Amend._3.doc
DOC document 86 KB Posted
- Attached to
- North Zone Thinning IDIQ
- Solicitation number
- AG-67T0-S-14-0018
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend._4.doc | DOC document | |
| Amend._2.doc | DOC document | |
| Amend._1.doc | DOC document | |
| Instruction_Sheet.doc | DOC document | |
| SOL.docx | DOCX document | |
| SF-1449.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
| 1 |
| 3 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| Amendment 3 |
| 05/16/2014 |
| 682284 |
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
USDA Forest Service Black Hills National Forest
8221 S. Hwy. 16 Rapid City, SD 57702 USDA Forest Service
Black Hills National Forest
8221 S. Hwy. 16
Rapid City, SD 57702
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) |
| (X) |
| 9A. AMENDMENT OF SOLICITATION NO. |
FORMCHECKBOX
AG-67T0-S-14-0018
9B. DATED (SEE ITEM 11)
03/22/2014
FORMCHECKBOX
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (X) |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN |
THE CONTRACT ORDER NO. IN ITEM 10A.
FORMCHECKBOX
FORMCHECKBOX
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
FORMCHECKBOX
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
FORMCHECKBOX
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
North Zone Thinning/Fuel Reduction The purpose of this amendment is toprovide minutes to the preproposal meeting and address a correction to the solicitation.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
| WILLIAM HIGHLAND ACO |
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
| /s/ |
| 05/16/2014 |
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
| 30-105 |
| STANDARD FORM 30 (REV. 10-83) |
Prescribed by GSA
FAR (48 CFR) 53.243
MEMORANDUM FOR RECORD
May 16, 2014
SUBJECT: Amendment 3, Preproposal Meeting Minutes and change to the solicitation, Black Hills National Forest, Solicitation AG-67T0-S-14-0018, Nort Zone Thinning/Fuel Reduction Northern Hills IDIQ Attending Pre-proposal Meeting:
William Highland 605-716-1883
ACO
US Forest Service
Gwen Tallmadge 605-642-4622
COR
US Forest Service
Kara Dunlap
307-283-1361
TMA
US Forest Service
Deb Tinker
605-642-4622
COR
US Forest Service
Steve Wilson
605-716-2078
COR
US Forest Service
John Giles
435-840-8086
GM
Giles Const. LLC
Ron Schmalzer 541-535-8920
Supervisor Summitt Forest Inc.
Jeff Gamet
406-499-0181
Contractor Summitt Forest Inc.
Troy Shockey
605-641-2959
Contractor ECO Timber LLC
Estaban Gonzalez 541-857-1106
Contractor GE Forestry Inc.
Juan Bautita
541-664-2982
Contractor Pacific Coast Con.
Mark Munoz
605-391-2955
Contractor M&R Contracting
Raul D Munoz
605-391-2471
Contractor M&R Contracting
Jack Baker
605-381-5431
Contractor Baker Timber Prod.
Martha Rivera
530-527-4543
Foreman Escareno Reforestation
The meeting was opened by the C/O, who went through the solicitation package and discussed the following areas:
· Request for Proposals are being utilized for the resulting award of the contract.
· The Schedule of Items reflects a base and two option years.
· Contractors are strongly encouraged to address the evaluation factors in their proposals.
· Fax quotes are not authorized.
· Acquisition is a Total Small Business set aside.
· Ensure DUNS number & Tax ID No. is provided on the Schedule of Items
· Amendments 1 & 2 were initiated and contractors will need to acknowledge that they received all amendments.
· Insurance coverage in the amounts stated in AGAR Clause 452.228-71 will be required before work is performed.
· South Dakota & Wyoming Service Wage Determinations are to be complied with under the contract.
· Offerors submitting a Request For Proposal are required by the FAR to use the System for Acquisition Management (SAM) (www.sam.gov). S.A.M registration expires on an annual basis and that it would be prudent to check that it has not expired. In addition, contractors shall have completed their Online Reps. & Certs. Application (ORCA), to be considered for award.
· Addressed contract ceiling amount, task order procedure, and minimum guarantee.
· Fire Prevention and Control must be followed.
· Contract work may be suspended during extreme weather conditions.
The Contracting Officer Representative addressed the technical aspects of the project.\ Correction to Solicitation:
1. Ref. Pg. 13, 2.2.37 Whips & Culls, Delete Exhibit C, Add Exhibit C.
/s/ William Highland
Contracting Officer