Attachment_01_-_ERFO_147_DOW.pdf
PDF 86 KB Posted
- Attached to
- FR 147 ERFO Mark Twain National Forest
- Solicitation number
- AG-64R4-S-15-0026BR
About this file
Attachment 01 - ERFO 147 DOW
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-64R4-S-15-0026_BID_COPY_(Return).pdf | ||
| Attachment_06_-_Past_Performance_Info.docx | DOCX document | |
| AG-64R4-S-15-0026.pdf | ||
| Attachment_05_-_Contractor_Information.docx | DOCX document | |
| Attachment_03_-_FSRD_147_Map.pdf | ||
| Attachment_04_-_Construction_Notes_-_ERFO_147_-_2015_-_Final_Edit.pdf | ||
| Attachment_02_-_DB_WD_MO150001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FSRD 147 - GLADE TOP - ERFO ROAD RECONDITIONING
DESCRIPTION OF WORK
DSR #: FSR-147
Disaster #: MO2013-1-FS
MILEPOST
0.00 Intersection with Ozark County Road 945 left and paved Ozark County Road A409.
Begin reconditioning FSRD 147 with appropriate construction equipment.
Begin reconditioning all ditch lines to a 1' minimum depth whether identified or not in the description of work.
Begin reconditioning all outlet ditches whether identified or not in the description of work with appropriate construction equipment. Reestablish ditch blocks as necessary.
Begin removing berm left.
Begin spreading 1" minus, crushed aggregate 2" deep x 18' wide.
.01 Recondition AA type outlet ditch left.
Rock removal shall be required in the ditch lines and road way.
End berm removal left.
Begin reconditioning ditch left.
.02 Recondition AA type outlet left.
Rock removal shall be required in ditch line right.
Place 2" clean, crushed aggregate 6" deep to correct soft spot 10' wide x 75' long.
COR will mark location on the ground.
.04 Recondition AA type outlet left.
.06 Recondition AA type outlet left.
.o8 Recondition AA type outlet left.
.14 Maintain corrugated metal pipe.
Clean inlet and outlet.
.16 Recondition AA type outlet left.
.18 Recondition AA type outlet left.
.22 Recondition AA type outlet left.
.23 Recondition AA type outlet left.
Reestablish ditch block.
.24 Rock removal shall be required in the roadway and ditch lines.
DSR #: FSR-147
Disaster #: MO2013-1-FS
MILEPOST
.25 Recondition AA type outlet left.
.29 Maintain intersection with Haden Park Picnic Area right.
Non-system road left.
.30 Maintain intersection with Haden Park Picnic Area right.
.33 Non-system road right.
.37 Maintain corrugated metal pipe.
Clean inlet and outlet.
.45 Maintain corrugated metal pipe.
Clean inlet and outlet.
Rock removal shall be required at this point.
Blend acceptable spoils into the project area as directed by COR.
.46 Rock removal shall be required in ditch right.
.51 Maintain corrugated metal pipe. Clean inlet and outlet.
.54 Construct AA type outlet ditch left.
.57 Scarify to a depth of 4" and place 2" clean, crushed aggregate 6" deep x 10' wide x 100' long.
COR will mark location on the ground.
.67 Construct AA type outlet ditch left.
Install a new corrugated metal pipe 34' long x 24" diameter.
Rock removal shall be required.
.69 Begin placing 2" clean, crushed aggregate 18' wide x 6" deep x 634' long.
COR will mark location on the ground.
.74 Private drive left.
Install a new corrugated metal pipe 34' long x 24" diameter left.
Rock removal shall be required.
DSR #: FSR-147
Disaster #: MO2013-1-FS
MILEPOST
.75 Install a new corrugated metal pipe 30' long x 24" diameter.
Rock removal shall be required.
Construct AA type outlet ditch left to the length specified by the COR.
.77 Recondition AA type outlet ditch left.
.81 Install a new corrugated metal pipe 45' long x 24" diameter across FSRD 147.
Install a new corrugated metal pipe 20' long x 18" diameter left across private access.
Rock removal shall be required to install corrugated metal pipe and to open ditch lines.
End ditches left and right.
.82 Unmarked county road right.
Private water line crosses road.
Contractor shall be responsible for locating and protecting the water line.
Maintain approaches to farm entrances left and right.
.89 Recondition ditches left and right.
Recondition BB type outlet ditch left.
.92 Construct AA type outlet ditch right.
.94 Recondition AA type outlet ditch left.
.95 Recondition AA type outlet ditch left.
.99 Recondition AA type outlet ditch left.
Construct AA type outlet ditch right.
1.00 Rock removal shall be required in roadway and ditch lines.
1.03 Recondition AA type outlet ditch left.
1.06 Replace existing corrugated metal pipe with a 38' long x 24" diameter corrugated metal pipe.
Rock removal shall be required.
COR shall identify historic components at this mile post to be protected.
DSR #: FSR-147
Disaster #: MO2013-1-FS
MILEPOST
1.08 Install a new corrugated metal pipe 34' long x 24" diameter.
Rock removal shall be required.
1.11 Install a new corrugated metal pipe 37' long x 24" diameter.
Rock removal shall be required.
1.15 Remove cattle guard structure.
Rock removal spoil may be utilized as directed by the COR to fill the void created by the cattle guard removal.
The COR must approve this fill material prior to incorporating it in the roadway.
Backfill any remaining void with 15 tons of 2" minus crushed aggregate.
Rock removal shall be required in road way and ditch lines.
1.16 Maintain corrugated metal pipe. Clean inlet and outlet.
1.20 Install a new corrugated metal pipe 37' long x 24" diameter.
Rock removal shall be required.
1.26 Maintain corrugated metal pipe.
Clean inlet and outlet.
1.34 Maintain corrugated metal pipe.
Clean inlet and outlet.
1.37 Remove hazard tree right as identified by the COR.
1.43 Maintain approach with Smoke Tree Scene scenic overlook left.
End ditches left and right.
1.48 Recondition AA type outlet ditch left.
Resume ditch line reconditioning left.
1.51 Remove 2 hazard trees left as identified by the COR.
1.54 Install a new corrugated metal pipe 32' long x 24" diameter.
DSR #: FSR-147
Disaster #: MO2013-1-FS
MILEPOST
1.60 Recondition AA type outlet ditch left.
Resume reconditioning ditch line right.
1.63 Recondition AA type outlet ditches left and right.
1.65 Recondition AA type outlet ditches left and right.
1.73 Remove hazard tree right as identified by the COR.
Install a new corrugated metal pipe 42' long x 24" diameter.
Recondition AA type outlet ditch left.
1.74 Recondition BB type outlet ditch left.
1.75 Recondition BB type outlet ditch left.
1.77 Recondition AA type outlet ditches left and right.
1.79 Recondition AA type outlet ditches left and right.
1.82 Recondition AA type outlet ditches left and right.
1.87 Recondition AA type outlet ditch right.
1.91 Recondition AA type outlet ditches left and right.
1.94 Recondition AA type outlet ditch left.
1.96 Recondition BB type outlet ditches left and right.
2.03 Maintain approach with scenic overlook right.
2.05 Maintain intersection with FSRD 145 right.
Resume reconditioning ditch left.
2.10 Recondition AA type outlet ditch left.
End spreading 1" minus, crushed aggregate 2" deep x 18' wide.
Discontinue road way reconditioning of FSRD 147. Proceed to work identified at mile post 4.02.
DSR #: FSR-147
Disaster #: MO2013-1-FS
MILEPOST
4.02 Install new corrugated metal pipe 28' long x 24" diameter.
Place 5 tons of 1" minus crushed aggregate over the road covering the installed corrugated metal pipe.
Discontinue road way reconditioning and proceed to work identified at mile post 5.50.
5.50 Resume road way reconditioning of FSRD 147.
Resume ditch reconditioning right.
Resume spreading 1" minus crushed aggregate 2" deep x 18' wide.
Remove hazard tree left as identified by the COR.
5.56 Remove 2 hazard trees left as identified by the COR.
5.60 Rock removal shall be required in the road way and ditch line.
Remove existing culvert.
5.68 Non-system road left.
5.69 Maintain corrugated metal pipe.
Clean inlet and outlet.
5.71 Resume reconditioning ditch left.
5.73 Maintain corrugated metal pipe.
Clean inlet and outlet.
5.74 Rock removal shall be required in the roadway and ditch line.
5.80 Maintain corrugated metal pipe.
Clean inlet and outlet.
5.87 Maintain Caney Fire Tower approach left.
Maintain corrugated metal pipe.
Clean inlet and outlet.
5.89 Maintain Caney Fire Tower approach left.
5.91 Maintain corrugated metal pipe.
Clean inlet and outlet.
DSR #: FSR-147
Disaster #: MO2013-1-FS
MILEPOST
5.94 Maintain turn out right. Place 10 tons of 1" minus, crushed aggregate over the turnout.
Protect stairway left.
6.00 Install a new corrugated metal pipe 29' long x 24" diameter.
6.03 Maintain corrugated metal pipe.
Clean inlet and outlet.
End spreading 1" minus crushed aggregate 2" deep x 18' wide.
6.12 Recondition BB type outlet ditch left.
6.18 Maintain approach to the Caney Picnic Ground entrance left.
6.20 Maintain approach to the Caney Picnic Ground walk in access left and parking area right.
Resume spreading 1" minus crushed aggregate 2" deep x 18' wide.
6.24 Recondition AA type outlet ditch left.
Maintain the approach to the Caney Picnic Ground parking area right.
6.25 Recondition AA type outlet ditches left and right. Rock removal shall be required in road way and ditch lines.
6.40 End reconditioning of FSRD 147.
End spreading 2" minus crushed aggregate 2" deep x 18' wide.