Attachment_B_Drawings.pdf

PDF 7 MB Posted

Attached to
Replace HVAC System Federal contract opportunity
Solicitation number
AG-63A9-S-16-0006
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

Attachment B Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Replace HVAC System, newest first.
File Type Posted
MIFC_HVAC_Schedule_of_Items_Rev2.pdf PDF
Attachment_A_Specifications.pdf PDF
Attachment_C_Wage_Rates.pdf PDF
AG-63A9-S-16-0006_SOL.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed

Professional Engineer under the laws of the

State of Minnesota.

A

B

C

D

E

A

B

C

D

E

2 3 4 5 6 7

1 2 3 4 5 6 7

Foster, Jacobs, & Johnson, Inc.

2015c

SWITCHES

RECEPTACLES

ELECTRICAL SYMBOL NOTES

SECURITY SYSTEM

WIRING

FIRE ALARM SYSTEMGENERAL POWER

COMMUNICATIONS

NURSE CALL SYSTEM

ELECTRICAL SYMBOL LEGEND

LIGHTING MOUNTING HEIGHT MOUNTING HEIGHT MOUNTING HEIGHT

MINNEAPOLIS

BRAINERD

BEMIDJI

HIBBING

DULUTH

FARGO

EAST GRAND

FORKS

D

D E

E F

F

G

G

H

H

I

I

101 102

116 118

NO WORK IN THIS AREA

NO WORK IN THIS AREA

NO WORK IN

THIS AREA

WH

BATHROOM

TESTING

ROOM

WEST CACHE/WAREHOUSE

SMOKEY BEAR

EAST CACHE/WAREHOUSE

SHOP AREA

STEAM

CLEANING

ROOM

A

A

C

C

EXISTING DUCTWORK

IN THIS AREA

TO REMAIN

OPEN TO

UPPER

LEVEL

SLOPED

GYP. BD.

BULKHEAD

EXPOSED TO

STRUCTURE

(NO WORK)

OPEN TO

UPPER

LEVEL

OPEN TO

UNDERSIDE

OF STAIRS

B

B

NO WORK

L L

S

L L

MAP RACK;

TIGHT TO

CEILING

L L

L

L

L

L S

WOOD TRIM; 9"

WOOD TRIM; 3 1/2"

L

L

CABLES

THROUGH

CEILING

L S

LLL

S

L

L L S

L L L L

LLLLLL

S

S

LL

S

L L L L

L L

CABLES

THROUGH

CEILING

M L

L

L

L L

L

S L

L

L

L L

LL

S

L L

L

L

LL

L

L w

COLUMN

WOOD TRIM

SECURITY

LIGHT

7'-10"

7'-10"

121B

L w

L L

L L L L

L

11'-0"

L L

133 132

134 135

SEE NOTE #8

S

L

= SPRINKLER HEAD

= SURFACE FLOURESCENT LIGHT FIXTURE

= 2x4 RECESSED FLOURESCENT LIGHT FIXTURE

= RECESSED "CAN" LIGHT FIXTURE

w = WI-FI ACCESS POINT DEVICE

= EXIT LIGHT - CEILING MOUNTED

= SUPPLY AIR DIFFUSER (24" x 24")

= SUPPLY AIR DIFFUSER (ROUND)

= RETURN AIR GRILL

= DIFFUSER (WITHIN SAT TILE)

= POWER POLE

= SPEAKER

= MIRROR (CEILING)M

= PROJECTOR (MOUNT THROUGH CEILING)

RCP SYMBOLS LEGEND

= SECURITY LIGHT

100 VESTIBULE

101 OFFICE

102 RECEPTION

103 OFFICE

104 VESTIBULE

105 HALLWAY / STAIR

106 IT

107 OFFICE

108 OFFICE

109 OFFICE

110 OFFICE

111 OFFICE

112 OPEN OFFICE

113 STORAGE

114 OFFICE

115 WOMAN

116 MEN

118 OFFICE

120 MECHANICAL

121 OPEN OFFICE

121A WORK ROOM

121B HALLWAY / STAIR

122 KIT (PREP) ROOM

123 ELECTRICAL

124 OPEN OFFICE

125 LUNCH ROOM

126 EMERGENCY WASH DOWN

127 OFFICE

128 OFFICE

130 WAREHOUSE

131 WAREHOUSE

132 SHOP

133 TOILET

134 CLEANING

135 TESTING

FIRST FLOOR ROOM SCHEDULE

VERIFY

WALL

THICKNESS

PREFINISHED 24 GAUGE SHEET METAL

CHANNEL (CEILING WHITE), INSTALLED

CONTINUOUS ALONG TOP OF EXISTING

WALLS. WALL THICKNESS x 1 1/2"

VERTICAL LEGS.

NEW WALL ANGLE RIVETED TO CHANNEL

NEW SAT CEILING

EXISTING TRIM (BOTH SIDES) TO REMAIN

EXISTING STUD AND GYPSUM BOARD WALL

NOTE: EXISTING CEILING

EXTENDING OVER THE EXISTING

WALLS IS TO BE REMOVED.

(ALTERNATE BID - CEILING REPLACEMENT)

GENERAL RCP PLAN NOTES

1. See the General Conditions of the specifications for the description of the Base Bid and Alternates.

2. All ceilings are 8’-0” AFF unless noted otherwise.

3. These Reflected Ceiling Plans indicated ceilings as is, including fire protection sprinkler heads, mechanical, ventilation, lighting and electronics (such as wi-fi devices, speakers, etc.).

Note: the location of some fresh air diffusers may be adjusted as required for proper coverage. See mechanical plans.

4. See specifications for a description of Base Bid and Alternate Bids.

5. Under the Base Bid the contractor shall remove and replace the ceiling system only as required for the construction of the new ventilation system (duct removal, duct installation, supply air diffusers, return air grills, etc, see mechanical plans). Items such as lighting, speakers, etc. are to remain in the finished project, and shall be removed and reinstalled or supported in place as required to complete the new construction.

6. Per Alternate Bids #2 all existing ceilings are to be removed, including all items contained in or on the ceiling system (see mechanical and electrical plans). New ceilings to be installed in a similar layout to the existing.

NOTE: The First Floor ceiling north of Grid 2.5 is continuous over the top of the walls. Under Alternate Bid #2 the new ceilings are to be laid out to suit individual rooms. See 2/A1.1 for top-of-wall detail.

7. Fire sprinklers are to remain as is except where indicated otherwise on the mechanical plans.

8. In Rooms 121 and 121A there is an old ceiling grid above the existing ceiling.

a. Under the Base Bid this old grid is to be removed as required to carry out the work of the project and is not to be replaced.

b. Under the Alternate Bid (new ceiling) the old grid is to be fully removed.

FIRST FLOOR

ÉåêáÅÜáåÖ ÅçããìåáíáÉë íÜêçìÖÜ ~êÅÜáíÉÅíìêÉ

ÇìäìíÜ=G=îáêÖáåá~G=Öê~åÇ=ê~éáÇëG=íïáå=ÅáíáÉë ïïïKÇëÖïKÅçã

Çê~ïå=ÄóW

ÅÜÉÅâÉÇ=ÄóW íóéÉÇLéêáåíÉÇ å~ãÉW êÉÖK=@W ëáÖå=Ç~íÉW

Ç~íÉW éêçàÉÅí=@W ëáÖå~íìêÉW f=ÜÉêÉÄó=ÅÉêíáÑó=íÜ~í=íÜáë=éä~åI ëéÉÅáÑáÅ~íáçåI=çê=êÉéçêí=ï~ë éêÉé~êÉÇ=Äó=ãÉ=çê=ìåÇÉê=ãó ÇáêÉÅí=ëìéÉêîáëáçå=~åÇ=íÜ~í=f=~ã=~ Çìäó=iáÅÉåëÉÇ=^êÅÜáíÉÅí=ìåÇÉê=íÜÉ ä~ïë=çÑ=íÜÉ=ëí~íÉ=çÑ=jáååÉëçí~K ëÜÉÉí íáíäÉW ëÜÉÉí åìãÄÉêW

Erik C. Wedge

43566

10/1/2015 3:05:12 PM

015075.00

MCT

ECW

10/2/2015

MN Inter Agency

Fire Center Grand Rapids, MN

A1.1

First Floor

RCP

êÉîáëáçå=L áëëìÉ åçK Ç~íÉ

1/8" = 1'-0"

First Floor RCP

1 1/2" = 1'-0"

Top Of Wall Detail

MTrueblood Image

E F

F

G

G

H

H

I

I

210 207

217 218

220 223

227225

WEST

CACHE/WAREHOUSE

(BELOW)

EAST

CACHE/WAREHOUSE

(BELOW)

MEZZANINE AREA

EXPOSED ROOF STRUCTURE

NO WORK

EXPOSED ROOF STRUCTURE

NO WORK

EXPOSED

ROOF

STRUCTURE

A

A

C

C

OPEN TO ROOF

STRUCTURE

FOR LADDER

EXPOSED ROOF

STRUCTURE

NO WORK

EXPOSED ROOF

STRUCTURE

B

S

L

L

L

L

L

L w

S

S

S

S w

L

L

L

L w

S

L

L

S

S

L

L w w

L

L

S

L

L

S

S L

L

L

S L

L

L L L

L

L

OPEN TO

STRUCTURE

7'-9"

9'-6"

L

L

L L

DUCT CHASE

(FLOOR TO

CEILING ONLY)

L L

LL

L

L

L

AIRPLANE

(SUSPENDED

FROM / THROUGH

CEILING GRID)

CURTAIN

(SUSPENDED

FROM/THROUGH

CEILING) WITH

WALL MOUNTED

PROJECTION

SCREEN BEHIND.

CURTAIN AND PROJECTION

SCREEN (SUSPENDED

FROM/THROUGH CEILING)

PROJECTOR (MOUNT

THROUGH CEILNG)

STEP IN CEILING

7'-8 1/2"

10'-5"

TV MOUNT

(THROUGH

CEILING)

L

PIPES

THROUGH

CEILING

w

L

LL L

L

L L

L

L

L w

L

L

L

WOOD TRIM

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

L

8'-0" TRACK LIGHTS

L

L

PIPE THROUGH

CEILING

L

L w

LLLL

w

16'-0" TRACK LIGHTS

8'-0" TRACK LIGHTS

CURTAIN AND PROJECTION

SCREEN (SUSPENDED

FROM/THROUGH CEILING)

9'-6"

203A 9'-0" 202A

207A

L

NEW STEP IN

CEILING; SEE

MECHANICAL

FOR FIRE

SPRINKLER

REVISION

EXISTING 10'-5"

NEW 8'-0" (BASE

BID & ALT.) SEE

NOTE #9.

7'-11" 7'-10"

218A

7'-7"

7'-10"

STEP IN

CEILING

7'-5"

7'-5"

MODEL HELICOPTER

SUSPENDED FROM /

THROUGH CEILING

7'-5"

7'-4"

7'-5"

SEE NOTE #10

S

L

= SPRINKLER HEAD

= SURFACE FLOURESCENT LIGHT FIXTURE

= 2x4 RECESSED FLOURESCENT LIGHT FIXTURE

= RECESSED "CAN" LIGHT FIXTURE

w = WI-FI ACCESS POINT DEVICE

= EXIT LIGHT - CEILING MOUNTED

= SUPPLY AIR DIFFUSER (24" x 24")

= SUPPLY AIR DIFFUSER (ROUND)

= RETURN AIR GRILL

= DIFFUSER (WITHIN SAT TILE)

= POWER POLE

= SPEAKER

= MIRROR (CEILING)M

= PROJECTOR (MOUNT THROUGH CEILING)

RCP SYMBOLS LEGEND

= SECURITY LIGHT

201 CONFERENCE

202 HALLWAY

202A MECHANICAL

203 STORAGE

203A STORAGE

204 STORAGE

205 ANTE

206 STORAGE

207 HALLWAY

207A STAIR

208 WOMAN

209 MEN

210 LUNCH

211 OPEN OFFICE

212 OFFICE

213 CONFERENCE

214 DISPATCH

215 DISPATCH

216 DISPATCH

217 OFFICE

218 HALLWAY

218A STAIR

219 MECHANICAL

220 OFFICE

221 OFFICE

222 OFFICE

223 OFFICE

224 CONFERENCE

225 OPEN OFFICE

226 OFFICE

227 OPEN OFFICE

231 MEZZANINE

SECOND FLOOR ROOM SCHEDULE

GENERAL RCP PLAN NOTES

GENERAL RCP NOTES – SECOND FLOOR

1. See the General Conditions of the specifications for the descriprtion of the Base Bid and Alternates.

2. All ceilings are 8’-0” AFF unless noted otherwise.

3. These Reflected Ceiling Plans indicated ceilings as is, including fire protection sprinkler heads, mechanical, ventilation, lighting and electronics (such as wi-fi devices, speakers, etc.).

NOTE: the location of some fresh air diffusers may be adjusted as required for proper coverage. See mechanical plans.

4. See specifications for a description of Base Bid and Alternate Bids.

5. Under the Base Bid and Alternate Bid #1 the contractor shall remove and replace the ceiling system only as required for the construction of the new ventilation system (duct removal, duct installation, supply air diffusers, return air grills, etc, see mechanical plans). Items such as projection screens, draperies & tracks, lighting, speakers, etc. are to remain in the finished project, and shall be removed and reinstalled or supported in place as required to complete the new construction.

6. Per Alternate Bids #2 & #3 all existing ceilings are to be removed, including all items contained in or on the ceiling system (see mechanical and electrical plans). New ceilings to be installed in a similar layout to the existing.

7. Fire sprinklers are to remain as is except where indicated otherwise on the mechanical plans.

8. Where a step is noted between the ceiling heights it shall be created as follows:

a. A step of 12 inches or less shall be fabricated with a prefinished sheet metal closure.

b. A step over 12 inches shall be fabricated of ceiling grid and panels (installed vertically).

9. West Portion of Hallway 207: Remove existing ceiling (at 10’-5” AFF) and install a Type-1 ceiling at 8’-0” AFF (Base Bid and Alternate Bids). Make all modifications to Mechanical, Sprinkler and Electrical/Lighting as required to lower ceiling (see mechanical plans). There will be a step in the ceiling between the existing ceiling (remaining to the east) and the new ceiling, see note #8.

10. Storage 203, 203A & 204: Remove the existing ceilings (at 9’-0” & (‘-6” AFF) and install new ceilings at 8’-0” AFF (Base Bid and Alternate Bids). Make all modifications to Mechanical, Sprinkler and Electrical/Lighting as required to lower ceilings (see mechanical drawings).

SECOND FLOOR

ÉåêáÅÜáåÖ ÅçããìåáíáÉë íÜêçìÖÜ ~êÅÜáíÉÅíìêÉ

ÇìäìíÜ=G=îáêÖáåá~G=Öê~åÇ=ê~éáÇëG=íïáå=ÅáíáÉë ïïïKÇëÖïKÅçã

Çê~ïå=ÄóW

ÅÜÉÅâÉÇ=ÄóW íóéÉÇLéêáåíÉÇ å~ãÉW êÉÖK=@W ëáÖå=Ç~íÉW

Ç~íÉW éêçàÉÅí=@W ëáÖå~íìêÉW f=ÜÉêÉÄó=ÅÉêíáÑó=íÜ~í=íÜáë=éä~åI ëéÉÅáÑáÅ~íáçåI=çê=êÉéçêí=ï~ë éêÉé~êÉÇ=Äó=ãÉ=çê=ìåÇÉê=ãó ÇáêÉÅí=ëìéÉêîáëáçå=~åÇ=íÜ~í=f=~ã=~ Çìäó=iáÅÉåëÉÇ=^êÅÜáíÉÅí=ìåÇÉê=íÜÉ ä~ïë=çÑ=íÜÉ=ëí~íÉ=çÑ=jáååÉëçí~K ëÜÉÉí íáíäÉW ëÜÉÉí åìãÄÉêW

Erik C. Wedge

43566

10/1/2015 3:06:59 PM

015075.00

MCT

ECW

10/2/2015

MN Inter Agency

Fire Center Grand Rapids, MN

A1.2

Second Floor RCP êÉîáëáçå=L áëëìÉ åçK Ç~íÉ

1/8" = 1'-0"

Level 2

E F

F

G

G

H

H

I

I

A

A

C

C

B

B

EXISTING

ROOF HATCH

TO REMAIN

EXISTING ROOF

WALKWAY PADS

TO REMAIN

HATCH

DENOTES

AREAS OF

PATCHING

RTU-5

(NEW)

RTU-4

(NEW)

RTU-3

(NEW)

RTU-1

(NEW)

RTU-2

(NEW)

PRV-1 (NEW)

EXISTING ROOF

WALKWAY PADS

TO REMAIN

NEW

WALKWAY

RTU-6

(NEW)

RTU-7

(NEW)EXISTING RTU

UNIT TO REMAIN

EXISTING RTU

REMOVED BY

MECHANICAL

EXISTING

CONDENSING UNIT

REMOVED BY MECH.

CONTRACTOR. PATCH

ROOF AS REQ'D

NEW GAS LINES BY

MECHANICAL, SEE

SHEET M2.2 FOR

SUPPORT LOCATIONS

(TYP.)

G G G G G G G G

G

G

G

G

G

G

G

G

G

NEW WALKWAY

REMOVE

EXISTING

WALKWAY PADS

AS REQ'D

NEW

WALKWAY

AS REQ'D

RTU REMOVED

BY MECH.

CONTRACTOR,

PATCH ROOF.

G

SHEET METAL

GOOSENECKS

REMOVED BY

MECHANICAL,

PATCH ROOF.

NEW

WALKWAY

NEW

WALKWAY

G

G

G

G

G G

G

G

RUBBER OR URETHANE ROD

PROVIDE TREATED WOOD BLOCKING

EXISTING METAL DECK. THIS

CONTRACTOR TO CUT DUCT OPENING

THROUGH ROOF DECK.

EXISTING INSULATION - CUT

& PATCH AS REQUIRED

EXISTING BALLASTED

EPDM ROOF SYSTEM

2 6

2 6

2 6

CURB BY MECH. CONTRACTOR

STOCK ADHERED IN PLACE

NEW EPDM MEMBRANE FLASHING

VAPOR BARRIER -

TURN UP AT EDGES

AROUND ENTIRE OPENING -

MATCH INSULATION THICKNESS

AND LEVEL CURB.

= NEW EQUIPMENT (BY MECHANICAL CONTRACTOR)

= EXISTING EQUIPMENT (REMOVE BY MECHANICAL

CONTRACTOR AS NOTED)

= APPROXIMATE AREA OF ROOF PATCH (AT NEW

OR REMOVED EQUIPMENT)

= EXISTING WALKWAY PADS (REMOVE AS

REQUIRED PER NEW EQUIPMENT INSTALLATIONS)

= NEW WALKWAY PADS

= GAS LINE (SEE MECHANICAL)

= EQUIPMENT SUPPORT BEAM

ROOF SYMBOLS LEGEND

G

WOOD SHALL SIT

ON METAL DECK.

MECHANICALLY

ATTACHED WOOD

BEAMS AND BLOCK

TO METAL ROOF

DECKING

MECHANICALLY

ATTATCH CORNER

JOINTS OF WOOD

BEAMS TO BLOCKING

(TYP.)

EXTEND 12'-0" WOOD

BEAM OVER THREE

JOIST MINIMUM

6" X 6" WOOD BEAM

MINIMUN 12'-0"

LONG AND OVER

THREE (3) JOISTS.

RTU ROOF CURB BY MECHANICAL CONTRACTOR

OPENING AS

COORDINATED WITH

MECHANICAL

CONTRACTOR

A1.3

A1.3

Sim

A1.3

Sim

6 x 6

SHEET METAL CAP

FLASHING FOR

PROTECTION

EPDM FLASHING

TOP CHORD JOISTS

METAL DECK

CUT & FIT INTO INSUL. &

EPDM MEMBRANE

GENERAL ROOF PLAN NOTES

ROOFING PLAN NOTES

1. Existing mechanical equipment, curbs, piping, conduit, etc. to be removed by the mechanical contractor. The roofing contractor is to remove any wood blocking remaining after the mechanical removals. The roofing contractor is to infill all openings in the metal decking remaining after removals with like profile decking (patches under 12 inches in any dimension may be infilled with 20 gauge flat sheet metal), All decking infills to be firmly anchored to the existing metal decking.

2. The roofing contractor is to remove existing rock ballast and fabric ballast underlayment as required for all removals and new work. Properly stockpile rock ballast (Do Not overload any areas of the structure) for reuse. Discard fabric underlayment.

3. The roofing contractor is to remove existing rubber walkway pads around removed equipment and as required to clear membrane patches.

4. The roofing contractor is to infill voids in the roof insulation system, left by the removal of the mechanical equipment, to match the thickness of the existing insulation.

5. The roofing contractor is to patch the EPDM roofing at mechanical removals to a sufficient extent to cover all openings in the existing membrane left from equipment removal and/or areas damaged by removal of existing flashings and/or walkway pads.

6. The roofing contractor is to furnish and install new wood beams and blocking as detailed and required.

7. The roofing contractor is to flash the new roof curbs and beams as detailed and approved (the mechanical contractor will install the new mechanical curbs, counter flashings, RTU’s etc.).

8. The roofing contractor is to install new rubber walkway pads per plan.

9. The roofing contractor is to install new fabric ballast underlayment and re-spreads rock ballast at all disturbed areas.

ÉåêáÅÜáåÖ ÅçããìåáíáÉë íÜêçìÖÜ ~êÅÜáíÉÅíìêÉ

ÇìäìíÜ=G=îáêÖáåá~G=Öê~åÇ=ê~éáÇëG=íïáå=ÅáíáÉë ïïïKÇëÖïKÅçã

Çê~ïå=ÄóW

ÅÜÉÅâÉÇ=ÄóW íóéÉÇLéêáåíÉÇ å~ãÉW êÉÖK=@W ëáÖå=Ç~íÉW

Ç~íÉW éêçàÉÅí=@W ëáÖå~íìêÉW f=ÜÉêÉÄó=ÅÉêíáÑó=íÜ~í=íÜáë=éä~åI ëéÉÅáÑáÅ~íáçåI=çê=êÉéçêí=ï~ë éêÉé~êÉÇ=Äó=ãÉ=çê=ìåÇÉê=ãó ÇáêÉÅí=ëìéÉêîáëáçå=~åÇ=íÜ~í=f=~ã=~ Çìäó=iáÅÉåëÉÇ=^êÅÜáíÉÅí=ìåÇÉê=íÜÉ ä~ïë=çÑ=íÜÉ=ëí~íÉ=çÑ=jáååÉëçí~K ëÜÉÉí íáíäÉW ëÜÉÉí åìãÄÉêW

Erik C. Wedge

43566

10/1/2015 3:07:17 PM

015075.00

MCT

ECW

10/2/2015

MN Inter Agency

Fire Center Grand Rapids, MN

A1.3

Roof Plan êÉîáëáçå=L áëëìÉ åçK Ç~íÉ

1/8" = 1'-0"

Roof

1 1/2" = 1'-0"

Mechanical Curb Detail

3/4" = 1'-0"

Typical RTU Plan

1 1/2" = 1'-0"

RTU Support Beam

IHGFEDCBA

8"

IHGFEDCBA

IHGFEDCBA

8"

General Notes:

Demolition Notes:

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed

Professional Engineer under the laws of the

State of Minnesota.

D

E

A

B

C

D

E

2 3 4 5 6 7

1/8" = 1'-0"

FLOOR PLAN1

General Notes:

Demolition Notes:

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed

Professional Engineer under the laws of the

State of Minnesota.

D

E

A

B

C

D

E

2 3 4 5 6 7

General Notes:

Demolition Notes:

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed

Professional Engineer under the laws of the

State of Minnesota.

D

E

A

B

C

D

E

2 3 4 5 6 7

8"

IHGFEDCBA

IHGFEDCBA

8"

Keyed Notes:

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed

Professional Engineer under the laws of the

State of Minnesota.

D

E

A

B

C

D

E

2 3 4 5 6 7

IHGFEDCBA

IHGFEDCBA

Keyed Notes:

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed

Professional Engineer under the laws of the

State of Minnesota.

D

E

A

B

C

D

E

2 3 4 5 6 7

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed

Professional Engineer under the laws of the

State of Minnesota.

D

E

A

B

C

D

E

2 3 4 5 6 7

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed

Professional Engineer under the laws of the

State of Minnesota.

D

E

A

B

C

D

E

2 3 4 5 6 7

B

EDCBA

8"

WEST

CACHE/WAREHOUSE

(BELOW)

203A

202A

218A

207A

FEDCBA

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed

Professional Engineer under the laws of the

State of Minnesota.

D

E

A

B

C

D

E

2 3 4 5 6 7

MAIN LEVEL DEMOLITION PLAN1

General Notes: Demolition Notes:

UPPER LEVEL DEMOLITION FLOOR PLAN2

1 REV 110/29/15

FEDCBA

ROOF DEMOLITION PLAN1

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed

Professional Engineer under the laws of the

State of Minnesota.

D

E

A

B

C

D

E

2 3 4 5 6 7

Keyed Notes:General Notes:

EDCBA

EDCBA

8"

121B

FEDCBA

FEDCBA

203A

215214 216

206?

202A

207A

218A

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed

Professional Engineer under the laws of the

State of Minnesota.

D

E

A

B

C

D

E

2 3 4 5 6 7

General Notes:

MAIN LEVEL LIGHTING PLAN1 1/8" = 1'-0"

UPPER LEVEL LIGHTING FLOOR PLAN2

Hex Notes:

ROOF PLAN1

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed

Professional Engineer under the laws of the

State of Minnesota.

D

E

A

B

C

D

E

2 3 4 5 6 7

Keyed Notes:

NO SCALE

RISER DIAGRAM2

File details come from the government source that posted it. Updated .