natural ground or the bottom of the channel to the tree tops.
Individual Parcel Operations – Work limits shall be shown on the site drawings or marked in the field. During the course of the cleanup operations the NRCS shall identify limits of work on individual parcels that are to be cleared adjacent to designated drainage channels.
4. Storm Debris Removal
Work shall begin at the most upstream end of the reach and progress in a downstream direction.
Removal methods include, but are not limited to, sawing, winching, lifting, floating, digging, or dragging. Excavation shall be limited to that necessary for stump removal.
Chambers County EWP Page 2 of 8
The following guidelines will be used to determine which trees, brush, stumps, and debris to remove. The final determination will be made by the Contracting Officer.
a. All downed trees and brush with the main stem greater than six (6) inch diameter lying wholly or partially within the limits of work shall be removed in their entirety. Downed trees and brush are defined as those trees and brush with lean of 45 degrees or less from horizontal having part of the main root system visible and projecting above normal ground level. Stump removal is required for downed trees and brush. Stump removal shall result in the removal of all woody vegetation above natural ground or the bottom of the channel.
b. Storm damaged trees and brush shall be removed from within the limits of work. Storm damaged trees are defined as those trees and brush with a lean of 45 degrees or less from the horizontal with minimum damage to the main root system. Stumps of damaged trees within the limits of work shall be saw cut parallel to and as close to ground level as the cutting tool will permit.
c. Storm damaged trees or brush rooted outside the limits of work but with limbs or tops inside the work limit shall be cut at the work limit and the limbs or top removed.
d. Limbs and other washed-in or blown in woody vegetation greater than four inches in diameter (measured at large end) or six (6) feet in length lying completely or partially within the work limits shall be removed in their entirety.
e. Broken tops or limbs (hangers) within the work limits that are longer than six (6) feet but still attached to or supported by the main tree shall be removed. Only the broken tops or limbs shall be removed if practical. All cuts shall be made on the tree side of the break.
f. Trees or brush other than described above that are to be removed will be marked by paint.
All building materials, manufactured items, and other loose foreign debris shall be removed. Cans, bottles, clothing, plastic bags and any styrofoam, plastic or manufactured item with the largest side having a surface area of one (1) square foot or less shall not be removed.
Chambers County EWP Page 3 of 8
The Contractor will submit to the Contracting Officer for approval his written plan for locating and removing submerged debris prior to the commencement of operations. Any underwater operation used in the performance of this work shall be conducted in accordance with all local, state, and federal regulations, as applicable to the area of jurisdiction, but under no circumstances will the operational requirements be less than specified in Occupational Safety and Health Administration (OSHA) regulation 29 CFR Ch. XVII-PART 1910-Subpart T- Commercial Diving Operations.
The Contractor shall retrieve and dispose of any debris that may become dislodged because of his operation.
5. Disposal
All debris that is not natural woody vegetation, such as building materials and manufactured items shall be hauled to the county landfill or designated disposal area(s) unless alternate off-site disposal areas are obtained by the Contractor and approved by the Contracting Officer. Items not accepted by the county landfill (tires, batteries, appliances that used refrigerants, paints, liquids, sealed containers, etc.) shall be disposed of at approved alternate sites at the Contractor’s expense and as approved by the Contracting Officer.
Natural woody and other vegetative debris shall be hauled off site and disposed of by the Contractor. Other means of disposing of the debris must be approved by Contracting Officer.
During debris removal operations, debris shall not be stockpiled in tributaries, side ditches, or other defined water entrances to the watercourse being cleaned.
6. Special Requirements
The Contractor shall take reasonable precautions to prevent further damage to the drainage ditch or stream and its environment to include channel banks, recreational facilities and undamaged trees and vegetation. No grading for equipment to work or benching of the channel sides will be permitted without the concurrence of the Contracting Officer.
Naturally leaning trees with apparently undamaged root systems and other undamaged vegetation shall be left standing. Removal of healthy trees shall be limited to those needed for access to work areas. Cutting of healthy trees will not be permitted without the concurrence of the Contracting Officer.
Chambers County EWP Page 4 of 8
“Hangers” are defined as loose broken branches more than 6 feet long that remain lodged in the tree or broken branches more than 6 feet long that are still connected to an otherwise healthy tree. “Hangers” shall be removed or cut away from the tree at the point of attachment if this can be done in a safe manner. If the Contracting Officer Representative determines that this can not be done in a safe manner, the tree shall be cut a maximum of 18” above ground level with the cut portion of the tree disposed of in accordance with this specification.
The number of drainage ditch and stream crossings shall be kept to a minimum.
Materials used to form stream crossings shall be removed once the work for the subject section is completed.
The Contractor shall use equipment suitable for operation on paved roadways (mats, rubber tired equipment, etc.) when obstruction removal is to be performed from bridges, culvert crossings or roadways.
The Contractor shall take all reasonable precautions to prevent further damage to structures, utilities, or other fixed improvements and shall promptly repair or replace, at his own expense, any such improvements damaged by his operations.
The Contractor shall photograph all known structures of a significant or unique nature such as low water crossings, dams, bridges, public and private utilities, etc. Prior to the commencement of operations near the structure. Photographs will be taken before any Contractor activity is allowed closer than 100 feet of the structure.
The Contractor shall backfill holes in the channel resulting from stump removal.
Backfill shall be the best fill material from within the channel area and within fifty (50) feet of the stump hole.
Fences, which must be cut or removed for the performance of the work, shall be repaired or replaced by the Contractor.
The Contractor shall not routinely operate heavy crawler type equipment, such as crawler tractors and tracked excavators, within flowing channels. The Contracting Officer shall approve any operation of heavy equipment within the banks of the watercourse.
Multiple work crews may be utilized. The Contractor shall provide a job coordinator for each work crew to be available at all times while work is in progress. Each job coordinator shall have a cellular telephone to communicate with the Government Inspector and others.
Trees and other vegetation designated to remain undisturbed shall be protected from damage throughout the duration of the construction period. Any damages resulting from the Contractor’s operations or neglect shall be repaired or replaced
Chambers County EWP Page 5 of 8 by the Contractor at his expense. Only damaged trees shall be removed.
Construction equipment shall be routed around trees designated to remain.
The Contractor shall secure all debris or material while it is transported on any roadway.
7. Measurement and Payment
Method 1 - For items of work for which specific lump sum prices are established in the contract, payment for obstruction removal shall be made at the contract lump sum price. Such payment shall constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to completion of the work.
All methods— The following provision applies to all methods of measurement and payment. Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in Section 8 of this specification.
Chambers County EWP Page 6 of 8
8. Items of Work and Construction Details
In SECTION 2, ACCESS, the Contractor shall access the designated drainage areas along the channel edge and within the 30 feet work limits. Where trees within the work limits are designated to remain by the Contracting Officer, the contractor shall route construction equipment around the tree as directed by the engineer. The removal of debris from the channel shall be with a 60’ long arm excavator with wide tracks. Hauling of debris from along the channel to a street shall be with a marsh buggy with rubber tracks. No rubber tired equipment shall be used in yard areas where rutting may occur. Operation of all equipment shall limit tracking and rutting in soft soils of residential yards.
In SECTION 4, STORM DEBRIS REMOVAL, shall also include removal of all accumulations of water grass, weeds and small sticks as identified by NRCS and deposited within the work limits.
The contractor will be required to systematically rake the channel bottom to find and remove all submerged debris deposited on the channel bottom.
Stumps shall not be removed but cut level with the ground surface.
In SECTION 5, DISPOSAL, The contractor may dispose of all vegetative woody debris by burning provided there is no “Burn Ban” in effect and he complies with all local and county burning requirements. The contractor shall be responsible for obtaining burn site if he chooses to use this as a disposal method.
Only woody and vegetative debris may be burned. The contractor shall start burning operations with the ignition of the fire no later than 10:00 a.m. and shall add no additional debris to the burn pile after 3:00 p.m. The contractor shall remain in attendance of the burn pile until it is extinguished or is considered safe to be left unattended for the night. Wind speed and humidity shall be considerations as to whether it may be safe to leave the burn pile unattended for the night.
All appliances and air conditioning units that use Freon shall be separated out and disposed of at a landfill that accepts this type debris. The Freon will be removed from the appliances prior to disposal by the land fill operators.
In SECTION 7, PAYMENT, The Contractor and Contracting Officer will review a segment for compliance to this specification once work is completed.
Completion of a bid schedule item is defined as full performance of this specification inclusive of debris removal, debris disposal and smoothing of work area. The Contracting Officer upon acceptance of the work shall certify an item as complete for debris removal and approve payment at the bid schedule lump sum price for that item.
Chambers County EWP Page 7 of 8
Items of work to be performed in conformance with this specification and the construction details are:
a. BID ITEMS #2 through #5, Debris Removal From Segments 1 through 4 in Oak Island.
BID ITEM 2, Segment 1
1. Segment 1 - shall consist of performing all work required by SECTION 1 of this specification within and along the channel according to the defined work limits. This requires removal and disposal of all storm debris within the channel and for a horizontal distance of 30 feet out from edge of the water on both sides of the drainage channel. The segment extends from its outlet into the bay to the south side of Bay Side Drive. There is approximately 1100 feet of channel in this segment.
BID ITEM 3, Segment 2
2. Segment 2 - shall consist of performing all work required by SECTION 1 of this specification within and along the channels according to the defined work limits. This requires removal and disposal of all storm debris within the channels and for a horizontal distance of 30 feet out from edge of the water on both sides of the drainage channels. The segment includes all drainage channels from the three outlets into the bay to north side of Bayside Drive and to the west site of Shady Glen Drive.
There is approximately 3000 feet of channel in this segment.
BID ITEM 4, Segment 3
3. Segment 3 - shall consist of performing all work required by SECTION 1 of this specification within and along the channels according to the defined work limits. This requires removal and disposal of all storm debris within the channels and for a horizontal distance of 30 feet out from edge of the water on both sides of the drainage channels. The segment includes all drainage channels from the east side of Shady Glen Drive to the south side of Poncho Road. It includes the drain and ditch along Poncho Road to West Bayshore Road. There is approximately 2800 feet of channel in this segment.
Chambers County EWP Page 8 of 8
BID ITEM 5, Segment 4
4. Segment 4 - shall consist of performing all work required by SECTION 1 of this specification within and along the channel according to the defined work limits. This requires removal and disposal of all storm debris within the channel and for a horizontal distance of 30 feet out from edge of the water on both sides of the drainage channel. The segment extends from Ponch Road for a distance 300 feet north of Ponch Road. Hand pickup and removal of debris will be required along the east side of the channel.