Work Summary
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-64R4-S-15-0021_Forest_Road_1508_ _1730_Restoration_Baldridge_Booker_Bend.pdf | ||
| FS.Supplemental.Specifications_2015.doc | DOC document | |
| Contractor_and_Past_Performance_Info.docx | DOCX document | |
| DBA_Wage_Determination_MO150001_Highway.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Baldridge School and Booker Bend Roads Restoration U.S. Department of Agriculture Forest Service – Region Nine Mark Twain National Forest Service Houston/Rolla/Cedar Creek Ranger District Phelps, Pulaski and Texas Counties Disaster No: MO2013-1-FS
DSR#: 1730-1 & 1508-1
SCHEDULE OF ITEMS
BID ITEM # 1 – Forest Road 1508 Baldridge School Road
| ITEM NUMBER |
| DESCRIPTION |
| METHOD OF MEASURE |
| PAY UNIT |
| ESTIMATED QUANTITY |
| 15101 |
| Mobilization |
| CQ |
| LPSM |
| 1 |
| 30109 |
| Aggregate surface base course |
Grading
| Sieve Size |
| Percent Passing |
| 2” |
| 100 (1) |
| 1” |
| 80-100(6) |
| 3/4” |
| 64-94 (6) |
| 3/8” |
| 40-69 (6) |
| No. 4 |
| 31-54 (6) |
| No. 200 |
| 4-7 (3) |
Compaction method A
| CQ |
| TON |
| 384 |
| 30311 |
| Road reconditioning, surfacing, Compaction method A |
| CQ |
| MI |
| 4.1 |
BID ITEM # 2 – Forest Road 1730 Booker Bend
| ITEM NUMBER |
| DESCRIPTION |
| METHOD OF MEASURE |
| PAY UNIT |
| ESTIMATED QUANTITY |
| 15101 |
| Mobilization |
| CQ |
| LPSM |
| 1 |
| 25102 |
| Placed riprap, Class II |
| % of Rock by Mass |
| Mass (lbs) |
| Approx. Cubic Dimensions (in) |
| 20 |
| 55 to 110 |
| 8 to 10 |
| 30 |
| 22 to 55 |
| 6 to 8 |
| 40 |
| 2 to 22 |
| 3 to 6 |
| 10 |
| 0 to 2 |
| 0 to 3 |
| CQ |
| TON |
| 18 |
| 20701 |
| Earthwork geotextile, type: |
| CQ |
| SYD |
| 5 |
| 20965 |
| Backfill Material |
| CQ |
| CYD |
| 40 |
| 30109 |
| Aggregate surface base course |
Grading
| Sieve Size |
| Percent Passing |
| 2” |
| 100 (1) |
| 1” |
| 80-100(6) |
| 3/4” |
| 64-94 (6) |
| 3/8” |
| 40-69 (6) |
| No. 4 |
| 31-54 (6) |
| No. 200 |
| 4-7 (3) |
Compaction method A
| CQ |
| TON |
| 164 |
| 30311 |
| Road reconditioning, surfacing, Compaction method A |
| CQ |
| MI |
| 5.6 |
· Governing specifications: FP-03 (available http://flh.fhwa.dot.gov/resources/pse/specs/fp-03/fp-03usc.pdf), Forest Service Supplement Specifications 2015.
· Quantities: Quantities for Pay Items 25102 and 30109 are a contract quantity. Weight tickets for each load of aggregate will be provided to the COR or Inspector prior to final inspection.
· Safety: The contractor shall comply with all applicable OSHA regulations.
· Traffic Control: Temporary traffic control is considered incidental to item #30311. Temporary road closures less than 2 hours are permitted. Road closures lasting longer than 2 hours will require prior approval from the COR. All closures must be signed in accordance with the MUTCD (Available http://mutcd.fhwa.dot.gov/).
· Soil Erosion and Pollution Control: Any areas disturbed by the contractor shall be seeded and mulch if not hardened within 14 days of stop work. This stabilization work shall be incidental to the work.
Permits: The contractor shall provide proper notification to the Missouri One Call System before any excavation
DESCRIPTION OF WORK
BID #1 – FR1508 Baldridge School Road
| Milepost | Description of Work | |
| 0.0 | Intersection of Forest Road 1508 Baldridge School Road with Elder Springs Road (County Road). Start of project. Establish temporary traffic control or temporary road closure as needed while working on FR1508. | |
| 3.6 to 4.1 | Place 384 tons of 1-inch minus with a typical depth of 3 inches and spread to a width of 12 feet. Flagging or staking will be placed to indicate the start of aggregate placement. | |
| 0.0 to 4.1 | Perform surface blading to maintain drainage and preserve existing typical section shown on page 5. | |
| 4.1 | Intersection with White Road. End of Project. |
BID #2 – FR1730 Booker Bend Road
| Milepost | Description of Work | |
| 0.0 | Intersection with Missouri Route J. Start of project. Establish temporary traffic control or temporary road closure while working on FR1730. | |
| 4.3 | Coordinate with COR prior to start to request construction limits and slope staking. Place and compact 40 cubic yards of backfill material in severely eroded gully perpendicular to the roadway to construct a U-shaped channel. This channel shall be covered in geotextile and armored with type II rock blanket (18 tons). The rock blanket thickness shall be approximately 15-inches thick. The final elevations of the structure should have zero grade with no overfall at the outlet and blend smoothly with the roadway. Unless manufacturer permits, riprap will not be dumped onto geotextile. Approval is required before riprap blanket installation. | |
| 0.0 to 5.6 | Place 164 tons of 1-inch minus with a typical depth of 3 inches and spread to a width of 12 feet at locations to be identified by the COR. Perform surface blading to maintain drainage and preserve existing typical sections shown on page 5. | |
| 5.6 | Intersection with unimproved low water crossing prior to the unimproved Big Piney River access. End of Project. |
AGGREGATE PLACEMENT
PROJECT NAME: Baldridge School and Booker Bend Roads Restoration Placed riprap, pay item #25012 shall be placed at the locations indicated below. This material will placed as a rock blanket for the riprap-lined channel.
| Bid Item |
| To Milepost |
| Tons |
| 2 – #25102 FR1730 Booker Bend |
| 4.3 |
| 18 |
Crushed aggregate base, pay item #30109 1” minus base shall be placed to the following depths indicated below. The mixing of binder will not be required with aggregate base. The spreading of aggregate base with a grader is required. Compaction Method A, shall be utilized to achieve the required compaction whereby the aggregate is compacted by operating spreading and hauling equipment over the full width of each layer of the aggregate.
| Bid Item |
| From Milepost |
| To Milepost |
| Width |
| Depth |
| Tons |
| 1 – #30109 FR1508 Baldridge School Road |
| 3.6 |
| 4.1 |
| 12 |
| 3” |
| 384 |
| 2 – #30109 FR1730 Booker Bend |
| TO BE FLAGGED BY THE COR |
| 12 |
| 3” |
| 164 |
TYPICAL ROADWAY SECTIONS
PROJECT NAME: Baldridge School and Booker Bend Roads Restoration
RECONDITIONING SPECIFICATIONS
(excerpted from FS Supplemental Specifications 2015)
303 - Road Reconditioning Description
303.01 This work consists of reconditioning ditches, shoulders, roadbeds, parking areas, turnouts, approach road intersections, cattleguards, asphalt surfaces and aggregate surfaces. Construct outslopes, clean and maintain all roadbed drainage structures.
Material
303.02 Conform to the following Subsection:
Water 725.01
Construction Requirements
303.03 Ditch Reconditioning. Remove all slide material, sediment, vegetation, and other debris from the existing ditches and culvert inlets and outlets. Reshape ditches and culvert inlets and outlets to achieve positive drainage and a uniform ditch width, depth, and grade. Dispose of waste as directed by the COR.
303.04 Shoulder Reconditioning. Repair soft and unstable areas according to Subsection 204.07. Remove all slide material, vegetation, and other debris from existing shoulders including shoulders of parking areas, turnouts, and other widened areas. Dispose of waste as directed by the COR.
303.05 Roadbed Reconditioning Repair soft and unstable areas according to Subsection 204.07. Remove all organic, deleterious material larger than 6 inches from the top 6 inches of subgrade. Dispose of waste as directed by the COR. Scarify, rip and shape the traveled way and shoulders. Remove surface irregularities and shape to provide a uniform surface.
Dispose of rock larger than 4 inches brought to the surface during scarification.
For portions of roads not requiring scarification, the roadbed may contain rocks larger than 4 inches provided they do not extend above the finished roadbed surface. Reduce in place or remove rock extending above the finished roadbed surface. Dispose of removed rock as directed by the COR.
Compact using the following method as specified:
(a) Compaction A. Operate equipment over the full width.
(b) Compaction B. Operate rollers over the full width of each layer until visual displacement ceases, but not fewer than three complete passes. Use rollers that meet the following requirements:
(1) Steel wheeled rollers, other than vibratory, capable of exerting a force of not less than 250 pounds per inch of width of the compression roll or rolls.
(2) Vibratory steel wheeled rollers equipped with amplitude and frequency controls with a minimum weight of 6 tons, specifically designed to compact the material on which it is used.
(3) Pneumatic-tired rollers with smooth tread tires of equal size that will provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 psi.
303.06 Aggregate Surface Reconditioning. Repair soft and unstable areas to the full depth of the aggregate surface and according to Subsection 204.07. Scarify to the depth of the aggregate surface or to a depth of 8 inches, whichever is less, and remove surface irregularities. Reshape, finish, and compact the entire aggregate surface according to Section 308.
303.07 Roadway Reconditioning. Perform all the applicable work described in Subsections 303.03 through 303.06.
Maintain the existing cross slope or crown unless otherwise shown on the plans. Establish a blading pattern that will retain the surfacing on the roadbed and provide a through mixing of the materials within the completed surface width.
Blade and shape the subgrade for both surfaced and unsurfaced roads when moisture content is suitable for compaction.