AG-6215-S-15-0009

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

NRCS-KS-126215

SALINA KS 67401

760 SOUTH BROADWAY

USDA-NRCS-KANSAS STATE OFFICE

NRCS-OK-127335

STILLWATER OK 74074-2655

100 USDA, SUITE 206

USDA-NRCS-OKLAHOMA STATE OFFICE

08/06/20150001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/06/2015

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to extend the RFQ due date and provide the minutes from the site showing.

a) The RFQ due date is extended to September 9, 2015 at 2:00PM CDT.

b) The site showing minutes are attached to this amendment.

c) All other terms and conditions remain the same.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

SHARLA K. GOFORTH

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Site Showing Minutes

AG-6215-S-15-0009 WRP Inn the Field and Tompkins

Attendees:

Richard Dirks, contractor Brandon Dirks, contractor Kelly Klausmeyer, NRCS COR John Vavroch, NRCS inspector Marty Gugelman, NRCS inspector Debbie Potter, Thomas county conservation district manager Tanya Gerstberger, NRCS district conservationist

Meeting started at 10:00 am CST in the Colby Service Center conference room.

Kelly Klausmeyer, COTR conducted the meeting.

The solicitation was reviewed, it was pointed out that the Contracting Officer (CO) is Sharla Goforth in the Stillwater, OK NRCS state office. All bids have to be submitted to her office by 9/7/2015.

Question was asked how we will handle weather conditions such as wetness or freezing this winter. We referred to Section F.3 of the solicitation, adverse weather is discussed there. It is recognized that wetlands may easily become saturated during construction and that the contract may be delayed due to conditions.

Question was asked if partial progress payments can be made during construction. Typically NRCS will make these kinds of payments once an invoice is received from the contractor. All invoices will have to be submitted via the Invoice Payment Platform (IPP) described in section G.4 in the solicitation. The CO is asked to clarify the procedure for making progress payments. Contractor will be allowed to submit progress payments

Question was asked if electronic 3D lines will be provided to the contractor for input into their GPS surveying system. The NRCS state office has these lines available and NRCS can provide them upon request.

The safety section H was reviewed, the contractor shall have a first aid certification from Red Cross or equivalent, a first aid kit, and a written safety program submitted to the CO.

AG-6215-S-15-0009

Amendment 0001

The construction plans were reviewed. The Inn the Field site benchmark is located well away from the construction, additional benchmarks closer to the work will be added by NRCS during stakeout. It was pointed out that fill must be placed over the gas pipeline prior to installing the other five fill mounds. The contractor will call Kansas One-Call prior to construction.

The Tompkins plans were reviewed. The seeding plan for this site is split into two areas: a critical area planting that is to be seeded and mulched, and a range seeding that is to have a cover crop with the cover destroyed by chemical weed control before seeding. There are two separate seed mixes for the two areas. It should be noted that the Inn the Field seed mix is different than the two mixes for the Tompkins site.

At 11:00 am CST the meeting adjourned and traveled to the Inn the Field site.

We dug a shallow hole in the south depression area, the soils are moist for the top two inches, but much drier underneath. We then traveled to the Tompkins site, Matt Palmquist, NRCS supervisory district conservationist, Kyle Franz, NRCS district conservationist, and Alex Heeger, NRCS soil conservation technician were present. We dug a small hole in the depression area, these soils are damp but not excessively wet. The areas to be seeded are growing marestail weeds.

There was discussion on whether the range planting can be made into the weeds without the cover crop. A decision on the cover crop will be made at the time of seeding, if adequate cover exists then the cover crop can be modified out of the contract.